This document is a bid solicitation from Clackamas County, Oregon for the Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project. The County is accepting sealed bids until May 9, 2023 at 2:00 PM Pacific Time. The project involves the replacement of a culvert along Johnson Creek in Oregon City, Oregon. Bidders are required to attend a mandatory pre-bid conference on April 20, 2023 at 10:00 AM Pacific Time. The contract will be awarded to the lowest responsive and responsible bidder, and the term of the contract is not specified.
The bid solicitation does not provide details on pricing terms, set asides, incumbents, funding requirements or sources. It also does not mention any renewal options for the contract. The document primarily focuses on the scope of work, response deadlines, and bidder requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Police Station CMGC RFP ADDENDUM NO 2 Issued May 9 2023.pdf | ||
| Notice of Intent to Award 2023-31.pdf | ||
| Hideaway Bid Tabs 5-9-23 sm.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clackamas Contract Form B-1 (2/2023)
CLACKAMAS COUNTY
NOTICE OF PUBLIC IMPROVEMENT CONTRACT OPPORTUNITY
INVITATION TO BID #2023-31
Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
April 13, 2023
Clackamas County (“County”) through its Board of County Commissioners is accepting sealed bids for the Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project until May 9, 2023, 2:00 PM, Pacific Time, (“Bid Closing”) at the following location:
Bidding Documents can be downloaded from the state of Oregon procurement website (“OregonBuys”) at the following address: https://oregonbuys.gov/bso/view/login/login.xhtml, Document No.S- C01010-00006542.
Prospective Bidders will need to sign in to download the information and that information will be accumulated for a Plan Holder's List. Prospective Bidders are responsible for obtaining any Addenda from Website listed above.
Submitting Proposals: Bid Locker Proposals will only be accepted electronically thru a secure online bid submission service, Bid Locker.
Email submissions to Clackamas County email addresses will no longer be accepted.
A. Completed proposal documents must arrive electronically via Bid Locker located at https://bidlocker.us/a/clackamascounty/BidLocker.
B. Bid Locker will electronically document the date and time of all submissions. Completed documents must arrive by the deadline indicated in Section 1 or as modified by Addendum.
LATE PROPOSALS WILL NOT BE ACCEPTED.
C. Proposers must register and create a profile for their business with Bid Locker in order to submit for this project. It is free to register for Bid Locker.
D. Proposers with further questions concerning Bid Locker may review the Vendor’s Guide located at https://www.clackamas.us/how-to-bid-on-county-projects .
Engineers Estimate: $547,680.00
Contact Information Procurement Process and Technical Questions: Tralee Whitley at Twhitley@clackamas.us
Bids will be opened and publicly read aloud at the above Delivery address after the Bid Closing. Bid results will also be posted to the OregonBuys listing shortly after the opening.
To be eligible for award under this Invitation to Bid, bidders (prime contractors) must submit a prequalification application (either ODOT or County) to the County at least two business days prior to the Bid Closing. County will reject bids from bidders who are not prequalified for the class of work indicated prior to the Bid Closing. Bidders must be prequalified in Earthwork and Drainage
State Prevailing Wage Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any https://oregonbuys.gov/bso/view/login/login.xhtml https://bidlocker.us/a/clackamascounty/BidLocker https://www.clackamas.us/how-to-bid-on-county-projects mailto:Twhitley@clackamas.us
Clackamas Contract Form B-1 (2/2023) listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement:
PREVAILING WAGE RATES for Public Works Contracts in Oregon, April 5, 2023, which can be downloaded at the following web address: http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx The Work will take place in Clackamas County, Oregon.
Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses.
http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx
Clackamas Contract Form B-2 (2/2023)
PUBLIC IMPROVEMENT CONTRACT OPPORTUNITY
Table of Contents
Section B-1………………………………............ Notice of Public Improvement Contract Opportunity
Section B-2……………………………………… Instructions to Bidders
Section B-3……………………………………… Supplemental Instructions to Bidders
Section B-4……………………………………… Bid Bond
Section B-5……………………………………… Bid Form
Section B-6……………………………………… Public Improvement Contract
Section B-7……………………………………… Performance Bond
Section B-8…………………………………….. Payment Bond
Section B-9…………………………………….. Project Information, Plans, Specifications and Drawings
PUBLIC IMPROVEMENT CONTRACT
INSTRUCTIONS TO BIDDERS
Clackamas County Local Contract Review Board Rules (“LCRB Rules”) govern this procurement process. LCRB Rules may be found at:
http://www.clackamas.us/code/documents/appendi xc.pdf. The Instructions to Bidders is applicable to the procurement process for Clackamas County, or any component unit thereof identified on the Notice of Public Improvement Contract Opportunity, herein after referred to as the “Owner.”
Article 1. Scope of Work
The work contemplated under this contract with the Owner, includes all labor, materials, transportation, equipment and services necessary for, and reasonably incidental to, the completion of all construction work in connection with the project described in the Project Manual which includes, but is not necessarily limited to, the Notice of Public Improvement Contract Opportunity, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Form, Bid Bond, Public Improvement Contract Form, Performance Bond, Payment Bond, and Plans, Specifications and Drawings.
