This document appears to be a summary of two scheme options for the placement of temporary towers as part of a state or local government contract opportunity. Scheme A describes placing the towers on top of existing Siderostat concrete footings, while Scheme B involves placing the towers on new concrete footings, with the locations being approximate.

The document does not provide additional details about the overall project scope, response requirements, or contract terms. There is no information about pricing, set-asides, incumbents, funding sources, or other salient details related to this contract opportunity.

View the file

Other files

File Type Posted
NTP Signed.pdf PDF
Prevailing wage for Blue Hills Tower.pdf PDF
1996_C-94-3-1_X1.1_Site_Survey_Extg_Conditi.tif TIF image
standard-contract-frm 2014~7.docx DOCX document
eppform~5.docx DOCX document
2017 9-20 Observ Instrum diagram.pdf PDF
Aerial of GBH.jpg JPG image
RFR-ITT57 2017 10-18.pdf PDF
EFT form.docx DOCX document
busreffm.doc DOC document
Taxpayer identification form.pdf PDF
2017 10-4 Temp Tower Invent.pdf PDF
2017 9-28 Observ siderostat Conc slab Report.pdf PDF
terms and conditions.doc DOC document
vendor agreement - tower.pdf PDF
promptpaydiscountform.docx DOCX document
COMMBUYS create-a-quote-v1~4.docx DOCX document
NTP for tower.pdf PDF
CASL_Form.rtf RTF text file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scheme A - Tower Location on top of existing Siderostat concrete footing

Scheme B - Tower Location on top of new concrete footing.

(Location approximate)