The document is a description of a state and local contract opportunity for the Belfast Keller Road Improvements project from Interstate 95 to Cranston Bluff Road in Brooks County, Georgia. The project consists of roadway widening from a two-lane section to a six-lane section up to Great Ogeechee Parkway, then transitioning to a four-lane divided section to a new high school site approximately 6,100 feet east of I-95. The improvements are being completed to accommodate growth in the area and will include two full access intersections, a roundabout at Heartwood Avenue, and one RCUT at a future access location.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient commercial information. It focuses on the project overview and scope of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Z:\27691\27691.0083\Documents\Construction\Bid\Addenda\Addendum #1 Addendum # 1 Dated October 10, 2024
BELFAST KELLER ROAD IMPROVEMENTS
FROM INTERSTATE 95 TO CRANSTON BLUFF ROAD
PREPARED FOR:
BRYAN COUNTY BOARD OF COMMISSIONERS
T&H PROJECT NO.
J–27691.0083
ADDENDUM NO. 1 October 10, 2024
GENERAL
This Addendum has been issued on behalf of Bryan County Board of Commissioners. The following information should be considered by prospective bidders in preparation of their proposals and is hereby incorporated into the Proposal Documents. Bidders shall be responsible for acknowledging receipt of this addendum in the Bid Form, Document 00313. Failure to do so will result in the proposal being considered non responsive.
PART I – QUESTIONS AND CLARIFICATIONS:
A. QUESTIONS:
1. Question: Will this project utilize the GDOT Asphalt Cement Index, or will it be a Non-
Indexed Project?
Answer: The project will not utilize the GDOT Asphalt Cement Index, thus it will be a
Non-Index project.
2. Question: Are there any Staging Plans for how you want the project to be constructed?
Answer: The are no staging plans for the project; however, as per General Note 35, the contractor shall submit Traffic Control and Staging Plans to Bryan County and the Engineer for approval prior to the start of construction. In addition, these plans should be submittal sufficiently ahead of the start of construction to allow for adequate review and approval by Bryan County and the Engineer.
3. Question: Do you have any Utility Relocation Schedules/Durations for scope of work that is not included in this project?
Answer: The Electrical will be relocated outside of the proposed ROW. Gas will be relocated within the proposed ROW and currently has been permitted. A relocation schedule has been requested from utilities and will be provided when/if received prior to bid. Relocations will not take place prior to construction commencement.
4. Question: Typically, GDOT will use 12.5mm Polymer for the final surface within the limits of Roundabouts, your typical sections only show 12.5mm. Are you sure you don’t want to go with 12.5mm Polymer?
Answer: Yes, the surface pavement will be as specified in the typical section and in the bid form and will not use the polymer.
5. Question: What is the Expected Notice to Proceed Date for this project?
Answer: The Expected Date of Notice to Proceed is January 2025.
BELFAST KELLER ROAD FROM I–95 TO CRANSTON BLUFF ROAD ADDENDUM #1
Z:\27691\27691.0083\Documents\Construction\Bid\Addenda\Addendum #1 Addendum # 1 Dated October 10, 2024
6. Question: The Drainage Profiles in the plans do not seem to match the storm drain shown on the plan view, could you please provide all of the Drainage Profiles for the storm drain pipe shown on the plan view?
Answer: Project adjustments resulted in drainage changes. The plan sheets have been updated, and profiles will be updated in Addendum No. 2.
7. Question: The Drainage Profiles in the plans do not seem to match the storm drain shown on the plan view, could you please provide all of the Drainage Profiles for the storm drain pipe shown on the plan view?
Answer: See answer to question 6.
8. Question: Typical section #2 shows the truck apron and circulatory lanes for the roundabout at the I-95 ramps as new construction. However, plan sheet 13-0002 appears to show that the existing travel lanes & the majority of the existing truck apron is to be retained. Please clarify if the existing truck apron and circulatory travel lanes will be removed and reconstructed as part of this job.
Answer: The Typical Sections have been revised. A portion of the truck apron will be removed and reconstructed.
9. Question: The tuck aprons are shown as 9” Class 3 Paving with Insignia Red color and stamped. The 9” Class 3 paving is used for the concrete travel lanes, which is not colored or stamped. Since these scopes of work will have different unit prices, please add a separate bid item for the truck apron (Class 3 Conc Paving, 9”, Colored & Stamped).
Answer: The truck apron will be paid under 9” Class 3 Conc.
10. Question: Would it be possible to get the CAD Files for this project now so that we can use them to determine the Grading on the project? With this being grading complete – 1 lump sum we need to know as much as possible about the earthwork volumes in order to price the work. The CAD Files will provide what we need.
Answer: Yes, files for earthwork can be provided. Interested parties may request files for earthwork calculations.
11. Question: Can you please confirm that you want Thermoplastic Rumble Strips installed for this project?
Answer: Rumble strips should be installed per detail T-19. The bid form has been updated to incorporate the pay item for rumble strips.
12. Question: Class 1 concrete paving (Section 431) requires an on-site concrete plant and is usually used for larger projects (greater than 50,000 SY). Based on the small quantity on this project (1,000 SY), please change this paving to Class 3 (Section
439).
Answer: Concrete paving items have been updated in the bid form.
PART II – CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
The Proposal Documents shall be changed in the following respects:
SECTION 00313 – BID FORM
Revised and added items.
BELFAST KELLER ROAD FROM I–95 TO CRANSTON BLUFF ROAD ADDENDUM #1
Z:\27691\27691.0083\Documents\Construction\Bid\Addenda\Addendum #1 Addendum # 1 Dated October 10, 2024
PART III – DRAWINGS
1. The plan sheets have been updated. Delete and replace the corresponding plan sheets with the attached:
• Sheet 04-0001
• 05 Series
• 13 Series
• 23 Series
• 25 Series
• 26 Series
All refenced documents are incorporated and made a part of the Specifications for the Project
Belfast Keller Road from I–95 To Cranston Bluff Road.
