Bid Form_GC_REV1_ADD3.pdf
PDF 61 KB Posted
- Attached to
- WWTP SBR 2 and Digester 2 Rehabilitation
- Solicitation number
- 6100061392
- Issued by
- Lebanon County, Allentown City, Pennsylvania
About this file
This document is a Bid Form for the FTIG Wastewater Treatment Plant - SBR 2 and Digester 2 Rehabilitation project in Pennsylvania. The project involves the replacement of existing treatment equipment and application of a protective coating system to concrete surfaces in SBR #2 and Digester #2 at the Fort Indiantown Gap Wastewater Treatment Plant. The Bid Form lists 8 bid items related to the general construction work, including selective demolition, coating systems, and treatment equipment. The total bid amount must be provided in both figure and written form. A mandatory pre-bid conference will be held on June 20, 2024, and questions are due by July 1, 2024. Bids are due on July 11, 2024, at 2:00 P.M.
The estimated range for the General Construction contract is $2,000,001.00 to $3,000,000.00, with liquidated damages of $750.00 per day. This project has been identified as eligible for Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals, which will be provided at a later date. Bids for this project will only be accepted electronically through the PA Supplier Portal.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM_REV 1_ADDENDUM NO. 3
DMVA Project#: 42210054 BID FORM - 1 FTIG Wastewater Treatment Plant – SBR 2 and Digester 2 Rehabilitation
THE BIDDER MUST TYPE/WRITE ITS TOTAL BID PRICE FOR EACH SEPARATE BID ITEM AND BASE BID ON THIS BID FORM. SEE SPECIFICATION SECTION 01 20 00 PRICE AND PAYMENT PROCEDURES FOR
BID ITEM DESCRIPTIONS.
FOR ALL GENERAL CONSTRUCTION (.1 CONTRACT):
BID
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
1. GENERAL CONTRACT
PROVISIONS 1 LUMP
SUM $__________________ $__________________
2. SELECTIVE DEMOLITION
– SBR 2 1 LUMP
SUM $__________________ $__________________
3. SELECTIVE DEMOLITION
– DIGESTER 2 1 LUMP
SUM $__________________ $__________________
4. COATING SYSTEM – SBR
2 1 LUMP
SUM $__________________ $__________________
5. COATING SYSTEM –
DIGESTER 2 1 LUMP
SUM $__________________ $__________________
6. TREATMENT EQUIPMENT
– SBR 2 1 LUMP
SUM $__________________ $__________________
7. TREATMENT EQUIPMENT
– DIGESTER 2 1 LUMP
SUM $__________________ $__________________
8.
SBR and DIGESTER GRIT
REMOVAL AND
DISPOSAL
60 CUBIC
YARD $__________________ $__________________
TOTAL BID
(Figure)
____________________________________________________________________________________ Dollars
(Written)
NOTE: TOTAL PRICE = QUANTITY x UNIT PRICE; TOTAL BID = SUM OF TOTAL PRICES