BID 2026-17 Clarifying Questions 2.pdf
PDF 155 KB Posted
- Attached to
- BID#2026-17 McBrod Roof Replacement
- Solicitation number
- S-C01010-00016300
- Issued by
- Clackamas County, Mission CDP, Oregon
About this file
This document is a clarifying questions response issued by Clackamas County, Oregon for BID #2026-17 concerning the McBrod Roof Replacement Project. The project involves the complete removal and replacement of a deteriorated roofing system on a 19,000-square-foot roof at 9000 SE McBrod Avenue in Milwaukie. The scope includes demolition of existing roofing, installation of 80-mil TPO membrane roofing with recovery boards (specifically 1/2" HD cover board with 2.5 R-Value), replacement of all vents and parapet caps, installation of flashing, and integration of a Guardian fall protection cable system with engineered anchor points. Sealed bids are due by April 16, 2026 at 2:00 PM Pacific Time, with a non-mandatory pre-bid conference held on April 2, 2026 at 10:00 AM at the project site. Substantial completion is required by June 30, 2026, with final completion by August 31, 2026. All work must be performed during normal weekday hours (Monday-Friday, 6:30 AM to 5:30 PM) with daily material loading and removal due to site constraints.
Key project clarifications address technical specifications and responsibility allocation. Bidders are responsible for coordinating Guardian's fall protection system design and incorporating associated costs into their bid. Load areas are located on the westside and must be coordinated the day before work. The County will retain existing HVAC/mechanical and skylight heights as currently installed, will not implement a complete roof taper system despite existing ponding, and will handle turnoff of fresh air intakes and utilities/electrical modifications through onsite Correctional Maintenance and Facilities Maintenance Electricians respectively. Serviceable existing drain bodies will be reused with case-by-case replacement determination. Bidders must submit a bid bond equal to ten percent of the bid amount, along with performance and payment bonds each equal to 100 percent of contract price, maintain Commercial General Liability insurance of $1,000,000 per claim and $2,000,000 per occurrence, and comply with Oregon prevailing wage requirements with 25 percent retainage held until certified payroll submission. The engineer's estimate is $275,000.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID 2026-17 McBrod Roof Replacement.pdf | ||
| BID 2026-17 Clarifying Questions 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2026-17
McBrod Roof Replacement Project (“BID”)
RESPONSE TO CLARIFYING QUESTIONS #2
April 9, 2026
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. Would It says 1/4" HD cover board with 2.5 R-Value, do you mean 1/2" HD cover board
ANSWER: Yes, we need ½” HD cover board.
2. Are the vent to be re-used?
ANSWER: Replace vents.
3. Do you have a plan for the Fall anchors system, or already have a system made by Guardian.
ANSWER: Guardian is our selected vendor. It will be your responsibility to reach out to Guardian directly and to incorporate their design into this project. This design cost and anchoring system will need to be factored into your installation.
4. Where are the load areas, and times
ANSWER: Load times are preferably made in the morning and coordinated the day before. Cone off designated area as needed. The load area is currently on the westside in middle. These details will be revisited during the preconstruction meeting.
5. This is one building, the specs says both buildings
ANSWER: Correct, this is for the 9000 SE McBrod Building only.
6. The HVAC/Mechanical, and skylights are lower than manufactures suggest, are we leaving them at existing heights?
ANSWER: Yes, the existing heights will remain the same.
7. Under Examination it states-C. Examine roof substrate to verify that it is properly sloped to drains and will not create ponding. - The whole roof ponds water do you want a complete taper system?
ANSWER: No, we do not want a complete taper system.
8. The interior walls do not have metal on them. Do we just go up and over?
ANSWER: Yes, go up and over.
9. The spec's seam to say to replace all vents is that correct?
ANSWER: Yes, replace all vents.
10. Are we reusing Existing drain bodies?
ANSWER: If they are serviceable, we will reuse them. Replacing will be done on a case-by-case basis.
11. Is there fresh air intakes that need to be turned off during re-roof? Who would be responsible.
ANSWER: Fresh air intakes will be turned off by onsite Correctional Maintenance.
12. Some utilities/electric would need to be turned off, and moved, who is responsible for those?
ANSWER: Utilities and electrical can be turned off and or moved by our Facilities Maintenance Electricians.
End of Clarifying Questions #2