Bid 2474 Amendment 1.pdf

PDF 5 MB Posted

Attached to
PW Bid 2474 - Building Improvements Project at Baxter WTP
Solicitation number
B2627069
Issued by
Pennsylvania

About this file

This is Amendment No. 1 to Bid 2474 issued by the City of Philadelphia for building improvements at the Baxter Water Treatment Plant (WTP), a municipal water treatment facility located at 9001 State Road in Philadelphia, Pennsylvania. The project, identified as Project No. 61103, involves door and window replacement activities at the Pre-Treatment Building and Intake Building. The bid opening is scheduled for Thursday, June 18, 2026. Key deliverables include the purchase, delivery, and installation of furniture as identified in project drawings and specifications, window replacement work performed on an opening-by-opening basis, and coordination with plant operations to prevent work disruptions. Working hours are defined as Monday through Friday, 7:00 a.m. to 3:00 p.m., excluding City holidays, with any schedule deviations requiring approval from the Philadelphia Water Department (PWD). The amendment clarifies contractor responsibilities regarding asbestos-containing materials (ACM), specifying that ACM-related work including above-ceiling work and window caulking will be paid under allowance Item No. GC-05 rather than GC-02 or GC-06. Additionally, the Baxter WTP staff will relocate obstructions to provide clear access to work areas with 48-hour advance notice, and contractors accessing the 4th floor pretreatment building—identified as a chemical dust contaminated area—must comply with confined space entry requirements and have self-contained breathing apparatus (SCBA) available.

The amendment updates the prevailing wage rate schedule effective May 26, 2026, replacing the previous schedule dated October 7, 2025, in compliance with the Philadelphia Labor Standards Unit directive. The updated schedule provides detailed wage classifications and hourly rates for building construction work, including base hourly rates and fringe benefits for numerous trade classifications such as asbestos workers, carpenters, electricians, laborers, and equipment operators. An Asbestos Survey Report dated January 15, 2025, prepared by BATTA Environmental Associates, Inc., identified Category II Non-friable ACM in door caulk, window caulk, and building caulk materials totaling approximately 605 square feet across multiple locations within the facility. The survey identified no Regulated Asbestos Containing Material (RACM) or Category I Non-friable ACM in the project areas. All identified Category II Non-friable ACM must be removed by a Pennsylvania-licensed Asbestos Contractor prior to any renovation or demolition activities that would crush, abrade, or dissolve the material matrix. The contractor must provide notification of intent to renovate or demolish to the Pennsylvania Department of Environmental Protection and EPA Region III at least 10 working days prior to construction activities and maintain a copy of the asbestos survey at the construction site throughout the project.

View the file

Other files

File Type Posted
Bid 2474 Seller_Quote_Checklist.pdf PDF
Zoom Link for Bid Opening Bid~13.pdf PDF
Bid 2474 Contract Dwgs.pdf PDF
Bid 2474 Specs~1.pdf PDF
Bid Pricing Page 2474 61103.xlsx XLSX spreadsheet
Consent Authorization Form 1~25.pdf PDF
Bid 2474 Ref Dwgs.pdf PDF
AD 2454 2474 2479~2.pdf PDF
ABL Bid 2474~1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment no. 1 Dated: June 10, 2026 Bid no.: 2474 Opening Date: Thursday, June 18, 2026

Amendment no. 1 - Page no. 1 of 3

NOTICE

It is the sole responsibility of the Seller to ensure that it has received any and all amendments and the Procurement Commissioner may in his/her sole discretion reject any bid for which all amendments have not been executed and returned.

PROPOSAL FOR

Project no.: 61103 Description: Building Improvements Project at Baxter WTP

IS AMENDED AS FOLLOWS:

GENERAL

1.) Remove the Prevailing Wage Rate Schedule effective October 7th, 2025 and replace with the attached Prevailing Wage Rate Schedule effective May 26th, 2026.

CONTRACTOR QUESTIONS AND RESPONSES

Bid no. 2474

1.) Please confirm that the Contractor is responsible for the furniture.

Response: Per drawing no. A1.22, Contractor to purchase, deliver, and install furniture as identified on drawings and in specifications.

2.) Please confirm that there are no work hour restrictions.

Response: Working hours for this project are defined as Monday through Friday, 7:00 a.m. to 3:00 p.m., excluding City holidays. Any deviation from this schedule must be approved by PWD.

3.) If temporary protections are installed immediately after window removal, can multiple windows be removed at a time or is the Contractor limited to an opening-by-opening basis, as noted?

Response: Per drawing no. A2.20, “Windows General Notes” #8, Work Sequence:

Window replacement must occur on an "opening by opening" basis. Windows at each opening must be complete, including trim & sealant prior to removing existing windows at the next opening. The sequence of work must be included in the project schedule proposed by Contractor & submitted to Owner & Architect for review & approval.

4.) Can the windows be removed from within the building?

Amendment no. 1 - Page no. 2 of 3

Response: Windows may be removed from within the building in locations where physically possible and must be coordinated with the Plant in advance of performing the work. Work must not interfere with Plant operations or cause any operational disruptions.

5.) Is an ACM survey or report available?

Response: Yes, see attached Asbestos Survey Report, dated January 15th, 2025.

6.) The special instructions specification states that ACM-related work will be paid for as part of the allowance assigned to Item no. GC-06. However, the description for this item states that it is for temporary masonry openings. Please confirm under which allowance the ACM work will be handled.

Response: ACM-related work will be paid for as part of the allowance assigned to Item no. GC-05.

7.) Please confirm that all ACM-related work, including, but not limited to, the above ceiling work and window caulking, is excluded from Item no. GC-02 and will be handled under one of the allowance items.

Response: ACM-related work will be paid for as part of the allowance assigned to Item no. GC-05.

8.) Are alternate urethane cement flooring manufacturers acceptable if they meet the specified requirements?

Response: Yes, refer to Section 01600, Material and Equipment, Part 1.02, Product Options and Substitutions.

9.) The equipment shed has tools, machinery, equipment racks and sea containers that prevent access. Who is responsible for providing clear access to the work areas?

Response: The Baxter Water Treatment Plant staff will relocate obstructions to provide clear access to work areas. Please provide 48-hour advance notice.

10.) The 4th floor of the pretreatment building is a chemical dust contaminated area. What are the required work restrictions or precautions?

Response: Refer to Section 01125, Contractor Requirements for Confined Space Entry, and Section 01127, Contractor Requirements for Entering Water Department Areas Which May Contain Hazardous Gases. Note: SCBA is required for anyone accessing 4th floor.

Amendment no. 1 - Page no. 3 of 3

AMENDMENT ACKNOWLEDGMENT

Seller must acknowledge receipt of Amendments in PHLContracts.

