Bid Cost Breakout by Line Items for PROJECT 589-19-503 rev5.xls

XLS spreadsheet 81 KB Posted

Attached to
Z2DA-- 589-19-503, Correct Deficiencies in BAS for Legionella Prevention (VA-20-00028966)
Solicitation number
36C25520R0078_1
Issued by

About this file

This document provides details for a federal construction contract opportunity to correct deficiencies in the building automation system for Legionella prevention at the Kansas City VA Medical Center. The project involves installing approximately 120 new flow meters and 204 temperature sensors connected to an existing Schneider Electric EcoStruxure building automation system. It also requires upgrading 22 universal network controllers to the newer Schneider Electric EcoStruxure control system. The electrical scope includes power for new controls and sensors from existing or new panelboards. Minimal abatement and patching is required. The contract type is firm fixed price with an estimated cost between $2 million and $5 million. The solicitation will be set aside for service-disabled veteran-owned small businesses and have a North American Industry Classification Code of 236220. The completion period is 180 calendar days from notice to proceed. The solicitation and site visit are scheduled for May 21, 2020 and July 2, 2020 respectively. Questions are due by email to the point of contact by the response deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid #1

CONSTRUCTION BID DOCUMENTSContracting Officer's Representative: Marcus Stevenson
Title:589-19-503: CORRECT DEFICIENCIES IN BAS FOR LEGIONELLA PREVENTIONName of Bidding General Contractor(GC):
Date:Working Facility: Kansas City VALabor Burden: KCMOSUB 10%GC0%
Comments:Project Schedule is 180 calendar days from contractors Notice-To-Proceed (N.T.P.)
RSMeansUnit CostTotal Cost
Line ItemSystem/SubsystemUnitQuantityPageTableUnit Material CostUnit Equipment CostUnit Labor CostMaterialEquipmentLaborTotal
02000 EXISTING CONDITIONS
02200 Environmental Abatement
02200-1Remove 3'-0" section of ACM pipe insulation via glove bag methodEA70$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
09000 FINISHES
09900 Miscellaneous Finishes
09000-1Cutting and patching allowance of finished surfaces related to plumbing/BAS workLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22000 PLUMBING
22300 Plumbing Equipment & Specialties
22300-1BTU meter and flow meter, insertion type, turbine, including pipe cutting and new (installation only, material provided by EC)
bypass (installation only, material provided by EC)EA11$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22300-2BTU meter and flow meter, inline, including pipe cutting and new bypass piping(installation only, material provided by EC)EA107$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22300-3BTU meter (installation only, material provided by EC)EA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22300-4Temperature sensors, strap on type (installation only, material provided by EC)EA321$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22300-5Labor Rate for hrly support after water utility outageHR1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22400 Domestic Water, Waste & Vent, & Storm Drainage Piping
22400-1Provide new taps in CW piping in Mechanical Rooms for chlorine injection, 3/4" capped valveEA119$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Reinsulate piping where sensors were installedEA440$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
23000 HEATING VENTILATION & AIR CONDITIONING
23600 Temperature Controls
22600-1Miscellaneous points & devicesLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
23700 Testing, Balancing, & Commissioning
22700-1Pipe system testingLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
22700-2CommissioningLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26000 ELECTRICAL
26200 Main Power Distribution
26200-1Install 20A/1P breaker in existing panelEA6$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-2Install 3P, 60A breaker in existing panel to feed new 60A sub-panelEA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-3Sub-panel, 60AEA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-4Feeder installation 600 V, including conduit and XHHW wire, 60ALNFT25$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-526600 Branch Power Distribution & Devices
26200-6MNL network control panels, including installation and programmingEA42$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-7Temperature sensors, 2" and under (material only, provided to PC for installation)EA283$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-8Temperature sensors, 2-1/2" and over (material only, provided to PC for
installation)EA38$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-9System 10 BTU meter and F-1100 flow meter, insertion type, turbine; 6" (material
only, provided to PC for installation)EA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-10System 10 BTU meter and F-1100 flow meter, insertion type, turbine; 4" (material
only, provided to PC for installation)EA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-11System 10 BTU meter and F-1100 flow meter, insertion type, turbine; 3" (material
only, provided to PC for installation)EA9$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-12System 10 BTU meter and F-4600 flow meter, in-line; 2-1/2" (material only,
provided to PC for installation)EA19$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-13System 10 BTU meter and F-4600 flow meter, in-line; 2" (material only, provided
to PC for installation)EA48$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-14System 10 BTU meter and F-4600 flow meter, in-line; 1-1/2" (material only, provided to PC for installation)EA17$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-15System 10 BTU meter and F-4600 flow meter, in-line; 1-1/4" (material only, provided to PC for installation)EA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-16System 10 BTU meter and F-4600 flow meter, in-line; 1" (material only, provided to PC for installation)EA18$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-17System 40 BTU meter; 2" (material only, provided to PC for installation)EA1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26200-1820A emergency/normal power circuit to panels/devices as indicatedLNFT1800$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
26900 Special Electrical
26900-1Universal network controller, including disconnection and removal of existing power wiring, disconnection of CAT5 network cabling, reprogramming, data
transfer and commissioningEA22$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27000 COMMUNICATIONS
27200 Tele/Data Systems
27200-1Floor core in IT closet for 3/4" conduit riserEA15$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27200-2Electric metallic tubing, 3/4" diameter, to 15' high, including fittings and supportsLNFT320$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27200-3Extend network cabling from nearest LON trunk to new metersLNFT42000$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
27200-4Modify existing LON network repeaters as needed, provide all testing, terminations
and engineering as requiredLNFT7$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GCGENERAL CONDITIONSLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GCCONTRACTOR'S FEESLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prof Srvcs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prof Srvcs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prof Srvcs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBCONTRACTOR 1GENERAL CONTRACTOR
MATERIAL$ - 0MATERIAL$ - 0
EQUIPMENT$ - 0EQUIPMENT$ - 0
LABOR$ - 0LABOR$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
OVERHEAD$ - 0OVERHEAD$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
PROFIT$ - 0PROFIT$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
LABOR BURDEN$ - 0LABOR BURDEN$ - 0
SUB 1 TOTAL$ - 0GC TOTAL$ - 0
SUB 1 TOTAL$ - 0
PROF SERVICES$ - 0
SUBTOTAL$ - 0
GC OH & PROFIT$ - 0
BOND/INSURANCE$ - 0
ESTIMATOR SIGNATURE ___________________________________________________________________TOTAL$ - 0