All other aspects of the project remain unchanged.
THOMAS & HUTTON
Doyle Kelley, P.E.
Project Manager
End of ADDENDUM NO. 1
00313 – 1
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
DOCUMENT 00313
BID FORM
PROJECT IDENTIFICATION: BELFAST KELLER ROAD IMPROVEMENTS FROM
INTERSTATE 95 TO CRANSTON BLUFF ROAD
CONTRACT IDENTIFICATION
AND NUMBER: J –27691.0083
THIS BID IS SUBMITTED TO: Bryan County
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening, or for such longer period of time BIDDER may agree to in writing upon request of OWNER.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:
a. BIDDER has examined and carefully studied the Plans and Specifications for the work and contractual documents relative thereto, and has read all Technical
Provisions, Supplementary Conditions, and General Conditions, furnished prior to the opening of Bids, and can fulfill the requirements of the work to be performed.
b. BIDDER further acknowledges hereby receipt of the following Addenda:
ADDENDUM NO. DATE
1 October 10,2024
c. BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions possibly affecting cost, progress, performance and furnishing of the Work;
d. BIDDER is familiar with and is satisfied to all federal, state, and local Laws and
Regulations possibly affecting cost, progress, performance and furnishing of the
Work.
00313 – 2
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
e. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structure at or contiguous to the site
(except underground Facilities) have been identified in the Supplementary
Conditions. BIDDER acknowledges such reports and drawings are not Contract
Documents and may not be complete for BIDDER’s purposes. BIDDER acknowledges OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the
Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions
(surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance and furnishing of the
Work in accordance with the times, price and other terms and conditions of the
Bidding Documents.
f. BIDDER is aware of the general nature of Work to be performed by Owner and others at the site relating to Work for which this Bid is submitted as indicated in the
Bidding Documents.
g. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the
Bidding Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
h. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies BIDDER has discovered in the Bidding Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
i. This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.
4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s):
00313 – 3
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
ROADWAY CONSTRUCTION
150-1000 Traffic Control 1 ls $ –
151-1000 Mobilization 1 ls $ –
163-0232 Temporary Grassing 50 ac $ –
163-0240 Mulch 460 tn $ –
163-0301 Construct and Remove Construction
Exits 4 ea $ –
163-0550 Construct and Remove Inlet Sediment
Trap 265 ea $ –
165-0010 Maintenance of Temporary Silt Fence, Type A 12,600 lf $ –
165-0030 Maintenance of Temporary Silt Fence, Type C 5,000 lf $ –
165-0101 Maintenance of Construction Exits 4 ea $ –
165-0105 Maintenance of Inlet Sediment Traps 265 ea $ –
167-1000 Water Quality Monitoring and Sampling 4 ea $ –
167-1500 Water Quality Inspections 18 mo $ –
171-0010 Temporary Silt Fence, Type A 12,600 lf $ –
171-0030 Temporary Silt Fence, Type C 5,000 lf $ –
205-0001 Unclassified Excavation 3,500 cy $ –
207-0203 Found Bkfill Matl, Tp 2 1,500 cy $ –
210-0100 Grading Complete 1 ls $ –
310-5120 Gr Aggr Base Crs, 12 Inch, Incl Material 41,100 sy $ –
402-1812 Recycled Asph Conc Leveling, Inc Bitum
Matl & H Lime 7,500 tn $ –
402-3121 Asph Conc 25 mm Superpave, GP 1 or 2
, Incl Bitum Matl & H Lime (3.5") 10,800 tn $ –
402-3130 Aph Conc 12.5 MM Superpave, GP 2
Only, Incl Bitum Matl & H Lime (2") 6,400 tn $ –
402-3190 Asph Conc 19mm Superpave, GP 1 or 2, Incl Bitum Matl & H Lime (2" & 3") 6,800 tn $ –
413-0750 Tack Coat 7,500 gl $ –
415-5000
Asphaltic Concrete Open Graded
Crack Relief Interlayer, GP2 Only, Incl
Bitum Matl & H Lime (1")
1,100 tn $ –
432-5010 Mill Asph Conc Pvmt, Variable Depth 19,300 sy $ –
439-0018 Plain PC Conc Pvmt, CL 3 Conc, 8 Inch
Thk 1,000 sy $ –
439-0020 Plain PC Conc Pvmt, CL 3 Conc, 9 Inch
Thk 1,500 sy $ –
441-0104 Conc Sidewalk, 4 In 5,500 sy $ –
441-0740 Concrete Median, 4 In 1,830 sy $ –
441-0748 Concrete Median, 6 In 300 sy $ –
00313 – 4
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
441-5008 Concrete Header Curb, 6 In, TP 7 400 lf $ –
