Bid 2474 Contract Dwgs.pdf
PDF 12 MB Posted
- Solicitation number
- B2627069
- Issued by
- Pennsylvania
About this file
Baxter Water Treatment Plant Building Improvements - Contract Drawings Summary
This is a set of architectural contract drawings for the Baxter Water Treatment Plant Building Improvements project (Work No. 61103) issued by the Philadelphia Water Department (PWD). The project encompasses building improvements across multiple structures at the Samuel S. Baxter Water Treatment Plant located at 9001 State Road, Philadelphia, PA 19136. The scope of work includes window and door replacement in multiple buildings, repairs to facade materials and exterior walls including masonry repairs, flashing repair, and refurbishment or replacement of facade-supporting steel including lintels, plates, and opening-spanning beams. The project involves work on the Filter Building, Pre-Treatment Building (with basement, first, second, third, fourth, and fifth floor plans), Intake Building, Maintenance and Electrical Shed, Post-Treatment Building, and Chemical Building. The drawings, prepared by Converse Winkler Architecture and Ramboll Americas Engineering Solutions as of September 15, 2025, include detailed floor plans, demolition elevations, construction elevations, door and window schedules, and mechanical, electrical, and plumbing coordination requirements.
The contract documents specify that the contractor is responsible for obtaining all permits and licenses, coordinating demolition activities with the owner, protecting existing utilities, and managing all site operations including equipment setup, material storage, and debris removal. All work must comply with the International Building Code 2018 Edition and applicable OSHA standards. The contractor shall submit shop drawings for review prior to fabrication, including structural design calculations, shoring plans, and performance assembly designs. Key construction standards referenced include AISC 360-16 for structural steel, ACI standards for concrete work, and AWS D1.1 for welding operations. The project requires coordination with multiple trades, verification of existing field conditions, and adherence to environmental protection regulations, particularly regarding lead-based paint removal and hazardous materials handling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 2474 Seller_Quote_Checklist.pdf | ||
| Zoom Link for Bid Opening Bid~13.pdf | ||
| Bid 2474 Specs~1.pdf | ||
| Bid Pricing Page 2474 61103.xlsx | XLSX spreadsheet | |
| Consent Authorization Form 1~25.pdf | ||
| Bid 2474 Amendment 1.pdf | ||
| Bid 2474 Ref Dwgs.pdf | ||
| AD 2454 2474 2479~2.pdf | ||
| ABL Bid 2474~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHADED AREA ARE BUILDGS
IN SCOPE OF WORK
LEGEND
331 MONTGOMERY AVE
BALA CYNWYD, PA 19144
CONVERSE
WINKLER
ARCHITECTURE
REV DATE DESCRIPTION
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
JOB NO.
PROJECT TITLE:
DRAWING TITLE:
DRAWING NUMBER:
P.W.D.WORK # 61103
AS INDICATED
AH/CWA
NMD/PDC
BAXTER WATER
TREATMENT PLANT
BUILDING IMPROVEMENTS
CS0.10
COVER SHEET
CW-2301
09/15/2025
BAXTER WATER TREATMENT PLANT
BUILDING IMPROVEMENTS PROJECT
SIGNATURES
SIGNATURES
SIGNATURES
DELAWARE
RIVER
RETENTION
POND
SEDIMENTATION
BASIN
MIXING
BASIN
MIXING
BASIN
SEDIMENTATION
BASIN
FILTER
BUILDING
PRE-TREATMENT
CHEMICAL BUILDING
POST-TREATMENT
BUILDING
INTAKE
BUILDING
DRAWING LIST LOCATION MAP SITE PLAN
SHEET NO. SHEET NAME
CS0.10 COVER SHEET
G0.10 GENERAL INFORMATION & NOTES
G1.10 CONTRACTOR STAGING PLAN
A1.10 FILTER BLDG & GROUNDS OVERALL PLAN
A1.11 FILTER BLDG PART PLAN LEVEL 1
A1.12 FILTER BLDG COMPLEX PLANS & DETAILS
A1.20 PRE-TREATMENT BLDG - 1ST FLOOR & BASEMENT PLANS
A1.21 PRE-TREATMENT BLDG - 2ND FLOOR PLAN
A1.22 PRE-TREATMENT BLDG - 2ND FLR BREAK RM ENLARGED PLANS & ELEVS
A1.23 PRE-TREATMENT BLDG - 3RD, 4TH & 5TH FLOOR PLANS
A1.24 PRE-TREATMENT BLDG - 2ND FLR REFLECTED CEILING PLAN
A1.30 INTAKE BLDG - FLOOR PLAN
A1.40 MAINTENANCE & ELEC SHED - FLOOR PLANS
A1.50 POST TREATMENT BLDG - 1ST FLR PLAN
AD2.20 PRE-TREATMENT BLDG - DEMOLITION ELEVATIONS
AD2.21 PRE-TREATMENT BLDG - DEMOLITION ELEVATIONS
AD2.30 INTAKE BUILDING - DEMOLITION ELEVATIONS
AD2.40 MAINTENANCE & ELEC SHED - DEMOLITION ELEVATIONS
AD2.50 POST-TREATMENT BLDG - DEMOLITION ELEVATIONS
A2.20 PRE-TREATMENT BLDG - ELEVATIONS
A2.21 PRE-TREATMENT BLDG - ELEVATIONS
A2.30 INTAKE BUILDING - ELEVATIONS
A2.40 MAINTENANCE & ELEC SHED - ELEVATIONS
A2.50 POST-TREATMENT BLDG - ELEVATIONS
A5.10 DOOR & FLOOR HATCHES SCHEDULE, TYPES & DETAILS
A5.20 WINDOW & STOREFRONT TYPES
A5.30 OPENING DETAILS
A5.31 OPENING DETAILS
A5.32 OPENING DETAILS & DETAILS
SITE
ELECTRICAL SHED
BUILDING
MAINTENANCE
SHED BUILDING
SAMUEL S. BAXTER WATER TREATMENT PLANT
9001 State Rd.
Philadelphia, PA 19136
GENERAL CONSTRUCTION - WORK NO. 61103
ARCHITECTURAL DRAWINGS
MEP DRAWINGS
E0.00 ELECTRICAL COVER SHEET
E3.00 ELECTRICAL NEW WORK PLANS
M0.00 MECHANICAL COVER SHEET
M2.00 MECHANICAL DEMO PLAN
M3.00 MECHANICAL NEW WORK PLANS
P0.00 PLUMBING COVER SHEET
P3.00 PLUMBING NEW WORK PLANS
PWD GENERAL MANAGER, PLANNING & ENGINEERING
PWD WATER COMMISSIONER
CONVERSE WINKLER ARCHITECTURE
RAMBOLL AMERICAS ENGINEERING SOLUTIONS
EARTH
GYPSUM / PLASTER
PLYWOODCONCRETE
MASONRY - BRICK
FINISH WOOD
STEEL
RIGID INSULATION
CRUSHED STONE
ROUGH
CONTINUOUS WOOD
DISCONTINUOUS
WOOD BLOCKING
ALUMINUMMASONRY - CMU
BATT INSULATION
MASONRY / STONE
FIRE STOPPING &
FIRE SAFING
PATTERNS
SEALANT &
BACKER ROD
FIBER REINFORCED
CONCRETE
A101
SIM
DOOR NUMBER
COLUMN GRID
KEY NOTE
SPOT ELEVATION TAG
NORTH ARROW
WALL SECTION
DETAIL SECTION
DETAIL CALL OUT #
Room name ROOM TAG
EXTERIOR ELEVATION
INTERIOR ELEVATION
3'-6"
DIMENSION
A#### #
A###
A101
BUILDING SECTION
A101
LEVELS
LEVEL NAME
ELEVATION
WALL TYPE #
WINDOW/PANEL TYPE #
N
A101
SIM
0'16' 16'
SCALE: 1/16" = 1'-0"
GRAPHIC SCALE
MATCHLINE
SYMBOLS
TOILET ACCESSORY TAG #
NEW DOOR
EXISTING DOOR
TO REMAIN
NEW WALL
EXISTING WALL
DEMOLISHED WALL
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
AOR ARCHITECT OF RECORD
ASPH ASPHALT
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOT BOTTOM OF
BRC BRICK COURSE
BSMT BASEMENT
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR CENTER LINE
COL COLUMN
CONC CONCRETE MASONRY UNIT
CONFIG CONFIGURATION
CONST CONSTRUCTION
CONT CONTINUE (OUS)
COORD COORDINATE
DIA DIAMETER
DIM DIMENSION
DN DOWN
DTL DETAIL
DWG DRAWING
EA EACH
EC ELECTRICAL CONTRACTOR
EL ELEVATION
ELEC ELECTRICAL CONTRACTOR
EP ELECTRICAL PANEL
EQ EQUAL
EXH EXHAUST
EXIST, EX, (E) EXISTING
EJ, EXP JT EXPANSION JOINT
EXT EXTERIOR
ETR EXISTING TO REMAIN
EXT EXTERIOR
F FIXED
FD FLOOR DRAIN
FDN FOUNDATIONS
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FFE FURNITURE FIXTURES EQUIPMENT
FLR FLOOR(ING)
FT FOOT
FTR FIRE TREATED
GA GAUGE, GAGE
GALV GALVANIZED
GEN GENERAL
GC GENERAL CONTRACTOR
GL GLASS
GRB GRADE BEAM
GWB GYPSUM WALL BOARD
H HIGH, HEIGHT
HB HOSE BIB
HCP HANDICAPPED
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HVAC HEATING, VENTILATION & AIR
CONDITIONING
INCL INCLUDE, (D), (ING)
INSUL INSULATION
INT INTERIOR
JT JOINT
LAV LAVATORY
LAV LIGHT FIXTURE, LINEAR FEET
LT WT LIGHT WEIGHT
MATL MATERIAL
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MEMB MEMBRANE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OPP OPPOSITE
OZ OUNCE
PAV PAVING
PC PLUMBING CONTRACTOR
PLAT PLATFORM
PLUM PLUMBING CONTRACTOR
P.O. PROJECT-OUT
PORTCEMT PORTLAND CEMENT
PR PAIR
PRE-FAB PREFABRICATE(D)
PREFIN PREFINISH(ED)
PRT PRESSURE TREATED
PT POINT
PT PAINTED
PTN PARTITIONS
PWD PLYWOOD
R RADIUS OR RISER
RD ROOF DRAIN
RECOM RECOMMENDED
REF REFERENCE
REQD REQUIRED
RM ROOM
RND ROUND
RO ROUGH OPENING
RWC RAINWATER CONDUCTOR
SCHED SCHEDULE
SIM SIMILAR
SPEC SPECIFICATIONS
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND(ED)
T TREAD
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TO TOP OF
TYP TYPICAL
UV UNIT VENTILATOR
VAR VARIES
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
W/ WITH
WD WOOD
WNDW WINDOW
WO WINDOW OPENING
ABBREVIATIONS & ACRONYMS
DEMOLITION GENERAL NOTES
THE FOLLOWING NOTES APPLY TO ALL DEMO DRAWINGS
1. WORK INCLUDES WINDOW AND DOOR REPLACMENT IN MULTIPLE BUILDINGS. SCOPE OF WORK IS DESCRIBED IN PLANS AND ELEVATIONS. WHERE REPLACEMENT OF DOORS AND WINDOWS IS EXTENSIVE, DEMO ELEVATIONS AND CONSTRUCTION ELEVATIONS ARE PROVIDED. PLANS REFER TO BOTH DEMO AND CONSTRUCTION SCOPE. REPORT ALL DISCREPANCIES BETWEEN DEMO ELEVATIONS AND CONSTRUCTION
ELEVATIONS OR BETWEEN ELEVATIONS AND PLANS TO THE ARCHITECT IMMEDIATELY.