Article 2. Examination of Site and Conditions
Before making a Bid, the Bidder shall examine the site of the work and ascertain all the physical conditions in relation thereto. The Bidder shall also make a careful examination of the Project Manual including the plans, specifications, and drawings and other contract documents, and shall be fully informed as to the quality and quantity of materials and the sources of supply of the materials. Failure to take these steps will not release the successful Bidder from entering into the contract nor excuse the Bidder from performing the work in strict accordance with the terms of the contract at the price established by the Bid.
The Owner will not be responsible for any loss or for any unanticipated costs, which may be suffered by the successful Bidder, as a result of such
Bidder's failure to be fully informed in advance with regard to all conditions pertaining to the work and the character of the work required, including site conditions. No statement made by an elected official, officer, agent, or employee of the Owner in relation to the physical or other conditions pertaining to the site of the work will be binding on the Owner, unless covered by the Project Manual or an Addendum.
Article 3. Interpretation of Project Manual and
Approval of Materials Equal to Those Provided in the Specifications
If any Bidder contemplating submitting a Bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications or forms of contract documents, or detects discrepancies or omissions, such Bidder may submit to the Architect (read "Engineer" throughout in lieu of Architect as appropriate) a written request for an interpretation thereof at least ten (10) calendar days prior to the date set for the Bid Closing.
When a prospective Bidder seeks approval of a particular manufacturer's material, process or item of equal value, utility or merit other than that designated by the Architect in the Project Manual, the Bidder may submit to the Architect a written request for approval of such substitute at least ten
(10) calendar days prior to the date set for the Bid Closing. The prospective Bidder submitting the request will be responsible for its prompt delivery.
Requests of approval for a substitution from that specified shall be accompanied by samples, records of performance, certified copies of tests by impartial and recognized laboratories, and such other information as the Architect may request.
To establish a basis of quality, certain processes, types of machinery and equipment or kinds of materials may be specified in the Project Manual either by description of process or by designating a http://www.clackamas.us/code/documents/appendixc.pdf http://www.clackamas.us/code/documents/appendixc.pdf manufacturer by name and referring to a brand or product designation or by specifying a kind of material. Whenever a process is designated or a manufacturer's name, brand or item designation is given, or whenever a process or material covered by patent is designated or described, it shall be understood that the words "or approved equal" follow such name, designation or description, whether in fact they do so or not.
Any interpretation of the Project Manual or approval of manufacturer's material will be made only by an Addendum duly issued. All Addenda will be posted to the OregonBuys listing and will become a part of the Project Manual. The Owner will not be responsible for any other explanation or interpretation of the Project Manual nor for any other approval of a particular manufacturer's process or item for any Bidder.
When the Architect approves a substitution by Addendum, it is with the understanding that the Contractor guarantees the substituted article or material to be equal or better than the one specified.
Article 4. Security to Be Furnished by Each
Bidder
Each Bid must be accompanied by either 1) a cashier's check or a certified check drawn on a bank authorized to do business in the State of Oregon, or
2) a Bid bond described hereinafter, executed in favor of the Owner, for an amount equal to ten percent (10%) of the total amount Bid as a guarantee that, if awarded the contract, the Bidder will execute the contract and provide a performance bond and payment bond as required. The successful Bidder's check or Bid bond will be retained until the Bidder has entered into a contract satisfactory to Owner and furnished a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond. The Owner reserves the right to hold the Bid security as described in Article 10 hereof. Should the successful Bidder fail to execute and deliver the contract as provided for in Article 12 hereof, including a satisfactory performance bond and payment bond within twenty (20) calendar days after the Bid has been accepted by the Owner, then the contract award made to such Bidder may be considered canceled and the Bid security may be forfeited as liquidated damages at the option of the Owner. The date of the acceptance of the Bid and the award of the contract as contemplated by the Project Manual shall mean the date of acceptance specified in the Notice of Intent to Award.
Article 5. Execution of Bid Bond
Should the Bidder elect to utilize a Bid bond as described in Article 4 in order to satisfy the Bid security requirements, such form must be completed in the following manner:
A. Bid bonds must be executed on the County forms, which will be provided to all prospective Bidders by the Owner.
B. The Bid bond shall be executed on behalf of a bonding company licensed to do business in the State of Oregon.
C. In the case of a sole individual, the bond need only be executed as principal by the sole individual. In the case of a partnership, the bond must be executed by at least one of the partners. In the case of a corporation, the bond must be executed by stating the official name of the corporation under which is placed the signature of an officer authorized to sign on behalf of the corporation followed by such person's official capacity, such as president, etc.
The corporation seal should then be affixed to the bond.
D. The name of the surety must be stated in the execution over the signature of its duly authorized attorney-in-fact and accompanied by the seal of the surety corporation.
Article 6. Execution of the Bid Form
Each Bid shall be made in accordance with: (i) the sample Bid Form accompanying these instructions;
(ii) the appropriate signatures for a sole individual, partnership, corporation or limited liability corporation shall be added as noted in Article 5C above; (iii) numbers pertaining to base Bids shall be stated both in writing and in figures; and (iv) the Bidder's address shall be typed or printed.
The Bid Form relates to Bids on a specific Project
Manual. Only the amounts and information asked for on the Bid Form furnished will be considered as the Bid. Each Bidder shall Bid upon the work exactly as specified and provided in the Bid Form.
The Bidder shall include in the Bid a sum to cover the cost of all items contemplated by the Contract.
