bid-43-26-award.pdf
PDF 150 KB Posted
- Attached to
- Swing Gates
- Solicitation number
- Bid 43-26
- Issued by
- Cheshire County, New Hampshire
About this file
This is a Request for Bid (RFB) Bid Summary and Tabulation document from the New Hampshire Department of Administrative Services, Division of Procurement Support Services, Bureau of Purchase and Property for swing gates required by the Department of Natural and Cultural Resources (DNCR) Trails Bureau. The procurement sought five 12'10" single swing gates to be delivered to White Lake State Park in Tamworth, New Hampshire. The RFB, numbered 43-26, was distributed on October 3, 2025, with a bid closing date of October 24, 2025, at 2:00 PM Eastern Time. The gates required modular design capable of complete on-site installation without welding, construction using domestic materials, and specific components including hinge posts, gate arms, lock open posts, walk-thru bollards, removable lock pins, chains, guarded lock and pin surrounds, and deadman plates. Bids were required to include comprehensive pricing for complete gate systems with delivery costs to the FOB destination point. Bid offers remained valid for 180 days from the closing date.
The bid tabulation shows six bidders were solicited, with 13 bids received and 3 non-responsive bidders noted. Bidders included Premier Fence LLC, Triple Construction LLC, Welch Welding, Duquette Steel & Structural Fabrications, Reliable Fence Co, Rotten Rock Hardscaping & Tree Service Inc, Tech International Inc, Ace Welding, DC Welding Inc, and Macy Industries Inc. Unit costs for the 12'10" single swing gates ranged from $3,125.00 to $9,780.00 per gate, with extended costs for the quantity of five ranging from $15,625.00 to $48,900.00. Payment methods accepted included P-card or ACH, with FOB delivery terms. The procurement required vendors to be registered to do business in New Hampshire with completed Vendor Application Packages on file with the Bureau of Purchase and Property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid_43_26.pdf | ||
| addendum-1-bid-43-26--1-.pdf | ||
| bid-43-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Procurement Support Services Bureau of Purchase Property
RFB Bid Summary
Gary S. Lunetta Director
(603) 271-2201
Agency Requisition# Bid Closing
Indicates Award:
Qty. UO M Product Description
Unit Cost Extended Cost Unit Cost Extended Cost Unit Cost Extended Cost Unit Cost Extended Cost 5 ea 12' 10: Single Swing Gates $4,200.00 $21,000.00 $5,641.00 $28,205.00 $3,256.00 $16,280.00 $3,980.00 $19,900.00
$21,000.00 $28,205.00 $16,280.00 $19,900.00
Unit Cost Extended Cost Unit Cost Extended Cost Unit Cost Extended Cost Unit Cost Extended Cost 5 ea 12' 10: Single Swing Gates $9,780.00 $48,900.00 $4,210.00 $21,050.00 $4,330.00 $21,650.00 $4,091.00 $20,455.00
$48,900.00 $21,050.00 $21,650.00 $20,455.00
Unit Cost Extended Cost Unit Cost Extended Cost 5 ea 12' 10: Single Swing Gates $3,125.00 $15,625.00 $3,500.00 $17,500.00
$15,625.00 $17,500.00
Special Notes:
Triple Construction LLC
Welch Welding Duquette Steel & Structural Fabrications
Number of Sourced bidders Number of NIGP Vendors Sourced Number of non-responsive bidders
Reliable Fence Co Rotten Rock Hardscaping & Tree Svc Inc Tech International Inc
Sub Total
Sub Total
DNCR
253481
10/24/25 2PM
Bid
RFB#
Agent Name 43-26
Rhonda Girard
Swing Gates
Premier Fence LLC
Sub Total
P-card or ACH
FOB Destination
Method of Payment (P-card/ACH)
FOB Delivered
Ace Welding DC Welding Inc Macy Industries Inc
No
Recommendation Summary
D&B Report Attached
13 (3 no bids-FW Webb, Gardeners Edge, Intrepid Industries)Number of Solicitations Received
Page 1/1
RFB Bid Tabulation
File details come from the government source that posted it. Updated .