2. SCOPE OF WORK ALSO INCLUDED REPAIRS TO FACADE MATERIALS AND EXTERIOR WALLS INCLUDING MASONRY REPAIRS, FLASHING REPAIR, THE REFURBISHMENT OR REPLACMENT OF FACADE-SUPPORTING
STEEL INCLUDING LINTELS, PLATES, AND OPENING-SPANNING BEAMS.
3. DETAIL DRAWINGS DESCRIBE BOTH REPAIRS TO FACADE/EXTERIOR WALLS AND WINDOW/DOOR REPLACMENT AS APPRORIATE. PHASE WORK IN A LOGICAL MANNER TO ALLOW COMPLETION OF ALL NECESSARY TASKS
WITHOUT REDOING WORK.
4. NO WINDOW REPLACMENT AT FILTER BUILDING IS PLANNED AS PART OF THE BASE SCOPE OF WORK.
EXISTING WINDOWS AT FILTER BUILDING TO REMAIN.
5. INTERIOR AND EXTERIOR SCOPE OF WORK IN ADDITION TO FACADE/EXTERIOR WALL REPAIRS AND DOOR AND
WINDOW REPLACEMENT IS DESCRIBED IN THE DRAWINGS.
6. CONTRACTOR SHALL COORDINATE ALL DEMOLITION ACTIVITIES WITH THE OWNER.
7. NOT ALL DEMOLITION WORK REQUIRED IS REFERENCED IN ARCHITECTURAL DRAWINGS. COORDINATE ALL
DEMO WORK WITH REQUIREMENTS OF DEMO/ NEW CONSTRUCTION, ALL TRADES.
8. ALL EXISTING ITEMS TO REMAIN UNLESS NOTED OTHERWISE.
9. FOR SALVAGED ITEMS COORDINATE WITH OWNER FOR STORAGE.
10. KEY NOTES ARE TYPICAL FOR ALL SIMILAR SHOWN ITEMS UNLESS OTHERWISE NOTED.
11. CLEAN/ PATCH/ REPAIR/ FINISH OF ALL SURFACES TO REMAIN AT LOCATIONS OF DEMOLITION/ MATERIAL
REMOVAL.
12. DEMOLITION DEFINITIONS:
• REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS
INDICATED TO BE SALVAGED.
• REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION IN A MANNER TO PREVENT DAMAGE AND DELIVER TO USING AGENCY READY TO REUSE OR STORE AS INDICATED ON DRAWINGS.
INCLUDE FASTENERS OR BRACKETS NEEDED FOR REATTACHMENT ELSEWHERE.
• REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
• EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE
NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND
REINSTALLED.
SUBMITTAL & SHOP DRAWING REQUIREMENTS
1. THE CONTRACTOR SHALL SUBMIT FOR REVIEW BY THE ARCHITECT AND THE ENGINEER ALL INFORMATION
REQUIRED BY THE CONTRACT DOCUMENTS, INCLUDING THE SPECIFICATIONS.
2. SHOP DRAWINGS SHALL BE PREPARED, SUBMITTED AND REVIEWED PRIOR TO PROCEEDING WITH
FABRICATION AND/OR INSTALLATION OF THE ASSOCIATED WORK.
3. REPRODUCTION OF ANY PORTION OF THE CONTRACT DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE REJECTED AND RETURNED.
4. SHOP DRAWINGS SUBMITTED FOR REVIEW SHALL BEAR THE CONTRACTOR'S STAMP OF APPROVAL WHICH SHALL CONSTITUTE CERTIFICATION THAT THE CONTRACTOR HAS VERIFIED ALL CONSTRUCTION CRITERIA, DIMENSIONS, MATERIALS, AND SIMILAR DATA AND HAS CHECKED EACH DRAWING FOR COMPLETENESS, COORDINATION, AND COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR'S REVIEW INCLUDES BUT IS NOT LIMITED TO VERIFICATION & COORDINATION OF ACTUAL FIELD CONDITIONS, INCLUDING ACTUAL DIMENSIONS, ANCHORAGES, OPENINGS, SLEEVES, ETC., FOR THE ASSEMBLY AND ADJACENT
CONDITIONS AS APPLY.
5. THE CONTRACTOR SHALL SUBMIT, FOR REVIEW, DRAWINGS AND CALCULATIONS FOR ALL PERFORMANCE ASSEMBLIES IDENTIFIED IN THE DRAWINGS AND SPECIFCATIONS AND LISTED BELOW. THE DESIGN OF THESE ASSEMBLIES IS THE RESPONSIBILITY OF THE CONTRACTOR'S ENGINEER REGISTERED IN THE PROJECT'S JURISDICTION. ALL SUBMITTALS SHALL BEAR CONTRACTOR'S ENGINEER'S SEAL AND SIGNATURE. REVIEW SHALL BE FOR GENERAL CONFORMANCE WITH THE PROJECT REQUIREMENTS AS INDICATED ON THE DRAWINGS AND IN THE GENERAL NOTES. DESIGNS SHALL TAKE INTO ACCOUNT ALL VERTICAL AND LATERAL
LOADS REQUIRED BY APPLICABLE BUILDING CODES AND PRESENT OWING TO CONDITIONS.
A. SHORING
B. NON-LOAD BEARING CFM STUD WALL SYSTEMS AND RELATED CONNECTIONS.
C. METAL FABRICATIONS
D. ENTRANCES, STOREFRONTS, AND CURTAIN WALLS. MAXIMUM DEFLECTION FOR BACK-UP AND SYSTEM AS
PER SPECIFCATIONS.
E. TRANSLUCENT FIBERGLASS SANDWICH PANELS.
F. INDICATED MECHANICAL, ELECTRICAL, AND PLUMBING HANGERS AND SUPPORTS.
G. ELECTRICAL AND FIRE ALARM EQUIPMENT.
GENERAL CONSTRUCTION NOTES
THE FOLLOWING NOTES APPLY TO ALL SHEETS
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND VERIFY EXISTING CONDITIONS INCLUDING FLOOR, CEILING AND WALL CONSTRUCTION, STRUCTURAL MEMBERS, AND THE LOCATION OF UTILITIES. ANY INCONSISTENCIES
SHALL BE BROUGHT TO THE ARCHITECT'S IMMEDIATE ATTENTION FOR RESOLUTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR LAYOUT AND VERIFYING ALL DIMENSIONS INCLUDING BOTH EXISTING AND NEW WORK, PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S
IMMEDIATE ATTENTION FOR RESOLUTION. DO NOT SCALE DRAWINGS.
3. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY INCONSISTENCY BETWEEN THESE PLANS AND GOVERNING BUILDING CODES AND ORDINANCES. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, AND MANUFACTURER'S SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS, LICENSES, AND ETC
REQUIRED BY REGULATING BODIES HAVING JURISDICTION.
5. ALL WORK TO BE DONE ADJACENT TO OCCUPIED SPACES. CONTRACTOR TO TAKE EVERY PRECAUTION TO MINIMIZE TRAVEL TO DUST, DIRT AND NOISE FROM THE CONSTRUCTION AREA TO ADJACENT SPACES.
TEMPORARY DUST PROTECTION TO BE ERECTED.
6. CONTRACTOR TO COORDINATE SCHEDULE AND SEQUENCING OF WORK WITH OWNER PRIOR TO BEGINNING
WORK AND THROUGHOUT THE COURSE OF THE PROJECT.
7. CONTRACTOR SHALL COORDINATE ALL GROUND OPERATIONS, INCLUDING LOCATIONS FOR EQUIPMENT SET UP, MATERIAL STORAGE, DEBRIS STORAGE AND REMOVAL, AND ETC WITH OWNER.
8. CONTRACTOR TO PATCH ALL AREA AFFECTED BY DEMOLITION OR REMOVAL OF EXISTING EQUIPMENT OR MATERIALS. NEW SURFACES TO BE FILLED, SANDED SMOOTH AND FINISHES TO MATCH ADJACENT SURFACE OR
AS SPECIFIED.
9. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING ALL WORK. CONTRACTOR TO COORDINATE CONSTRUCTION AROUND EXISTING EQUIPMENT, CONDUIT
CABLING, ETC.
10. PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE SEALED WITH UL/FM APPROVED MATERIALS
AND PROCEDURES SHALL BE COORDINATED WITH OWNER/ ARCHITECT.
11. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION
CONTROL AND HAZARDOUS AND TOXIC MATERIALS.
12. CONTRACTOR SHALL PROTECT ALL WORK AND THE OWNER'S PROPERTY FROM DAMAGE OR LOSS RESULTING FROM DUST, DIRT, WATER, THEFT, FIRE OR ANY OTHER EVENT IN CONNECTION WITH THE CONTRACT.
13. ALL DETAILS, INSTRUCTIONS, NOTES, FINISHES, MATERIALS AND DIMENSIONS SHALL BE CONSIDERED TYPICAL
FOR SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE.
14. ALL NOTES DESCRIBE NEW CONSTRUCTION UNLESS STATED OTHERWISE. ALL WORK SHOWN IS NEW UNLESS SHOWN IN GRAY OR HALF-TONE LINES AND/OR NOTED AS EXISTING (E). SEE ALSO "SYMBOLS" FOR DISTINCTION
OF EXISTING/DEMO/NEW CONSTRUCTION AND SCOPE.
15. ALL DETAILS SHALL INCORPORATE MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS FOR
WARRANTY APPROVAL.
16. RESPONSIBILITY DEFINITIONS:
• FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.
• INSTALL: PERFORM OPERATIONS AT SITE INCLUDING UNLOADING, TEMPORARY STORING, UNPACKING, ASSEMBLING, ERECTING, PLACING, CONNECTING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS.
• PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE.
ALL ITEMS ARE TO BE PROVIDED BY THE CONTRACTOR UNLESS NOTES OTHERWISE.
331 MONTGOMERY AVE
BALA CYNWYD, PA 19144
CONVERSE
WINKLER
ARCHITECTURE
REV DATE DESCRIPTION
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
JOB NO.
PROJECT TITLE:
DRAWING TITLE:
DRAWING NUMBER:
P.W.D.WORK # 61103
AS INDICATED
AH/CWA
NMD/PDC
BAXTER WATER
TREATMENT PLANT
BUILDING IMPROVEMENTS
G0.10
GENERAL INFORMATION &
NOTES
CW-2301
09/15/2025
GENERAL REQUIREMENTS
GENERAL STRUCTURAL NOTES
1. THESE NOTES THESE NOTES ARE GENERAL AND SUPPLEMENT TO THE SPECIFICATIONS. THESE NOTES APPLY TO THE ENTIRE PROJECT UNLESS MODIFIED OR NOTED OTHERWISE IN THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL METHODS AND MEANS OF CONSTRUCTION AND FOR JOB SAFETY. PROVIDE PROTECTIVE SHELTERS AND BARRICADES AS NEEDED TO MAINTAIN PUBLIC SAFETY
AND TO PREVENT DAMAGE TO THE FACILITIES AND ALL EQUIPMENT CONTAINED WITHIN.
3. VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR TO FABRICATION OF ANY PIECES.
NO CONNECTION OR DIMENSION SHALL BE REVISED OR MODIFIED IN THE FIELD WITHOUT WRITTEN APPROVAL BY THE ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS AND SHALL
REPORT ANY DISCREPANCIES TO THE ENGINEER FOR RESOLUTION.
4. ALL DESIGN PRESENTED HEREIN IS TO BE PERFORMED IN ACCORDANCE WITH THE INTERNATIONAL
BUILDING CODE, 2018 EDITION, INCLUDING ALL AMENDMENTS.
5. ALL REQUIRED CONTRACTOR DESIGNS SHALL BE PERFORMED IN ACCORDANCE WITH THE ABOVE
REFERENCED CODE.
6. SECTIONS AND DETAILS SHOWN, WHILE DRAWN FOR SPECIFIC LOCATIONS, ARE INTENDED TO ESTABLISH
THE GENERAL TYPES OF DETAILS TO BE USED THROUGHOUT, UNLESS NOTED OTHERWISE.
7. ALL STRUCTURAL TRADES SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER OF RECORD FOR APPROVAL PRIOR TO FABRICATING ANY PIECES. SHOP DRAWINGS PREPARED BY THE CONTRACTORS, SUPPLIERS, ETC., SHALL BE REVIEWED BY THE STRUCTURAL ENGINEER ONLY FOR CONFORMANCE WITH DESIGN CONCEPT.
NO WORK SHALL BE STARTED WITHOUT SUCH REVIEW. ALL DRAWING REVISIONS AFTER THE FIRST
SUBMITTAL SHALL HAVE ALL CHANGES CLEARLY IDENTIFIED.
8. DESIGN LOADS FOR THE PROJECT ARE LISTED ON DRAWING G0.01.
9. FIELD DRILLING OF HOLES IN ANY STRUCTURAL MEMBER, EXCEPT WHERE EXPLICITLY FIELD DRILLING OF HOLES IN ANY STRUCTURAL MEMBER, EXCEPT WHERE EXPLICITLY SHOWN ON DRAWINGS, IS NOT
PERMITTED WITHOUT THE WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER.
10. EQUIPMENT ANCHOR BOLT SIZES, TYPES, AND PATTERNS SHALL BE VERIFIED WITH THE EQUIPMENT ANCHOR BOLT SIZES, TYPES, AND PATTERNS SHALL BE VERIFIED WITH THE MANUFACTURER. ALL BOLT
PATTERNS SHALL BE TEMPLATE TO ENSURE ACCURACY OF PLACEMENT.
11. DRAWINGS SHALL BE USED IN COORDINATION WITH DRAWINGS OF ALL OTHER DISCIPLINES AND
MANUFACTURER'S SHOP DRAWINGS.
12. IF A CONFLICT IS FOUND BETWEEN DIFFERENT PORTIONS OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. CONTINUED CONSTRUCTION OF THE AREA IN CONFLICT SHALL BE AT THE CONTRACTOR'S OWN RISK UNTIL THE CONFLICT IS RESOLVED BY THE
ENGINEER.
13. WHENEVER ONE MEMBER IS FASTENED TO ANOTHER WITH BOLTS SET AT A UNIFORM SPACING, THERE
SHALL BE A MINIMUM OF TWO BOLTS PER PIECE CONNECTED.
14. SCALING OF DRAWINGS TO DETERMINE DIMENSIONS OF ELEMENTS IS NOT PERMITTED.
15. DRAWINGS SHALL NOT BE REPRODUCED TO CREATE SHOP DRAWINGS OR SHORING DOCUMENTATION
WITHOUT THE EXPRESS WRITTEN CONSENT OF THE ARCHITECT/ENGINEER.
16. ALL WORK SHALL BE INSPECTED IN ACCORDANCE WITH CHAPTER 17 OF THE REFERENCED BUILDING CODE.
SUBMIT ALL REPORTS TO THE ENGINEER OF RECORD FOR REVIEW. AT THE COMPLETION OF THE PROJECT, THE SPECIAL INSPECTION REPORT SHALL BE COMPLETED, SIGNED BY THE SPECIAL INSPECTOR, AND
SUBMITTED TO THE ENGINEER OF RECORD FOR RECORD PURPOSES.
DEMOLITION AND SHORING
1. DEMOLITION INCLUDES ALL WORK NECESSARY FOR THE REMOVAL AND DISPOSAL OF CONCRETE, STEEL, AND ANY OTHER MATERIAL SHOWN OR SPECIFIED TO BE REMOVED.
2. CARRY OUT THE DEMOLITION IN SUCH A MANNER THAT ADJACENT STRUCTURES AND PORTIONS OF
STRUCTURES WHICH ARE TO REMAIN ARE NOT ENDANGERED.
3. VISIT THE SITE AND INSPECT ALL EXISTING STRUCTURES. TAKE SPECIAL CARE TO OBSERVE AND RECORD ANY DEFECTS WHICH MAY EXIST IN BUILDINGS OR STRUCTURES ADJACENT TO BUT NOT DIRECTLY AFFECTED BY THE DEMOLITION WORK. SUBMIT TO THE OWNER A COPY OF THIS INSPECTION AT LEAST FIVE
WORKING DAYS PRIOR TO COMMENCING THE DEMOLITION.
4. PERFORM DEMOLITION WORK IN ACCORDANCE WITH THE APPLICABLE OCCUPATIONAL SAFETY PERFORM
DEMOLITION WORK IN ACCORDANCE WITH THE APPLICABLE OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) STANDARDS INCLUDING 29 CFR PART 1926 SAFETY AND HEALTH REGULATIONS
FOR CONSTRUCTION.
5. PROVIDE WARNING SIGNS AND PROTECTION BARRIERS AS NECESSARY, ADJACENT TO THE WORK AS
APPROVED. MAINTAIN THESE ITEMS DURING THE DEMOLITION PERIOD.
6. UNDERTAKE NO DEMOLITION WORK UNTIL ALL MECHANICAL AND ELECTRICAL SERVICES AFFECTED BY THE
WORK HAVE BEEN PROPERLY DISCONNECTED AND CAPPED.
7. TEST FOR HAZARDOUS MATERIALS AND ELIMINATE THE HAZARD BEFORE DEMOLITION IS STARTED.
8. PROVIDE ADEQUATE SCAFFOLDING, SHORING, BRACING AND PROTECTIVE COVERING AND DUST CONTROL MEASURES TO PROTECT PERSONNEL AND EQUIPMENT AGAINST INJURY OR DAMAGE. COVER FLOOR AND ROOF OPENINGS NOT USED FOR MATERIAL DROPS WITH MATERIAL SUBSTANTIAL ENOUGH TO SUPPORT ANY LOADS PLACED ON IT. PROPERLY SECURE THE COVERS TO PREVENT ACCIDENTAL MOVEMENT.