The Bidder shall Bid upon all alternates that may be indicated on the Bid Form. When Bidding on an alternate for which there is no charge, the Bidder shall write the words "No Charge" in the space provided on the Bid Form. If one or more alternates are shown on the Bid Form, the Bidder shall indicate whether each is "add" or "deduct."
Article 7. Prohibition of Alterations to Bid
Bids that are incomplete, or contain ambiguities or have differing conditions required by the Bidder, including requested changes or exceptions to the Public Improvement Contract form or other portions of the Project Manual, may be rejected in Owner’s sole and absolute discretion.
Article 8. Submission of Bid
Each Bid shall be sealed in an envelope, properly addressed to the Owner, showing on the outside of the envelope the name of the Bidder and the name of the project. Bids will be received at the time and place stated in the Notice of Public Improvement Contract Opportunity.
Article 9. Bid Closing and Opening of Bids
All Bids must be received by the Owner at the place and time set for the Bid Closing. Any Bids received after the scheduled Bid Closing time for receipt of Bids will be rejected.
At the time of opening and reading of Bids, each Bid received will be publicly opened and read aloud, irrespective of any irregularities or informalities in such Bids.
Generally, Bid results will be posted to the Oregonbuys Website within a couple hours of the opening.
Article 10. Acceptance or Rejection of Bids by Owner
Unless all Bids are rejected, the Owner will award a contract based on the lowest responsive Bid from a responsible Bidder. If that Bidder does not execute the contract, it will be awarded to the next lowest responsible Bidder or Bidders in succession.
The Owner reserves the right to reject all Bids and to waive minor informalities. The procedures for contract awards shall be in compliance with the provisions of the LCRB Rules in effect at that time.
The Owner reserves the right to hold the Bid and Bid security of the three lowest Bidders for a period of thirty (30) calendar days from and after the time of Bid opening pending award of the contract.
Following award of the contract the Bid security of the three lowest Bidders may be held twenty (20) calendar days pending execution of the contract.
All other Bids will be rejected and Bid security will be returned.
In determining the lowest Bidder, the Owner reserves the right to take into consideration any or all authorized base Bids as well as alternates or combinations indicated in the Bid Form.
If no Bid has been accepted within thirty (30) calendar days after the opening of the Bids, each of the three lowest Bidders may withdraw the Bid submitted and request the return of the Bid security.
Article 11. Withdrawal of Bid
At any time prior to the Bid Closing, a Bidder may withdraw its Bid. This will not preclude the submission of another Bid by such Bidder prior to the time set for the Bid Closing.
After the time set for the Bid Closing, no Bidder will be permitted to withdraw its Bid within the time frames specified in Article 10 for award and execution, except as provided for in that Article.
Article 12. Execution of Contract, Performance Bond and Payment Bond
The Owner will provide the successful Bidder with contract forms within seven (7) calendar days after the completion of the award protest period. The Bidder is required to execute the contract forms as provided, including a performance bond and a payment bond from a surety company licensed to do surety business in the State of Oregon, within seven (7) calendar days after receipt of the contract forms. The contract forms shall be delivered to the Owner in the number called for and to the location as instructed by the Owner.
Article 13. Recyclable Products
Contractors will use recyclable products to the maximum extent economically feasible in the performance of the Contract.
Article 14. Clarification or Protest of the Solicitation Document or Specifications
Any request for clarification or protest of the solicitation document or specifications must be submitted in the manner provided for in the applicable section of the LCRB Rules to the Procurement Representative referenced in the Notice of Public Improvement Contract Opportunity.
A protest of the Solicitation Document must be received within seven (7) business days of the issuance of the Bid or within three (3) business days of issuance of an addendum.
Requests for clarification may be submitted no less than five (5) business days prior to the Bid Closing Date.
Article 15. Protest of Intent to Award
Owner will name the apparent successful Bidder in a “Notice of Intent to Award” letter.
Identification of the apparent successful Bidder is procedural only and creates no right in the named Bidder to the award of the contract. Competing Bidders will be notified by publication of the Notice of Intent to Award on the OregonBuys Website of the selection of the apparent successful Bidder(s) and Bidders shall be given seven (7) calendar days from the date on the “Notice of Intent to Award” letter to review the file at the Procurement Division office and file a written protest of award, pursuant to C-049-0450. Any award protest must be in writing and must be delivered by email, hand delivery, or mail to the Procurement Division Director at: Procurement Division, 2051 Kaen Road, Oregon City, OR 97045.
Article 16. Disclosure of First-Tier Subcontractors
Within two (2) working hours after the Bid Closing, all Bidders shall submit to the County a disclosure form identifying any first-tier subcontractors (those entities that would be contracting directly with the prime contractor) that will be furnishing labor and materials on the contract, if awarded, whose subcontract value would be equal to or greater than: (a) Five percent (5%) of the total contract price, but at least $15,000; or (b) $350,000, regardless of the percentage of the total contract price.
Disclosures may be submitted with the Bid or may be hand delivered to the Bid Closing address or emailed to the Contract Information Analyst listed on the Notice of Contract Opportunity.
Clackamas Contract Form B-3 (2/2023)
SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
Project Name: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
The following modify the Clackamas County “Instructions to Bidders” for this Project. Where a portion of the Instructions to Bidders has been modified by these Supplemental Instructions to Bidders, the unaltered portions shall remain in effect.