&R&F Department of Veterans Affairs:

Enter COMBINED SUBCONTRACTORS LABOR BURDEN PERCENTAGE Department of Veterans Affairs:

Enter GENERAL CONTRACTOR LABOR BURDEN PERCENTAGE Department of Veterans Affairs:

Note to the Preparer: Areas highlighted in Green: Subs Combined Yellow: General Contractor

Bid Deduct #1

CONSTRUCTION BID DOCUMENTSContracting Officer's Representative: Marcus Stevenson
Title:589-19-503: CORRECT DEFICIENCIES IN BAS FOR LEGIONELLA PREVENTIONName of Bidding General Contractor(GC):
Date:Working Facility: Kansas City VALabor Burden: KCMOSUB 10%GC0%
Comments:Project Schedule is 180 calendar days from contractors Notice-To-Proceed (N.T.P.)
RSMeansUnit CostTotal Cost
Line ItemSystem/SubsystemUnitQuantityPageTableUnit Material CostUnit Equipment CostUnit Labor CostMaterialEquipmentLaborTotal
26900-1Universal network controller, including disconnection and removal of existing power wiring, disconnection of CAT5 network cabling, reprogramming, data
transfer and commissioningEA22$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GCGENERAL CONDITIONSLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GCCONTRACTOR'S FEESLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
GC$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prof Srvcs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prof Srvcs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Prof Srvcs$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SUBCONTRACTOR 1GENERAL CONTRACTOR
MATERIAL$ - 0MATERIAL$ - 0
EQUIPMENT$ - 0EQUIPMENT$ - 0
LABOR$ - 0LABOR$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
OVERHEAD$ - 0OVERHEAD$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
PROFIT$ - 0PROFIT$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
LABOR BURDEN$ - 0LABOR BURDEN$ - 0
SUB 1 TOTAL$ - 0GC TOTAL$ - 0
George KaraboyiasSUB 1 TOTAL$ - 0
PROF SERVICES$ - 0
SUBTOTAL$ - 0
GC OH & PROFIT$ - 0
BOND/INSURANCE$ - 0
ESTIMATOR SIGNATURE ___________________________________________________________________TOTAL$ - 0

&L&8&F Department of Veterans Affairs:

Note to the Preparer: Areas highlighted in Green: Subs Combine Yellow: General Contractor Department of Veterans Affairs:

Enter COMBINED SUBCONTRACTORS LABOR BURDEN PERCENTAGE Department of Veterans Affairs:

Enter GENERAL CONTRACTOR LABOR BURDEN PERCENTAGE