Technical Questions 080811.pdf

PDF 75 KB Posted

Attached to
Design/Build a Clean Room Federal contract opportunity
Solicitation number
BEP-RFP-11-0017
Issued by
Department of the Treasury Office of the Comptroller of the Currency

About this file

Questions- 08/08/2011

View the file

Other files for this federal contract opportunity

Other files attached to Design/Build a Clean Room, newest first.
File Type Posted
SF-30(AMENDMENT1) Clean Room.docx DOCX document
SF-30(AMENDMENT2) Clean Room.docx DOCX document
answers08.08.11.doc.docx DOCX document
Cleanroomsolitcitation.PDF PDF
Clean Room Questions.pdf PDF
Clean Room Questions.pdf PDF
Clean Room Questions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

305 Settlers Trail, McKinney Texas 75069 | Phone: 469-952-2534 | Cell: 480-735-9548 Service Disabled Veteran Owned, Small Business

Z:\Proposals A-L\Bureau of Engraving\Questions\Technical Questions 080511.docx

August 5, 2011

Crystal Reed-Tweedy, Contract Specialist

Crystal.Reed-Tweedy@bep.gov

Phone: 202-874-2183

Fax: 202-874-3135

Re: Bureau of Engraving Design/Build a Cleanroom, Solicitation Number: BEP-RFP-11-0017

Dear Crystal, Below you will find some additional questions regarding the above referenced project.

1. Can you supply the specifications or cut sheets for the Glove box and Downdraft Table since these affect the HVAC design?

2. Where do you envision the 2000 CFM ventilation exiting the room and the building?

3. Does this single pass air get treated before it mixes with the outside atmosphere?

4. Have you considered the need for an air curtain at the door to buffer entering and leaving contamination?

5. The 18,000 BTUs does not match the room load for even 750 CFM pressurization air for this climate. Please advise.

6. Is the 750 CFM intended to be positive pressure within the room?

7. Is the concrete pad reinforced to code to support the weight of the structure?

Thank you for the opportunity to provide a proposal for this project and providing us with the tour of the location.

Best Regards, Robert Loontiens President