2017 9-20 Observ Instrum diagram.pdf
PDF 404 KB Posted
- Attached to
- ITT 57 2-way radio equip supplies
- Solicitation number
- BD-18-1020-DCRCU-DC250-20935
- Issued by
- Suffolk County, Massachusetts
About this file
This document appears to be a diagram depicting the placement of weather observation instruments at the top of a temporary tower. The instruments include an A. Davis Anemometer & Vane, a B. Belfort Aerovane, a C. NWS 420C, and a D. Contacting Anemometer. The instruments are to be installed at a height to match the existing weather instrumentation within 1 inch, and the minimum span of the arm out from the support is 26 inches, with a maximum span of 48 inches from the center support.
The document provides technical specifications and placement details for the installation of these weather observation instruments, but does not include any information about a state or local contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NTP Signed.pdf | ||
| Prevailing wage for Blue Hills Tower.pdf | ||
| 1996_C-94-3-1_X1.1_Site_Survey_Extg_Conditi.tif | TIF image | |
| standard-contract-frm 2014~7.docx | DOCX document | |
| eppform~5.docx | DOCX document | |
| Aerial of GBH.jpg | JPG image | |
| RFR-ITT57 2017 10-18.pdf | ||
| EFT form.docx | DOCX document | |
| busreffm.doc | DOC document | |
| Taxpayer identification form.pdf | ||
| BHWO temp tower locations.pdf | ||
| 2017 10-4 Temp Tower Invent.pdf | ||
| 2017 9-28 Observ siderostat Conc slab Report.pdf | ||
| terms and conditions.doc | DOC document | |
| vendor agreement - tower.pdf | ||
| promptpaydiscountform.docx | DOCX document | |
| COMMBUYS create-a-quote-v1~4.docx | DOCX document | |
| NTP for tower.pdf | ||
| CASL_Form.rtf | RTF text file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. Davis Anonemometer & Vane. Installed immediately.
Wires to a transmitter ideally located in the building.
B. Belfort Aerovane. Installed immediately.
C. NWS 420C Installed after calibration period. D. Contacting Anemometer.
Installed after calibration period.
A
B
C
D
Placement of Weather Instruments at top of temporary tower.
Height to match existing w/i 1” +/-
EastWest
South
North
Minimum span of arm out from support is 26”. Maximum span of each arm from center support is 48”
File details come from the government source that posted it. Updated .