441-5025 Concrete Header Curb, 4 In, TP 9 600 lf $ –
441-6222 Conc Curb & Gutter, 8in X 30in, TP 2 15,400 lf $ –
441-6740 Conc Curb & Gutter, 8in X 30in, TP 7 14,600 lf $ –
446-1100 Pvmt Reinf Fabric Strips, TP2, 18 Inch
Width 7,000 lf $ –
500-3201 Class B Concrete, Retaining Wall 45 cy $ –
500-3900 Class B Concrete, Incl Reinf Steel 20 cy $ –
500-9999 Class B Conc, Base or Pvmt Widening 100 cy $ –
550-2180 Side Drain Pipe, 18 In, H 1-10 200 lf $ –
550-4118 FlaredEnd Section 18 In, Side Drain 10 ea $ –
550-4218 FlaredEnd Section 18 In, Storm Drain 28 ea $ –
550-4224 FlaredEnd Section 24 In, Storm Drain 17 ea $ –
550-5180 Storm Drain Pipe, 18 In, Class III 7,380 lf $ –
550-5183 Storm Drain Pipe, 18 In, Class V 50 lf $ –
550-5240 Storm Drain Pipe, 24 In, Class III 1,525 lf $ –
550-5243 Storm Drain Pipe, 24 In, Class V 700 lf $ –
550-5423 Storm Drain Pipe, 42 In, Class V 550 lf $ –
603-2181 Stn Dumped Rip Rap, TP3, 18 In 450 sy $ –
603-7000 Plastic Filter Fabric 450 sy $ –
611-4003 Reconstruct Misc Drainage Structure 4 ea $ –
634-1200 Right Of Way Markers 62 ea $ –
636-1033 Highway Signs, TP1 Matl, Refl Sheeting, TP9
220 sf $ –
636-1036 Highway Signs, TP1 Matl, Refl Sheeting, TP11
410 sf $ –
636-1077 Highway Signs, Alum Extruded Panels, Refl Sheeting, TP 9 130 sf $ –
636-2070 Galv Steel Posts, TP7 1,040 lf $ –
636-2080 Galv Steel Posts, TP8 135 lf $ –
636-2090 Galv Steel Posts, TP9 355 lf $ –
636-3010 Ground-Mounted Breakaway Sign
Support 9 ea $ –
639-3014 Steel Strain Pole, Type IV, Incl Luminaire
Arm 8 ea $ –
641-1200 Guardrail, TP W 200 lf $ –
641-5001 Guardrail Anchorage, TP 1 4 ea $ –
653-0110 Thermoplastic Pvmt Marking, Arrow, TP 1 10 ea $ –
653-0120 Thermoplastic Pvmt Marking, Arrow, TP 2 56 ea $ –
653-0130 Thermoplastic Pvmt Marking, Arrow, TP 3 1 ea $ –
653-0132 Thermoplastic Pvmt Marking, Arrow, TP
3A 1 ea $ –
653-0296 Thermoplastic Pvmt Marking, Word, TP 15 8 ea $ –
653-1501 Thermoplastic Solid Traf Stripe, 5in, White 22,100 lf $ –
00313 – 5
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
653-1502 Thermoplastic Solid Traf Stripe, 5in, Yellow 600 lf $ –
653-1704 Thermoplastic Solid Traf Stripe, 24in, White 310 lf $ –
653-1804 Thermoplastic Solid Traf Stripe, 8 In, White 5,540 lf $ –
653-1906 Thermoplastic Solid Traf Stripe, 6 In, White 3,350 lf $ –
653-3501 Thermoplastic Skip Traf Stripe, 5 In, White 17,700 glf $ –
653-4503 Thermoplastic Skip Traf Stripe, 6 In, White 60 glf $ –
653-4830 Thermoplastic Skip Traf Stripe, 18 In, White 160 glf $ –
653-6004 Thermoplastic Traf Striping, White 1,250 sy $ –
653-6006 Thermoplastic Traf Striping, Yellow 100 sy $ –
654-1003 Raised Pvmt Markers TP3 350 ea $ –
655-6030 Preformed Plastic Pvmt Mkg Arrow, Contrast (Black-White), TP 3 2 ea $ –
657-5535 Preformed Plastic Pvmt Mkg Arrow, Contrast (Black-White), TP 3A 2 ea $ –
657-1085 Preformed Plastic Solid Pvmt Mkg, 8 In, Contrast (Black-White), TP PB 1,500 lf $ –
657-1110 Preformed Plastic Solid Pvmt Mkg, 11 In, Contrast (Black-White), TP PB 850 lf $ –
657-3085 Preformed Plastic Skip Pvmt Mkg, 8 In, Contrast (Black-White), TP PB 200 glf $ –
657-4998 Preformed Plastic Pavement Marking, Contrast (Black-White), TP PB 1,800 sy $ –
667-1000 Signal Installation No- 1 (Access
1/Access2) 1 ls $ –
667-1000 Signal Installation No- 2 (US 278 & Great
Ogeechee PkwyAccess3) 1 ls $ –
668-1100 Catch Basin, GP 1 79 ea $ –
668-1110 Catch Basin, GP 1, Addl Depth 20 lf $ –
668-2100 Drop Inlet, GP 1 34 ea $ –
668-2110 Drop Inlet, GP 1, Addl Depth 20 lf $ –
668-2200 Drop Inlet, GP 2 5 ea $ –
668-2210 Drop Inlet, GP 2, Addl Depth 20 lf $ –
668-7018 Drain Inlet, 18 In 4 ea $ –
680-6140 Luminaire, TP4, LED 8 ea $ –
682-2120 Pull Box, Type 2 20 ea $ –
682-2130 Pull Box, Type 3 8 ea $ –
682-2150 Pull Box, Type 5 2 ea $ –
682-6219 Conduit, Nonmetl, TP 2, 1 In 200 lf $ –
682-6222 Conduit, Nonmetl, TP 2, 2 In 160 lf $ –
682-6233 Conduit, Nonmetl, TP 3, 2 In 1,710 lf $ –
682-9950 Directional Bore- Signal No 1 100 lf $ –
00313 – 6
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF
ITEM DESCRIPTION
QUANTITY COST
UNITS MEASURE
PER
UNIT
TOTAL COST
682-9950 Directional Bore- Signal No 2 90 lf $ –
700-6910 Permanent Grassing 19.00 ac $ –
700-7000 Agricultural Lime 75.00 tn $ –
700-8000 Fertilizer Mixed Grade 23.00 tn $ –
700-8100 Fertilizer Nitrogen Content 940 lb $ –
1001 Landscaping 1 ls $ –
1005 Lighting 1 ls $ –
1010 Handrail 1 ls $ –
TOTAL
PROJECT
TOTAL BID:
and _____ /100 Dollars
Unit Prices have been computed in accordance with paragraph 11.03.C of the General
Conditions.