MEMORANDUM

TO: Municipal Operating Departments and Awarding Agencies

FROM: Andre Bragg, Director, Office of Labor Standards

DATE: Effective May 26th, 2026

RE: Updated Prevailing Wage Schedule for the City of Philadelphia

The Philadelphia Labor Standards Unit has issued an updated prevailing wage rate schedule for construction projects done on behalf of the City of Philadelphia. Enclosed herein you will find the two (2) decisions, which comprise the updated prevailing wage schedule. They are as follows:

I. Building Construction II. Heavy and Highway Construction

Please direct any questions or concerns regarding the prevailing wage rate schedule to my attention:

Philadelphia Labor Standards Unit 1 S. Broad St, 3rd Floor Room Philadelphia, PA 19107 Telephone Numbers: (215) 686-2132 Fax Number: (215) 686-2116

Thank you for your cooperation.

Amendment #1 6/10/2026

Prevailing Wage Schedule (Effective 5/26/2026) Building Construction

Prevailing wage rate schedule for construction work done on behalf of city of Philadelphia including repair, alteration, and remodeling work

I. BUILDING CONSTRUCTION

A. Job Classification and Wage Rates

Basic Hourly Rate Fringe Benefits Asbestos worker Journeyman 64.51 50.26

Handler Level 1 34.67 24.60 Handler Level 2 50.80 24.60 Boilermaker 58.00 36.57 Bricklayer 50.00 32.76 Carpenter 57.72 30.89 Cement Mason 50.81 32.51 Drywall Finisher 45.07 33.64 Electrician 75.05 48.19 (as of 5/3/2027) 78.33 51.16 (as of 5/1/2028) 81.99 54.00 (telecommunication senior tech) 65.86 35.64 (telecommunication tech a) 61.91 33.51 Elevator Constructor 71.85 45.77 Footnotes for elevator mechanics:

A. Paid Vacation: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Year's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

Glazier 51.30 39.37 Ironworker Structural & Ornamental 53.20 41.01 Reinforcing (Rod setter) 50.39 36.65 Rigger & Machinery Mover 46.86 36.27 Laborer Journeyman Class One 39.10 27.42

Journeyman Class Two 39.20 27.42 Journeyman Class Three 39.25 27.42

Journeyman Class Four 39.40 27.42 Journeyman Class Five 39.45 27.42 Journeyman Class Six 39.24 27.42

Journeyman Class Seven 40.38 27.42

Journeyman Class Eight 40.43 27.42 Journeyman Class Nine 40.53 27.42 Journeyman Class Ten 40.68 27.42 Journeyman Class Eleven 40.93 27.42 Journeyman Class Twelve 39.50 27.42

LABORER: ASBESTOS ABATEMENT,

LEAD ABATEMENT,

TOXIC WASTE HANDLING,

HAZARDOUS WASTE HANDLING

Master Abatement Technician 41.00 27.70 Landscape Laborer Class I 32.15 24.30 Class II 32.15 24.30 Lather 52.64 29.46 Line Construction

Lineman 62.54 31.36 Winch Truck Operator 43.78 27.18 Ground hand 37.52 24.90 Watch/Flag Person 26.74 21.19

Marble Setter 48.40 32.45 Marble Finisher 50.00 32.80 Millwright 60.20 35.81 Painter Brush & Roller 45.71 35.22 Spray, Steel, & Swing 47.46 35.22 Bridges 62.57 35.04 Piledriverman 53.23 41.74 (Diver) 66.54 41.74 (Diver Tender) 53.23 41.74 Plasterer 46.43 34.35 Plumber 70.53 39.46 Pointer, Caulker, & Cleaner 51.35 31.80 Power Equipment Operator

Group One 55.67 35.34 Group One A 58.68 36.22

Group Two 55.43 35.26 Group Two A 58.44 36.14

Group Three 51.34 34.06 Group Four 51.04 33.97 Group Five 49.32 33.46

Group Six 48.34 33.16 Group Seven (A)* 67.73 40.48 Group Seven (B)* 67.44 40.39

***TOXIC/HAZARDOUS WASTE REMOVAL***

Roofer 44.13 34.77 Shingle 34.35 22.20 Slate & Tile 37.35 22.20 Sheet Metal Worker 65.06 54.48 (Sign Makers and Hangers) 33.48 26.41 Soft Floor Layer (Resilient Floor) 53.93 30.54 Sprinklerfitter 69.12 36.10 Steamfitter 75.12 47.29 Stone Mason 50.00 32.80 Surveying And Layout (Chief of Party) 67.52 30.44 (Instrument Person) 58.71 30.44 (Rodman) 46.97 23.54

Terrazzo Mechanic 52.21 31.26 Terrazzo Finisher (Grinder) 45.08 28.46 Terrazzo Finisher (Finisher) 45.88 29.41 Tile Setter 52.21 31.26 Tile Finisher 40.52 29.90 Truck Driver Journeyman Class I 38.57 23.87 Journeyman Class II 38.67 23.87

Journeyman Class III and Low Boy 38.92 23.87 Wall Coverer 46.47 34.55 Welder - Rate for craft to which, welding work is incidental.

Window Tinter 27.42 15.13

B. Job Classification Definitions: Building Construction,

1. Laborer Classifications:

Class One: Strip concrete, dismantle concrete, load, unload, handle and/or transport reinforced steel and steel mesh, carry lumber, handle miscellaneous building materials operate jack hammers, use paving breakers and other pneumatic tools, build scaffolds, perform raking, handle asphalt, perform spading and concrete pit work, perform grading, perform form pinning or shorting, perform demolition work with exception of burners, lay conduits, lay ducts, perform sheeting or lagging, lay non-metallic pipe, perform caulking.

Class Two: Power Buggies, Burners on Demolition.

Class Three: Wagon drill operator (single)

Class Four: Powderman, wagon drill operator (multiple), perform circular caissons excavations, caisson groundman, perform underpinning excavation, perform laborers’ work at depths of eight (8) feet or below.

Class Five: Caisson bottom worker.

Class Six: Yard worker.

Class Seven: Trackmen, Brakemen, Groutmen, Bottom Shaft Men, All Other Men in Free Air Tunnels.

Class Eight: Caisson Foreman

Class Nine: Miner Helper, Form Setters.

Class Ten: Miners Bore Driver, Blasters, Drillers, Pneumatic Shield Operator.

Class Eleven: Welders & Burners.

Class Twelve: Mason Tenders Landscape Laborers:

Class I: Landscape laborer Class II: Farm tractor driver, hydro seeder, mulched nozzle worker, backhoe operator, bulldozer crawler type loader, tree crane operator.