1. To be eligible for award under this Invitation to Bid, bidders (prime contractors) must submit a prequalification application (either ODOT or County) to the County at least two business days prior to the Bid Closing. County will reject bids from bidders who are not prequalified for the class of work indicated prior to the Bid Closing. Bidders must be prequalified in Earthwork and Drainage.
2. Electronic Submissions: The County is requiring all bids for this project be electronically submitted. Complete Bids (including all attachments) will only be accepted electronically thru a secure online bid submission service, Bid Locker. Email submissions to Clackamas County email addresses will no longer be accepted. https://bidlocker.us/a/clackamascounty/BidLocker.
Bids will be publicly read aloud via the computer application, Zoom. Bidders will be allowed to video conference or listen by phone to the bid results. The projects Zoom meeting can be accessed via the information below:
ZOOM LINKS.
Join Zoom Meeting https://clackamascounty.zoom.us/j/85899869776
Meeting ID: 858 9986 9776 One tap mobile
+12532050468,,85899869776# US
+12532158782,,85899869776# US (Tacoma)
Dial by your location
+1 253 205 0468 US
+1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 408 638 0968 US (San Jose)
+1 669 444 9171 US
+1 669 900 6833 US (San Jose) https://bidlocker.us/a/clackamascounty/BidLocker https://clackamascounty.zoom.us/j/85899869776
Clackamas Contract Form B-3 (2/2023)
+1 719 359 4580 US
+1 386 347 5053 US
+1 507 473 4847 US
+1 564 217 2000 US
+1 646 876 9923 US (New York)
+1 646 931 3860 US
+1 689 278 1000 US
+1 301 715 8592 US (Washington DC)
+1 305 224 1968 US
+1 309 205 3325 US
+1 312 626 6799 US (Chicago)
+1 360 209 5623 US
Meeting ID: 858 9986 9776 Find your local number: https://clackamascounty.zoom.us/u/kb7ug8EJyl
**The Apparent Low bid results will be posted to the projects OregonBuys listing as soon as possible following the bid opening.
3. Good Faith Effort: Clackamas County encourages participation in contracts by Historically Underrepresented Businesses. “Historically Underrepresented Businesses” are State of Oregon-certified and self-identified minority, women and emerging small business as well as firms that are certified federally or by another state or entity with substantially similar requirements as the State of Oregon.
Bidders must perform Good Faith Effort (defined below) and submit Form 1 and Form 2 for the Bidders Bid to be considered responsive. Form 1 and Form 2 must be submitted within two (2) hours after the Closing Date and Time. Form 1 and Form 2 may be submitted to either the Contact Information Analyst listed on Notice of Contract Opportunity or via the https://bidlocker.us/a/clackamascounty/BidLocker listing.
“Good Faith Effort” is a requirement of a prime contractor to reach out to at least three Historically Underrepresented Business Subcontractors for each division of work that will be subcontracted out and to complete the required forms. If fewer than three Historically Underrepresented Business Subcontractors are reasonably available for a particular division of work, the Bidder must specifically note the reason for there being fewer than three contacts. The outreach should be performed with sufficient time to give the subcontractors at least 5 calendar days to respond to the opportunity. Form 3, which documents the actual amount of subcontractors on the project, must be submitted with the project final pay application. Compliance with the Good Faith Effort and submission of Forms 1, 2 and 3 is a contractual requirement for final payment.
The sufficiency of the documentation or the performance of Good Faith Effort shall be in the sole and absolute determination of Clackamas County. Only those Bidders that Clackamas County has determined have not sufficiently performed Good Faith Effort shall have protest rights of the determination for such Bidder.
No Bidder shall have protest rights of the sufficiency of any other Bidder completing Good Faith Effort.
https://clackamascounty.zoom.us/u/kb7ug8EJyl
Clackamas County GFE (12/2023) Page 1 of 4
GOOD FAITH EFFORT
SUBCONTRACTOR AND SELF-PERFORMED WORK LIST
(FORM 1)
Prime Contractor Name: Total Contract Amount:
Project Name: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
PRIME SELF-PERFORMING: Identify below ALL GFE Divisions of Work (DOW) to be self-performed. Good Faith Efforts are otherwise required.
DOW BIDDER WILL SELF-PERFORM (GFE not required)
PRIME CONTRACTOR SHALL DISCLOSE AND LIST ALL SUBCONTRACTORS, including those Minority-owned, Woman-owned, and Emerging Small Businesses (“M/W/ESB”) that you intend to use on the project. Delivery via bid locker https://bidlocker.us/a/clackamascounty/BidLocker within 2 hours of the BID/Quote Closing Date/Time.
LIST ALL SUBCONTRACTORS BELOW
Use correct legal name of Subcontractor
(No Assumed Business Names)
Division of Work (Painting, electrical, landscaping, etc.)
List ALL DOW performed by Subcontractors
DOLLAR
AMOUNT OF
SUBCONTRACT
If Certified or self-reporting
MBE/WBE/ESB
Subcontractor
Check box
MBE
WBE
ESB
Name Address City/St/Zip Phone#
OCCB#
Address City/St/Zip
City/St/Zip
City/St/Zip
Clackamas County GFE (12/2023) Page 2 of 4
GFE SUBCONTRACTOR AND SELF-PERFORMED WORK LIST (FORM 1) cont’d
Prime Contractor Name: Total Contract Amount:
Project Name: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
(No Assumed Business Names)
Division of Work (Painting, electrical, landscaping, etc.)
DOLLAR
self-reporting
MBE/WBE/ESB
Subcontractor
Address City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
Clackamas County GFE (2/2023) Page 3 of 4
GOOD FAITH EFFORT
M/W/ESB CONTACT / BIDS RECEIVED LOG
(FORM 2)
Prime Contractor:
Project: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
Prime Contractor must contact or endeavor to contact at least 3 M/W/ESB Subcontractors for each Division of Work. Prime Contractor shall record its contacts with M/W/ESB Subcontractors through use of this log (or equivalent) entering all required information. All columns shall be completed where applicable. Additional forms may be copied if needed.
NAME OF M/W/ESB
SUBCONTRACTOR
Divisions of Work (Painting, electrical, landscaping, etc.)
Date Sollicitation Letter / Fax
Sent
PHONE CONTACT
BID ACTIVITY
Check Yes or No
REJECTED BIDS
(if bid received & not used)
Notes
Will Bid
Bid Received
Bid Used
Bid Amount Reason Not Used (Price, Scope or Other. If Other, explain in Notes>>)
Date of Call Person Receiving Call
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Clackamas County GFE (2/2023) Page 4 of 4
GOOD FAITH EFFORT
PROJECT COMPLETION REPORT
(FORM 3)
Prime Contractor Name: Total Contract Amount:
Project Name: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
Complete this form and submit with your request for final payment upon the project completion. Please list all subcontractors used for the project. Use additional sheets as necessary.
(No Assumed Business Names)
Division of Work (Painting, electrical, landscaping, etc.)
FINAL DOLLAR
self-reported
MBE/WBE/ESB
Subcontractor
Address City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
City/St/Zip
BY SIGNING BELOW, I HEREBY CERTIFY THAT THE ABOVE LISTED FIRMS HAVE BEEN UTILIZED BY OUR COMPANY IN THE AMOUNTS REPRESENTED ABOVE AND THAT
THE INFORMATION CONTAINED HEREIN IS COMPLETE AND ACCURATE. .
Authorized Signature of Contractor Representative Date
Clackamas County Contract Form B-4 (1/2017)
BID BOND
Project Name: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
We, _____________________________________, as “Principal,” (Name of Principal) and __________________________________________, an _________________ Corporation, (Name of Surety) authorized to transact Surety business in Oregon, as “Surety,” hereby jointly and severally bind ourselves, our respective heirs, executors, administrators, successors and assigns to pay unto Clackamas County (“Obligee”) the sum of ($____________________________)
______________________________________________________________________ dollars.
WHEREAS, the condition of the obligation of this bond is that Principal has submitted its proposal or bid to an agency of the Obligee in response to Obligee’s procurement document (No. ) for the project identified above which proposal or bid is made a part of this bond by reference, and Principal is required to furnish bid security in an amount equal to ten (10%) percent of the total amount of the bid pursuant to the procurement document.
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect.
IN WITNESS WHEREOF, we have caused this instrument to be executed and sealed by our duly authorized legal representatives this ___________day of ______________________, 20____.
Principal:_______________________________________
By:____________________________________________
Signature
Official Capacity
Attest:__________________________________________ Corporation Secretary
Surety:________________________________________
By: Attorney-In-Fact
City State Zip
Phone Fax
Clackamas County Contract Form B-5 (2/2023)
BID FORM
PROJECT: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project BID CLOSING: May 9, 2023, 2:00 PM, Pacific Time BID OPENING: May 9, 2023, 2:05 PM, Pacific Time
FROM: __________________________________________________________________
Bidder’s Name (must be full legal name, not ABN/DBA)
TO: https://bidlocker.us/a/clackamascounty/BidLocker
1. Bidder is (check one of the following and insert information requested):
____a. An individual; or
____b. A partnership registered under the laws of the State of ____________________; or
____c. A corporation organized under the laws of the State of ____________________; or
____d. A limited liability corporation organized under the laws of the State of _____________________________;
and authorized to do business in the State of Oregon hereby proposes to furnish all material and labor and perform all work hereinafter indicated for the above project in strict accordance with the Contract Documents for the Basic Bid as follows:
____________________________________________ Dollars ($__________________) and the Undersigned agrees to be bound by the following documents:
• Notice of Public Improvement Contract Opportunity
• Instructions to Bidders • Supplemental Instructions to Bidders
• Bid Bond • Bid Form
• Public Improvement Contract Form • Performance Bond and Payment Bond
• Prevailing Wage Rates • Payroll and Certified Statement Form
• Plans, Specifications and Drawings
• ADDENDA numbered _______ through_______, inclusive (fill in blanks)
2. The Undersigned proposes to add to or deduct from the Base Bid indicated above the items of work relating to the following Alternate(s) as designated in the Specifications: N/A
3. The Undersigned proposes to add to or deduct from the Base Bid indicated above the items or work relating to the following Unit Price(s) as designated in the Specifications, for which any adjustments in the Contract amount will be made in accordance with the project specifications: Provide the attached Bid Schedules with Bid.
4. The work shall be completed within the time stipulated and specified in 00180.50(h) of the Special Provisions for Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
Clackamas County Contract Form B-5 (1/2023) Page 2
5. Accompanying herewith is Bid Security which is equal to ten percent (10%) of the total amount of the Basic Bid, plus the total sum of Alternatives (if any).
6. The Undersigned agrees, if awarded the Contract, to execute and deliver to Clackamas County, within twenty (20) calendar days after receiving the Contract forms, a Contract Form, and a satisfactory Performance Bond and Payment Bond each in an amount equal to one hundred percent (100% ) of the Contract sum, using forms provided by the Owner. The surety requested to issue the Performance Bond and Payment Bond will be:
(name of surety company - not insurance agency)
The Undersigned hereby authorizes said surety company to disclose any information to the Owner concerning the Undersigned's ability to supply a Performance Bond and Payment Bond each in the amount of the Contract.
7. The Undersigned further agrees that the Bid Security accompanying the Bid is left in escrow with Clackamas County; that the amount thereof is the measure of liquidated damages which the Owner will sustain by the failure of the Undersigned to execute and deliver the above-named Contract Form, Performance Bond and Payment Bond, each as published, and that if the Undersigned defaults in either executing the Contract Form or providing the Performance Bond and Payment Bond within twenty (20) calendar days after receiving the Contract forms, then the Bid Security shall become the property of the Owner at the Owner's option; but if the Bid is not accepted within thirty (30) calendar days of the time set for the opening of the Bids, or if the Undersigned executes and timely delivers said Contract Form, Performance Bond and Payment Bond, the Bid Security shall be returned.
8. The Undersigned certifies that: (i) This Bid has been arrived at independently and is being submitted without collusion with and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment or services described in the invitation to bid designed to limit independent bidding or competition; and (ii) the contents of the Bid have not been communicated by the Undersigned or its employees or agents to any person not an employee or agent of the Undersigned or its surety on any Bond furnished with the Bid and will not be communicated to such person prior to the official opening of the Bid.
9. The undersigned HAS, HAS NOT (check one) paid unemployment or income taxes in Oregon within the past 12 months and DOES, DOES NOT (check one) a business address in Oregon. The undersigned acknowledges that, if the selected bidder, that the undersigned will have to pay all applicable taxes and register to do business in the State of Oregon before executing the Contract Form.
10. The Undersigned agrees, if awarded a contract, to comply with the provisions of ORS 279C.800 through 279C.870 pertaining to the payment of the prevailing rates of wage.
11. Contractor's CCB registration number is ____________________________. As a condition to submitting a bid, a Contractor must be registered with the Oregon Construction Contractors Board in accordance with ORS 701.035 to 701.055, and disclose the registration number. Failure to register and disclose the number will make the bid unresponsive and it will be rejected, unless contrary to federal law.
12. The successful Bidder hereby certifies that all subcontractors who will perform construction work as described in ORS 701.005(2) were registered with the Construction Contractors Board in accordance with ORS 701.035 to 701.055 at the time the subcontractor(s) made a bid to work under the contract.
13. The successful Bidder hereby certifies that, in compliance with the Worker's Compensation Law of the State of Oregon, its Worker's Compensation Insurance provider is ______________________________, Clackamas County Contract Form B-5 (1/2023) Page 3
Policy No. , and that Contractor shall submit Certificates of Insurance as required.
14. Contractor’s Key Individuals for this project (supply information as applicable):
Project Executive:__________________________, Cell Phone: ____________________, Project Manager: __________________________, Cell Phone: ____________________, Job Superintendent: ________________________, Cell Phone: ____________________, Project Engineer: __________________________, Cell Phone: ____________________.
15. The Undersigned certifies that it has not discriminated against minority, women, or emerging small businesses in obtaining any subcontracts for this project.
16. The Undersigned certifies that it has a drug testing program in accordance with ORS 279C.505.
REMINDER: Bidder must submit the below First-Tier Subcontractor Disclosure Form.
By signature below, Contractor agrees to be bound by this Bid.
NAME OF FIRM _______________________________________
ADDRESS _______________________________________
TELEPHONE NO _______________________________________
EMAIL _______________________________________
SIGNATURE 1) _______________________________________
Sole Individual or 2) _______________________________________ Partner or 3) _______________________________________ Authorized Officer or Employee of Corporation
* * * * * E N D O F B I D * * * * *
ITEM # SECTION ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE
1 00180 Work Place Harassment Prevention Plan LS 1
2 00196 Extra Work as Authorized FA 1 $40,000.00 $40,000.00
3 00210 Mobilization LS 1
4 00221 Temporary Work Zone Traffic Control, Complete
LS 1
5 00226 Temporary Barrier LF 38
6 00240 Temporary Drainage Facilities LS 1
7 00280 Temporary Fence, 6 Ft Chain Link Fence with
Concrete Blocks
LF 100
8 00280 Erosion Control LS 1
9 00290 Turbidity Monitoring LS 1
10 00290 Pollution Control Plan LS 1
11 00305 Construction Survey Work LS 1
12 00310 Removal of Structures and Obstructions LS 1
13 00320 Clearing and Grubbing LS 1
14 00330 Removal of Gravel Washout LS 1
15 00335 Subgrade Geotextile SY 500
16 00595 Hideaway Court Crossing Structure LS 1
17 00640 Aggregate Base CY 160
18 00640 Temporary Aggregate Base for Stage-1 CY 50
19 01030 Permanent Seeding ACRE 0
20 01040 Topsoil CY 20
21 01040 Shrubs, #2 Container Each 60
22 01050 Chain Link Fence with Black Vinyl Coating, 4-
Ft. Fabric Height
LF 92
23 01091 Fish Cobble LS 1
PROPOSED COST BID SCHEDULE _________________________________________________________________________
(Numerically)
PROPOSED COST BID SCHEDULE _________________________________________________________________________
(Written in Words)
COMPANY NAME ________________________________________________________________________________________
AUTHORIZED SIGNATURE ________________________________________________________________________________
Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
BID SCHEDULE #2023-31
Bases and Wearing Surfaces
Right of Way Development and Control
General Conditions
Temporary Features and Appurtenances
Roadwork
Bridges
Clackamas County Contract Form B-5 (1/2023) Page 4
FIRST-TIER SUBCONTRACTOR DISCLOSURE FORM
PROJECT: #2023-31
BID OPENING: May 9, 2023, 2:00 PM, Pacific Time
Failure to submit this Form by the disclosure deadline will result in a nonresponsive bid.
INSTRUCTIONS:
This First-Tier Subcontractor Disclosure Form (“Form”) must be submitted and received at the location specified in the Notice of Public Improvement Contract Opportunity on the advertised Bid Closing, and within two working hours after the advertised Bid Closing Time.
A. Completed proposal documents must arrive electronically via Bid Locker located at https://bidlocker.us/a/clackamascounty/BidLocker.
B. Bid Locker will electronically document the date and time of all submissions. Completed documents must arrive by the deadline indicated in Section 1 or as modified by Addendum.
LATE PROPOSALS WILL NOT BE ACCEPTED.
C. Proposers must register and create a profile for their business with Bid Locker in order to submit for this project. It is free to register for Bid Locker.
D. Proposers with further questions concerning Bid Locker may review the Vendor’s Guide located at https://www.clackamas.us/how-to-bid-on-county-projects .
Subcontractor lists may be submitted with the bid in the same envelope or email at the Bid Closing date and time. Subcontractor lists MUST be submitted within two (2) hours of the Bid Closing date and time.
List below the name of each subcontractor that will be furnishing labor, or labor and materials, for which disclosure is required, the category of work that the subcontractor will be performing, and the dollar value of the subcontract. Enter “NONE” if the value of the project bid is less than $100,000 or there are no subcontractors that need to be disclosed. ATTACH ADDITIONAL SHEETS IF NECESSARY.
SUBCONTRACTOR NAME DOLLAR VALUE CATEGORY OF WORK
1. ____________________________
2. ____________________________
3. ____________________________
4. ____________________________
5. ____________________________
6. ____________________________
The above listed first-tier subcontractor(s) are providing labor, or labor and material, with a Dollar Value equal to or greater than:
a) 5% of the total Contract Price, but at least $15,000. If the Dollar Value is less than $15,000 do not list the subcontractor above; or
b) $350,000 regardless of the percentage of the total Contract Price.
Firm Name:
Bidder Signature: Phone # https://www.clackamas.us/how-to-bid-on-county-projects
Clackamas County Contract Form B-6 (2/23)
CLACKAMAS COUNTY
PUBLIC IMPROVEMENT CONTRACT
Contract #
This Public Improvement Contract (the “Contract”), is made by and between the Clackamas County, a political subdivision of the State of Oregon, hereinafter called “Owner,” and Contractor Name (No DBA/ABN), hereinafter called the “Contractor” (collectively the “Parties”), shall become effective on the date this Contract has been signed by all the Parties and all County approvals have been obtained, whichever is later.
Project Name: # 2023-31 Johnson Creek Tributary (Hideaway Court) Culvert Replacement Project
1. Contract Price, Contract Documents and Work.
The Contractor, in consideration of the sum of Dollars ($ ) (the "Contract Price"), to be paid to the Contractor by Owner in the manner and at the time hereinafter provided, and subject to the terms and conditions provided for in the Instructions to Bidders and other Contract Documents (as defined in the project specifications) referenced within the Instructions to Bidders), all of which are incorporated herein by reference, hereby agrees to perform all Work described and reasonably inferred from the Contract Documents. The Contract Price is the amount contemplated by the Base Bid adjusted for Alternates [Identify accepted Alternates], as indicated in the accepted Bid.
The following documents are incorporated by reference in this Contract and made a part hereof:
• Notice of Contract Opportunity • Instructions to Bidders
• Supplemental Instructions to Bidders • Bid Bond
• Bid Form • Performance Bond and Payment Bond
• Prevailing Wage Rates • Payroll and Certified Statement Form
• Plans, Specifications and Drawings • [Addenda]
The Plans, Specifications and Drawings expressly incorporated by reference into this Contract includes, but is not limited to, the Special Provisions for Highway Construction (the “Specifications”), together with the provisions of the Oregon Standard Specifications for Construction (2021) referenced therein.
The Contractor shall comply with the prohibitions set forth in ORS 652.220, compliance of which is a material element of this Contract and failure to comply is a material breach that entitles County to exercise any rights and remedies available under this Contract including, but not limited to, termination for default.
2. Representatives.
Contractor has named as its Authorized Representative to act on its behalf. Owner designates, or shall designate, its Authorized Representative as indicted below (check one):
Unless otherwise specified in the Contract Documents, the Owner designates Stan Monte as its Authorized Representative in the administration of this Contract. The above-named individual shall be the initial point of contact for matters related to Contract performance, payment, authorization, and to carry out the responsibilities of the Owner.
Name of Owner’s Authorized Representative shall be submitted by Owner in a separate writing.
3. Key Persons.
The Contractor’s personnel identified below shall be considered Key Persons and shall not be replaced during the project without the written permission of Owner, which shall not be unreasonably withheld. If the
Contractor intends to substitute personnel, a request must be given to Owner at least 30 days prior to the intended time of substitution. When replacements have been approved by Owner, the Contractor shall provide a transition period of at least 10 working days during which the original and replacement personnel shall be working on the project concurrently. Once a replacement for any of these staff members is authorized, further replacement shall not occur without the written permission of Owner. The Contractor’s project staff shall consist of the following personnel:
Project Executive: shall be the Contractor’s project executive, and will provide oversight and guidance throughout the project term.
Project Manager: shall be the Contractor’s project manager and will participate in all meetings throughout the project term.
Job Superintendent: shall be the Contractor’s on-site job superintendent throughout the project term.
Project Engineer: shall be the Contractor’s project engineer, providing assistance to the project manager, and subcontractor and supplier coordination throughout the project term.
4. Contract Dates.
COMMENCEMENT DATE: Upon Issuance of Notice to Proceed (“NTP”) IN-WATER WORK PERIOD: July 15, 2023 –August 30, 2023 SUBSTANTIAL COMPLETION: September 30, 2023 FINAL COMPLETION: December 31, 2024
Time is of the essence for this Contract. It is imperative that the Work in this Contract reach Substantial Completion and Final Completion by the above specified dates.
5. Insurance Certificates and Required Performance and Payment Bonds.
5.1 In accordance with Section 00170.70 of the Specifications, Contractor shall furnish proof of the required insurance naming Clackamas County as an additional insured. Insurance certificates may be returned with the signed Contract or may be emailed to the County Contract Analyst.
5.2 Primary Coverage: Insurance carried by Contractor under the Contract shall be the primary coverage. The coverages indicated are minimums unless otherwise specified in the Contract Documents.
5.2.1 Workers' Compensation: All employers, including Contractor, that employ subject workers who work under the Contract in the State of Oregon shall comply with ORS 656.017 and provide the required Workers’ Compensation coverage, unless such employers are exempt under ORS
656.126. This shall include Employer’s Liability Insurance with coverage limits of not less than the minimum amount required by statute for each accident. Contractors who perform the Work without the assistance or labor of any employee need not obtain such coverage if the Contractor certifies so in writing. Contractor shall ensure that each of its Subcontractors complies with these requirements. The Contractor shall require proof of such Workers’ Compensation coverage by receiving and keeping on file a certificate of insurance from each Subcontractor or anyone else directly employed by either the Contractor or its Subcontractors.
5.3 Builder's Risk Insurance: During the term of the Contract, for new construction the Contractor shall obtain and keep in effect Builder's Risk insurance on an all risk forms, including earthquake and flood, for an amount equal to the full amount of the Contract, plus any changes in values due to modifications, Change Orders and loss of materials added. Such Builder's Risk shall include, in addition to earthquake and flood, theft, vandalism, mischief, collapse, transit, debris removal, and architect's fees “soft costs” associated with delay of Project due to insured peril. Any deductible shall not exceed $50,000 for each loss, except the earthquake and flood deductible which shall not exceed 2 percent of each loss or $50,000, whichever is greater. The deductible shall be paid by Contractor.
The policy will include as loss payees Owner, the Contractor and its Subcontractors as their interests may appear.
5.4 Builder's Risk Installation Floater: For Work other than new construction, Contractor shall obtain and keep in effect during the term of the Contract, a Builder's Risk Installation Floater for coverage of the Contractor's labor, materials and equipment to be used for completion of the Work performed under the Contract. The minimum amount of coverage to be carried shall be equal to the full amount of the Contract. The policy will include as loss payees Owner, the Contractor and its Subcontractors as their interests may appear. Owner may waive this requirement at its sole and absolute discretion.
5.4.1 Such insurance shall be maintained until Owner has occupied the facility.
5.4.2 A loss insured under the Builder’s Risk insurance shall be adjusted by the Owner and made payable to the Owner as loss payee. The Contractor shall pay Subcontractors their just shares of insurance proceeds received by the Contractor, and by appropriate agreements, written where legally required for validity, shall require Subcontractors to make payments to their Sub-subcontractors in similar manner. The Owner shall have power to adjust and settle a loss with insurers.
5.5 "Tail" Coverage: If any of the required liability insurance is arranged on a "claims made" basis, "tail" coverage will be required at the completion of the Contract for a duration of 36 months or the maximum time period available in the marketplace if less than 36 months. Contractor shall furnish certification of "tail" coverage as described or continuous "claims made" liability coverage for 36 months following Final Completion. Continuous "claims made" coverage will be acceptable in lieu of "tail" coverage, provided its retroactive date is on or before the effective date of the Contract.
Owner’s receipt of the policy endorsement evidencing such coverage shall be a condition precedent to Owner’s obligation to make final payment and to Owner’s final acceptance of Work or services and related warranty (if any).
5.6 Notice of Cancellation or Change: If the Contractor receives a non-renewal or cancellation notice from an insurance carrier affording coverage required herein, or receives notice that coverage no longer complies with the insurance requirements herein, Contractor agrees to notify Owner by fax within five (5) business days with a copy of the non-renewal or cancellation notice, or written specifics as to which coverage is no longer in compliance.