BIDDER acknowledges estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities determined as provided, determined as provided in the Contract Documents.
5. BIDDER agrees the Work in the area from Sta. 172+29.00 to 206+42.14 shall be substantially complete by September 1, 2025. The remainder of the project shall be substantially complete by July 1, 2026 and completed and ready for final payment by August 15, 2026.
6. BIDDER accepts provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within times specified in the Agreement.
7. The following documents are attached to and made a condition of this Bid:
a. Required Bid Security in the form of 10 percent of the Bid Total Price.
8. The undersigned further agrees in case of failure on his/her part to execute the said contract and the Bond within 30 consecutive calendar days after written notice being given of the award of the contract, the check or bid bond accompanying this bid, and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure, otherwise, the check or bid bond accompanying this proposal shall be returned to the undersigned.
00313 – 7
Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #1 dated 10/10/2024
9. Communications concerning this Bid shall be addressed to:
Doyle D. Kelley, PE
Thomas & Hutton
50 Park of Commerce Way
Savannah, GA 31405
(912)721–4160 kelley.d@tandh.com
10. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions of Instructions.
SUBMITTED 2024.
CONTRACTOR'S NAME
ADDRESS:
BY:
State Contractor License No.
DURING THE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH UTILITIES
ARE BASED ON INFORMATION OBTAINED FROM UTILITY COMPANIES.
13. THIS IS NOT A SUE UTILITY LOCATION PROJECT. UTILITIES SHOWN
THAT WILL BE REMOVED OR DESTROYED TO ALLOW FOR CONSTRUCTION.
TREES WITHIN THE CONSTRUCTION LIMITS OR LIMITS OF DISTURBANCE
TREES TO REMAIN IN THE RIGHT OF WAY. THIS DOES NOT APPLY TO
TRAILER PLACEMENT, ETC.) OCCUR UNDER THE DRIP LINE OF EXISTING
VEHICULAR USE, BORROW OR WASTE ACTIVITIES, SEDIMENT BASINS,
ACTIVITIES (SUCH AS THE USE OF EASEMENTS, STAGING,CONSTRUCTION,
12. THE CONTRACTOR SHALL ENSURE THAT NO CONSTRUCTION-RELATED
FOREST SERVICE SOUTHERN RESEARCH STATION FOR REFERENCE.
PLANTS IN SOUTHERN FORESTS' GTR SRS-131, PRODUCED BY THE USDA
TREE - PAULOWNIA TMENTOSA SEE 'A MANAGEMENT GUIDE FOR INVASIVE
BROUSSONETIA PAYRIFERA CHINABERRY - MELIA AZEDARACH PRINCESS
ALTISSIMA WHITE MULBERRY - MORUS ALBA PAPER MULBERRY -
MIMOSA- ALBIZIA JULIBRISSIN TREE OF HEAVEN - AILANTHUS
PROTECTION AND SHOULD BE REMOVED IF POSSIBLE. THESE INCLUDE:
11. INVASIVE OR UNDESIRABLE SPECIES DO NOT QUALIFY FOR ANY
INVASIVE PEST PLANTS.
SERVICE SOUTHERN RESEARCH STATION FOR REFERENCE ON SPECIFIC
SOUTHERN FORESTS' GTR SRS-131, PRODUCED BY THE USDA FOREST
201.3.05.A. SEE 'A MANAGEMENT GUIDE FOR INVASIVE PLANTS IN
SPECIFICATION SECTION 201-CLEARING AND GRUBBING RIGHT OF WAY,
10. INCLUDE ERADICATION OF INVASIVE SPECIES IF ENCOUTERED PER
ITEMS. COST WILL BE INCLUDED IN OVERALL BID SUBMITTED.
9. NO SEPARATE PAYMENT WILL BE MADE FOR TEMPORARY DRAINAGE
DRAINS AND BOX CULVERTS.
8. FOUNDATION BACKFILL MATERIAL TP II WILL BE USED AT ALL CROSS
CONSTRUCTION DEBRIS AT NO ADDITIONAL COST TO THE PROJECT.
SHOWN IN GA. SPECIFICATION 201 TO DISPOSE OF EXISTING BRIDGE /
CONTRACTOR SHALL PROVIDE AN ENVIRONMETALLY APPROVED SITE AS
CONSTRUCTION DEBRIS WITHIN THE PROJECT'S LIMITS. THE
7. THERE IS NO KNOWN SUTIBLE PLACE TO BURY EXISTING BRIDGE/
INCLUDED IN THE LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT REMOVAL AND PREPARATION, SHALL ALSO BE
JOINTS ASSOCIATED WITH SHOULDER REMOVAL, AS WELL AS ALL OTHER
IN THE LUMP SUM BID FOR GRADING COMPLETE. SAWED LONGITUDINAL
TO BE CONSTRUCTED SHALL BE REMOVED. REMOVAL SHALL BE INCLUDED
6. EXISTING PAVED SHOULDERS WHERE NEW TRAVEL OR TURN LANES ARE
COMPLETE.
STRUCTURES SHALL BE INCLUDED IN THE LUMP SUM BID FOR GRADING
ALL COSTS ASSOCIATED WITH THE REMOVAL OF THESE PIPES AND
CONSTRUCTION LIMITS ARE TO BE REMOVED UNLESS OTHERWISE NOTED.
5. ALL EXISTING PIPES AND STRUCTURES WITHIN THE PROPOSED
INFORMATION.
STANDARD SPECIFICATION AND SUPPLEMENTS THERETO FOR ADDITIONAL
LANDFILL OR IN AN ENGINEERED FILL. SEE SECTION 201 OF THE
PERMITTED SOLID WASTE FACILITY, A PERMITTED INERT WASTE
OUTSIDE THE PROJECT RIGHT OF WAY SHALL BE PLACED IN EITHER A
OCCURRING IN THEM. ALL COMMON FILL OR EXCESS MATERIAL DISPOSED
ENVIRONMENTALLY APPROVED PRIOR TO CONSTRUCTION ACTIVITIES
4. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE
FOR PIPE ON THE PROJECT.
WRAPPING PIPE JOINTS SHALL BE INCLUDED IN THE OVERALL COST
MINIMUM OVERLAP. EQUIVALENT TO MIRAFI 14ON. THE COST FOR
OF FILTER FABRIC, 4'-0" WIDE. CENTERED ON JOINT WITH A 1'-0"
3. ALL CONCRETE PIPE JOINTS SHALL BE WRAPPED WITH TWO LAYERS
THE COST FOR PIPE ON THE PROJECT.
TO THE COST OF THE PROJECT AND THE COST SHALL BE INCLUDED IN
(EXISTING AND PROPOSED) SHALL BE CONSIDERED INCIDENTAL
THE FLUSHING AND CLEANING OF DROP INLETS, CULVERTS AND PIPES
COMPLETION OF CONSTRUCTION TO REMOVE ANY SILT AND DEBRIS.
2. CONTRACTOR IS TO FLUSH ALL RETAINED INLETS AND PIPE AT THE
FOR THIS PROJECT.
PROJECT IS MORE THAN 1.0 ACRE, A NOTICE OF INTENT IS REQUIRED
1. SINCE THE PROJECT DISTURBED AREA ASSOCIATED WITH THIS
CROSSING ARE NECESSARY.
AND THE TOPS OF PROPOSED RELOCATED WATER MAINS WHERE VERTICAL
CLEARANCE SEPARATION BETWEEN THE BOTTOM OF PROPOSED STORM PIPES
30. CONTRACTOR TO MAINTAIN A MINIMUM OF 18" OF VERTICAL
COMPANY PRIOR TO CONSTRUCTION.
OF THE UTILITIES. AND SHALL COORDINATE WITH THE LOCAL UTILITY
IMPACT EXISTING UTILITIES ONLY IF NECESSARY FOR THE PROTECTION
MAINS, GAS LINES, AND SEWER MAINS, CONTRACTPR TO REMOVE AND
EXISTING UTILITIES. INCLUDING EXISTING POWER LINES, WATER
29. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
28. THIS PROJECT WILL NOT INCLUDE ASPHALT INDEXING.
PRIOR TO CONSTRUCTION.
COORDINATE WITH BRYAN COUNTY AND UTILITY OWNER A MINIMUM OF 72
27. ALL EXISTING GAS LINES ARE ACTIVE. CONTRACTOR TO
INTERRUPTIONS.
COORDINATE WITH CITY OF RICHMOND HILL REGARDING SERVICE
26. ALL EXISTING WATER & SEWER MAINS ARE ACTIVE. CONTRACTOR TO
DISTRICT'S FIELD MANUAL (THE GREEN BOOK).
WITH THE STATE OF GEORGIA SOIL AND WATER CONSERVATION
EROSION CONTROL PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE
EROSION CONTROL PRACTICES ONCE CONSTRUCTION IS COMPLETE. ALL
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REMOVING
UNPAVED AREAS, CONSTRUCTION ACCESS AND STORM WATER MONITORING.
PROTECTION, SILT FENCE INSTALLATION AS NEEDED, GRASSING IN
PRACTICES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, INLET
25. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL
BRYAN COUNTY ON ANY PROPOSED DISTURBANCE TO ACCESS.
TIMES DURING CONSTRUCTION. COORDINATE WITH PROPERTY OWNERS AND
24. MAINTAIN ACCESS TO THE PROPERTIES AND SIDE ROADS AT ALL
IN EASEMENTS THAT WERE LABELED TO REMAIN.
23. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF DAMAGED ITEMS
BETTER AFTER CONSTRUCTION IS COMPLETED.
22. RESTORE TEMPORARY EASEMENTS AREA TO EXISTING CONDITIONS OR
THE PLANS.
21. UTILIZE CLASS V REINFORCED CONCRETE PIPE WHERE NOTED IN
INSTALLCONDUIT/EQUIPMENT.
PRIOR TO ANY NEW PAVING. NO NEW PAVING SHALL BE CUT TO
20. ALL CONDUIT WHICH IS RUN UNDER ROADWAY SHALL BE INSTALLED
ITEM IS TO BE INCLUDED WITH THE COST OF THE CONDUIT.
GALVANIZED PULL WIRE IN EACH EMPTY CONDUIT. THE COST OF THIS
19. THE CONTRACTOR SHALL INSTALL A NYLON PULL CORD OR
WITHIN THE RIGHT OF WAY.
ON THE DRAWING ARE DIAGRAMMATIC. CONTRACTOR SHALL INSTALL THEM
18. ALL CONDUIT AND ELECTRICAL JUNCTION BOXES (EJB) PLACEMENTT
EARTH AT A DEPTH OF NOT LESS THAN 24".
INSTALLED UNDERNEATH ROADWAYS AND DRIVES SHALL BE BUIRIED IN
17. ALL UNDERGROUND CONDUIT SHALL BE SCH 40 PVC. CONDUIT
PROCEDURES SHALL FOLLOW GDOT STANDARD SPECIFICATIONS.
BE PAID FOR IN OVERALL COST OF BID. TESTING FREQUENCY AND
OF ALL REQUIRED QUALITY TESTING SERVICES. COST OF TESTING SHALL
16. CONTRACTOR SHALL BE RESPONSIBLE FOR EMPLOYMENT AND PAYMENT
WILL BE CUT FLUSH WITH EXISTING GROUND.
OUTSIDE OF CUT/FILL LIMITS. ALL STUMPS OUTSIDE CUT/FILL LIMITS
BELFAST KELLER ROAD & SIDE ROADS. NO GRUBBING WILL BE ALLOWED
15. CONTRACTOR SHALL CLEAR AND GRUB ENTIRE RIGHT OF WAY ALONG
AND GRUBBING.
SPECIFICATIONS AND WILL BE INCLUDED IN PRICE BID FOR CLEARING
ACCORDANCE WITH SECTION 411 OF THE GEORGIA STANDARD
REQUIRED, SAW CUT OF EXISTING PAVEMENT WILL BE REQUIRED IN
14. IN AREAS WHERE NEW PAVEMENT OR PAVEMENT WIDENING IS
REPORT.CONTRACTOR MAY EVALUATE NATIVE SOIL FOR CONFORMITY.
CONFORMITY TO TESTING AND SPECIFICATIONS IN GEOTECHNICAL
INFORMATIONAL PURPOSES. CONTRACTOR SHALL BE RESPONSIBLE FOR
39. GEOTECHNICAL REPORT PROVIDED TO CONTRACTOR FOR
COASTAL ELECTRIC COOPERATIVE DURING CONSTRUCTION.
ARE THE RESPONSIBILITY OF THE CONTRACTOR. COORDINATE WITH
ALL OTHER LIGHTING INSTALLATIONS OR RELOCATIONS ON THE PROJECT
INSTALLED BY COASTAL ELECTRIC COOPERATIVE.
38. LIGHTING IN THE AREA OF STA. 174+00 TO STA. 182+00 WILL BE
REPRESENTATIVE.
THIS BID ITEM IS ONLY TO BE USED AFTER APPROVAL FROM OWNER
UNSUITABLE MATERIALS THAT MAY BE ENCOUNTERED ON THE PROJECT.
THIS ITEM IS TO COVER THE REMOVAL AND REPLACEMENT OF
37. PAY ITEM "UNCLASSIFIED EXCAVATION" INCLUDED IN BID FORM.
INFORMATIONAL PURPOSES ONLY.
36. GEOTECHNICAL REPORT INCLUDED IN SPECIFICATIONS FOR
35. LANE CLOSURES ARE PROHIBITED BETWEEN 7 A.M. AND 8:30 A.M.
TRAFFIC CONTROL.
PAVEMENT REQUIRED TO STAGE THE JOB IN THE LUMP SUM BID FOR
TRAFFIC CONTROL. THE CONTRACTOR SHALL INCLUDE ANY TEMPORARY
POTENTIAL ROAD DETOURS) SHALL BE INCLUDED IN LUMP SUM BID FOR
CONSTRUCTION. ALL SIGNS AND NECESSARY MATERIALS (INCLUDING
TO BRYAN COUNTY AND THE ENGINEER FOR APPROVAL PRIOR TO
34. CONSTRACTOR SHALL SUBMIT TRAFFIC CONTROL AND STAGING PLANS
COUNTY AND THE ENGINEER IMMEDIATELY.
SHOWN ON THE CONSTRUCTION PLANS, CONTRACTOR SHALL NOTIFY BRYAN
33. IF ANY UTILITIES ARE LOCATED IN THE FIELD THAT ARE NOT
CONTROL.
OF THE JOB SHALL BE INCLUDED IN THE LUMP SUM BID FOR TRAFFIC
32. ANY TEMORARY PAVING REQUIRED TO FACILITATE THE CONSTRUCTION
CONSTRUCTION.
ANY POTENTIAL UNSUITABLE MATERIAL BE ENCOUNTERED DURING
31. CONTRACTOR SHALL NOTIFY BRYAN COUNTY AND ENGINEER SHOULD
CONCRETE - DRIVEWAY CONRETE, 8 IN THICK
GRADED AGGREGATE BASE 6 IN
CONC. 19 MM SUPERPAVE, GP1 OR 2 INCL BITUM MATL & H LIME,
GP2 ONLY, INCL BITUM MATL & H LIME, 220 LB,SY RECYCLED ASPHALT
ASPHALT - 165 LB/SY RECYCLED ASPHALT CONC., 12.5 MM SUPERPAVE,
COMMERCIAL:
CONCRETE - DRIVEWAY CONCRETE, 6 IN THICK
GP2 ONLY, INCL BITUM MATL & H LIME, GRADED AGGREGATE BASE 6 IN
ASPHALT - 165 LB/SY RECYCLED ASPHALT CONC., 12.5 MM SUPERPAVE,
RESIDENTIAL:
CONSTRUCTED USING:
AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED. DRIVES SHALL BE
THE ENGINEER PRIOR TO MAKING ANY REVISIONS TO LOCATION, WIDTH,
AVAILABLE DATA: THE CONTRACTOR SHALL OBTAIN THE APPROVAL FROM
PLANS. EXISTING DRIVEWAY LOCATIONS ARE SHOWN FROM THE BEST
DRIVES SHALL BE 24 FEET WIDE UNLESS NOTED OTHERWISE IN THE
AT THE THROAT UNLESS NOTED OTHERWISE IN THE PLANS. COMMERCIAL
EARTH/GRAVEL DRIVES. RESIDENTIAL DRIVES SHALL BE 14 FEET WIDE
FOR ASHPALT, CONCRETE FOR CONCRETE, AND ASPHALT FOR
GREATER. ALL DRIVEWAYS SHALL BE REPLACED AS FOLLOWS ASHPALT
BACK TO THE TIE IN POINT OR REQUIRED RIGHT OF WAY, WHICHEVER IS
43. ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED WILL BE PAVED
TO BE INCLUDED IN THE COST OF THE CONCRETE PAY ITEM.