9. REMOVE ALL DEBRIS FROM STRUCTURES DURING DEMOLITION. DO NOT ALLOW DEBRIS TO ACCUMULATE IN PILES. PROVIDE ADEQUATE LIGHTING AT ALL TIMES DURING DEMOLITION. CLOSE AREAS BELOW
DEMOLITION WORK TO WORKMEN WHILE REMOVAL IS IN PROGRESS.
10. DO NOT DROP ANY MATERIAL TO ANY POINT LYING OUTSIDE THE EXTERIOR WALLS OF THE STRUCTURE
UNLESS THE AREA IS EFFECTIVELY PROTECTED.
11. DO NOT ALLOW ANY WORKMEN TO STAND ON ANY WALL, BEAM OR OTHER STRUCTURAL MEMBER TO REMOVE MATERIAL EXCEPT WHEN ADEQUATE STAGING OR SCAFFOLD PROTECTION IS PROVIDED AT A DISTANCE NOT EXCEEDING 12 FEET BELOW THE TOP OF EXCEEDING 12 FEET BELOW THE TOP OF SUCH
WALLS AND OTHER REASONABLE PRECAUTIONS ARE TAKEN.
12. REMOVE ALL DEBRIS, RUBBISH, SCRAP PIECES, EQUIPMENT AND MATERIALS RESULTING FROM THE DEMOLITION. TAKE TITLE TO ALL DEMOLISHED MATERIAL AND REMOVE IT FROM THE SITE, EXCEPT FOR
ITEMS TO BE SAVED.
STRUCTURAL STEEL
1. THE DESIGN OF ALL STRUCTURAL STEEL IS IN ACCORDANCE WITH THE REQUIREMENTS OF THE AMERICAN INSTITUTE OF
STEEL CONSTRUCTION "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS", AISC 360-16.
2. THE FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE REQUIREMENTS OF THE ABOVE AISC
SPECIFICATION.
3. MATERIAL FOR STRUCTURAL STEEL SHAPES SHALL CONFORM TO THE FOLLOWING UNLESS NOTED OTHERWISE ON THE DRAWINGS: WIDE FLANGE SECTIONS: ASTM A992, GRADE 50 M, S, C, MC, & L SHAPES & PLATES: ASTM A36 HSS SHAPES &
STRUCTURAL TUBING: ASTM A500, GRADE B (FY = 46 KSI)
4. ALL BOLTS FOR CONNECTING STEEL MEMBERS SHALL BE HIGH-STRENGTH BOLTS CONFORMING TO ASTM F3125 GRADE 325, TYPE N, UNLESS OTHERWISE NOTED.
5. ALL BOLTS SHALL BE 3/4" MINIMUM DIAMETER WITH HARDENED WASHERS UNDER THE TURNING ELEMENT, UNLESS NOTED
OTHERWISE.
6. WELDED CONNECTIONS
A. WELDING OPERATIONS AND DESIGN SHALL BE IN ACCORDANCE WITH THE STRUCTURAL WELDING OPERATIONS AND DESIGN SHALL BE IN ACCORDANCE WITH THE STRUCTURAL WELDING CODE, AWS D1.1, AS MODIFIED BY THE AISC
SPECIFICATION
B. WELDING SHALL BE PERFORMED BY WELDERS CERTIFIED ACCORDING TO THE RULES OF THE AMERICAN WELDING
SOCIETY (AWS).
C. AWS CLASS E70XX SERIES ELECTRODES USING THE SHIELDED ARC PROCESS SHALL BE USED FOR WELDING NEW
STRUCTURAL STEEL.
D. SCALE, OIL, PAINT, LACQUER, GALVANIZING, AND ANY OTHER FOREIGN MATERIAL SHALL SCALE, OIL, PAINT, LACQUER, GALVANIZING, AND ANY OTHER FOREIGN MATERIAL SHALL BE REMOVED FROM ALL CONTACT SURFACES AND AREAS WITHIN
TWO INCHES OF WELD DURING WELDING PER THE REQUIREMENTS OF AWS D1.1 SECTION 5.14.
E. BUTT WELDS SHALL BE 100% PENETRATION WELDS AND FILLET WELDS A MINIMUM OF 1/4" UNLESS NOTED OTHERWISE.
7. DO NOT PAINT STEEL
SURFACES WHICH ARE TO BE WELDED OR ENCASED IN CONCRETE.
8. ALL CAST-IN ANCHOR BOLTS SHALL BE
ASTM F1554 GRADE 55 UNLESS NOTED OTHERWISE.
9. ALL EXPOSED STEEL SHALL BE HOT DIP
GALVANIZED PER ASTM A123.
CONCRETE
1. ALL CONCRETE AND REINFORCING STEEL WORK SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN CONCRETE
INSTITUTE PUBLICATIONS: ACI 301, ACI 311, ACI 315, ACI 318, ACI 347, ACI 304.
2. ALL REINFORCING STEEL SHALL BE HIGH-STRENGTH NEW BILLET STEEL CONFORMING TO ASTM A615, GRADE 60. ALL
REINFORCING STEEL SHALL BE EPOXY-COATED, PER ASTM A775.
3. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE AT 28 DAYS (PER ACI CYLINDER TEST) SHALL BE 5,000 PSI. ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE HAVING A DENSITY OF 145-150 POUNDS PER CUBIC FOOT.
4. REINFORCING STEEL SHALL HAVE CLEAR COVER AS FOLLOWS UNLESS OTHERWISE NOTED ON THE DRAWINGS: CONCRETE CAST AGAINST EARTH: 3 INCHES 3 INCHES CONCRETE EXPOSED TO EARTH OR WEATHER: 2 INCHES 2 INCHES INTERIOR
CONCRETE EXPOSED TO LIQUID OR ABRASIVE TRAFFIC: 2 INCHES 2 INCHES
5. ALL EXPOSED EDGES OR CORNERS OF CONCRETE SHALL BE CHAMFERED 3/4", UNLESS OTHERWISE NOTED.
6. ALL NEW CONCRETE SURFACES EXPOSED TO VIEW SHALL RECEIVE A TROWELED FINISH, UNLESS OTHERWISE NOTED.
7. ALL CAST-IN-PLACE CONCRETE SHALL CONTAIN TYPE I OR II PORTLAND CEMENT AND SHALL BE SUPPLIED BY THE SAME MANUFACTURER FOR THE ENTIRE PROJECT. AGGREGATE SHALL MEET ASTM C33 WITH ¾” MAX AGGREGATE.
8. NO CHLORIDES SHALL BE ALLOWED IN THE CONCRETE MIX. ALL CONCRETE EXPOSED TO WEATHER SHALL BE AIR- ENTRAINED WITH ASTM C260 ADMIXTURE (5.5% AIR CONTENT). ALL INTERIOR CONCRETE SHALL BE NON-AIR-ENTRAINED (3%
MAX AIR CONTENT).
9. CHECKED SHOP DRAWINGS SHOWING REINFORCING DETAILS, INCLUDING REBAR SIZES, LAPS, SPACING AND PLACEMENT, SHALL BE SUBMITTED TO THE ENGINEER OF RECORD FOR REVIEW PRIOR TO FABRICATION.
10. UNLESS OTHERWISE NOTED, NO CONCRETE SHALL BE PLACED WITHOUT A MINIMUM REINFORCEMENT OF .002 TIMES THE
CONCRETE CROSS SECTIONAL AREA IN EACH DIRECTION.
11. PROVIDE ADEQUATE BOLSTERS, HI-CHAIRS, SUPPORT BARS, ETC., TO MAINTAIN SPECIFIED CLEARANCES FOR THE ENTIRE LENGTH OF ALL REINFORCING BARS. PROVIDE CONTINUOUS #4 SPACER BARS IN WALLS AND SLABS TO SUPPORT DOWELS.
12. PROVIDE PLASTIC TIPPED ACCESSORIES FOR REINFORCEMENT AT ALL FACES OF EXPOSED CONCRETE, INTERIOR OR
EXTERIOR.
13. ALL FIELD BENDING OF REINFORCING SHALL BE DONE COLD. HEATING OF BARS WILL NOT BE PERMITTED.
14. NO ALUMINUM OF ANY TYPE SHALL BE ALLOWED IN THE CONCRETE WORK, UNLESS COATED TO PREVENT ALUMINUM CONCRETE REACTION. MAXIMUM O.D. OF EMBEDDED CONDUIT SHALL BE NO LARGER THAN ONE-THIRD OF THE SLAB
THICKNESS, LOCATED IN THE MIDDLE THIRD OF THE SLAB.
ENVIRONMENTAL NOTES
1. DRAWING 101B2906 FROM 1940 INDICATES THAT “ALL NEW STEEL WORK PAINTED ONE ALL NEW STEEL WORK PAINTED ONE SHOP COAT OF RED LEAD AND ONE FIELD COAT OF LEAD AND OIL PAINT.” CONTRACTORS MUST COMPLY WITH ALL REQUIREMENTS OF THE US OSHA LEAD IN CONSTRUCTION STANDARD (29CFR1926.62). COMPLIANCE SHALL INCLUDE, BUT NOT LIMITED TO, THE FOLLOWING COMPONENTS: WORKPLACES EXPOSURE ASSESSMENT, GENERAL HOUSEKEEPING PROCEDURES, PERSONAL HYGIENE, AND ENGINEERING CONTROLS TO MINIMIZE EXPOSURE TO DUST GENERATED BY LBP
DEMOLITION ACTIVITIES.
2. SUBMIT A DETAILED SAFE WORK PRACTICES PLAN OF THE PROCEDURES PROPOSED FOR USE IN COMPLYING WITH
HAZARDOUS MATERIALS ENCOUNTERED DURING THIS PROJECT.
COLUMN REHABILITATION NOTES:
1. REMOVE GROUT FROM BASE OF COLUMNS WHERE GROUT IS CRACKED OR OTHERWISE VISIBLY DAMAGED.
2. REMOVE ALL RUST, PAINT, AND OTHER MATERIAL/DEBRIS FROM EXISTING STEEL BY MECHANICAL MEANS TO EXPOSE BARE METAL AT ALL LOCATIONS WHERE DAMAGED GROUT WAS REMOVED. SEE REQUIREMENTS FOR REMOVAL AND DISPOSAL OF LEAD BASED PAINT. ENGINEER TO REVIEW CONDITION OF EXISTING COLUMN BASE ONCE EXPOSED AND CLEANED TO
DETERMINE IF ANY AREAS ARE IN NEED OF FURTHER REPAIR.
3. WHERE ADDITIONAL REPAIR IS DEEMED UNNECESSARY, PAINT ALL NEWLY EXPOSED STEEL PER PAINT MANUFACTURERS WRITTEN INSTRUCTIONS. OVERLAP REMAINING EXISTING PAINT BY A MIN. OF 1”. REPLACE PROTECTIVE GROUT IN KIND.
4. WHERE ADDITIONAL REPAIR IS REQUIRED, ADDITIONAL DETAIL TO BE PROVIDED AFTER EXTENT OF DAMAGE CAN BE
ASSESSED.
MATERIALS & RELATED NOTES
GENERAL SYMBOLOGY NOTES
FILTER BLDG
PRE-TREATMENT
CHEMICAL BLDG
ELECTRICAL
SHED BLDG
MAINTENANCE
BLDG
POST-TRATMENT
BLDG
INTAKE
BLDG
SEDIMENTATION
SLOW MIXING BASINS
NORTH ROAD
SOUTH ROAD
BUILDINGS IN SCOPE OF WORK
LEGEND
INDICATES AREAS WHERE EQUIPMENT
CANNOT BE SETUP OR MATERIAL STORED.
CONTRACTOR SHALL PROVIDE TEMPORARY
CONSTRUCTION FENCING AROUND THE
PERIMETER OF CROSS HATCHED AREAS IN
ORDER TO KEEP OUT CONSTRUCTION
PERSONNEL, VEHICLES, MATERIALS, ETC...
331 MONTGOMERY AVE
BALA CYNWYD, PA 19144
CONVERSE
WINKLER
ARCHITECTURE
REV DATE DESCRIPTION
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
JOB NO.
PROJECT TITLE:
DRAWING TITLE:
DRAWING NUMBER:
P.W.D.WORK # 61103
AS INDICATED
AH/CWA
NMD/PDC
BAXTER WATER
TREATMENT PLANT
BUILDING IMPROVEMENTS
G1.10
CONTRACTOR STAGING
PLAN
CW-2301
09/15/2025
SCALE: 1" = 80'-0"G1.10
1 BUILDING LOCATIONS AND STAGING PLAN
SHEET NOTES
1. CONTRACTOR MUST COORDINATE WITH AND OBTAIN
APPROVAL FROM THE PLANT BEFORE UTILIZING ANY AREA FOR
STAGING/LAY DOWN, MATERIAL STORAGE, SITE ACCESS,
PARKING, ETC..
2. ALL ROADWAYS ARE RESTRICTED FOR STAGING UNLESS
APPROVED BY PLANT.
A1.11
A1.12
A1.12
NORTH SEDIMENTATION BASIN
A1.12
NORTH WATER TOWER
SOUTH WATER TOWER
A1.12
A1.12
SOUTH SEDIMENTATION BASIN
SOUTH VALVE CHAMBER
NORTH VALVE CHAMBER
DEMOLITION GENERAL NOTES
THE FOLLOWING NOTES APPLY TO ALL DEMO DRAWINGS
1. WORK INCLUDES WINDOW AND DOOR REPLACMENT IN MULTIPLE BUILDINGS. SCOPE OF WORK IS DESCRIBED IN PLANS AND ELEVATIONS. WHERE REPLACEMENT OF DOORS AND WINDOWS IS EXTENSIVE, DEMO ELEVATIONS AND CONSTRUCTION ELEVATIONS ARE PROVIDED. PLANS REFER TO BOTH DEMO AND CONSTRUCTION SCOPE. REPORT ALL DISCREPANCIES BETWEEN DEMO ELEVATIONS AND CONSTRUCTION
ELEVATIONS OR BETWEEN ELEVATIONS AND PLANS TO THE ARCHITECT IMMEDIATELY.
2. SCOPE OF WORK ALSO INCLUDED REPAIRS TO FACADE MATERIALS AND EXTERIOR WALLS INCLUDING MASONRY REPAIRS, FLASHING REPAIR, THE REFURBISHMENT OR REPLACMENT OF FACADE-SUPPORTING
STEEL INCLUDING LINTELS, PLATES, AND OPENING-SPANNING BEAMS.
3. DETAIL DRAWINGS DESCRIBE BOTH REPAIRS TO FACADE/EXTERIOR WALLS AND WINDOW/DOOR REPLACMENT AS APPRORIATE. PHASE WORK IN A LOGICAL MANNER TO ALLOW COMPLETION OF ALL NECESSARY TASKS
WITHOUT REDOING WORK.
4. NO WINDOW REPLACMENT AT FILTER BUILDING IS PLANNED AS PART OF THE BASE SCOPE OF WORK.
EXISTING WINDOWS AT FILTER BUILDING TO REMAIN.
5. INTERIOR AND EXTERIOR SCOPE OF WORK IN ADDITION TO FACADE/EXTERIOR WALL REPAIRS AND DOOR AND
WINDOW REPLACEMENT IS DESCRIBED IN THE DRAWINGS.
6. CONTRACTOR SHALL COORDINATE ALL DEMOLITION ACTIVITIES WITH THE OWNER.
7. NOT ALL DEMOLITION WORK REQUIRED IS REFERENCED IN ARCHITECTURAL DRAWINGS. COORDINATE ALL
DEMO WORK WITH REQUIREMENTS OF DEMO/ NEW CONSTRUCTION, ALL TRADES.
8. ALL EXISTING ITEMS TO REMAIN UNLESS NOTED OTHERWISE.
9. FOR SALVAGED ITEMS COORDINATE WITH OWNER FOR STORAGE.
10. KEY NOTES ARE TYPICAL FOR ALL SIMILAR SHOWN ITEMS UNLESS OTHERWISE NOTED.
11. CLEAN/ PATCH/ REPAIR/ FINISH OF ALL SURFACES TO REMAIN AT LOCATIONS OF DEMOLITION/ MATERIAL
REMOVAL.
12. DEMOLITION DEFINITIONS:
• REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS
INDICATED TO BE SALVAGED.
• REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION IN A MANNER TO PREVENT DAMAGE AND DELIVER TO USING AGENCY READY TO REUSE OR STORE AS INDICATED ON DRAWINGS.
INCLUDE FASTENERS OR BRACKETS NEEDED FOR REATTACHMENT ELSEWHERE.
• REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
• EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE
NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND
REINSTALLED.
GENERAL CONSTRUCTION NOTES
THE FOLLOWING NOTES APPLY TO ALL SHEETS
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND VERIFY EXISTING CONDITIONS INCLUDING FLOOR, CEILING AND WALL CONSTRUCTION, STRUCTURAL MEMBERS, AND THE LOCATION OF UTILITIES. ANY INCONSISTENCIES
SHALL BE BROUGHT TO THE ARCHITECT'S IMMEDIATE ATTENTION FOR RESOLUTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR LAYOUT AND VERIFYING ALL DIMENSIONS INCLUDING BOTH EXISTING AND NEW WORK, PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S
IMMEDIATE ATTENTION FOR RESOLUTION. DO NOT SCALE DRAWINGS.
3. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY INCONSISTENCY BETWEEN THESE PLANS AND GOVERNING BUILDING CODES AND ORDINANCES. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, AND MANUFACTURER'S SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS, LICENSES, AND ETC
REQUIRED BY REGULATING BODIES HAVING JURISDICTION.
5. ALL WORK TO BE DONE ADJACENT TO OCCUPIED SPACES. CONTRACTOR TO TAKE EVERY PRECAUTION TO MINIMIZE TRAVEL TO DUST, DIRT AND NOISE FROM THE CONSTRUCTION AREA TO ADJACENT SPACES.
TEMPORARY DUST PROTECTION TO BE ERECTED.
6. CONTRACTOR TO COORDINATE SCHEDULE AND SEQUENCING OF WORK WITH OWNER PRIOR TO BEGINNING
WORK AND THROUGHOUT THE COURSE OF THE PROJECT.
7. CONTRACTOR SHALL COORDINATE ALL GROUND OPERATIONS, INCLUDING LOCATIONS FOR EQUIPMENT SET UP, MATERIAL STORAGE, DEBRIS STORAGE AND REMOVAL, AND ETC WITH OWNER.
8. CONTRACTOR TO PATCH ALL AREA AFFECTED BY DEMOLITION OR REMOVAL OF EXISTING EQUIPMENT OR MATERIALS. NEW SURFACES TO BE FILLED, SANDED SMOOTH AND FINISHES TO MATCH ADJACENT SURFACE OR
AS SPECIFIED.
9. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING ALL WORK. CONTRACTOR TO COORDINATE CONSTRUCTION AROUND EXISTING EQUIPMENT, CONDUIT
CABLING, ETC.
10. PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE SEALED WITH UL/FM APPROVED MATERIALS
AND PROCEDURES SHALL BE COORDINATED WITH OWNER/ ARCHITECT.
11. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION
CONTROL AND HAZARDOUS AND TOXIC MATERIALS.
12. CONTRACTOR SHALL PROTECT ALL WORK AND THE OWNER'S PROPERTY FROM DAMAGE OR LOSS RESULTING FROM DUST, DIRT, WATER, THEFT, FIRE OR ANY OTHER EVENT IN CONNECTION WITH THE CONTRACT.
13. ALL DETAILS, INSTRUCTIONS, NOTES, FINISHES, MATERIALS AND DIMENSIONS SHALL BE CONSIDERED TYPICAL
FOR SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE.
14. ALL NOTES DESCRIBE NEW CONSTRUCTION UNLESS STATED OTHERWISE. ALL WORK SHOWN IS NEW UNLESS SHOWN IN GRAY OR HALF-TONE LINES AND/OR NOTED AS EXISTING (E). SEE ALSO "SYMBOLS" FOR DISTINCTION
OF EXISTING/DEMO/NEW CONSTRUCTION AND SCOPE.
15. ALL DETAILS SHALL INCORPORATE MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS FOR
WARRANTY APPROVAL.
16. RESPONSIBILITY DEFINITIONS:
• FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.
• INSTALL: PERFORM OPERATIONS AT SITE INCLUDING UNLOADING, TEMPORARY STORING, UNPACKING, ASSEMBLING, ERECTING, PLACING, CONNECTING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS.
• PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE.
ALL ITEMS ARE TO BE PROVIDED BY THE CONTRACTOR UNLESS NOTES OTHERWISE.
331 MONTGOMERY AVE
BALA CYNWYD, PA 19144
CONVERSE
WINKLER
ARCHITECTURE
REV DATE DESCRIPTION
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
JOB NO.
PROJECT TITLE:
DRAWING TITLE:
DRAWING NUMBER:
P.W.D.WORK # 61103
AS INDICATED
AH/CWA
NMD/PDC
BAXTER WATER
TREATMENT PLANT
BUILDING IMPROVEMENTS
A1.10
FILTER BLDG & GROUNDS
OVERALL PLAN
CW-2301
09/15/2025
SCALE: 1" = 40'-0"A1.10
1 FILTER BLDG OVERALL PLAN
KEY PLAN - NOT TO SCALE
UP
DN
F1 F2
F3
F4
F5
8.02
8.018.01
8.01
8.02
STAIR
OFFICE
STORAGE
LOADING DOCK
ELECTRICAL ROOM
8.17 8.17
DEMOLITION GENERAL NOTES
THE FOLLOWING NOTES APPLY TO ALL DEMO DRAWINGS
1. WORK INCLUDES WINDOW AND DOOR REPLACMENT IN MULTIPLE BUILDINGS. SCOPE OF WORK IS DESCRIBED IN PLANS AND ELEVATIONS. WHERE REPLACEMENT OF DOORS AND WINDOWS IS EXTENSIVE, DEMO ELEVATIONS AND CONSTRUCTION ELEVATIONS ARE PROVIDED. PLANS REFER TO BOTH DEMO AND CONSTRUCTION SCOPE. REPORT ALL DISCREPANCIES BETWEEN DEMO ELEVATIONS AND CONSTRUCTION
ELEVATIONS OR BETWEEN ELEVATIONS AND PLANS TO THE ARCHITECT IMMEDIATELY.
2. SCOPE OF WORK ALSO INCLUDED REPAIRS TO FACADE MATERIALS AND EXTERIOR WALLS INCLUDING MASONRY REPAIRS, FLASHING REPAIR, THE REFURBISHMENT OR REPLACMENT OF FACADE-SUPPORTING
STEEL INCLUDING LINTELS, PLATES, AND OPENING-SPANNING BEAMS.
3. DETAIL DRAWINGS DESCRIBE BOTH REPAIRS TO FACADE/EXTERIOR WALLS AND WINDOW/DOOR REPLACMENT AS APPRORIATE. PHASE WORK IN A LOGICAL MANNER TO ALLOW COMPLETION OF ALL NECESSARY TASKS
WITHOUT REDOING WORK.
4. NO WINDOW REPLACMENT AT FILTER BUILDING IS PLANNED AS PART OF THE BASE SCOPE OF WORK.
EXISTING WINDOWS AT FILTER BUILDING TO REMAIN.
5. INTERIOR AND EXTERIOR SCOPE OF WORK IN ADDITION TO FACADE/EXTERIOR WALL REPAIRS AND DOOR AND
WINDOW REPLACEMENT IS DESCRIBED IN THE DRAWINGS.
6. CONTRACTOR SHALL COORDINATE ALL DEMOLITION ACTIVITIES WITH THE OWNER.
7. NOT ALL DEMOLITION WORK REQUIRED IS REFERENCED IN ARCHITECTURAL DRAWINGS. COORDINATE ALL
DEMO WORK WITH REQUIREMENTS OF DEMO/ NEW CONSTRUCTION, ALL TRADES.
8. ALL EXISTING ITEMS TO REMAIN UNLESS NOTED OTHERWISE.
9. FOR SALVAGED ITEMS COORDINATE WITH OWNER FOR STORAGE.
10. KEY NOTES ARE TYPICAL FOR ALL SIMILAR SHOWN ITEMS UNLESS OTHERWISE NOTED.
11. CLEAN/ PATCH/ REPAIR/ FINISH OF ALL SURFACES TO REMAIN AT LOCATIONS OF DEMOLITION/ MATERIAL
REMOVAL.
12. DEMOLITION DEFINITIONS:
• REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS
INDICATED TO BE SALVAGED.
• REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION IN A MANNER TO PREVENT DAMAGE AND DELIVER TO USING AGENCY READY TO REUSE OR STORE AS INDICATED ON DRAWINGS.
INCLUDE FASTENERS OR BRACKETS NEEDED FOR REATTACHMENT ELSEWHERE.
• REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
• EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE
NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND
REINSTALLED.
GENERAL CONSTRUCTION NOTES
THE FOLLOWING NOTES APPLY TO ALL SHEETS
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND VERIFY EXISTING CONDITIONS INCLUDING FLOOR, CEILING AND WALL CONSTRUCTION, STRUCTURAL MEMBERS, AND THE LOCATION OF UTILITIES. ANY INCONSISTENCIES
SHALL BE BROUGHT TO THE ARCHITECT'S IMMEDIATE ATTENTION FOR RESOLUTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR LAYOUT AND VERIFYING ALL DIMENSIONS INCLUDING BOTH EXISTING AND NEW WORK, PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S
IMMEDIATE ATTENTION FOR RESOLUTION. DO NOT SCALE DRAWINGS.
3. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY INCONSISTENCY BETWEEN THESE PLANS AND GOVERNING BUILDING CODES AND ORDINANCES. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, AND MANUFACTURER'S SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS, LICENSES, AND ETC
REQUIRED BY REGULATING BODIES HAVING JURISDICTION.
5. ALL WORK TO BE DONE ADJACENT TO OCCUPIED SPACES. CONTRACTOR TO TAKE EVERY PRECAUTION TO MINIMIZE TRAVEL TO DUST, DIRT AND NOISE FROM THE CONSTRUCTION AREA TO ADJACENT SPACES.
TEMPORARY DUST PROTECTION TO BE ERECTED.
6. CONTRACTOR TO COORDINATE SCHEDULE AND SEQUENCING OF WORK WITH OWNER PRIOR TO BEGINNING
WORK AND THROUGHOUT THE COURSE OF THE PROJECT.
7. CONTRACTOR SHALL COORDINATE ALL GROUND OPERATIONS, INCLUDING LOCATIONS FOR EQUIPMENT SET UP, MATERIAL STORAGE, DEBRIS STORAGE AND REMOVAL, AND ETC WITH OWNER.
8. CONTRACTOR TO PATCH ALL AREA AFFECTED BY DEMOLITION OR REMOVAL OF EXISTING EQUIPMENT OR MATERIALS. NEW SURFACES TO BE FILLED, SANDED SMOOTH AND FINISHES TO MATCH ADJACENT SURFACE OR
AS SPECIFIED.
9. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING ALL WORK. CONTRACTOR TO COORDINATE CONSTRUCTION AROUND EXISTING EQUIPMENT, CONDUIT
CABLING, ETC.
10. PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE SEALED WITH UL/FM APPROVED MATERIALS
AND PROCEDURES SHALL BE COORDINATED WITH OWNER/ ARCHITECT.
11. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION
CONTROL AND HAZARDOUS AND TOXIC MATERIALS.
12. CONTRACTOR SHALL PROTECT ALL WORK AND THE OWNER'S PROPERTY FROM DAMAGE OR LOSS RESULTING FROM DUST, DIRT, WATER, THEFT, FIRE OR ANY OTHER EVENT IN CONNECTION WITH THE CONTRACT.
13. ALL DETAILS, INSTRUCTIONS, NOTES, FINISHES, MATERIALS AND DIMENSIONS SHALL BE CONSIDERED TYPICAL
FOR SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE.
14. ALL NOTES DESCRIBE NEW CONSTRUCTION UNLESS STATED OTHERWISE. ALL WORK SHOWN IS NEW UNLESS SHOWN IN GRAY OR HALF-TONE LINES AND/OR NOTED AS EXISTING (E). SEE ALSO "SYMBOLS" FOR DISTINCTION
OF EXISTING/DEMO/NEW CONSTRUCTION AND SCOPE.
15. ALL DETAILS SHALL INCORPORATE MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS FOR
WARRANTY APPROVAL.
16. RESPONSIBILITY DEFINITIONS:
• FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.
• INSTALL: PERFORM OPERATIONS AT SITE INCLUDING UNLOADING, TEMPORARY STORING, UNPACKING, ASSEMBLING, ERECTING, PLACING, CONNECTING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS.
• PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE.
ALL ITEMS ARE TO BE PROVIDED BY THE CONTRACTOR UNLESS NOTES OTHERWISE.
331 MONTGOMERY AVE
BALA CYNWYD, PA 19144
CONVERSE
WINKLER
ARCHITECTURE
REV DATE DESCRIPTION
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
JOB NO.
PROJECT TITLE:
DRAWING TITLE:
DRAWING NUMBER:
P.W.D.WORK # 61103
AS INDICATED
AH/CWA
NMD/PDC
BAXTER WATER
TREATMENT PLANT
BUILDING IMPROVEMENTS
A1.11
FILTER BLDG PART PLAN
LEVEL 1
CW-2301
09/15/2025
SCALE: 1/8" = 1'-0"A1.11
1 ADMIN. BLDG FIRST FLOOR
CONSTRUCTION KEYNOTES
8.01 REMOVE & REPLACE EXIST DOOR/FRAME HARDWARE. SEE A5.10 FOR DOOR SCHEDULE
8.02 REMOVE & REPLACE EXIST ROLLING DOOR W/ POWER OPERATED COMPLETE SYSTEM. PROVIDE ALL NECESSARY
HARDWARE FOR PROPER OPERATION. SEE A5.10 FOR DOOR SCHEDULE. SEE ALSO ELEC DWGS
8.17 DOOR CONTROL INCLUDING ELECTRIC STRIKE. SEE ELEC DRAWINGS.
DN DN
DNDN
F6
A1.12
H2 H2A
8.02
8.078.07
A1.12
FILTER ROOM
(E) CONCRETE CURB (E) CONCRETE CURB
A1.12
H2
SIM 4 SIDES
DEMOLITION GENERAL NOTES
THE FOLLOWING NOTES APPLY TO ALL DEMO DRAWINGS
1. WORK INCLUDES WINDOW AND DOOR REPLACMENT IN MULTIPLE BUILDINGS. SCOPE OF WORK IS DESCRIBED IN PLANS AND ELEVATIONS. WHERE REPLACEMENT OF DOORS AND WINDOWS IS EXTENSIVE, DEMO ELEVATIONS AND CONSTRUCTION ELEVATIONS ARE PROVIDED. PLANS REFER TO BOTH DEMO AND CONSTRUCTION SCOPE. REPORT ALL DISCREPANCIES BETWEEN DEMO ELEVATIONS AND CONSTRUCTION
ELEVATIONS OR BETWEEN ELEVATIONS AND PLANS TO THE ARCHITECT IMMEDIATELY.
2. SCOPE OF WORK ALSO INCLUDED REPAIRS TO FACADE MATERIALS AND EXTERIOR WALLS INCLUDING MASONRY REPAIRS, FLASHING REPAIR, THE REFURBISHMENT OR REPLACMENT OF FACADE-SUPPORTING
STEEL INCLUDING LINTELS, PLATES, AND OPENING-SPANNING BEAMS.
3. DETAIL DRAWINGS DESCRIBE BOTH REPAIRS TO FACADE/EXTERIOR WALLS AND WINDOW/DOOR REPLACMENT AS APPRORIATE. PHASE WORK IN A LOGICAL MANNER TO ALLOW COMPLETION OF ALL NECESSARY TASKS
WITHOUT REDOING WORK.
4. NO WINDOW REPLACMENT AT FILTER BUILDING IS PLANNED AS PART OF THE BASE SCOPE OF WORK.
EXISTING WINDOWS AT FILTER BUILDING TO REMAIN.
5. INTERIOR AND EXTERIOR SCOPE OF WORK IN ADDITION TO FACADE/EXTERIOR WALL REPAIRS AND DOOR AND
WINDOW REPLACEMENT IS DESCRIBED IN THE DRAWINGS.
6. CONTRACTOR SHALL COORDINATE ALL DEMOLITION ACTIVITIES WITH THE OWNER.
7. NOT ALL DEMOLITION WORK REQUIRED IS REFERENCED IN ARCHITECTURAL DRAWINGS. COORDINATE ALL
DEMO WORK WITH REQUIREMENTS OF DEMO/ NEW CONSTRUCTION, ALL TRADES.
8. ALL EXISTING ITEMS TO REMAIN UNLESS NOTED OTHERWISE.
9. FOR SALVAGED ITEMS COORDINATE WITH OWNER FOR STORAGE.
10. KEY NOTES ARE TYPICAL FOR ALL SIMILAR SHOWN ITEMS UNLESS OTHERWISE NOTED.
11. CLEAN/ PATCH/ REPAIR/ FINISH OF ALL SURFACES TO REMAIN AT LOCATIONS OF DEMOLITION/ MATERIAL
REMOVAL.
12. DEMOLITION DEFINITIONS:
• REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS
INDICATED TO BE SALVAGED.
• REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION IN A MANNER TO PREVENT DAMAGE AND DELIVER TO USING AGENCY READY TO REUSE OR STORE AS INDICATED ON DRAWINGS.
INCLUDE FASTENERS OR BRACKETS NEEDED FOR REATTACHMENT ELSEWHERE.
• REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
• EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE
NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR REMOVED AND
REINSTALLED.
GENERAL CONSTRUCTION NOTES
THE FOLLOWING NOTES APPLY TO ALL SHEETS
1. THE CONTRACTOR SHALL EXAMINE THE SITE AND VERIFY EXISTING CONDITIONS INCLUDING FLOOR, CEILING AND WALL CONSTRUCTION, STRUCTURAL MEMBERS, AND THE LOCATION OF UTILITIES. ANY INCONSISTENCIES
SHALL BE BROUGHT TO THE ARCHITECT'S IMMEDIATE ATTENTION FOR RESOLUTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR LAYOUT AND VERIFYING ALL DIMENSIONS INCLUDING BOTH EXISTING AND NEW WORK, PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S
IMMEDIATE ATTENTION FOR RESOLUTION. DO NOT SCALE DRAWINGS.
3. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY INCONSISTENCY BETWEEN THESE PLANS AND GOVERNING BUILDING CODES AND ORDINANCES. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, AND MANUFACTURER'S SPECIFICATIONS.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND PAYING FOR ALL PERMITS, LICENSES, AND ETC
REQUIRED BY REGULATING BODIES HAVING JURISDICTION.
5. ALL WORK TO BE DONE ADJACENT TO OCCUPIED SPACES. CONTRACTOR TO TAKE EVERY PRECAUTION TO MINIMIZE TRAVEL TO DUST, DIRT AND NOISE FROM THE CONSTRUCTION AREA TO ADJACENT SPACES.
TEMPORARY DUST PROTECTION TO BE ERECTED.
6. CONTRACTOR TO COORDINATE SCHEDULE AND SEQUENCING OF WORK WITH OWNER PRIOR TO BEGINNING
WORK AND THROUGHOUT THE COURSE OF THE PROJECT.
7. CONTRACTOR SHALL COORDINATE ALL GROUND OPERATIONS, INCLUDING LOCATIONS FOR EQUIPMENT SET UP, MATERIAL STORAGE, DEBRIS STORAGE AND REMOVAL, AND ETC WITH OWNER.
8. CONTRACTOR TO PATCH ALL AREA AFFECTED BY DEMOLITION OR REMOVAL OF EXISTING EQUIPMENT OR MATERIALS. NEW SURFACES TO BE FILLED, SANDED SMOOTH AND FINISHES TO MATCH ADJACENT SURFACE OR
AS SPECIFIED.
9. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING ALL WORK. CONTRACTOR TO COORDINATE CONSTRUCTION AROUND EXISTING EQUIPMENT, CONDUIT
CABLING, ETC.
10. PENETRATIONS THROUGH FIRE RATED CONSTRUCTION SHALL BE SEALED WITH UL/FM APPROVED MATERIALS
AND PROCEDURES SHALL BE COORDINATED WITH OWNER/ ARCHITECT.
11. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION FOR POLLUTION
CONTROL AND HAZARDOUS AND TOXIC MATERIALS.
12. CONTRACTOR SHALL PROTECT ALL WORK AND THE OWNER'S PROPERTY FROM DAMAGE OR LOSS RESULTING FROM DUST, DIRT, WATER, THEFT, FIRE OR ANY OTHER EVENT IN CONNECTION WITH THE CONTRACT.
13. ALL DETAILS, INSTRUCTIONS, NOTES, FINISHES, MATERIALS AND DIMENSIONS SHALL BE CONSIDERED TYPICAL
FOR SIMILAR CONDITIONS, UNLESS NOTED OTHERWISE.
14. ALL NOTES DESCRIBE NEW CONSTRUCTION UNLESS STATED OTHERWISE. ALL WORK SHOWN IS NEW UNLESS SHOWN IN GRAY OR HALF-TONE LINES AND/OR NOTED AS EXISTING (E). SEE ALSO "SYMBOLS" FOR DISTINCTION
OF EXISTING/DEMO/NEW CONSTRUCTION AND SCOPE.
15. ALL DETAILS SHALL INCORPORATE MANUFACTURER'S RECOMMENDATIONS AND REQUIREMENTS FOR
WARRANTY APPROVAL.
16. RESPONSIBILITY DEFINITIONS:
• FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.
• INSTALL: PERFORM OPERATIONS AT SITE INCLUDING UNLOADING, TEMPORARY STORING, UNPACKING, ASSEMBLING, ERECTING, PLACING, CONNECTING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS.
• PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE.
ALL ITEMS ARE TO BE PROVIDED BY THE CONTRACTOR UNLESS NOTES OTHERWISE.
FLOOR HATCH AS SCHEDULED.
3" NOM SUPPORT WIDTH FOR FRAME, VIF.
BACKER ROD & CONTINUOUS
SEALANT ALL SIDES
ANCHORS AT HOLD-DOWN TABS AS
REQUIRED BY HATCH INSTALLATION
S STL SHIM
(E) STL ANGLE. SCRAPE, PREP
& PAINT W/ RUST RESISTANT PAINT
LINE OF BUILDING
WALL - SEE PLANS
N O
TE
A
NOTE A: 6" MIN. USE NON DESTRUCTIVE MEANS TO LOCATE
REBAR. COORDINATE ANCHOR LOCATIONS ON HATCH SHOP
DRAWINGS TO AVOID INTERFERENCE WITH (E) REBAR
ADHESIVE-APPLIED
RESILIENT TRAFFIC
TRANSITIONS AS SHOWN
IN PLAN
1 1/2" DRAIN CONNECTION - SIDE EXIT AT
FRAME. OWNER TO APPROVE DRAIN LOCATION
WITHIN BLDG. COORDINATE W/
ARCHITECT/ENGINEER
S STL SHIM - 3/16" MIN THICKNESS, 6" LONG
SPACING AS REQUIRED BY HATCH
INSTALLATION
HOLD-DOWN TABS
(E) REINFORCED
CONCRETE WALLS,
BEAMS, OR CURBS
H3 H3
4'-8"
4' -8
4'-8"
4' -8
" 10
A1.12
A1.12
8.08 8.08
SIM. OTHER
SIDES
SIM. OTHER
SIDES
(E) CONCRETE CURB/APRON -
VERIFY CONFIGURATION IN FIELD
(E) CONCRETE CURB/APRON -
VERIFY CONFIGURATION IN FIELD
32.02
32.01 2 SIDES
32.02
32.012 SIDES
DN
DN DN
(E) +/- 9'-2 1/2" VIF
(E
'-2 " V
IF
A1.12
H1 H1
(E) BUILDING(E) BUILDING
(E) +/- 9'-2 1/2" VIF
(E
'-2 " V
IF
8.078.07
A1.12
(E) CONCRETE CURB
32.02
32.01
3 SIDES
2 LOCATIONS
(E) CONCRETE CURB
3 SIDES
2 LOCATIONS
32.01
32.02
H1
SIM 4 SIDES
A1.12
(E) REINFORCED
CONCRETE WALLS,
BEAMS OR CURB
(E) STL ANGLE. SCRAPE, PREP
& PAINT W/ RUST RESISTANT PAINT
NOM 3" BEARING
FLOOR HATCH AS SCHEDULED
CONT SEALANT TAPE
ANCHORS AT HOLD-DOWN TABS AS
REQUIRED BY HATCH INSTALLATION
S STL SHIM
1 1/2" DRAIN CONNECTION - SIDE EXIT AT
FRAME. OWNER TO APPROVE DRAIN LOCATION
WITHIN BLDG. COORDINATE W/
ARCHITECT/ENGINEER
HOLD-DOWN TABS
REMOVE (E) STL SUPPORT ANGLE
RESILIENT TRAFFIC
TRANSITIONS AS SHOWN
IN PLAN
ADHESIVE-APPLIED
ATTACHMENT STRIP
CENTER OF 36"
ALTITUDE VALVE
'-0
28'-0"
(E) CONCRETE VAULT CHAMBER
AT GRADE
A1.12
SIM 4 SIDES
(E) OPENING +/- 15'-6" V.I.F.
R
EF
8'
-3
(E ) O
PE
N
IN
G
7' -6
" V .I.
F.
REF.
3'-3"
4 SIDES
4 LOCATIONS
32.02
32.01
CENTER OF 36"
ALTITUDE VALVE
28'-0"
'-0
(E) CONCRETE VAULT CHAMBER
AT GRADE
A1.12
SIM 4 SIDES
R
EF
8' -3
(E) OPENING +/- 15'-6" VIF
(E ) O
PE
N
IN
G
7' -6
" V
IF
4 SIDES
4 LOCATIONS
32.02
32.01
331 MONTGOMERY AVE
BALA CYNWYD, PA 19144
CONVERSE
WINKLER
ARCHITECTURE
REV DATE DESCRIPTION
RAMBOLL AMERICAS
ENGINEERING SOLUTIONS
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
JOB NO.
PROJECT TITLE:
DRAWING TITLE:
DRAWING NUMBER:
P.W.D.WORK # 61103
AS INDICATED
AH/CWA
NMD/PDC
BAXTER WATER
TREATMENT PLANT
BUILDING IMPROVEMENTS
A1.12
FILTER BLDG COMPLEX
PLANS & DETAILS
CW-2301
09/15/2025
SCALE: 1/8" = 1'-0"A1.12
2 FILTER BUILDING SOUTH FLOOR PLAN - FLOOR DOORS H2, H2A
SCALE: 1/4" = 1'-0"A1.12
7 FLOOR DOOR SECTION H2, H2A
SCALE: 3" = 1'-0"A1.12
9 H1, H2 & H4 TYPE FLOOR DOOR EDGE DETAIL
SCALE: 1/4" = 1'-0"A1.12
3 NORTH SEDIMENTATION BASIN - FLOOR DOORS H3
SCALE: 1/8" = 1'-0"A1.12
1 FILTER BUILDING NORTH FLOOR PLAN - FLOOR DOORS H1
SCALE: 1/4" = 1'-0"A1.12
6 FLOOR DOOR SECTION H1
SCALE: 3" = 1'-0"A1.12
10 H3 TYPE FLOOR DOOR EDGE DETAIL
CONSTRUCTION KEYNOTES
8.02 REMOVE & REPLACE EXIST ROLLING DOOR W/ POWER OPERATED COMPLETE SYSTEM. PROVIDE ALL NECESSARY
HARDWARE FOR PROPER OPERATION. SEE A5.10 FOR DOOR SCHEDULE. SEE ALSO ELEC DWGS
8.07 REMOVE & REPLACE EXISTING DIAMOND STEEL PLATES/ STRUCTURE WITH ALUMINUM DIAMOND PLATE FLOOR
ACCESS DOOR. SEE 4/A5.10 FOR DOOR TYPES
8.08 ALUMINUM DIAMOND PLATE FLOOR ACCESS DOOR. SEE 4/A5.10 FOR DOOR TYPES
32.01 PRE-FORMED RUBBER TRANSITIONS. ADHESIVE INSTALLATION.
32.02 PRE-FORMED OR MITERED CORNERS
SCALE: 1/4" = 1'-0"A1.12
5 N ALTITUDE VALVE CHAMBER - FLOOR DOOR H4
SCALE: 1/4" = 1'-0"A1.12
4 S ALTITUDE VALVE CHAMBER - FLOOR DR H4
D W
DN
UP
UP
SERVICE
ELEV.
SUPPORT
BUILDING
DN
DN
DN
DN
DN
DN
DN
DN
DN
SF1
SF2
B B C
DOOR BELOW
P6P5
P7 P8
P2
P3
P1
P13
B1BBBB
AA
8.02 8.028.01
8.028.02 8.01
8.10
8.10
TRUCK LOADING DOCK
NORTH
ENTRANCE
SOUTH
ENTRANCE
HALLWAY
E
G
3 6 754
C
A
J
L
AA
M
F
9 11
SF5
SF4
SF4
SF4
K
H
G
E
D
B6.06
8.17
8.17
8.17
8.17
DEMOLITION GENERAL NOTES
THE FOLLOWING NOTES APPLY TO ALL DEMO DRAWINGS
1. WORK INCLUDES WINDOW AND DOOR REPLACMENT IN MULTIPLE BUILDINGS. SCOPE OF WORK IS DESCRIBED IN PLANS AND ELEVATIONS. WHERE REPLACEMENT OF DOORS AND WINDOWS IS EXTENSIVE, DEMO ELEVATIONS AND CONSTRUCTION ELEVATIONS ARE PROVIDED. PLANS REFER TO BOTH DEMO AND CONSTRUCTION SCOPE. REPORT ALL DISCREPANCIES BETWEEN DEMO ELEVATIONS AND CONSTRUCTION
ELEVATIONS OR BETWEEN ELEVATIONS AND PLANS TO THE ARCHITECT IMMEDIATELY.
2. SCOPE OF WORK ALSO INCLUDED REPAIRS TO FACADE MATERIALS AND EXTERIOR WALLS INCLUDING MASONRY REPAIRS, FLASHING REPAIR, THE REFURBISHMENT OR REPLACMENT OF FACADE-SUPPORTING
STEEL INCLUDING LINTELS, PLATES, AND OPENING-SPANNING BEAMS.
3. DETAIL DRAWINGS DESCRIBE BOTH REPAIRS TO FACADE/EXTERIOR WALLS AND WINDOW/DOOR REPLACMENT AS APPRORIATE. PHASE WORK IN A LOGICAL MANNER TO ALLOW COMPLETION OF ALL NECESSARY TASKS
WITHOUT REDOING WORK.
4. NO WINDOW REPLACMENT AT FILTER BUILDING IS PLANNED AS PART OF THE BASE SCOPE OF WORK.
EXISTING WINDOWS AT FILTER BUILDING TO REMAIN.
5. INTERIOR AND EXTERIOR SCOPE OF WORK IN ADDITION TO FACADE/EXTERIOR WALL REPAIRS AND DOOR AND
WINDOW REPLACEMENT IS DESCRIBED IN THE DRAWINGS.
6. CONTRACTOR SHALL COORDINATE ALL DEMOLITION ACTIVITIES WITH THE OWNER.
7. NOT ALL DEMOLITION WORK REQUIRED IS REFERENCED IN ARCHITECTURAL DRAWINGS. COORDINATE ALL
DEMO WORK WITH REQUIREMENTS OF DEMO/ NEW CONSTRUCTION, ALL TRADES.
8. ALL EXISTING ITEMS TO REMAIN UNLESS NOTED OTHERWISE.
9. FOR SALVAGED ITEMS COORDINATE WITH OWNER FOR STORAGE.
10. KEY NOTES ARE TYPICAL FOR ALL SIMILAR SHOWN ITEMS UNLESS OTHERWISE NOTED.
11. CLEAN/ PATCH/ REPAIR/ FINISH OF ALL SURFACES TO REMAIN AT…
This is the start of the file's text. The full file is on GovTribe.