Laborer - Lather and Plasterer: Wheel and/or hod carry any lather and plaster materials used by lathering and plastering contractors’ build scaffolds; build runways; perform clean-up and removal of debris as covered by lathering and plastering contractor’s contract; deliver any material used by lathering and plastering contractors, from curbside to building and back, unless motor vehicles are permitted to enter building with required materials; all mortar designated for use by plasterer shall be carried via wheelbarrow or hod; all plastering and fire proofing machines, as well as guns and mixers requiring the assistance of a worker other than plasterer operator, shall be manned by helper (tender).

2. Power Equipment Operator Classifications – Building Group One:

Handling steel and stone in connection with erection Cranes doing hook work Any machines handling machinery Helicopters Concrete Pumps (building)

Machines similar to above, including remote control equipment Group One A:

Handling steel and stone in connection with erection.

Cranes doing hook work Any machines handling machinery Concrete Pumps (Building) High Rail/Burro Crane Rail Loader (Winch Boom Type) All equipment in this group which previously received the hour in lieu of an oiler will receive Wage Group I (A). Equipment in this Wage Group that does not require an oiler.

Machines similar to above, including remote control equipment

Group Two:

All types of cranes All types of backhoes

Cableways Draglines

Keystones All types of shovels

Derricks Pavers 21E and over Trenching machines Trench shovels Cable spinning machine

Gradalls Front- end Loaders

Boat Captain

Hoist with Two Towers Building Hoists-double drum (unless used as a single drum) Pippin type backhoes Tandem scrapers Tower type crane operation erecting dismantling jumping or jacking Drills self-contained (Drillmaster type) Forklift (20ft. and over) Motor Patrols (fine grade) Batch Plant with Mixer Carryalls, Scrapers, Tournapulls Roller (High Grade Finishing) Spreaders (Asphalt) Bulldozers and Tractors Mechanical-Welder Conveyor Loaders (Euclid-Type Wheel) Concrete Pumps (Heavy Highway)

Milling Machine Bobcat Side Boom

Directional Boring Machines Vermeer Saw Type Machine (other than handheld) Tractor Mounted Hydro Axe Chipper with boom

All Auto grade and concrete finishing machines Bundle Pullers/Extractors (Tubular) Machines similar to the above including remote-controlled equipment *Surcharge Group Two (A):

Crawler backhoes and Crawler gradalls over one (1) cubic yard factory rating Hydraulic backhoes over one (1) cubic yard factory rating Single person operation truck cranes 15 tons and over factory rating Cherry picker type machinery and equipment 15 tons and over factory rating, etc.

Cranes doing hook work will be paid Wage Group I (A).

All equipment in this Group which previously received the hour in lieu of an oiler will receive Wage Group II (A) including concrete pumps (Heavy/Highway).

Machines similar to the above including remote-controlled equipment

*Surcharge Group Three:

Asphalt Plant Engineers

Conveyors (except building conveyors) Well Driller Forklift Trucks of all types

Ditch Witch (small trenchers) Motor Patrols Fine Grade machines Rollers Concrete Breaking Machines (Guillotine Only) Stump Grinder High- or Low-Pressure Boilers

Building Hoist (single drum) Elevator Operator (New Construction) Machines similar to those above including remote control equipment Group Four:

Seamen Pulverizing Mixer Form Line Graders Farm Tractors Road Finishing Machines Concrete Spreaders (Heavy Highway) Power Broom (self-contained) Seed Spreader Grease Truck Machines similar to the above including remote-controlled equipment

Group Five:

Compressors Pumps Well pint pumps Conveyors (Building) Welding Machines Heaters Tireman, Power Equipment Maintenance Engineers (Power Boats) Miscellaneous Equipment Operator

Elevator Operator (Renovations) House Car

Machines similar to those above including remote control equipment Group Six:

Fireman Oilers and Deck Hands (Personnel Boats)/Grease Truck Helpers *Surcharge Group Seven (A):

Handling steel and stone in connection with erection Cranes doing hook work Any machines handling machinery Cable spinning machine

Helicopters Concrete pumps (Building)

High Rail/Burro Crane Rail Loader (Winch Boom Type) Machines similar to above, including remote control equipment

Group Seven B All types of cranes

All types of backhoes Cableways Conveyor Loader (Euclid-Type Wheel)

Drag Lines Keystones

All types of shovels

Derricks Pavers 21E and over Trench shovels Trenching machines Gradalls Front-end Loaders

Boat Captain Hoist with two towers Concrete Pumps (Heavy Highway) Building Hoists-double drum (unless used as a single drum) Milling Machine Mucking Machines in Tunnel

Pippin type backhoes Bobcat

Tandem scrapers Side Boom Tower type crane–operation, erecting, dismantling, Jumping or jacking Directional Boring Machines Vermeer Saw Type Machine (other than handheld) Drills self-contained (Drillmaster type) Forklift (20 ft. & over)

Track or Mounted Hydro Axe Motor Patrols (Fine Grade)

Chipper with boom Batch Plant with Mixer

All auto grade and concrete finishing machines Carryalls, Scapers & Tournapulls Rollers (High Grade Finishing) Bundle Pullers/Extractors (Tubular) Spreaders (Asphalt) Bulldozers and Tractors Mechanic – Welders

Production Switch Tamper Ballast Regulators

Tie Replacer Rail/Road Loader Power Jack liner Machines similar to above, including remote control equipment

3. Truck driver classifications:

Class I: Helper, stake body truck operator (single axle, dumpster).

Class II: Dump truck operator, tandem truck operator, batch truck operator, semi-trailer truck operator, agitator-mixer truck operator, dump Crete type vehicle operator, asphalt distributor, farm tractor operator (when tractor used to transport materials), stake body truck (tandem) operator.

Class III: Euclid type; off highway equipment back truck operator; belly dump truck operator; double-hitched equipment trailer operator; straddle carrier (Ross) operator; low-bed trailer truck operator

Prevailing Wage Schedule (5/26/2026) Heavy/Highway Construction

II. HEAVY AND HIGHWAY CONSTRUCTION

A. JOB CLASSIFICATION AND WAGE RATES

Basic Hourly Rate Fringe Benefits Boilermaker 55.00 35.82 Carpenter 58.76 30.54 Cement Mason 48.10 32.71 Electrician 75.05 48.19 (as of 5/3/2027) 78.33 51.16 (as of 5/1/2028) 81.99 54.00 Ironworkers Structural & Ornamental 53.20 41.01 Reinforcing (Rod setter) 50.29 34.77 Rigger & Machinery Mover 46.73 34.39 Laborers

Group One 40.20 27.80 Group Two 40.20 27.80 Group Three 40.20 27.80 Group Four 35.00 27.80 Group Five 41.05 27.80 Group Six 41.10 27.80 Group Seven 40.95 27.80 Group Eight 40.70 27.80

Group Nine 40.55 27.80 Group Ten 40.70 27.80 Group Eleven 40.60 27.80 Group Twelve 42.30 27.80 Group Thirteen 44.33 27.80 Group Fourteen 40.90 27.80 Landscaping Laborer Class I 30.43 23.95 Class II 29.13 23.95 Line Construction