42. THE INSIGNIA RED #31136 COLOR USED FOR THE TRUCK APRON IS
OVERALL BID FOR TRAFFIC CONTROL.
THE PORTABLE CHANGEABLE MESSAGE SIGNS IS TO BE INCLUDED IN THE
CHANGE USING PORTABLE CHANGEABLE MESSAGE SIGNS. THE COST OF
CONTRACTOR SHALL INFORM THE TRAVELING PUBLIC OF THE UPCOMING
41. TWO (2) WEEKS PRIOR TO OPENING OF THE ROUNDABOUTS, THE
PAID FOR UNDER THE BID ITEM "LANDSCAPING".
TRANSPORTATION STANDARDS AND DETAIL RA-1. THIS WORK SHALL BE
40. ROUNDABOUT LANDSCAPING SHALL FOLLOW GEORGIA DEPARTMENT OF
UTILITY OWNER SERVICE
CITY OF RICHMOND HILL WATER
CITY OF RICHMOND HILL SEWER
ATLANTA GAS LIGHT NATURAL GAS
CLEARWAVE FIBER FIBER
COASTAL ELECTRIC POWER
COMCAST FIBER
BRIGHT SPEED FIBER
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
10/10/2024 arce.r
GPLOT-ORD
gplotborder-ORD-PO.tbl
0027691_4.dgn
8:38:53 AM
GPLN-CE
0001-04
BELFAST KELLER ROAD
I-95 TO CRANSTON BLUFF
GENERAL NOTES
www.thomasandhutton.com
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
N
A
B
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 3 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
CL
Profile Grade
2%
4% 4%
2:1 MAX
2:
MAX
2:
MAX
2:1 MAX
Sidewalk
Shoulder
2%
G H
I
R
D
2%2%
2'-6"
2'-6"
4'0"
2'-0"
24'-0" to 10'-0" 0'-6" to 14'-0"
Varies
Travel Lane
0'-0" to 24'-2"
2%
R
D
2'-6" 2'-6"
I I
0'-0" to 14'-5"
Slip Lane
12'-0" to 23'-4"
VARIES
Varies
8'-0" 2'-0"
16'-0"
PAY LIMITS FOR GAB
PAY LIMITS FOR GAB
Q
Varies
Median
Raised Concrete
Varies
Median
Raised Grassed
Varies
TURN LANE
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
TURN LANES ALSO APPLY TO OPPOSITE-HAND SECTIONS. SEE
TYPICAL SECTIONS ILLUSTRATING SUPERELEVATION AND 1.
NOTES:
NOT to SCALE
BELFAST KELLER ROAD/CR90
TANGENT SECTION
WIDENING & FULL DEPTH CONCRETE
TYPICAL SECTION #1
STA. 139+81.00 to STA. 141+50.00
STA. 130+03.92 to STA 133+78.19 NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
M M
Existing Pavement Existing Pavement
2%
2'-0" 2'-0"
R
D
M
2%
2'-0"
Travel Lane
12'-0"
Varies
PAVEMENT WIDENING
28'-4" to 90'-5"
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
10/10/2024 anderson.v
GPLOT-ORD
0027691_5.dgn
8:30:16 AM
0001-05
TYPICAL SECTIONS
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 3 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
BELFAST KELLER ROAD/CR90
ROUNDABOUT
TYPICAL SECTION #2
STA. 139+00.00 to STA. 139+80.74
Circulatory Roadway WidthIsland Radius
LC
Inscribed Circle Radius
CENTER OF ROUNDABOUT
2'-6"
K
18'-0"
79' 6.6" to 95'6"
VARIES
8"6"
J
PAY LIMITS FOR GAB
PAY LIMITS FOR GAB
42'-3" 9'-0" to 17'-0"
6"
Truck Apron Circulatory Roadway Width
19'-0" to 21'-8.2"
VARIES
Divider Raised Lane
2'-0" to 5'-0"
Varies
L
D
1% to 2% 1% (Typ)1% to 2%
1% (Typ)1% to 2% 1% (Typ)
6:1 to 10:1 (Typ)
Type 9 Curb Face Concrete Median
Monolithic Integral
H
Q
0' to 7'-0"
Varies
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
M
D
2:
MAX
2:1 MAX
2%
Q
7'-6"
10'-0"
Shoulder
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
10/10/2024 anderson.v
GPLOT-ORD
8:30:16 AM
0002-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 3 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
SINCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
RAMP SECTION
TYPICAL SECTION #3
STA. 718+00.00 to STA. 718+22.50
RAMP C
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
2:
MAX
4:1
C L
Existing Ramp C
O
PAY LIMITS FOR GAB
4'-0"
VARIES
0'-0" to 28'-0"
2% or SE
VARIES
12'-2" to 44'-0"
4% or SE
Slip Lane
Existing Pavement
2:
MAX
2:1 MAX
Sidewalk
Shoulder
2%2%2%
2'-6"
4'0"
2'-6"
Slip Lane
18'
8'-0" 2'-0"
16'-0"
4'-0"
N R
D
S
C L
Existing Ramp C
PAY LIMITS FOR GAB
2% or SE Existing Pavement
R
D
S
2'-6"
0'-0" to 34'-0"
Varies
Median
Raised Concrete
STA. 718+22.50 to STA. 718+89.27
RAMP C
Varies
H
GQ
II
H
2:
MAX
4:1
12'-0" 12'-0"
10'-0"
PAVED
Outside Shoulder
Q
2'-0"
4'-0"
4%/SE
STA. 716+50.00 to STA. 718+00.00
RAMP C CONCRETE SHOULDER
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
10/10/2024 anderson.v
GPLOT-ORD
8:30:17 AM
0003-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 3 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
GADOT
LOWNDES
GADOT
LOWNDES
NOT to SCALE
BELFAST KELLER ROAD/CR90
TANGENT SECTION
WIDENING & FULL DEPTH ASPHALT
TYPICAL SECTION #4
STA. 141+50.00 to STA. 166+61.72
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
24'-0" TO 48'-0"
VARIES
20'-0" 36'-0" to 60'-0"
VARIES
CL
Profile Grade
2% 2%
12'-0"12'-0" 12'-0"
Travel LaneTravel LaneTravel Lane
2'-6" 2'-6"
4% 4%
16'-0"
8'-0"4'-0"
2:
MAX
2:1 MAX
2'-6"
Sidewalk
Shoulder
2%
13'-0"
2%
5'-0" 4'-0"
2:1 MAX
2:
MAX
2'-6"
Sidewalk
Shoulder
OF CONSTRUCTION CENTERLINE
SHIFTS FROM LEFT TO RIGHT
24' EXISTING PAVEMENT
0'-0" TO 10'-0"
VARIES
MEDIAN
0'-0" TO 10'-0"
VARIES
0'-0" TO 12'-0"
VARIES
Turn Lane
PAY LIMITS FOR GAB PAY LIMITS FOR GAB
A
B
C
D
N
E
A
B
F
P
C
G
G
Existing Pavement
A
B
C
D
N
H I
H
I
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
12'-0"
Travel Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
12'-0"
Travel Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
2.5%
24'-0"
Clear Zone
0'-0" TO 12'-0"
VARIES
Turn Lane
16'-0"
5'-0"4'-0"
2:1 MAX
2'-6"
Sidewalk
Shoulder
2%
Q G H
2:
MAX
VARIES 4'-0"
4:1 TYP
4:
TY
P
DITCH SECTION
2%
5'-0" 4'-0"
2'-6"
Sidewalk
Q
G
H
13'-0"
Shoulder
4:1
MAX
2:
MAX
2:1 MAX
24'-0"
Clear Zone
E d g e o f T r a v e l
L a n e
DITCH SECTION
VARIES4'
NOTE: END SIDEWALK STA 150+55.20NOTE: END SIDEWALK STA 163+49.59
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
10/10/2024 anderson.v
GPLOT-ORD
0004-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 3 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
GADOT
LOWNDES
NOT to SCALE
BELFAST KELLER ROAD/CR90
TANGENT SECTION
WIDENING & FULL DEPTH ASPHALT
TYPICAL SECTION 5
STA. 179+35.26 to STA. 203+00.00
STA. 166+61.72 to STA. 176+62.52
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
24'-0" TO 48'-0"
VARIES
20'-0" 36'-0" to 60'-0"
VARIES
CL
Profile Grade
2% 2%
12'-0"12'-0" 12'-0"
Travel LaneTravel LaneTravel Lane
2'-6" 2'-6"
4% 4%
16'-0"
2:
MAX
2:1 MAX
2'-6"
Shoulder
2%
13'-0"
2%
2:1 MAX
2:
MAX
2'-6"
Shoulder
OF CONSTRUCTION CENTERLINE
SHIFTS FROM LEFT TO RIGHT
24' EXISTING PAVEMENT
0'-0" TO 10'-0"
VARIES
MEDIAN
0'-0" TO 10'-0"
VARIES
0'-0" TO 12'-0"
VARIES
Turn Lane
PAY LIMITS FOR GAB PAY LIMITS FOR GAB
A
B
C
D
N
E
A
B
F
P
C
Existing Pavement
A
B
C
D
N
H I
H
I
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
12'-0"
Travel Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
24'-0"
Clear Zone
0'-0" TO 12'-0"
VARIES
Turn Lane
16'-0"
5'-0"4'-0"
2:1 MAX
2'-6"
Sidewalk
Shoulder
2%
Q G H
2:
MAX
VARIES 4'-0"
4:1 TYP
4:
TY
P
DITCH SECTION
24'-0"
Clear Zone
2%
8'-0" 4'-0"
2'-6"
Sidewalk
Q
G
H
13'-0"
Shoulder
4:1
MAX
2:
MAX
2:1 MAX
24'-0"
Clear Zone
E d g e o f T r a v e l
L a n e
DITCH SECTION
VARIES0'-0" to 4'-0"
VAREIS
NOTE: BEGIN SIDEWALK STA 189+50.64
NOTE: BEGIN SIDEWALK STA 199+08.90
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
10/10/2024 anderson.v
GPLOT-ORD
0005-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 3 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
BELFAST KELLER ROAD/CR90
ROUNDABOUT
TYPICAL SECTION #6
STA. 176+62.52 to STA. 179+35.26
Circulatory Roadway WidthIsland Radius
LC
Inscribed Circle Radius
CENTER OF ROUNDABOUT
2'-6"
K
18'-0"
107'-6"
8"6"
J
PAY LIMITS FOR GAB
PAY LIMITS FOR GAB
46'-6" 18'-0"
6"
Truck Apron Circulatory Roadway Width
18'-0"
Divider Raised Lane
2'-0" to 5'-0"
Varies
L
D
1% to 2% 1% (Typ)1% to 2%
1% (Typ)1% to 2% 1% (Typ)
6:1 to 10:1 (Typ)
Type 9 Curb Face Concrete Median
Monolithic Integral
H
Q
2'-0" to 7'-0"
Varies
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving…