Bid No. 1072 - Highview Drive Detention Basin Plan Set.pdf
PDF 6 MB Posted
- Solicitation number
- 1072
- Issued by
- Bristol County, Rhode Island
About this file
These are bid documents for the Sherry Avenue Drainage Improvements Project - Phase I, located in Bristol, Rhode Island. The project involves constructing a detention basin on Highview Drive, with work including site preparation, drainage improvements, and installation of various infrastructure components. The documents are dated September 2025 and prepared by BETA, an engineering firm. The project plans include detailed drawings for existing conditions, site preparation, construction plans, and specific construction details such as sediment control, erosion prevention, and outlet structures.
The project involves creating a detention basin with specific engineering specifications, including a perforated outlet structure, concrete curb overflow weir, and grassed access paths. The construction will require careful management of existing utilities, landscaping, and drainage systems. The plans specify technical details like pipe installations, basin bottom elevations, and specific materials to be used, such as New England Logging Road Mix for seeding and white cedar for fencing. The documents provide comprehensive guidance for contractors, including notes on dewatering, utility excavation, backfill requirements, and specific installation techniques for various project components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid No. 1072 - Highview Drive Detention Basin Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Steven Contente Town Administrator Project Area
Location Plan Not to Scale
Index of Drawings Sheet Number
7-9
Description Title Sheet
Legend and Abbreviations
General Notes
Existing Conditions Plan
Site Prep Plan
Construction Plan
Construction Details
Plans Prepared by:
Title Sheet
N
BID DOCUMENTS
September 2025
Sherry Avenue Drainage Improvements Project - Phase I
Highview Drive Detention Basin Town of Bristol, Rhode Island
\\B
ET
A-
IN
C .C
O M
\R I\T
RA
N
S\
0\
- S
H
ER
RY
A
VE
N
U E
D
RA
IN
AG
E
IM
PR
O
VE
M
EN
TS
\0 _C
O N
ST
RU
C
TI
O N
P
LA
N
SE
T\ D
RA
W
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
RU
C
TI
O
N P
LA
N
S
ET
\1
C O
VE
R.
D W
G
Plot Date: 9/9/2025 1:30 PM
Bristol, RI
ISSUE DATE
NUMBER DATE MADE BY CHECKED BY REVISIONS
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY SUBCONSULTANT TITLE
9/ 9/
:3
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_L
EG
EN
D
A N
D A
BB
R
EV
.D
W G
(B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
LEGEND AND ABBREVIATIONS
PROPOSEDEXISTING
GENERAL SYMBOLS
v v v v
CURB (TYPE AS NOTED)
BERM
EDGE OF PAVEMENT / LIMIT OF PAVEMENT
CATCH BASIN (OR GUTTER INLET,
DROP INLET, CATCH BASIN CURB INLET)
ELECTRIC HANDHOLE (NUMBER AS NOTED)
ELECTRIC MANHOLE
TELEPHONE MANHOLE (TYPE NOTED)
WATER MANHOLE (TYPE NOTED)
SEWER MANHOLE (TYPE NOTED)
DRAINAGE MANHOLE (TYPE NOTED)
GAS GATE / GAS SHUT OFF
WATER GATE / WATER SHUT OFF
HYDRANT
FIRE ALARM BOX
STREET LIGHT POLE
UTILITY POLE
SIGN
GUY POLE
ABANDONED UTILITY LINE (TYPE AS NOTED)
DRAIN PIPE (SIZE AND SLOPE AS NOTED)
SEWER MAIN (SIZE AS NOTED)
SEWER SERVICE LINE
ELECTRIC DUCT
GAS MAIN (SIZE AS NOTED)
GAS SERVICE LINE
WATER MAIN (SIZE AS NOTED)
WATER SERVICE LINE
TELEPHONE DUCT (SIZE AS NOTED)
MAIL BOX
WOOD GUARD RAIL STEEL BEAM GUARD,
WOOD OR STEEL POSTS (TYPE AS NOTED)
STEEL GUARD RAIL, STEEL POSTS (TYPE NOTED)
STONE WALL
RETAINING WALL (TYPE NOTED)
HIGHWAY/PROPERTY BOUND (TYPE AS NOTED)
STATE HIGHWAY LAYOUT LINE (S.H.L.)
CITY, TOWN, COUNTY OR STATE BOUNDARY LINE
PROPERTY LINE
TEMPORARY EASEMENT LINE
PERMANENT EASEMENT LINE
CONSTRUCTION BASELINE
SURVEY LINE
RAILROAD OR STREET RAILWAY TRACKS WITH SIDELINES
WHEELCHAIR RAMP
TREE (SIZE AND TYPE AS NOTED)
HEDGE
FENCE (SIZE AND TYPE AS NOTED)
EDGE OF WETLAND W/ FLAGGED NUMBER
EDGE OF RIVER/STREAM LINE
50 FT. WETLAND BUFFER LIMIT
100 FT. WETLAND BUFFER LIMIT
100 FT. RIVER FRONT LIMIT
200 FT. RIVER FRONT LIMIT
WOODED AREA / LIMIT OF CLEARING
SPOT GRADE
SAW CUT LINE
COMPOST FILTER SOCK
TREE PROTECTION
LEGEND
10'-12" RCP
10'-8" PVC
ABBREVIATIONS
UTILITIES
CB
CBCI
CIP
CIT
CL.
COND.
CAP
CMP
CPP
CSP
CULV.
CI
DI
DIP
DMH
EL. (OR ELEV.)
FM
F&C F&G
GIP
GG
GI
HDW
HYD.
INV.
LP
MH
PVC
PWW
R&D
RCP
SMH
SD
TSV&B
TS
TSC
UP
VCP
WG
WM
WIP
CATCH BASIN
CATCH BASIN WITH CURB INLET
CAST IRON PIPE
CHANGE IN TYPE
CLASS (PIPE, CONCRETE, EXCAVATION, ETC.)
CONDUIT
CORRUGATED ALUMINUM PIPE
CORRUGATED METAL PIPE
CORRUGATED PLASTIC PIPE
CORRUGATED STEEL PIPE
CULVERT
CURB INLET
DROP INLET
DUCTILE IRON PIPE
DRAIN MANHOLE
ELEVATION
FORCE MAIN
FRAME AND COVER
FRAME AND GRATE
GALVANIZED IRON PIPE
GAS GATE
GUTTER INLET
HEADWALL
HYDRANT
INVERT ELEVATION
LIGHT POLE
MANHOLE
POLY-VINYL-CHLORIDE PIPE
PAVED WATER WAY
REMOVE & DISPOSE
REINFORCED CONCRETE PIPE (CLASS III UNLESS NOTED)
SEWER MANHOLE
SUBDRAIN
TAPPING SLEEVE, VALVE AND BOX
TRAFFIC SIGNAL
TRAFFIC SIGNAL CONDUIT
UTILITY POLE
VITRIFIED CLAY PIPE
WATER GATE
WATER METER/WATER MAIN
WROUGHT IRON PIPE
ABAN.
ADJ.
AADT
APPROX.
B
BM
BIT.
BB
BC
BOC
BOS
BOW
BD OR BND
BLDG.
CEM.
C
CLF
CONC.
CC
CONT.
CONST.
CO.
CS
D
DWY.
EB
EP, EOP
EL.
ETW
EXIST.
FLDSTN
FDN.
GAR.
GRAN.
GC
GE
GRAV.
GD
HOR.
HMA
HO
IP
JCT
LT.
LP
MB
MAX.
MIN.
NB
NTS
OC
PVMT.
PGL
PROJ.
P OR PROP. LINE
PROP.
R
RR
R&D
REM.
REMOD.
RET.
R&R R&S
ABANDON
ADJUST
ANNUAL AVERAGE DAILY TRAFFIC
APPROXIMATE
BASELINE
BENCH MARK
BITUMINOUS
BITUMINOUS BERM
BITUMINOUS CURB
BOTTOM OF CURB
BOTTOM OF STEP
BOTTOM OF WALL
BOUND
BUILDING
CEMENT
CENTER LINE
CHAIN LINK FENCE
CONCRETE
CONCRETE CURB
CONTINUOUS
CONSTRUCTION
COUNTY
COMBINED SEWER PIPE
DELTA ANGLE (CENTRAL ANGLE OF HORIZ. CURVE)
DRIVEWAY
EAST BOUND
EDGE OF PAVEMENT
ELEVATION
EDGE OF TRAVEL WAY
EXISTING
FIELDSTONE
FOUNDATION
GARAGE
GRANITE
GRANITE CURB
GRANITE EDGING
GRAVEL
GROUND
HORIZONTAL
HOT MIX ASPHALT
HOUSE
IRON PIPE
JUNCTION
LEFT
LOW POINT
MAIL BOX
MAXIMUM
MINIMUM
NORTH BOUND
NOT TO SCALE
ON CENTER
PAVEMENT
PROFILE GRADE LINE
PROJECT
PROPERTY LINE
PROPOSED
RADIUS OF CURVATURE
RAILROAD
REMOVE & DISPOSE
REMOVE
REMODEL
RETAINING
REMOVE AND RESET
REMOVE AND STACK
GENERAL
L
L L
RIGHT
RIGHT-OF-WAY
ROAD
SHEET
SHOULDER
SIDEWALK
SOUTH BOUND OR STONE BOUND
STATE HIGHWAY LAYOUT LINE
STATION
STREET
TANGENT
TANGENT DISTANCE OF CURVE/TRUCK PERCENTAGE
TEMPORARY EASEMENT BOUNDARY
TEMPORARY
TOP OF CURB
TOP OF STEP
TOP OF WALL
TURNING POINT
TYPICAL
VARIABLE
VERTICAL
VERTICAL CURVE
VERTICAL GRANITE CURB
WEST BOUND
WHEELCHAIR RAMP
RT.
ROW
RD.
SHT.
SHLD.
SDWK.
SB
SHLL
STA.
ST.
TAN
T
TEB
TEMP.
TOC
TOS
TOW
TP
TYP.
VAR.
VERT.
VC
VGC
WB
WCR
PROPOSEDEXISTING
BUILDING
CONTOUR MAJOR
CONTOUR MINOR
DRIVEWAY DIRT
DRIVEWAY PAVED
TEST PIT "QUALITY LEVEL A" DATA POINT
BORING
PROBE
MONITORING WELL
CAP / PLUG PIPE
BH-15'
P-10'
WG
GG
TP
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY SUBCONSULTANT TITLE
9/ 9/
:3
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_G
EN
ER
AL
N O
TE
S.
D W
G (B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
GENERAL NOTES
GENERAL NOTES:
1. VERTICAL DATUM - NAVD 88.
2. THE STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION (AMENDED FEBRUARY 2025) AND ALL APPROVED REVISIONS
IN THE COMPILATIONS OF APPROVED SPECIFICATIONS, THE LATEST EDITION OF THE RHODE ISLAND STANDARD DETAILS WITH REVISIONS, THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE RIDOT TRAFFIC DESIGN MANUAL (OCTOBER 2004), THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z-60.1-1986) AND ALL AMENDMENTS WILL GOVERN EXCEPT FOR MEASUREMENT AND PAYMENT. SPECIFICATIONS OF THE CONTRACT SHALL GOVERN FOR MEASUREMENT AND PAYMENT.
3. EXISTING BASE MAPPING (TOPOGRAPHY AND PHYSICAL FEATURE LOCATIONS) IS FROM AERIAL PHOTOGRAMMETRY BY T3 GLOBAL STRATEGIES, INC., BRIDGEVILLE, PA, AUGUST 2004 AND SUPPLEMENTED BY SURVEY COMPLETED BY DIPRETE ENGINEERING, INC.
CRANSTON, RI.
4. THE LOCATION OF SUBSURFACE UTILITIES SHOWN IS APPROXIMATE AND NOT GUARANTEED TO BE COMPLETE OR ACCURATE. THE CONTRACTOR SHALL VERIFY THE LOCATIONS AND ELEVATIONS OF EXISTING UTILITY LINES AND STRUCTURES PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR MUST NOTIFY DIG SAFE PRIOR TO ANY EXCAVATION, DEMOLITION WORK IN PUBLIC
OR PRIVATE WAYS OR UTILITY COMPANY RIGHT OF WAYS OR EASEMENTS.
5. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED TO THE
ENGINEER FOR THE RESOLUTION OF THE CONFLICT.
6. THE CONTRACTOR SHALL ALTER THE MASONRY OF THE TOP SECTION OF ALL EXISTING DRAINAGE AND SANITARY STRUCTURES AS NECESSARY FOR THE CHANGES IN GRADE, AND RESET ALL WATER, AND DRAINAGE FRAMES, GRATES AND BOXES TO THE PROPOSED FINISH SURFACE GRADE. REQUIRED NEW MASONRY SHALL BE CLAY BRICK CONFORMING TO M04.03.1.
7. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION AND ADJUSTMENT OF GAS, ELECTRIC, TELEPHONE, CABLE TV, FIRE ALARM AND ANY OTHER PRIVATE UTILITIES BY THE UTILITY COMPANIES. ALL UTILITY CASTINGS AND FIRE ALARM
BOXES SHALL BE ADJUSTED TO FINISHED GRADE BY THEIR RESPECTIVE OWNERS.
8. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE
CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
9. THE TERM "PROPOSED" (PROP.) MEANS WORK TO BE CONSTRUCTED USING NEW MATERIALS OR, WHERE APPLICABLE, RE-USING
EXISTING MATERIALS IDENTIFIED AS "REMOVE AND RESET" (R&R).
10. TRENCH DEWATERING IS ANTICIPATED FOR THIS WORK AND DISCHARGE OF FINES OR SEDIMENTS IS NOT PERMITTED. SEE SOIL
EROSION AND SEDIMENTATION CONTROL NOTES.
11. CONTRACTOR SHALL VERIFY EXISTING GRADE ELEVATIONS. IF ANY ADJUSTMENT IS REQUIRED DUE TO DIFFERENT EXISTING GRADES FOUND IN THE FIELD, THE CONTRACTOR SHALL NOTIFY AND OBTAIN THE APPROVAL OF THE ENGINEER PRIOR TO
PERFORMING THE WORK.
12. EXCEPT WHERE NOTED BY PROPOSED CONTOUR LINES, ALL FINAL CONTOUR LINE ELEVATIONS SHALL BE THE SAME AS EXISTING
CONTOUR LINE ELEVATIONS.
TREE PRESERVATION:
1. TREES WITHIN THE LIMITS OF GRADING SHALL NOT BE REMOVED UNLESS APPROVED BY THE ENGINEER
2. PRIOR TO CONSTRUCTION, PROTECT TREES WITHIN THE LIMIT OF DISTURBANCE BY INSTALLING WOOD FRAMING AROUND TREES, AS INDICATED IN THE CONTRACT DRAWINGS.
3. PRIOR TO CONSTRUCTION, DETERMINE REQUIRED CLEARANCES AND CONTRACT LICENSED ARBORIST TO PRUNE TREES.
4. BRANCHES OR LIMBS DAMAGED DURING CONSTRUCTION SHALL BE CUT BACK TO THE TRUNK OR A LATERAL BRANCH.
5. MAKE EVERY EFFORT TO MAINTAIN EXCAVATION ACTIVITIES OUTSIDE LIMITS OF THE TREE CANOPY.
6. ROOTS LARGER THAN 1.5" IN DIAMETER ENCOUNTERED IN EXCAVATIONS SHALL BE CUT OFF SQUARELY USING A SHARP ARBORIST
SAW.
7. STRIP AND SEGREGATE TOPSOIL PRIOR TO EXCAVATING IN UNPAVED AREAS. FOLLOWING BACKFILL OPERATIONS PLACE TOPSOIL
BACK IN THE APPROPRIATE PLACE WITHOUT COMPACTION AND VERTICALLY MULCH ROOT SYSTEM. NO AMENDMENTS SHALL BE
ADDED.
8. IMMEDIATELY FOLLOWING BACKFILL OPERATIONS PROVIDE DEEP WATERING OF THE ROOT SYSTEM, APPLICATION OF FERTILIZER, AND VERTICAL MULCHING.
9. MAINTAIN STORAGE OF EQUIPMENT AND MATERIALS A DISTANCE AT LEAST TWO (2) TIMES THE DISTANCE OF THE RADIUS OF THE
TREE CANOPY.
SOIL EROSION AND SEDIMENTATION CONTROL:
1. ALL EROSION AND SEDIMENTATION (E&S) CONTROL MEASURES WILL BE INSTALLED AND INSPECTED PRIOR TO THE START OF
CONSTRUCTION. THE E&S CONTROLS SHALL BE CLEANED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION OPERATIONS AND UNTIL ALL DISTURBED AREAS ARE STABILIZED AFTER CONSTRUCTION IS COMPLETE. E&S CONTROLS SHALL BE INSPECTED AND CLEANED AFTER ALL STORM EVENTS AND UPON THE REQUEST OF THE OWNER OR ENGINEER. CONTRACTOR WILL MAINTAIN AN ADEQUATE SUPPLY OF SILT SOCK ON SITE TO BE INSTALLED IN AREAS WHERE EXISTING E&S CONTROLS HAVE FAILED OR AS DETERMINED NECESSARY BY THE ENGINEER. NO WORK OR STORAGE OF CONSTRUCTION EQUIPMENT WILL BE PERMITTED OUTSIDE THE LIMIT OF DISTURBANCE ADJACENT TO THE WETLAND. TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROLS (SILT SOCKS, ETC.) SHALL BE MAINTAINED UNTIL ALL EXPOSED SOILS ARE SATISFACTORILY STABILIZED.
2. ALL CATCH BASINS SHALL BE PROTECTED WITH FILTER FABRIC INSERTS IN UNPAVED LOCATIONS AND PAVED OR OTHERWISE
IMPERVIOUS AREAS FOR THE DURATION OF THE PROJECT.
3. CONSTRUCTION ENTRANCES CONSISTING OF STONE STABILIZED PAD SHALL BE PROVIDED AND MAINTAINED BY THE CONTRACTOR
TO PREVENT TRACKING OF OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS.
4. ALL REFERENCED SOIL EROSION AND SEDIMENTATION CONTROLS INCLUDING MATERIALS USED, APPLICATION RATES AND THE INSTALLATION PROCEDURES SHALL BE PERFORMED PER THE "RHODE ISLAND SOIL EROSION AND SEDIMENTATION CONTROL HANDBOOK", LATEST EDITION, WITH ALL SOIL CONSERVATION SERVICE, AND/OR THE RHODE ISLAND DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
5. UPON COMPLETION AND ACCEPTANCE OF SITE PREPARATION AND INITIAL INSTALLATION OF EROSION, RUNOFF, AND SEDIMENT CONTROLS AND TEMPORARY POLLUTION PREVENTION MEASURES, THE OPERATOR SHALL INITIATE APPROPRIATE STABILIZATION PRACTICES DURING ALL PHASES OF CONSTRUCTION ON ALL DISTURBED AREAS AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED.
6. ANY DISTURBED AREAS THAT WILL NOT HAVE ACTIVE CONSTRUCTION ACTIVITY OCCURRING WITHIN 14 DAYS MUST BE STABILIZED USING THE CONTROL MEASURES, SUCH AS EROSION CONTROL MATTING, AND IN ACCORDANCE WITH APPLICABLE MEASURES SPECIFIED IN THE RHODE ISLAND SOIL EROSION AND SEDIMENT CONTROL HANDBOOK (AS AMENDED).
7. ONLY AREAS THAT CAN BE REASONABLY EXPECTED TO HAVE ACTIVE CONSTRUCTION WORK BEING PERFORMED WITHIN 14 DAYS OF DISTURBANCE WILL BE CLEARED/GRUBBED AT ANY ONE TIME. IT IS NOT ACCEPTABLE TO CLEAR AND GRUB THE ENTIRE CONSTRUCTION SITE IF PORTIONS WILL NOT BE ACTIVE WITHIN THE 14-DAY TIME FRAME. PROPER PHASING OF CLEARING AND GRUBBING ACTIVITIES SHALL INCLUDE TEMPORARY STABILIZATION TECHNIQUES FOR AREAS CLEARED AND GRUBBED THAT WILL
NOT BE ACTIVE WITHIN THE 14-DAY TIME FRAME.
8. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN TWENTY FOUR HOURS AFTER AN EVENT WHICH GENERATES 0.25 INCHES OF RAIN IN A TWENTY FOUR HOUR PERIOD.
CLEANOUT OF ACCUMULATED SEDIMENT BEHIND THE SILT SOCK SHALL BE PERFORMED WHEN ½ THE ORIGINAL HEIGHT OF THE SILT SOCK BECOMES FILLED WITH SEDIMENT. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE HAS BEEN
REMOVED SHOULD BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED.
9. VEGETATIVE PRACTICES ON DISTURBED SOILS, INCLUDING STOCKPILES, SHALL BEGIN AS SOON AS POSSIBLE BUT NO LATER THAN 14 DAYS AFTER THE LAST ACTIVITY IN THAT AREA UNLESS ACTIVITY IS TO RESUME WITHIN 21 DAYS.
10. AREAS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH EROSION CONTROL MATS OR BLANKETS IN
COMBINATION WITH SEEDING, AS INDICATED ON THE DRAWINGS AND SPECIFIED.
11. EXCESS SOIL, STUMPS, TREES, ROCKS, BOULDERS, AND OTHER REFUSE SHALL BE DISCARDED OFF-SITE IN AN APPROPRIATE
UPLAND LOCATION, OUTSIDE OF ALL REGULATED WETLAND AREAS.
DEWATERING:
1. THE CONTRACTOR IS RESPONSIBLE FOR THE ADEQUATE DESIGN AND IMPLEMENTATION OF THE DEWATERING SYSTEM.
2. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM THE STATE AND LOCAL AUTHORITIES
REGARDING THE OPERATION AND DISCHARGE OF THE DEWATERING SYSTEM.
3. DISPOSE OF ALL PUMPED WATER IN ACCORDANCE WITH RIDEM REQUIREMENTS.
4. DISCHARGE WATER THROUGH SETTLING BASINS OR METHOD APPROVED BY THE ENGINEER.
5. OPERATE DEWATERING SYSTEMS TO LOWER THE GROUNDWATER LEVEL IN EXCAVATIONS AND MAINTAIN 2' BELOW SUBGRADE
ALLOWING ALL SUBSEQUENT WORK TO BE DONE ON A STABLE DRY SUBGRADE.
6. MODIFY DEWATERING PROCEDURES WHICH CAUSE, OR THREATEN TO CAUSE, DAMAGE TO NEW OR EXISTING FACILITIES, TO PREVENT FURTHER DAMAGE. MODIFICATIONS TO BE MADE AT NO ADDITIONAL EXPENSE TO THE OWNER. REPAIR DAMAGED
FACILITIES AT CONTRACTOR'S EXPENSE.
7. DISCHARGE WATER IN A MANNER THAT WILL NOT CAUSE EROSION, FLOODING, DAMAGE TO PUBLIC OR PRIVATE AREAS, COMPLETED
WORK, IMPROVED OR OTHERWISE.
8. REMOVE ALL MATERIAL AND EQUIPMENT FROM THE SITE UPON COMPLETION OF DEWATERING OPERATIONS.
9. REMOVE ALL DEWATERING WELLS OR SUMPS UPON COMPLETION OF THE WORK.
CONSTRUCTION REQUIREMENTS:
1. PROVIDE BYPASS PUMPING EQUIPMENT TO BYPASS WASTEWATER FLOWS AROUND WORK LOCATION IN ACCORDANCE WITH THE
SPECIFICATIONS.
2. SCHEDULE UTILITY SHUTDOWNS (INCLUDING BUT NOT LIMITED TO SEWER, WATER AND GAS) IN ADVANCE WITH THE RESPECTIVE UTILITY PROVIDERS, AND PROVIDE ADVANCE NOTIFICATION TO THOSE WHO WILL BE AFFECTED BY AN INTERRUPTION IN SEWER, WATER OR GAS SERVICE IN ACCORDANCE WITH THE NOTIFICATION REQUIREMENTS FOR EACH UTILITY.
3. PIPE REMOVAL EACH DAY SHALL BE LIMITED TO THE AMOUNT THAT CAN BE REPLACED ON THAT SAME DAY.
4. SERVICE CONNECTIONS SHALL BE COMPLETELY REESTABLISHED AT THE END OF EACH DAY.
5. SERVICE CONNECTION LOCATIONS ARE APPROXIMATE. CONNECTIONS SHALL BE LOCATED DURING EXCAVATION AND PROTECTED.
TIME AND EXPENSE REQUIRED TO WORK IN THIS MANNER SHALL BE PART OF THE BID AND SHALL NOT BE THE BASIS FOR ANY CLAIM
AGAINST THE OWNER.
6. EXISTING CAPPED SERVICE WYES SHALL NOT BE REPLACED UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VERIFYING THE DEPICTED LOCATIONS OF ANY AND ALL SANITARY SEWER
SERVICES PRIOR TO THE START OF WORK.
8. ALL SANITARY SEWER SERVICE CONNECTIONS SHALL BE DYE-TESTED FOR VERIFICATION OF CONNECTIVITY TO SEWER MAIN PRIOR TO DISCONNECTION FROM THE EXISTING SEWER MAIN AND FOLLOWING RECONNECTION TO THE NEW SEWER MAIN.
UTILITY EXCAVATION AND BACKFILL:
1. BACKFILL MATERIALS SHALL BE PLACED IN LAYERS NOT EXCEEDING 6 INCHES THICKNESS MEASURED PRIOR TO COMPACTION.
UNLESS OTHERWISE INDICATED OR SPECIFIED, EACH LAYER SHALL BE COMPACTED TO 95% MAXIMUM RELATIVE DENSITY (MRD) IN ACCORDANCE WITH ASTM D1557. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SIEVE AND PROCTOR ANALYSIS FOR NEW
AND IN-SITU MATERIAL.
2. BACKFILL WITH THE MATERIALS AND TO THE LIMITS INDICATED ON THE DRAWINGS.
3. BACKFILL MATERIALS AROUND THE PIPE SHALL BE COMPACTED TO A MINIMUM OF 90% MRD.
4. AS THE EXCAVATION APPROACHES PIPES, CONDUITS, OR OTHER UNDERGROUND STRUCTURES, DIGGING BY MACHINERY SHALL BE
DISCONTINUED AND THE EXCAVATION SHALL BE DONE BY MEANS OF HAND TOOLS. SUCH MANUAL EXCAVATION WHEN INCIDENTAL TO NORMAL EXCAVATION SHALL BE INCLUDED IN THE WORK TO BE DONE UNDER ITEMS INVOLVING NORMAL EXCAVATION. DAMAGE
TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
5. IF THE BOTTOM OF ANY EXCAVATION IS TAKEN OUT BEYOND THE LIMITS INDICATED OR PRESCRIBED, THE RESULTING VOID SHALL BE BACKFILLED AT THE CONTRACTOR'S EXPENSE WITH THOROUGHLY COMPACTED 34" CRUSHED STONE.
6. IF MATERIAL UNSUITABLE FOR FOUNDATION AND/OR BACKFILLING (IN THE OPINION OF THE ENGINEER) IS FOUND AT OR BELOW THE GRADE TO WHICH EXCAVATION WOULD NORMALLY BE CARRIED IN ACCORDANCE WITH THE DRAWINGS, THE CONTRACTOR SHALL REMOVE SUCH MATERIAL TO THE REQUIRED WIDTH AND DEPTH AND REPLACE IT WITH THOROUGHLY COMPACTED CRUSHED
STONE, GRAVEL BORROW, FINE AGGREGATE OR CONCRETE AS DIRECTED.
7. EXCAVATE TRENCH TO DEPTHS PERMITTING THE PIPE TO BE LAID AT THE ELEVATIONS, SLOPES, OR DEPTHS OF COVER INDICATED
ON THE DRAWINGS, AND AT UNIFORM SLOPES BETWEEN INDICATED ELEVATIONS.
8. LENGTH OF TRENCH OPEN AT ANY ONE TIME WILL BE CONTROLLED BY CONDITIONS, SUBJECT TO ANY LIMITS THAT MAY BE
PRESCRIBED BY THE ENGINEER.
9. WHENEVER ANY TRENCH OBSTRUCTS PEDESTRIAN AND VEHICULAR TRAFFIC IN OR TO ANY PUBLIC STREET, PRIVATE DRIVEWAY OR PROPERTY ENTRANCE, OR ON PRIVATE PROPERTY, CONTRACTOR SHALL TAKE SUCH MEANS AS MAY BE NECESSARY TO MAINTAIN
PEDESTRIAN AND VEHICULAR TRAFFIC AND ACCESS.
10. STREETS AND PREMISES ARE TO BE KEPT FREE FROM UNNECESSARY OBSTRUCTIONS, DEBRIS AND ALL OTHER MATERIALS.
11. ALL OPEN EXCAVATIONS ARE TO BE COVERED AT THE END OF EACH DAY BY MEANS OF STEEL PLATES OR SOME OTHER
SATISFACTORY COVER OF ADEQUATE SIZE AND STRENGTH SUITABLY HELD IN PLACE TO KEEP ALL TRAFFIC OUT OF EXCAVATIONS.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING FOR AND SECURING ANY AND ALL REQUIRED PERMITS FROM
THIRD-PARTY UTILITY PROVIDERS (INCLUDING BUT NOT LIMITED TO SANITARY SEWER, WATER, GAS, TELEPHONE, OR ELECTRIC), AND SHALL BE RESPONSIBLE FOR ANY COSTS ASSOCIATED THEREWITH. WORK ON AND AROUND OTHER UTILITIES SHALL BE PERFORMED IN ACCORDANCE WITH ANY AND ALL APPLICABLE REQUIREMENTS OF THE PERMITS ISSUED BY THE UTILITY
PROVIDERS.
SANITARY SEWER MODIFICATION/REPLACEMENT NOTES:
WHERE EXIST. SANITARY SEWER PIPES AND/OR STRUCTURES ARE TO BE A) MODIFIED, OR B) REPLACED WITH NEW SANITARY SEWER PIPES IN THE SAME HORIZONTAL LOCATION, CONTRACTOR SHALL ADHERE TO THE FOLLOWING SEQUENCE OF WORK:
1) INSTALL MANHOLE TO MANHOLE BYPASS PUMPING SYSTEM FOR SANITARY SEWER FLOWS (CONTRACTOR TO DETERMINE TYPE
AND SIZE OF BYPASS PUMPS AND PIPING).
2) LOCATE AND DYE TEST ALL EXISTING SEWER LATERAL CONNECTIONS ALONG THE EXISTING MAIN.
1) PERFORM EXISTING SEWER PIPE & STRUCTURE MODIFICATIONS OR REMOVAL AND NEW SEWER INSTALLATION; PROVIDE
LATERAL WYES AT ALL EXISTING SEWER LATERAL LOCATIONS.
2) RECONNECT EXISTING SEWER LATERALS TO NEW SEWER MAIN; ADJUST SLOPES AND DEPTHS OF LATERAL PIPES BETWEEN
EDGES OF ROADS AND SEWER MAIN USING APPROVED GASKETED PVC FITTINGS TO MEET NEW WYE ELEVATIONS.
3) RELOCATE SEWER BYPASS PUMPING SYSTEM TO NEXT SECTION OF PIPE TO BE INSTALLED.
4) DYE TEST ALL RECONNECTED SEWER LATERALS TO VERIFY CONNECTIONS TO NEW SEWER MAIN.
TEMPORARY SEWER SERVICE INTERRUPTIONS FOR NEW SEWER INSTALLATION SHALL LAST NO LONGER THAN TWELVE (12) HOURS, AND SHALL BE SCHEDULED WITH A MINIMUM FORTY-EIGHT (48) HOURS ADVANCE NOTICE TO THE AFFECTED PROPERTY OWNERS AS WELL AS NOTICE IMMEDIATELY PRIOR TO THE SHUTDOWN. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SCHEDULING HIS WORK IN A
MANNER WHICH WILL MINIMIZE SERVICE INTERRUPTIONS.
S
114.07
DINV 24
S
S
114.69
DTOP 18
*+)*8+'9�&4+8'
ISSUE DATE
NUMBER DATE MADE BY CHECKED BY REVISIONS
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
20 0 20
SCALE IN FEET: 1"=20'
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY SUBCONSULTANT TITLE
9/ 9/
:2
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_E
XI
ST
IN
G C
O N
D
IT
IO
N
S
PL
AN
S.
D W
G (B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
EXISTING CONDITIONS
114.07
DINV 24
S
S
114.69
DTOP 18
*+)*8+'9�&4+8'
X X
X X
X
XX
X
XXXXX
X X
X X
X
X X X X X
ISSUE DATE
NUMBER DATE MADE BY CHECKED BY REVISIONS
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
20 0 20
SCALE IN FEET: 1"=20'
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY SUBCONSULTANT TITLE
9/ 9/
:1
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_S
IT
E
PR
EP
P
LA
N
S.
D
W G
(B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
SITE PREPARATION PLAN
LIMIT OF DISTURBANCE
PROP. 6' TEMPORARY
CONSTRUCTION CHAIN
LINK FENCE
PROP. COMPOST
FILTER SOCK
PROP. CONSTRUCTION
ACCESS RIDOT STD 9.9.0
PROP. CATCH BASIN
INLET PROTECTION
CLEAR AREA, LOCATE
BURIED SEWER MANHOLE,
REBUILD/RECONSTRUCT
MANHOLE. REMOVE AND DISPOSE
EXIST. FRAME AND COVER.
FURNISH AND INSTALL PROPOSED
FRAME AND COVER. ADJUST COVER
TO GRADE.
CLEAR AND GRUBREMOVE AND DISPOSE
EXISTING CHAIN LINK FENCE
REMOVE AND DISPOSE
EXISTING CHAIN LINK FENCE
DRIP LINE TREE PROTECTION
RI STD 51.1.1
REMOVE AND DISPOSE
EXISTING CHAIN LINK FENCE
REMOVE AND DISPOSE
EXISTING CHAIN LINK FENCE
CONDUCT TEST PIT AT START
OF CONSTRUCTION TO VERIFY
SIZE, DEPTH, AND LOCATION OF
EXIST. SEWER
FENCE TO BE COORDINATED
WITH OWNER/ABUTTER
(REMOVE AND STACK EXIST.
8' WOOD PICKET FENCE IF
REQUIRED)
NOTE: TEST PITS SHALL BE REQUIRED PRIOR TO THE
CONSTRUCTION OF DRAINAGE INFRASTRUCTURE TO VERIFY
DEPTH AND LOCATION OF EXISTING INFRASTRUCTURE.
RETAIN BOULDERS (5)
RETAIN EXIST. 24" PIPE
114.07
DINV 24
S
S
114.69
DTOP 18
*+)*8+'9�&4+8'
XXXX
X
X X
X
X X X X X
X X
X X
X
113.5
113.5
PROP. OVERFLOW-2A
RIM=116.0±
INV OUT (6" PVC N)= 112.50 (OVERFLOW-2)
5' 6" PVC
S=(0.00%)
EL = 112.500
PROP. OVERFLOW-2
RIM=116.5±
INV OUT (18" HDPE N)= 113.50 (HW-4)
34' 18" HDPE
S=(0.50%)
11' 6" PVC
S=(0.00%)
EL = 113.500
ISSUE DATE
NUMBER DATE MADE BY CHECKED BY REVISIONS
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
20 0 20
SCALE IN FEET: 1"=20'
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY SUBCONSULTANT TITLE
9/ 9/
:5
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_C O
N
ST
R U
C
TI
O N
P
LA
N S.
D W
G (B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
CONSTRUCTION PLAN
EMERGENCY CONCRETE
CURB OVERFLOW WEIR
EL. = 117.00
PROP. HEADWALL.
(RIDOT STD. 2.1.0 )
INV. OUT = 114.10
PROP. GRASSED
ACCESS PATH
PROP. PERFORATED OUTLET
STRUCTURE (SEE DETAIL)
PROP. RIPRAP OVERFLOW
SPILLWAY TYPE R-5
(SEE DETAIL)
PROP. DETENTION BASIN
PROP. 4" LOAM AND SEED
WITHIN LOD
PROP. RIPRAP FOREBAY.
BOTTOM EL. = 113.50
PROP. GRASSED
ACCESS PATH.
PROP. 4' WOOD POST AND
RAIL FENCE (SEE DETAIL)
PROP. 4' WOOD POST AND
RAIL FENCE DOUBLE GATE
PROP. HEADWALL.
(RIDOT STD. 2.1.0 )
INV. OUT = 113.33
REMOVE AND DISPOSE
EXIST. 18" CMP
FENCE TO BE COORDINATED
WITH OWNER/ABUTTER
PROP. 4' WOOD POST AND
RAIL FENCE DOUBLE GATE
GATE LOCATION TO BE
COORDINATED IN THE FIELD
NOTE: CONTRACTOR SHALL INSTALL LOAM AND SEED
PRIOR TO THE SUBSTANTIAL COMPLETION DATE.
CONTRACTOR SHALL UTILIZE TEMPORARY OR
BIODEGRADABLE EROSION CONTROL BLANKETS IN
ACCORDANCE WITH THE LATEST RHODE ISLAND SOIL
EROSION AND SEDIMENT CONTROL HANDBOOK TO
STABILIZE THE SITE FOR THE WINTER SHUTDOWN PERIOD.
RESEEDING OF THE PROJECT AREA WILL BE REQUIRED IN
THE SPRING SEEDING WINDOW IN ACCORDANCE WITH
RIDOT SECTION LO2.
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY
AS SHOWN
SUBCONSULTANT TITLE
9/ 9/
:5
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
.D W
G (B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
CONSTRUCTION DETAILS NO. 1
COMPOST FILTER SOCK
NOT TO SCALE
COMPOST FILTER SOCK MINIMUM 12 INCHES IN
DIAMETER WITH AN EFFECTIVE HEIGHT OF 9.5 INCHES.
SOCKS FOR COMPOST FILTERS SHALL BE JUTE MESH
OR APPROVED BIODEGRADABLE MATERIAL.
ADDITIONAL SOCKS SHALL BE USED AT THE DIRECTION
OF THE ENGINEER.
TAMP SOCKS IN PLACE TO ENSURE GOOD CONTACT
WITH SOIL SURFACE. IT IS NOT NECESSARY TO TRENCH
SOCKS INTO EXISTING GRADE.
UNDISTURBED
SUBGRADE
2 IN. DEEP x 12 IN. WIDE LAYER OF LOOSE
COMPOST MATERIAL PLACED ON
UPHILL/FLOW SIDE OF SOCKS TO FILL SPACE
BETWEEN SOIL SURFACE AND SOCKS.
LIMIT OF
WORK
2 INCH X 2 INCH X 3 FEET UNTREATED HARDWOOD
STAKES, UP TO 5 FT. APART OR AS REQUIRED TO SECURE
SOCKS IN PLACE.
WHEN STAKING IS NOT POSSIBLE, SUCH AS WHEN SOCKS
MUST BE PLACED ON PAVEMENT, HEAVY CONCRETE OR
CINDER BLOCKS CAN BE USED BEHIND SOCKS UP TO 5 FT.
APART OR AS REQUIRED TO SECURE SOCKS IN PLACE.
INSTALLATION TO OCCUR AT OR
WIITHIN LIMIT OF WORK TO PREVENT
IMPACTS TO RESOURCE AREAS.
DIRECTION
OF FLOW
NOTES:
1. PROVIDE A MINIMUM SOCK DIAMETER OF 12 INCHES FOR SLOPES UP TO 50 FEET IN LENGTH WITH
A SLOPE RATIO OF 3H:1V OR STEEPER. LONGER SLOPES OF 3H:1V MAY REQUIRE LARGER SOCK DIAMETER OR ADDITIONAL COURSING OF FILTER SOCKS TO CREATE A FILTER BERM. REFER TO
MANUFACTURER'S RECOMMENDATIONS FOR SITUATIONS WITH LONGER OR STEEPER SLOPES.
2. INSTALL SOCKS ALONG CONTOURS AND PERPENDICULAR TO SHEET OR CONCENTRATED FLOW.
3. DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR INTERMITTENT STREAMS.
4. CONFIGURE SOCKS AROUND EXISTING SITE FEATURES TO MINIMIZE SITE DISTURBANCE AND
MAXIMIZE CAPTURE AREA OF STORMWATER RUN-OFF.
PLAN OF TEMPORARY
STOCKPILED AREA
SECTION A-A
A
PLAN
A
INLET SEDIMENT CONTROL DEVICE
(WITH OPTIONAL CURB DEFLECTOR)
SIDE VIEW INSTALLED
INSTALLATION DETAIL
EROSION CONTROL BLANKET
CONCRETE WASHOUT AREA DETAIL
SECTION A-A
A A
10' TYP.
10' TYP.
3' TYP.
PLAN
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY
AS SHOWN
SUBCONSULTANT TITLE
9/
/2
8:
A
M \\B
ET
A-
IN
C
.C O
M \R
I\T R
AN
S\
0\
- S H
ER
R
Y
AV
EN
U
E D
R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0 _C
O N
ST
R
U C
TI
O
N P
LA
N
SE
T\
D R
AW
IN
G F
IL
ES
\P
LA
N
SE
T\ C
O N
ST
R
U C
TI
O
N P
LA
N
S
ET
\1
_C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
.D
W G
(B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
CONSTRUCTION DETAILS NO. 2
SEDIMENT FOREBAY CROSS-SECTION
M
IN
4' -0
RI STD. 4.4.0 CATCH BASIN
WITH DOME FRAME AND
GRATE. SEE PLANS FOR RIM
ELEVATION.
BASIN BOTTOM. SEE
PLANS FOR ELEVATION
24" DIA. PERFORATED SDR 35 PVC
RISER WITH CAP ON TOP OF PIPE.
EXTEND THE PIPE 1'-6" BELOW
BASIN GRADE. PROVIDE A
MINIMUM OF 65 - 3 4" DIAMETER
HOLES SET EVENLY THROUGHOUT
THE LENGTH OF RISER
6" PERFORATED SDR 35 PVC
RISER. PROVIDE A MINIMUM OF 4
- 3 4" DIAMETER HOLES AT 6 INCH
INTERVALS ABOVE THE BASIN
BOTTOM
PROP. 6" SDR 35 PVC
ELBOW
PROP. SOLID 6" SDR 35
PVC DRAIN PIPE. SEE
PLANS FOR LENGTH.
4 " CRUSHED
STONE JACKET
6" CRUSHED STONE
COMPACTED EXISTING
SUBGRADE
SEE PLANS FOR
INVERT
PROP. 18" HDPE
OUTLET PIPE. SEE
PLANS FOR INVERT
AND LENGTH.
3' -0
OUTLET CONTROL STRUCTURE
NOT TO SCALE
24" PVC CAP
GRAVEL BORROW
(SECTION M01.09 COLUMN 1b OF
THE GRADATION TABLE)
CONCRETE CURB OVERFLOW
WEIR DETAILS
NOT TO SCALE
6.0'
(SEE PLAN)3' 3'
6" (MIN.)
6" (MIN.)
18" (MIN.)
12"
12"
SECTION A-A
6" (MIN.)
1'-10"
6" (MIN.)
DETENTION BASIN
CROSS-SECTION
NEW ENGLAND LOGGING
ROAD MIX (UPLAND SEED
MIX) OR APPROVED EQUAL
NEW ENGLAND LOGGING
ROAD MIX (UPLAND SEED
MIX) OR APPROVED EQUAL
NOTES:
1. SHALL BE IN ACCORDANCE WITH SECTIONS L01 AND L02 OF THE R.I. STANDARD SPECIFICATIONS.
DOME FRAME AND GRATE
ROUND WOOD 3 RAIL FENCE
NOTES:
1. ALL WOOD SHALL BE WHITE CEDAR NATURAL FINISH.
2. AFTER SETTING POSTS, TAMP BACKFILL FIRMLY IN PLACE.
FINISH GRADE
ROUND WOOD RAIL
(TOP & BOTTOM)
4" TO 41
2" x 8' LONG RAIL
RAILS TO FIT
MORTISE IN POST
4" DIAM. x 7' 9" LINE
AND END POSTS
2"x4" 14 GAUGE BLACK
WELDED WIRE MESH
12" DIA. (MIN.)
CLASS A CONC.
FOOTING
ELEVATION WITH DOUBLE GATE
NOTES:
1. ALL WOOD SHALL BE WHITE CEDAR NATURAL FINISH.
2. AFTER SETTING POSTS, TAMP BACKFILL FIRMLY IN PLACE.
3. ALL HINGES, LATCHES AND LOCKS ARE TO BE BLACK
18" HEAVY DUTY STEEL DROP ROD
OR APPROVED EQUAL
ISSUE DATE
NUMBER DATE MADE BY CHECKED BY REVISIONS
DRAWN BY:
DESIGNED BY:
CHECKED BY:
UNLESS OTHERWISE NOTED OR CHANGED BY REPRODUCTION
SCALE
BETA JOB NO.
SHEET NO.
11789
9/10/2025
SHERRY AVENUE
DRAINAGE IMPROVEMENTS - PHASE 1
REGISTERED PROFESSIONAL PREPARED BY
AS SHOWN
SUBCONSULTANT TITLE
9/ 9/
:2
PM
\\B
ET
A-
IN
C .C
O M
\R I\T
R
AN
S\
0\
- S
H
ER
R Y
AV
EN
U E
D R
AI
N
AG
E
IM
PR
O
VE
M
EN
TS
\0
_C O
N
ST
R U
C
TI
O N
P
LA
N
SE
T\ D
R
AW
IN
G
F
IL
ES
\P
LA
N
SE
T\
C O
N
ST
R U
C
TI
O N
P
LA
N S
ET
\1
_C O
N
ST
R U
C
TI
O N
D
ET
AI
LS
.D W
G (B
ET
A
ST
B
BW
.S
TB
BRISTOL, RI
AJM
JMC
NBI
HIGHVIEW DRIVE DETENTION BASIN
CONSTRUCTION DETAILS NO. 2
LINE OF NARROW TRENCH LIMIT
UNDISTURBED MATERIAL
PAYMENT LIMITS
EXCAVATION
FOR NORMAL
OR DIRECTED
OTHERWISE INDICATED
LIMIT EXCEPT WHERE
OF NARROW TRENCH
PLACE BELOW THE LINE
SHALL BE LEFT IN
SHEETING, IF USED,
6"
D
MIN.
BEYOND THIS LINE
SHALL PROJECT
NO UNEXCAVATED
MATERIAL OR LEDGE
D=NOMINAL PIPE
EXCAVATION
PAYMENT LIMITS
DIAMETER
FOR ROCK
THROUGHLY COMPACTED
GRAVEL BORROW
3/4" CRUSHED STONE COMPACTED
TO A DENSITY OF 85% OR
GREATER PLACED AGAINST
UNDISTURBED MATERIAL
OR SHEETING
SE
E
N O
TE
S
TYPICAL DRAIN TRENCH SECTION
EXISTING BRICK
AND/OR REINFORCED
CONCRETE RISER
EXISTING GRADE PROPOSED GRADE
EXISTING FRAME AND GRATE TO BE RESET
ADJUST TO PROPOSED GRADE
WITH HIGH STRENGTH BRICK OR
CONCRETE GRADE RING
NOTE:
CONTRACTOR TO VERIFY EXISTING AND PROPSOED ELEVATIONS BEFORE START OF WORK.
STRUCTURE ADJUSTMENT, TYPE II, RAISE GRADE (<8")
NOT TO SCALE
EXISTING BRICK AND/OR
REINFORCED CONCRETE
RISER TO BE REMOVED
EXISTING GRADE
PROPOSED GRADE
EXISTING FRAME AND GRATE TO BE RESET,
SEE TABLE ON CU601 FOR REPLACEMENT
CONCRETE RISER
#5 DOWELS @ 12" O.C., SET
IN 1 12" DIA. HOLE FILLED
WITH NON-SHRINK GROUT
ADJUST TO PROPOSED GRADE
WITH HIGH STRENGTH BRICK
9"
NOTE:
CONTRACTOR TO VERIFY EXISTING AND PROPSOED ELEVATIONS BEFORE START OF WORK.
STRUCTURE ADJUSTMENT, TYPE III, RAISE GRADE (>8")
NOT TO SCALE
| Sheets and Views |
| Title Sheet |
| Sheets and Views |
| LEG ABV |
| Sheets and Views |
| GEN NOTES |
| Sheets and Views |
| Ex Con Plan |
| Sheets and Views |
| Site Prep |
| Sheets and Views |
| Construction Plan |
| Sheets and Views |
| 1 |
| Sheets and Views |
| 2 |
| Sheets and Views |
| 3 |
File details come from the government source that posted it. Updated .