Lineman 65.10 34.45 Winch Truck Operator 45.57 27.57 Ground hand 39.06 25.27 Watch/Flag Person 27.84 21.32

Millwright 60.20 35.81 Painters

Brush & Roller 45.71 35.22 Spray, Steel, & Swing 47.46 35.22 Bridges 62.57 35.04

Piledriverman 53.23 41.74 (Diver) 66.54 41.74 (Diver Tender) 53.23 41.74 Plumber 70.53 39.46

Power Equipment Operator

Group One 55.67 35.34 Group One A 58.68 36.22

Group Two 55.43 35.26 Group Two A 58.44 36.14 Group Three 51.34 34.06 Group Four 51.04 33.97 Group Five 49.32 33.46 Group Six 48.34 33.16 Group Seven (A)* 67.73 40.48 Group Seven (B)* 67.44 40.39

*TOXIC/HAZARDOUS WASTE REMOVAL

Power Equipment Operator Dredger Class A1 42.66 14.01 Class A2 38.02 13.73 Class B1 36.89 13.66 Class B2 34.73 13.53 Class C1 33.78 13.18 Class C2 32.69 13.11 Class D 27.16 12.58

Steamfitter 75.12 47.13 Stone Mason 50.00 32.80 Surveying And Layout (Chief of Party) 65.96 30.09 (as of 5/1/2026) 67.52 30.44 (Instrument Person) 57.36 30.09 (as of 5/1/2026) 58.71 30.44 (Rodman) 45.88 23.19 (as of 5/1/2026) 46.97 23.54 Truck Driver Class I 38.42 23.87 Class II 38.52 23.87 Class III 39.02 23.87

B. Job Classification Definitions: Heavy and Highway Construction

1. Laborer Classifications:

Group One: Yard workers: (laborer, scale mixerman, burnerman, dustman, feeder) . Group Two: General laborer; Asphalt Shovelers; Sheeting, Shoring & Lagging – Laborer;

Stone, Granite & Artificial Stone Setting Laborer; Hod Carriers; Scaffold Building; Relief Joint & Approach Slabs; Assembling & Placing Gabions; Pneumatic Tool Laborers;

Concrete

Forms & Stripping Laborers; Concrete Lumber Material Laborers; Steel & Steel

Mesh (carrying & handling); Form Pinners; Mortar Mixers; Pouring & Placing Concrete;

Grade Men.

Group Three: Vibrator Laborers; Finish Surface Asphalt Rackers; Jackhammer Operators;

Paving Breaker Operator; Pipelayer & Caulker (all joints up to within 5 feet of the Building Foundation Line); Conduit & Duct Layers

Group Four: Flag person Group Five: Miners Group Six: Welders and Burners.

Group Seven: Miner Bore Driver; Blasters; Drillers Pneumatic Shield Operator Group Eight: Form Setters

Group Nine: Trackmen; Brackmen; Groutmen; Bottom Shaft Men; All other Laborers in Free Air Tunnels; Underpinning (When an underpinning excavation for a pier hole of five feet square or less and eight feet or more deep is dug, the rate shall apply only after a depth of eight feet is reached, to the men working in the bottom)

Group Ten: Circular Caissons (Where an excavation for circular caissons are dug eight feet or more below the natural grade level adjacent to the starting point of the caisson hole, at ground level, for the men working in the bottom); Welders, Burners & Air Tuggers Group Eleven: Powdermen; Multiple Wagon Drill Operator Laborer

Group Twelve: Caisson Laborer Foreman Group Thirteen: Toxic/Hazardous waste Handler Group Fourteen: Wagon Drill/Hydraulic Track Drill Operator Laborer Landscape Laborers:

Class I: Landscape laborer Class II: Farm tractor driver, hydroseeder, mulcher nozzle worker, backhoe operator, bulldozer crawler type loader, tree crane operator.

2. Power Equipment Operator Classifications - Heavy, & Highway Group One:

Handling steel and stone in connection with erection Cranes doing hook work Any machines handling machinery Cable spinning machine Helicopters Concrete Pumps (building) Machines similar to above including remote control equipment Group One A:

Handling steel and stone in connection with erection.

Cranes doing hook work Any machines handling machinery Concrete Pumps (Building) High Rail/Burro Crane Rail Loader (Winch Boom Type)

All equipment in this group which previously received the hour in lieu of an oiler will receive Wage Group I (A). Equipment in this Wage Group that does not require an oiler.

Machines similar to above, including remote control equipment Group Two:

All types of cranes All types of backhoes Draglines Keystones

All types of shovels Derricks

Pavers 21E and over Trenching machines Trench shovels Gradalls Front- end Loaders Boat Captain Hoist with Two Towers

Building Hoists-double drum (unless used as a single drum) Pippin type backhoes

Tandem scrapers Tower type crane operation erecting dismantling jumping or jacking

Drills self-contained (Drillmaster type) Forklift (20ft. and over)

Motor Patrols (fine grade) Batch Plant with Mixer Carryalls, Scrapers, Tournapulls Roller (High Grade Finishing)

Bulldozers and Tractors Mechanical-Welder Conveyor Loaders (Euclid-Type Wheel) Concrete Pumps (Heavy Highway) Milling Machine Bobcat Side Boom

Directional Boring Machines Vermeer Saw Type Machine (other than handheld) Tractor Mounted Hydro Axe Chipper with boom All Auto grade and concrete finishing machines

Bundle Pullers/Extractors (Tubular) Machines similar to the above including remote-controlled equipment Group Two A:

Crawler backhoes and Crawler gradalls over one (1) cubic yard factory rating Hydraulic backhoes over one (1) cubic yard factory rating Single person operation truck cranes 15 tons and over factory rating Cherry picker type machinery and equipment 15 tons and over factory rating, etc.

Cranes doing hook work will be paid Wage Group I (A).

All equipment in this Group which previously received the hour in lieu of an oiler will receive Wage Group II (A) including concrete pumps (Heavy/Highway).

Machines similar to the above including remote-controlled equipment Group Three:

Asphalt Plant Engineers Conveyors (except building conveyors) Well Drillers Forklift Trucks of all types Ditch Witch (small trenchers) Motor Patrols

Fine Grade machines Rollers

Concrete Breaking Machines (Guillotine Only) Stump Grinder High- or Low-Pressure Boilers

Building Hoist (single drum) Elevator Operator (New Construction) Machines similar to those above including remote control equipment

Group Four:

Seamen Pulverizing Mixer

Form Line Graders Farm Tractors Road Finishing Machines Concrete Spreaders (Heavy Highway)

Power Broom (self-contained) Seed Spreader Grease Truck

Machines similar to the above including remote-controlled equipment Group Five:

Compressors Pumps Well pint pumps

Conveyors (Building) Welding Machines Heaters Tireman, Power Equipment Maintenance Engineers (Power Boats)

Miscellaneous Equipment Operator Elevator Operator (Renovations) House Car Machines similar to those above including remote control equipment Group Six:

Fireman Oilers and Deck Hands (Personnel Boats) Grease Truck Helpers Group Seven A:

Handling steel and stone in connection with erection Cranes doing hook work Any machines handling machinery

Cable spinning machinery Helicopters Concrete pumps (Building)

High Rail/Burro Crane Rail Loader (Winch Boom Type) Machines similar to above, including remote control equipment Group Seven B:

All types of cranes All types of backhoes Cableways Conveyor Loader (Euclid-Type Wheel)

Drag Lines Keystones All types of shovels Derricks Pavers 21E and over

Trench shovels Trenching machines

Gradalls Front-end Loaders Boat Captain Hoist with two towers

Concrete Pumps (Heavy, Highway) Building Hoists-double drum (unless used as a single drum)

Milling Machine Mucking Machines in Tunnel Pippin type backhoes

Bobcat Tandem scrapers Side Boom

Tower type crane operation, erecting, dismantling, Jumping or jacking Directional Boring Machines Vermeer Saw Type Machine (other than handheld) Drills self-contained (Drillmaster type) Forklift (20 ft & over)

Tractor Mounted Hydro Axe Motor Patrols (Fine Grade) Chipper with boom Batch Plant with Mixer All auto grade and concrete finishing machines Carryalls, Scapers & Tournapulls

Rollers (High Grade Finishing) Bundle Pullers/Extractors (Tubular) Spreaders (Asphalt) Bulldozers and Tractors Mechanic – Welders Production Switch Tamper Ballast Regulators Tie Replacer Rail/Road Loader

Power Jack liner Machines similar to above, including remote control equipment *Surcharge

Power Equipment Operator Dredger Classifications Class A: Lead Dredge man, Operator, Leverman, Licensed Tug Operator over 1000HP.

Class A1: Dozer Operator, Front-end Loader.

Class B1: Derrick Operator, Spider/Spill Barge Operator, Engineer, Electrician, Chief Welder Chief Mate, Fill Placer, Operator 2, Maintenance Engineer, Licensed Boat Operator.

Class B2: Certified Welder.

Class C1: Mate, Drag Barge Operator, Steward, Assistant Fill Placer, Welder.

Class C2: Boat Operator.

Class D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Porter/Janitor, Oiler.

3. Truck Driver Classifications:

Class I: Helper, stake body truck operator (single axle, dumpster) Class II: Dump truck operator, tandem truck operator, batch truck operator, semi-trailer truck operator, agitator-mixer truck operator, dumpcrete type vehicle operator, asphalt distributor, farm tractor operator (when used to transport materials), stake body truck (tandem) operator.

Class III: Euclid type, off highway equipment back truck operator, belly dump truck operator, double-hitched equipment trailer operator, straddle carrier (Ross) operator; lowbed trailer truck operator.

NOTE:

1. Contractors are advised to contact the Philadelphia Labor Standards Unit with any questions regarding job classification, prevailing wage rates, and fringe benefits.

2. Prior to employing apprentices on a public works project, the contractor is required to provide written evidence of employee’s registration with a statewide training program recognized by the U.S.

Bureau of Apprenticeship and Training (BAT). Contractors shall forward proper documentation for each bona fide apprentice to:

Philadelphia Labor Standards Unit Municipal Services Building 1 S. Broad Street – 3rd Floor

Philadelphia, PA 19102-1670 Telephone Number: (215) 686-2132

Fax Number: (215) 686-2116

ASBESTOS SURVEY REPORT

PHILADELPHIA WATER DEPARTMENT-BAXTER WATER

TREATMENT PLANT

9001 STATE ROAD.,

PHILADELPHIA, PENNSYLVANIA

Prepared by:_______________ Alyssa Cartagena | Regional Project Manager

Reviewed By:________________ Neeraj Batta |Vice President

Prepared For:

Nicole M. Dress AIA, LEED AP, WELL AP Converse Winkler Architecture LLC

331 Montgomery Ave., Bala Cynwyd, Pennsylvania 19004

Prepared by:

BATTA Environmental Associates, Inc

6 Garfield Way Newark, DE. 19713

January 15, 2025

BEA#1096623

BATTA Environmental Associates, Inc

6 Garfield Way

Newark, DE. 19713

Ph: 855.862.2882 Fx: 302.737.5764 info@battaenv.com

Battaenv.com

CONTENTS

Section Page

1.0 - INTRODUCTION

2.0 - METHODS AND LIMITATIONS

2.1 ASBESTOS SURVEY METHODS

2.2 LABORATORY ANALYSIS METHODS

2.3 LIMITATIONS

3.0 - SURVEY RESULTS

3.1 ASBESTOS ANALYSIS RESULTS

3.2 ADDITIONAL OBSERVATIONS

4.0 - RECOMMENDATIONS

4.1 RECOMMENDATIONS FOR REGULATED (FRIABLE) ACM

4.2 RECOMMENDATIONS FOR CATEGORY I NONFRIABLE ACM

4.3 RECOMMENDATIONS FOR CATEGORY II NONFRIABLE ACM

4.4 GENERAL RECOMMENDATIONS

APPENDICES

APPENDIX A Laboratory Analysis Report – Certificates of Analysis APPENDIX B AIR Report APPENDIX C Company and Individual Licenses & Certifications

1 Ph: 855.862.2882

BATTA Environmental Associates, Inc.

SECTION 1.0

INTRODUCTION

An asbestos survey was performed at Baxter Water Treatment Plant located at 9001 State Road, in Philadelphia, Pennsylvania. The survey was conducted on December 12th, 2024, by Steve Woronicak, a City of Philadelphia Asbestos Investigator, from Batta Environmental Associates, Inc. (BEA).

The specific project scope will be limited to the Door and Window Replacement activities during the renovations at the Pre-Treatment Building and Intake Building at the Baxter Water Treatment Plant located at 9001 State Road in Philadelphia, Pennsylvania.

The inspection was performed by a City of Philadelphia Asbestos Investigator, experienced in identifying and sampling suspect ACM. If there was newly discovered material present that was not homogenous to the original samples, additional sampling would be required. All observed suspect materials were sampled to determine asbestos content and no materials were assumed to contain asbestos.

All samples collected were analyzed at Batta Laboratories, LLC, using Polarized Light Microscopy (PLM) methods. All suspect materials in the survey area were tested and materials were assumed to contain asbestos. A total of Forty-One (41) samples were collected. Thirty-Two (32) samples were analyzed by PLM and Nine (9) were not analyzed due to positive stop protocols.

Laboratory Certificates of Analysis are located in Appendix A of this report. All field records, chain of custodies, and field drawings are in Appendix B and company and individual licenses and certifications can be found in Appendix C.

3 BATTA Environmental Associates, Inc

SECTION 2.0

METHODS AND LIMITATIONS

2.1 ASBESTOS SURVEY METHODS

The site was inspected for suspect ACM, unless otherwise noted. Each observed suspect material was assigned a homogenous area number, described, and measured. Each observed suspect material was sampled or assumed to be asbestos. Samples of suspect ACM were collected using procedures established by the United States (US) Environmental Protection Agency (EPA) Code of Federal Regulations (CFR) Title 40 Part 763 Subpart E, Asbestos-Containing Materials in Schools.

At the beginning of the survey, the inspector(s) conducted a walkthrough of the areas identifying and sampling different types of probable ACM and categorizing these materials.

Each probable ACM was grouped into homogenous areas, which group a particular material by similar characteristics such as appearance, texture, manufacturer, etc. All similar materials within a particular building or process area were in their own homogenous area groups.

ACM’s were also further divided into three categories:

• “Surfacing Materials” material that is sprayed-on, troweled on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

• “Thermal System Insulation” material applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain, or water condensation, or for other purposes.

▪ “Miscellaneous ACM“ interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal insulation.

ACM’s inventoried in this survey are classified as either friable or non-friable. Friable ACM can be crumbled or reduced to powder by hand pressure whereas non-friable ACM cannot.

4 BATTA Environmental Associates, Inc

The EPA asbestos NESHAP regulation further classifies nonfriable ACM into two categories.

• Category I. Nonfriable ACM includes any asbestos-containing packing, gasket, resilient floor covering or asphalt roofing product.

• Category II. Nonfriable ACM includes any nonfriable ACM other than Category I nonfriable ACM.

Samples were collected in airtight, sealed bags for transportation to Batta Laboratories, LLC for analysis. During sample collection procedures, good safety and hygiene practices were implemented to prevent asbestos airborne contamination from being introduced into the building’s atmosphere.

All field records pertaining to samples collected during this inspection can be found in Appendix B of this report and each sample is listed as follows:

1. Field Number

2. Lab Number

3. AHERA Classification

4. Sample Location

5. Material Sampled

6. Lab Results

All lab data pertaining to the samples analyzed can be found in Appendix A of this report and each sample is listed as follows:

1. Date Analyzed

2. Field Sample Number

3. Lab Sample Number

4. Sample Location

5. Asbestos Content

6. Non-Asbestos Content

Samples were analyzed using an A, B, C… positive stop protocol for each set of homogenous materials (materials with similar characteristics). If a sample in the homogenous set tested positive for asbestos (greater than 1% by composition) then the other samples in that set were not analyzed. If asbestos was not detected in a sample, then all samples from that homogenous set were analyzed for asbestos until one tested positive.

5 BATTA Environmental Associates, Inc

2.2 LABORATORY ANALYSIS METHODS

All samples collected during the survey were analyzed at Batta Laboratories, LLC, an A.I.H.A., NVLAP certified laboratory. Upon arrival at the laboratory, the samples were logged-in and submitted for analysis.

PLM samples were analyzed utilizing the Environmental Protection Agency’s test method:

“Methods for the determination of Asbestos in Bulk Building Materials” (EPA 600/R-93/116, July 1993) and the McCrone Research Institute’s “The Asbestos Particle Atlas” as the principal analytical references. Additional treatment and tests may be required to accurately define composition (i.e. ashing, extraction, acetone treatment, and TEM).

The PLM method utilizes a light microscope equipped with polarizing filters. The identification of asbestos fiber bundles is determined by the visual properties displayed when the sample is treated with various dispersion staining liquids. Identification is substantiated by the actual structure of the fiber and the effect of polarized light on the fiber, all of which is viewed by a trained technician. The limit of detection of asbestos by PLM is about one percent (1%) by area.

Samples containing lower levels of asbestos are not reliably detectable by this technique.

Analysis was performed by using the bulk sample for visual observation and slide preparation(s) for microscopic examination and identification. The samples analyzed for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), silicon carbide whiskers, carbon fibers, fibrous non-asbestos constituents (cellulose, synthetic, etc.), and non-fibrous constituents. Using a stereoscope, the microscopist visually estimated relative amounts of each constituent by determining the volume of each constituent in proportion to the total volume of the sample.

The asbestos NESHAP recommends that asbestos bulk samples that are less than 10% by PLM are to be analyzed by point counting for friable ACM and mandates point counting when PLM results for friable ACM are in trace amounts (< 1%) in order to declare that the material is non-asbestos containing. The point-count procedure mandated by NESHAP is in the EPA “Interim” Bulk Method. For each layer to be point counted, eight mounts are made by dispersing 8 pinches of sample in suitable fluid. Each of the mounts is examined under the polarizing light microscope using an eyepiece reticule that superimposes a grid of points over the field of view. Fifty non-empty points are examined for each mount, yielding 400 points – some of which would be identified as asbestos and the rest as non-asbestos material.

6 BATTA Environmental Associates, Inc

2.3 LIMITATIONS

This survey was limited in scope to an asbestos survey of Baxter Water Treatment Plant at 9001 State Road, in Philadelphia, Pennsylvania, as defined by contract documents and the project scope of work. Hazardous materials such as lead based paint, PCBs, fluorescent light tubes, mercury switches, HID lamps, lead acid batteries, refrigerants, stored chemicals, or other environmentally sensitive materials were not assessed as part of this inspection.

This asbestos survey report has been prepared by BEA in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions. No other warranty expressed or implied is made. The intent of this survey report is to assist the building owner or management in locating hazardous materials. This document is not intended to be utilized as a proposal or a project design document for the remediation of hazardous materials discovered during this investigation.

The survey was conducted to identify asbestos containing materials on the select interior areas of the building. Some asbestos containing materials may not have been discovered due to inaccessibility. Any suspect materials discovered subsequent to the issue of this survey report should be evaluated or sampled and analyzed to determine the nature of the suspect asbestos material.

BEA's interpretations and recommendations are based upon the results of sample collection and analyses in compliance with environmental regulations, quality control and assurance standards, and the scope of work. The results, conclusions, and recommendations contained in this report pertain to conditions observed at the time of the survey.

7 BATTA Environmental Associates, Inc

SECTION 3.0

SURVEY RESULTS

3.1 ASBESTOS ANALYSIS RESULTS

A total of Forty-One (41) samples were collected. Thirty-Two (32) samples were analyzed by PLM and Nine (9) were not analyzed due to positive stop protocols. The original laboratory report / certificates of analysis are found in Appendix A and survey field records are found in Appendix B.

The following table summarizes the samples collected. Building materials from this survey were found to contain asbestos in amounts greater than 1 % (NAD = No Asbestos Detected, RACM = Regulated Asbestos Containing Material, CAT I NF = Category I Non-friable ACM, & CAT II NF = Category II Non-friable ACM).

Baxter Water Treatment Plant

Material Location % ACM Category Condition Quantity

Window Caulk Exterior Windows 3% Chrysotile CAT II D 150 SF

Window Glaze Exterior Windows NAD NA NA NA

Top Coat Plaster Break Room NAD NA NA NA

Bottom Coat Plaster Break Room NAD NA NA NA

12”x12” Floor Tile Break Room NAD NA NA NA

12”x12” Floor Tile Mastic Break Room NAD NA NA NA

Yellow Baseboard Mastic Break Room NAD NA NA NA

Brown Baseboard Mastic Break Room NAD NA NA NA

Exterior Door Caulk P1 Exterior Door- South 5% Chrysotile CAT II ND 30 SF

Exterior Door Caulk P2 Exterior Door- North NAD NA NA NA

5th Floor Door Caulk 5th Floor Stairwell 4% Chrysotile CAT II ND 50 SF

Window Sill- Exterior Hall outside 5th Floor

Stairwell NAD NA NA

NA

Window Sill- Interior 5th Floor 15% Chrysotile CAT II ND 100 SF

Door Caulk Loading Dock Door P4 5% Chrysotile CAT II ND 50 SF

Exterior Window Caulk West Door-PTB NAD NA NA NA

Exterior Building Caulk West Door-PTB 2% Chrysotile CAT II ND 100 SF

Roll-Up Door Caulk Intake Building- Exterior 5% Chrysotile CAT II ND 75 SF

Window Caulk Interior- Intake Building 5% Chrysotile CAT II ND 50 SF

8 BATTA Environmental Associates, Inc

Baxter Water Treatment Plant

Material Location % ACM Category Condition Quantity

Exterior Window Caulk Exterior- Intake Building NAD NA NA NA

3.2 ADDITIONAL OBSERVATIONS

In addition to the results presented in Section 4.1, BEA observed the following:

• Only accessible areas were inspected.

• If any new suspect asbestos materials are discovered during the renovation/demolition phase of this project, then they should be tested for asbestos prior to handling.

9 BATTA Environmental Associates, Inc

SECTION 4.0

RECOMMENDATIONS

4.1 RECOMMENDATIONS FOR REGULATED ACM (RACM)

The following materials were NOT identified as RACM during this inspection:

These materials must be removed prior to any activity that would release asbestos fibers from this material. Specifically, any renovation or demolition activity that will crush, abrade, or dissolve the matrix of this material must be performed by a Pennsylvania licensed Asbestos Contractor. If these materials are in good condition and not impacted by the renovation/demolition and will remain on/in the facility, no other special handling, or action is required for these materials.

4.2 RECOMMENDATIONS FOR CATEGORY I NONFRIABLE ACM

The following materials were NOT identified to be Category I Non-friable ACM during this inspection:

These materials are required to be removed by a Pennsylvania licensed asbestos contractor if proposed renovations or demolition will impact these materials in such a manner as to render them friable and thus RACM. Specifically, any renovation or demolition activity that will crush, abrade, or dissolve the matrix of these materials must be performed by a Pennsylvania-licensed Asbestos Contractor. If these materials are in good condition and not impacted by the renovation/demolition or if renovation/demolition work will not render the material friable then they may remain on/in the facility. If demolished, this material and the building components associated with it must be disposed of in a Construction/Demolition landfill and must not be reused or recycled.

4.3 RECOMMENDATIONS FOR CATEGORY II NONFRIABLE ACM

The following materials were identified as Category II Non-friable ACM during this inspection:

- Door Caulk, Window Caulk, and Building Caulk

These materials identified as Category II Nonfriable ACM must be removed prior to any renovation or demolition activity that will crush, abrade, or dissolve the matrix of this material.

The removal of this material must be performed by a Pennsylvania-licensed Asbestos Contractor.

If this material is in good condition and not impacted by the renovation/demolition and will remain on/in the facility, no other special handling, or action is required for this material.

10 BATTA Environmental Associates, Inc

4.4 GENERAL RECOMMENDATIONS

Based on the results of this survey, BEA has the following general recommendations:

• If any suspect materials are discovered after this inspection that were not assessed in this survey then they should be sampled and analyzed to determine asbestos content and to initiate appropriate responses.

The Pennsylvania Department of Environmental Protection and the US Environmental Protection Agency – Region III, require notification of intent to renovate or demolish when asbestos is present. Notification must be sent at least 10 working days prior to the start of any construction activities. The general contractor should also keep a copy of this survey at the construction site during the entire construction project as proof of compliance with 40 CFR 61 (NESHAP).

Newark, DE. 19713

Ph: 855.862.2882 Fx: 302.737.5764 info@battaenv.com Battaenv.com

APPENDIX A

LABORATORY ANALYSIS REPORT

Newark, DE. 19713

Ph: 855.862.2882 Fx: 302.737.5764 info@battaenv.com Battaenv.com

APPENDIX B

ASBESTOS INSPECTION REPORT (AIR)

1. Name of Building / Property: Address

2. Name of Building / Property Owner: Address Phone No.

3. Name of Philadelphia Certified Investigator: Certification No. Contact Information / Email / Phone No.

L&I Commercial Activity No. (Former Business Privilege License No.) Business Tax ID No.

4. Name of Philadelphia Licensed Laboratory: License No. Phone No.

6.

7. (ACMs) identified? Yes (List Below) No (explain)

8. Suspected ACM's sampled? Yes (attached are copies of the laboratory chain of custody and bulk sample results.) No (Why?)

9. List all identified ACM's located in the planned renovation/demolition areas. Damaged ACM must be listed and then repaired or removed prior to renovation. You (Investigator) must label all ACM that may be left in the work area. (Attached are add'tl sheets)

Location

Description

Type (Code 1)

Amount Square Linear

Condition (Code 2)

Action (Code 3)

Code 1 Code 2 Code 3 FRI - Friable DD - Deteriorated or REM - Removal necessary prior to Demo/Reno NF1 - Non-Friable, Cat. 1 Delaminated NRN - No removal necessary, label ACM NF2 - Non-Friable, Cat. 2 ND - Non-Damaged REP - Repair & Label ACM, removal not necessary

10. I hereby certify that the foregoing statements are true and the information contained in this report is true. This certification is made subject to the penalties set forth in 18 PA. C.S. S4904 relating to unsworn falsification to authorities. Furthermore I certify that the inspection, sampling, and labeling requirements of section X of the Asbestos Control Regulation (ACR) have been met. The building owner has been notified of the ACR requirements and given a copy of this report. If the inspection has revealed ACM which will be disturbed by the proposed work or if it has revealed ACM in bad condition, the building owner has been notified to remove or repair the ACM in accordance with the ACR prior to renovation or demolition activity.

11. Signature of Certified Asbestos Investigator: Date: Signature of Building Owner: Date:

5. Scope of Work: (Insert or attach a complete description of the portion of the subject property inspected and the anticipated work that will result in the disturbance of the identified Asbestos Containing Materials (ACMs) (e.g. demolition, asbestos abatement, and / or renovation activities.)

Date Received L&I: Date Received AMS:

Date Inspected Inspector No.

O ff ic e

U se

O n ly

Property has been declared to be in imminent danger (ID) of failure or collapse by the City of Philadelphia Department of Licenses & Inspections.

Attached is a copy of the L&I Notice of Violation declaring the property I.D. **Note: INVESTIGATOR MUST BE ON SITE DURING DEMOLITION!

Square Linear Yellow Carpet Mastic CAT II 280 ND REM 9"x9" Grey Floor Tile CAT I 280 ND REM

Radiator Paper Underlayment RACM 9 D REM

Radaitor Felt Material RACM 9 D REM 9"x9" Grey Floor Tile CAT I 650 ND REM 9"x9" Black Floor Tile CAT I 650 ND REM

12"x12" Grey Floor Tile CAT I 20 ND REM Black Mastic a/w 12"x12"

Grey Floor Tile CAT II 20 ND REM Fiberglass Pipe Insulation

Mastic Coating CAT II 4 ND REM 12"x12" Grey Floor Tile CAT I 260 ND REM

Black Mastic a/w 12"x12" Grey Floor Tile CAT II 260 ND REM Radiator Paper Underlayment RACM 30 D REM

Radaitor Felt Material RACM 30 D REM Radiator Paper Underlayment RACM 30 D REM

Radaitor Felt Material RACM 30 D REM 12"x12" Grey Floor Tile CAT I 200 ND REM

Black Mastic a/w 12"x12" Grey Floor Tile CAT II 200 ND REM

Old Elevator Room 9"x9" Floor Tile (Tan) CAT I 260 ND REM East Hallway 9"x9" Floor Tile (Tan) CAT I 680 ND REM

Window Glazing CAT II 30 ND REM Window Caulking CAT II 30 ND REM

Wallpaper RACM 20 ND REM 9"x9" Floor Tile (Tan) CAT I 160 ND REM

AmountType (Code 1)DescriptionLocation

Action (Code 3)

Condition (Code 2)

NE Corner Room

2nd Floor Hallway

Room 230

Room 240

Mechanical Room

East Room

The Wellington 2nd Floor - AIR Table

Radiator Paper Underlayment RACM 3 D REM

Radaitor Felt Material RACM 3 D REM Radiator Paper Underlayment RACM 30 D REM

Radaitor Felt Material RACM 30 D REM Fiberglass Tar Elbow

Insulation RACM 10 EA ND REM Radiator Paper Underlayment RACM 30 D REM

Radaitor Felt Material RACM 30 D REM

Throughout Pipe Insulation/Fittings

(assumed behind hard walls and ceilings) RACM TBD x x

SW Office

SE Office

Newark, DE. 19713

Ph: 855.862.2882 Fx: 302.737.5764 info@battaenv.com Battaenv.com

APPENDIX C

COMPANY AND INDIVIDUAL

CERTIFICATIONS

Bid 2474 Amendment #1
AMENDMENT ACKNOWLEDGMENT
Seller must acknowledge receipt of Amendments in PHLContracts.
Wages Attachment
MEMORANDUM
Fax Number: (215) 686-2116
Lineman 62.54 31.36
Group One 55.67 35.34
Lineman 65.10 34.45

Group One 55.67 35.34

Baxter ACM Report
6778f25262cfbe008bfad69cbf8506e8148dd0f79cf8c1db15067193c7eb16f8.pdf
ACM SPEC APPENDIX.pdf
6778f25262cfbe008bfad69cbf8506e8148dd0f79cf8c1db15067193c7eb16f8.pdf
6778f25262cfbe008bfad69cbf8506e8148dd0f79cf8c1db15067193c7eb16f8.pdf
6778f25262cfbe008bfad69cbf8506e8148dd0f79cf8c1db15067193c7eb16f8.pdf
A.I.R. fillable green 11.07.18.pdf
AIR Table.pdf
Sheet1

ACM SPEC APPENDIX.pdf

6778f25262cfbe008bfad69cbf8506e8148dd0f79cf8c1db15067193c7eb16f8.pdf
City of Philadelphia 2023-2024.pdf
Name Building/Property: Baxter Water Treatment Plant “Building Improvements” Project
1 Name of Building Property Address: 9001 State Road., Philadelphia, PA
Name Building/Property Owner: Converse Winkler Architecture LLC
Owner Address: 331 Montgomery Ave., Bala Cynwyd, PA
Owner Ph No: (610)664-0806
Name Certified Investigator: Amber Frechette
Certif No: 22-000027
Contact Info: 302.737/3376
L&I: 3702058392/423867
Business Tax ID: 5703079
Licensed Lab: Batta Labs
Lab Lic No: 112
Lab Ph No: 302.737.3376
5 Scope of Work Insert or attach a complete description of the portion of the subject property inspected and the anticipated work that will result in the disturbance of the identified Asbestos Containing Materials ACMs eg demolition asbestos abatement and or renovation activities: "Building Improvements" Project
Property has been declared to be: Off
ACM: Yes
ACM Explanation:
ACM Samples: Yes
LocationRow1: See Attached Table
DescriptionRow1:
Type Code 1Row1:
Amount Square LinearRow1:
Amount Square LinearRow1_2:
Condition Code 2Row1:
Action Code 3Row1:
LocationRow2:
DescriptionRow2:
Type Code 1Row2:
Amount Square LinearRow2:
Amount Square LinearRow2_2:
Condition Code 2Row2:
Action Code 3Row2:
LocationRow3:
DescriptionRow3:
Type Code 1Row3:
Amount Square LinearRow3:
Amount Square LinearRow3_2:
Condition Code 2Row3:
Action Code 3Row3:
LocationRow4:
DescriptionRow4:
Type Code 1Row4:
Amount Square LinearRow4:
Amount Square LinearRow4_2:
Condition Code 2Row4:
Action Code 3Row4:
LocationRow5:
DescriptionRow5:
Type Code 1Row5:
Amount Square LinearRow5:
Amount Square LinearRow5_2:
Condition Code 2Row5:
Action Code 3Row5:
LocationRow6:
DescriptionRow6:
Type Code 1Row6:
Amount Square LinearRow6:
Amount Square LinearRow6_2:
Condition Code 2Row6:
Action Code 3Row6:
Date: 01/15/2025
Owner Date: