27691_0083 Belfast Keller Road _ I_95 to Cran.pdf
PDF 30 MB Posted
- Solicitation number
- PE-77523-NONST-2025-000000037
- Issued by
- Brooks County, Georgia
About this file
The document is a description of a state and local contract opportunity for the Belfast Keller Road Improvements project in Brooks County, Georgia. The project consists of roadway improvements to Belfast Keller Road from the I-95 interchange to the new high school site, approximately 6,100 feet east of I-95. The improvements include widening the road from two lanes to six lanes up to Great Ogeechee Parkway, then transitioning to a four-lane divided section to the school. The design will include two full access intersections, a roundabout at Heartwood Avenue, and one RCUT at a future access location. The improvements are being completed to accommodate the coming growth at the interchange and along the corridor.
The document does not provide any details on pricing terms, set asides, incumbents, funding requirements or sources, or any other salient information beyond the project overview and scope of work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIRECTIONS SIGN
DO NOT ENTER
RECLAIMED WATER/IRRIGATION LINERECLAIMED WATER/IRRIGATION LINE
GRAVEL PILE
6' CHAIN LINK FENCE
6' CHAIN LINK FENCE
EXPOSED 2" PIPE W/ VALVEEXPOSED 2" PIPE W/ VALVE
HARGRAY TELECOMM. 3'x2' VAULTHARGRAY TELECOMM. 3'x2' VAULT
ROAD WORK SIGNROAD WORK SIGN
STOP SIGNSTOP SIGN
UNFINISHED BRICK SIGNUNFINISHED BRICK SIGN
4'x2' TELECOMM VAULT
STOP SIGN
EXPOSED BLUE WIRES
2" PIPE W/ VALVE
LYING ON GROUND
1" PVC IRRIGATION LINE
SPEED LIMIT SIGN
LYING ON GROUND
1" PVC IRRIGATION LINE
3'x2'HARGRAY TELECOMM. BOX
3.5'x2' CENTURY LINK TELECOMM. BOX
ROUNDABOUT AHEAD
WRONG WAY
WRONG WAY
CROSSWALK
MEDICAL OFFICE BUILDING
POND 1
TOB: 18.5
NWL: 13.5
BOT: 7.5
25-YR:
15.54
100-YR:
16.01
0+00
1+00
2+00
3+00
4+00
.2
T
P H
A
SE
1BP
H
A
SE
1A
U
T
IL
IT
Y E
A S E
M E
N T T
Y P
U
T
IL
IT
Y E
A S
E M
E N
T T
Y P
F R
O N
T B
S L
R
E A
R B
S L
5'
SI
DE
BSL
D E
N D
R O
N D
R
IV
E
D E
N D
R O
N D
R
IV
E
2+
3+
4+
5+
6+
+0
+0
+0
P O
N D
D E T E N T
IO
N
S T O
R Y
T Y P E
II
S
IG
N
M O
N U
M E N T
S T O
R Y
T Y P E
II
S T O
R Y
T Y P E I
S T O
R Y
T Y P E
II
I
C
LU
B H
O U S E
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
S T O
R Y
T Y P E
II
I
' S
E
TB
A C K T
O T
O P O
F B A N K
S T O
R Y
T Y P E I
G A T E
GATE
S T O
R Y
T Y P E
II
I
P A R
K C E N T R
A L
S T O
R Y
T Y P E I o
WATER MAIN EASEMENT
WATER MAIN EASEMENT
R O
O M
P U
M P
A R E A
P O
O L / A
M E N
IT
Y
E A
S E
M E
N T
10'
SETBACK
BUI
LDI
NG
B
U
IL
D
IN
G S
E T
B A
C K
15'
WOODS LINE
WOODS LINE
L1
L1
L2
C
MILES
PLANS COMPLETED - -
REVISIONS
1.729
0.000
1.729
PLAN AND PROFILE OF PROPOSED
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
0.000
1.729
LENGTH OF PROJECT
TRAFFIC A.D.T.:
TRAFFIC A.D.T.:
DIRECTIONAL DIST:
SPEED DESIGN:
24 HR.TRUCKS %:
% TRUCKS:
DESIGN DATA:
PROJECT DESIGNATION: EXEMPT
COUNTY No.029
SPECIFICATIONS.
BIDDER IS SPECIFICALLY DIRECTED TO SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE
BIND BRYAN COUNTY OR THE DEPARTMENT OF TRANSPORTATION IN ANY WAY. THE ATTENTION OF
HOWEVER, THE SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT
UPON FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS.
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
THE DEPARTMENT OF TRANSPORTATION AND/OR BRYAN COUNTY.
HIGHWAY DEPARTMENT OF GEORGIA, AND SHALL BE DEEMED TO MEAN
" DEPARTMENT " WHEN THE CONTEXT THEREOF MEANS THE STATE
STATE HIGHWAY DEPARTMENT ", " HIGHWAY DEPARTMENT ", OR
DEPARTMENT OF GEORGIA ", " STATE HIGHWAY DEPARTMENT ", " GEORGIA
USED IN CONNECTION WITH THIS DOCUMENT, TO " STATE HIGHWAY
WRITINGS, DOCUMENTS, DRAWINGS, OR PHOTOGRAPHS USED, OR TO BE
ALL REFERENCES IN THIS DOCUMENT, WHICH INCLUDES ALL PAPERS,
NOTE :
MAJOR COLLECTOR
FUNCTIONAL CLASS:
100% IN CONG. DIST. NO. 1.
BRYAN COUNTY AND IS
THIS PROJECT IS 100% IN
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
01-0001
LOCATION SKETCH
6,000 (2021)
28,000 (2036)
50% / 50%
6%
N/A
TO CRANSTON BLUFF RD.
45 MPH - GREAT OGEECHEE PKWY.
GREAT OGEECHEE PKWY.
40 MPH - INTERCHANGE TO
I-95 TO CRANSTON BLUFF ROAD
BELFAST KELLER ROAD
BELFAST KELLER ROAD
N B
E
N T
R A
N C E
R A
M P
D
N B
E
X I T
C
INTERSTATE
DEEP CREEK RD
G R E A T
O G E E C H E E
P K
W Y
OUT
FI
TT
ER
S
PK
DR
B E L F A S T
K E L L E R
R O A D
C SCAPE RD
CRANS
TON
BLUF
F
RD
WI
LDC
AT
B
LVD
INTERSTATE
P O
8/19/2019 anderson.v
9/26/2024 GPLOT-ORD
gplotborder-ORD-PO.tbl
0027691_1.dgn
CONCOV
DRAWING No.www.thomasandhutton.com
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
STA 130+03.92
BEGIN CONSTRUCTION
BEGIN PROJECT
STA 206+42.14
END CONSTRUCTION
END PROJECTG
R E
G E E
C H E E
P A
R K
W A Y
O U T F I T T E
R S
P A
K
I V E
H E A R T
W O
O D
A V E N U E
H E A
R T
W O
O D
A V E
N U E
D E N D R
O N
D R I V E
20+00.00
ROAD 2
STA 12+50.00
ROAD 1
STA 151+00.51
BELFAST KELLER
INTERSECTION
STA 40+00.00
GREAT OGEECHEE PARKWAY
STA 162+98.97
BELFAST KELLER
INTERSECTION
STA 33+22.49
ROAD 3
STA 162+97.42
BELFAST KELLER
INTERSECTION
STA 50+00.00
DRIVE
OUTFITTERS PARK
STA 170+04.15
BELFAST KELLER
INTERSECTION
STA 63+80.00
HEARTWOOD AVENUE
STA 177+48.16
BELFAST KELLER
INTERSECTION
STA 70+00.00
HEARTWOOD AVENUE
STA 178+61.17
BELFAST KELLER
INTERSECTION
STA 90+00.00
ROAD ACCESS 7
STA 81+60.00
ROAD ACCESS 6
STA 189+32.16
BELFAST KELLER
INTERSECTION
STA 95+00.00
DENDRON DRIVE
STA 198+86.10
BELFAST KELLER
INTERSECTION
R O
A D
A C
C E
S S
R
O A
D A
C C
E S
S
R O
A D
A C
C E
S S
R
O A
D A
C C
E S
S
R O
A D
A C
C E
S S
RO
E
G
G
IASIGER
TERED
IGNE
NEER
No. 031048
PROFESSIONAL
RJ
,YELLEK .D
E
L
Y O
D
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
IO
Erosion Control Watershed Map-Site Monitoring55-0001
BMP Location Details54-0001 - 54-0054
ESPCP Drainage Area Map53-0001
ESPC General Notes Drawing51-0001 - 51-0008
Erosion Control Cover Drawing50-0001
Erosion Control Plans
Utility Relocation Plans44-0001 - 44-0018
Special Constructioin Detail38-0001 - 38-0007
Retaining Wall Envelopes31-0001 - 31-0001
Signal Plans27-0001 - 27-0006
Signing and Marking Plans and Details - Plan Drawings26-0001 - 26-0018
Lighting Plans25-0001 - 25-0009
Utility Plans24-0001A - 24-0018
Cross Sections23-0001 - 23-0030
Drainage Profiles22-0001 - 22-0006
Drainage Area Map21-0001
Special Grading Drawings (Sediment/Detention Basins, Parking Lots, etc…)18-0001 - 18-0017
Crossroad Profiles16-0001 - 16-0004
Mainline Roadway Profile Drawings15-0001 - 15-0015
Mainline Roadway, Crossroad, Side Street, and Frontage Road Plan Drawings13-0001 - 13-0018
Construction Layout Drawing (Stakeout Drawing)11-0001 - 11-0006
Typical Sections05-0001 - 05-0006
General Notes/Project Notes04-0001 - 04-0003
Index Drawing02-0001
Cover Drawing01-0001
DRAWING NO. DESCRIPTION DRAWING NO. DESCRIPTION
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
gplotborder-ORD.tbl
0027691_2.dgn
12:45:05 PM
GPLN-CE
0002-02
BELFAST KELLER ROAD
I-95 TO CRANSTON BLUFF
INDEX
www.thomasandhutton.com Savannah, GA 31405 • 912.234.5300
50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
DURING THE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH UTILITIES
ARE BASED ON INFORMATION OBTAINED FROM UTILITY COMPANIES.
13. THIS IS NOT A SUE UTILITY LOCATION PROJECT. UTILITIES SHOWN
THAT WILL BE REMOVED OR DESTROYED TO ALLOW FOR CONSTRUCTION.
TREES WITHIN THE CONSTRUCTION LIMITS OR LIMITS OF DISTURBANCE
TREES TO REMAIN IN THE RIGHT OF WAY. THIS DOES NOT APPLY TO
TRAILER PLACEMENT, ETC.) OCCUR UNDER THE DRIP LINE OF EXISTING
VEHICULAR USE, BORROW OR WASTE ACTIVITIES, SEDIMENT BASINS,
ACTIVITIES (SUCH AS THE USE OF EASEMENTS, STAGING,CONSTRUCTION,
12. THE CONTRACTOR SHALL ENSURE THAT NO CONSTRUCTION-RELATED
FOREST SERVICE SOUTHERN RESEARCH STATION FOR REFERENCE.
PLANTS IN SOUTHERN FORESTS' GTR SRS-131, PRODUCED BY THE USDA
TREE - PAULOWNIA TMENTOSA SEE 'A MANAGEMENT GUIDE FOR INVASIVE
BROUSSONETIA PAYRIFERA CHINABERRY - MELIA AZEDARACH PRINCESS
ALTISSIMA WHITE MULBERRY - MORUS ALBA PAPER MULBERRY -
MIMOSA- ALBIZIA JULIBRISSIN TREE OF HEAVEN - AILANTHUS
PROTECTION AND SHOULD BE REMOVED IF POSSIBLE. THESE INCLUDE:
11. INVASIVE OR UNDESIRABLE SPECIES DO NOT QUALIFY FOR ANY
INVASIVE PEST PLANTS.
SERVICE SOUTHERN RESEARCH STATION FOR REFERENCE ON SPECIFIC
SOUTHERN FORESTS' GTR SRS-131, PRODUCED BY THE USDA FOREST
201.3.05.A. SEE 'A MANAGEMENT GUIDE FOR INVASIVE PLANTS IN
SPECIFICATION SECTION 201-CLEARING AND GRUBBING RIGHT OF WAY,
10. INCLUDE ERADICATION OF INVASIVE SPECIES IF ENCOUTERED PER
ITEMS. COST WILL BE INCLUDED IN OVERALL BID SUBMITTED.
9. NO SEPARATE PAYMENT WILL BE MADE FOR TEMPORARY DRAINAGE
DRAINS AND BOX CULVERTS.
8. FOUNDATION BACKFILL MATERIAL TP II WILL BE USED AT ALL CROSS
CONSTRUCTION DEBRIS AT NO ADDITIONAL COST TO THE PROJECT.
SHOWN IN GA. SPECIFICATION 201 TO DISPOSE OF EXISTING BRIDGE /
CONTRACTOR SHALL PROVIDE AN ENVIRONMETALLY APPROVED SITE AS
CONSTRUCTION DEBRIS WITHIN THE PROJECT'S LIMITS. THE
7. THERE IS NO KNOWN SUTIBLE PLACE TO BURY EXISTING BRIDGE/
INCLUDED IN THE LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT REMOVAL AND PREPARATION, SHALL ALSO BE
JOINTS ASSOCIATED WITH SHOULDER REMOVAL, AS WELL AS ALL OTHER
IN THE LUMP SUM BID FOR GRADING COMPLETE. SAWED LONGITUDINAL
TO BE CONSTRUCTED SHALL BE REMOVED. REMOVAL SHALL BE INCLUDED
6. EXISTING PAVED SHOULDERS WHERE NEW TRAVEL OR TURN LANES ARE
COMPLETE.
STRUCTURES SHALL BE INCLUDED IN THE LUMP SUM BID FOR GRADING
ALL COSTS ASSOCIATED WITH THE REMOVAL OF THESE PIPES AND
CONSTRUCTION LIMITS ARE TO BE REMOVED UNLESS OTHERWISE NOTED.
5. ALL EXISTING PIPES AND STRUCTURES WITHIN THE PROPOSED
INFORMATION.
STANDARD SPECIFICATION AND SUPPLEMENTS THERETO FOR ADDITIONAL
LANDFILL OR IN AN ENGINEERED FILL. SEE SECTION 201 OF THE
PERMITTED SOLID WASTE FACILITY, A PERMITTED INERT WASTE
OUTSIDE THE PROJECT RIGHT OF WAY SHALL BE PLACED IN EITHER A
OCCURRING IN THEM. ALL COMMON FILL OR EXCESS MATERIAL DISPOSED
ENVIRONMENTALLY APPROVED PRIOR TO CONSTRUCTION ACTIVITIES
4. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE
FOR PIPE ON THE PROJECT.
WRAPPING PIPE JOINTS SHALL BE INCLUDED IN THE OVERALL COST
MINIMUM OVERLAP. EQUIVALENT TO MIRAFI 14ON. THE COST FOR
OF FILTER FABRIC, 4'-0" WIDE. CENTERED ON JOINT WITH A 1'-0"
3. ALL CONCRETE PIPE JOINTS SHALL BE WRAPPED WITH TWO LAYERS
THE COST FOR PIPE ON THE PROJECT.
TO THE COST OF THE PROJECT AND THE COST SHALL BE INCLUDED IN
(EXISTING AND PROPOSED) SHALL BE CONSIDERED INCIDENTAL
THE FLUSHING AND CLEANING OF DROP INLETS, CULVERTS AND PIPES
COMPLETION OF CONSTRUCTION TO REMOVE ANY SILT AND DEBRIS.
2. CONTRACTOR IS TO FLUSH ALL RETAINED INLETS AND PIPE AT THE
FOR THIS PROJECT.
PROJECT IS MORE THAN 1.0 ACRE, A NOTICE OF INTENT IS REQUIRED
1. SINCE THE PROJECT DISTURBED AREA ASSOCIATED WITH THIS
CROSSING ARE NECESSARY.
AND THE TOPS OF PROPOSED RELOCATED WATER MAINS WHERE VERTICAL
CLEARANCE SEPARATION BETWEEN THE BOTTOM OF PROPOSED STORM PIPES
30. CONTRACTOR TO MAINTAIN A MINIMUM OF 18" OF VERTICAL
COMPANY PRIOR TO CONSTRUCTION.
OF THE UTILITIES. AND SHALL COORDINATE WITH THE LOCAL UTILITY
IMPACT EXISTING UTILITIES ONLY IF NECESSARY FOR THE PROTECTION
MAINS, GAS LINES, AND SEWER MAINS, CONTRACTPR TO REMOVE AND
EXISTING UTILITIES. INCLUDING EXISTING POWER LINES, WATER
29. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
28. THIS PROJECT WILL NOT INCLUDE ASPHALT INDEXING.
PRIOR TO CONSTRUCTION.
COORDINATE WITH BRYAN COUNTY AND UTILITY OWNER A MINIMUM OF 72
27. ALL EXISTING GAS LINES ARE ACTIVE. CONTRACTOR TO
INTERRUPTIONS.
COORDINATE WITH CITY OF RICHMOND HILL REGARDING SERVICE
26. ALL EXISTING WATER & SEWER MAINS ARE ACTIVE. CONTRACTOR TO
DISTRICT'S FIELD MANUAL (THE GREEN BOOK).
WITH THE STATE OF GEORGIA SOIL AND WATER CONSERVATION
EROSION CONTROL PRACTICES SHALL BE IMPLEMENTED IN ACCORDANCE
EROSION CONTROL PRACTICES ONCE CONSTRUCTION IS COMPLETE. ALL
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND REMOVING
UNPAVED AREAS, CONSTRUCTION ACCESS AND STORM WATER MONITORING.
PROTECTION, SILT FENCE INSTALLATION AS NEEDED, GRASSING IN
PRACTICES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, INLET
25. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EROSION CONTROL
BRYAN COUNTY ON ANY PROPOSED DISTURBANCE TO ACCESS.
TIMES DURING CONSTRUCTION. COORDINATE WITH PROPERTY OWNERS AND
24. MAINTAIN ACCESS TO THE PROPERTIES AND SIDE ROADS AT ALL
IN EASEMENTS THAT WERE LABELED TO REMAIN.
23. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF DAMAGED ITEMS
BETTER AFTER CONSTRUCTION IS COMPLETED.
22. RESTORE TEMPORARY EASEMENTS AREA TO EXISTING CONDITIONS OR
THE PLANS.
21. UTILIZE CLASS V REINFORCED CONCRETE PIPE WHERE NOTED IN
INSTALLCONDUIT/EQUIPMENT.
PRIOR TO ANY NEW PAVING. NO NEW PAVING SHALL BE CUT TO
20. ALL CONDUIT WHICH IS RUN UNDER ROADWAY SHALL BE INSTALLED
ITEM IS TO BE INCLUDED WITH THE COST OF THE CONDUIT.
GALVANIZED PULL WIRE IN EACH EMPTY CONDUIT. THE COST OF THIS
19. THE CONTRACTOR SHALL INSTALL A NYLON PULL CORD OR
WITHIN THE RIGHT OF WAY.
ON THE DRAWING ARE DIAGRAMMATIC. CONTRACTOR SHALL INSTALL THEM
18. ALL CONDUIT AND ELECTRICAL JUNCTION BOXES (EJB) PLACEMENTT
EARTH AT A DEPTH OF NOT LESS THAN 24".
INSTALLED UNDERNEATH ROADWAYS AND DRIVES SHALL BE BUIRIED IN
17. ALL UNDERGROUND CONDUIT SHALL BE SCH 40 PVC. CONDUIT
PROCEDURES SHALL FOLLOW GDOT STANDARD SPECIFICATIONS.
BE PAID FOR IN OVERALL COST OF BID. TESTING FREQUENCY AND
OF ALL REQUIRED QUALITY TESTING SERVICES. COST OF TESTING SHALL
16. CONTRACTOR SHALL BE RESPONSIBLE FOR EMPLOYMENT AND PAYMENT
WILL BE CUT FLUSH WITH EXISTING GROUND.
OUTSIDE OF CUT/FILL LIMITS. ALL STUMPS OUTSIDE CUT/FILL LIMITS
BELFAST KELLER ROAD & SIDE ROADS. NO GRUBBING WILL BE ALLOWED
15. CONTRACTOR SHALL CLEAR AND GRUB ENTIRE RIGHT OF WAY ALONG
AND GRUBBING.
SPECIFICATIONS AND WILL BE INCLUDED IN PRICE BID FOR CLEARING
ACCORDANCE WITH SECTION 411 OF THE GEORGIA STANDARD
REQUIRED, SAW CUT OF EXISTING PAVEMENT WILL BE REQUIRED IN
14. IN AREAS WHERE NEW PAVEMENT OR PAVEMENT WIDENING IS
PAID FOR UNDER THE BID ITEM "LANDSCAPING".
TRANSPORTATION STANDARDS AND DETAIL RA-1. THIS WORK SHALL BE
40. ROUNDABOUT LANDSCAPING SHALL FOLLOW GEORGIA DEPARTMENT OF
REPORT.CONTRACTOR MAY EVALUATE NATIVE SOIL FOR CONFORMITY.
CONFORMITY TO TESTING AND SPECIFICATIONS IN GEOTECHNICAL
INFORMATIONAL PURPOSES. CONTRACTOR SHALL BE RESPONSIBLE FOR
39. GEOTECHNICAL REPORT PROVIDED TO CONTRACTOR FOR
DURING CONSTRUCTION.
CONTRACTOR SHALL COORDINATE WITH COASTAL ELECTRIC COOPERATIVE
38. LIGHTING TO BE INSTALLED BY COASTAL ELECTRIC COOPERATIVE.
REPRESENTATIVE.
THIS BID ITEM IS ONLY TO BE USED AFTER APPROVAL FROM OWNER
UNSUITABLE MATERIALS THAT MAY BE ENCOUNTERED ON THE PROJECT.
THIS ITEM IS TO COVER THE REMOVAL AND REPLACEMENT OF
37. PAY ITEM "UNCLASSIFIED EXCAVATION" INCLUDED IN BID FORM.
INFORMATIONAL PURPOSES ONLY.
36. GEOTECHNICAL REPORT INCLUDED IN SPECIFICATIONS FOR
35. LANE CLOSURES ARE PROHIBITED BETWEEN 7 A.M. AND 8:30 A.M.
TRAFFIC CONTROL.
PAVEMENT REQUIRED TO STAGE THE JOB IN THE LUMP SUM BID FOR
TRAFFIC CONTROL. THE CONTRACTOR SHALL INCLUDE ANY TEMPORARY
POTENTIAL ROAD DETOURS) SHALL BE INCLUDED IN LUMP SUM BID FOR
CONSTRUCTION. ALL SIGNS AND NECESSARY MATERIALS (INCLUDING
TO BRYAN COUNTY AND THE ENGINEER FOR APPROVAL PRIOR TO
34. CONSTRACTOR SHALL SUBMIT TRAFFIC CONTROL AND STAGING PLANS
COUNTY AND THE ENGINEER IMMEDIATELY.
SHOWN ON THE CONSTRUCTION PLANS, CONTRACTOR SHALL NOTIFY BRYAN
33. IF ANY UTILITIES ARE LOCATED IN THE FIELD THAT ARE NOT
CONTROL.
OF THE JOB SHALL BE INCLUDED IN THE LUMP SUM BID FOR TRAFFIC
32. ANY TEMORARY PAVING REQUIRED TO FACILITATE THE CONSTRUCTION
CONSTRUCTION.
ANY POTENTIAL UNSUITABLE MATERIAL BE ENCOUNTERED DURING
31. CONTRACTOR SHALL NOTIFY BRYAN COUNTY AND ENGINEER SHOULD
CONCRETE - DRIVEWAY CONRETE, 8 IN THICK
GRADED AGGREGATE BASE 6 IN
CONC. 19 MM SUPERPAVE, GP1 OR 2 INCL BITUM MATL & H LIME,
GP2 ONLY, INCL BITUM MATL & H LIME, 220 LB,SY RECYCLED ASPHALT
ASPHALT - 165 LB/SY RECYCLED ASPHALT CONC., 12.5 MM SUPERPAVE,
COMMERCIAL:
CONCRETE - DRIVEWAY CONCRETE, 6 IN THICK
GP2 ONLY, INCL BITUM MATL & H LIME, GRADED AGGREGATE BASE 6 IN
ASPHALT - 165 LB/SY RECYCLED ASPHALT CONC., 12.5 MM SUPERPAVE,
RESIDENTIAL:
CONSTRUCTED USING:
AND/OR NUMBER OF DRIVES TO BE CONSTRUCTED. DRIVES SHALL BE
THE ENGINEER PRIOR TO MAKING ANY REVISIONS TO LOCATION, WIDTH,
AVAILABLE DATA: THE CONTRACTOR SHALL OBTAIN THE APPROVAL FROM
PLANS. EXISTING DRIVEWAY LOCATIONS ARE SHOWN FROM THE BEST
DRIVES SHALL BE 24 FEET WIDE UNLESS NOTED OTHERWISE IN THE
AT THE THROAT UNLESS NOTED OTHERWISE IN THE PLANS. COMMERCIAL
EARTH/GRAVEL DRIVES. RESIDENTIAL DRIVES SHALL BE 14 FEET WIDE
FOR ASHPALT, CONCRETE FOR CONCRETE, AND ASPHALT FOR
GREATER. ALL DRIVEWAYS SHALL BE REPLACED AS FOLLOWS ASHPALT
BACK TO THE TIE IN POINT OR REQUIRED RIGHT OF WAY, WHICHEVER IS
33. ALL DRIVEWAYS THAT ARE TO BE RECONSTRUCTED WILL BE PAVED
TO BE INCLUDED IN THE COST OF THE CONCRETE PAY ITEM.
32. THE INSIGNIA RED #31136 COLOR USED FOR THE TRUCK APRON IS
OVERALL BID FOR TRAFFIC CONTROL.
THE PORTABLE CHANGEABLE MESSAGE SIGNS IS TO BE INCLUDED IN THE
CHANGE USING PORTABLE CHANGEABLE MESSAGE SIGNS. THE COST OF
CONTRACTOR SHALL INFORM THE TRAVELING PUBLIC OF THE UPCOMING
41. TWO (2) WEEKS PRIOR TO OPENING OF THE ROUNDABOUTS, THE
UTILITY OWNER SERVICE
CITY OF RICHMOND HILL WATER
CITY OF RICHMOND HILL SEWER
ATLANTA GAS LIGHT NATURAL GAS
CLEARWAVE FIBER FIBER
COASTAL ELECTRIC POWER
COMCAST FIBER
BRIGHT SPEED FIBER
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
gplotborder-ORD-PO.tbl
0027691_4.dgn
12:03:03 PM
0001-04
GENERAL NOTES
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
GENERAL NOTES - STANDARD SIGNS
IN THE CENTER OF THE SIGN AND FLUSH WITH THE BACK OF THE SIGN.
½ INCH x (WIDTH OF SIGN) ALUMINUM OR GALVANIZED STEEL STRAP LOCATED
6. EACH 42 OR 48 INCH WIDE x 18 OR 24 INCH HIGH SIGN REQUIRES ONE 2 INCH x
INCH DIAMETER, DRILLED OR PUNCHED, AS SHOWN ON THE SIGN PLATE DETAILS.
WIDTH FROM THE EDGE OF THE SIGN. SIGN PLATE BOLT HOLES SHALL BE ⅜
THE SIGN. THE CENTERLINE OF EACH POST SHALL BE INSET 1/6TH OF THE SIGN
WITH THE BACK OF THE SIGN WITH ONE EACH ACROSS THE TOP AND BOTTOM OF
SIGN) ALUMINUM OR GALVANIZED STEEL STRAPS. THE STRAPS SHALL BE FLUSH
SHALL BE MOUNTED ON TWO POSTS WITH 2 EACH 2 INCH x ½ INCH x (WIDTH OF
5. SINGLE PLATE, HORIZONTAL RECTANGULAR SIGNS OVER 48 INCHES IN WIDTH
UNSTIPULATED DISTANCE BEHIND GUARDRAIL.
4c. WHEN GUARDRAIL IS PRESENT OR BEING PROPOSED, SIGNS SHALL BE POSTED AN
BE AT LEAST 2 FEET FROM THE CURB FACE TO THE NEARER EDGE OF THE SIGN(S).
GREATER. THE HORIZONTAL CLEARANCE IN NON-MOUNTABLE CURB SECTIONS SHALL
NORMAL EDGE OF PAVEMENT TO THE NEARER EDGE OF THE SIGN(S), WHICHEVER IS
SHALL BE 6 FEET FROM THE EDGE OF THE PAVED SHOULDER OR 12 FEET FROM THE
4b. HORIZONTAL CLEARANCE FOR STANDARD HIGHWAY SIGNS ON ALL OTHER ROADWAYS
NORMAL EDGE OF PAVED SHOULDER, OR EDGE OF GRADED SHOULDER WHEN PRESENT.
CLEARANCE FOR STANDARD HIGHWAY SIGNS ON RAMPS SHALL BE 2 FEET FROM THE
THE SIGN(S), UNLESS SPECIFIED OTHERWISE IN THE PLANS. HORIZONTAL
SHALL BE 32 FEET FROM THE NORMAL EDGE OF PAVEMENT TO THE NEARER EDGE OF
4a. HORIZONTAL CLEARANCE FOR STANDARD HIGHWAY SIGNS ON INTERSTATE HIGHWAYS
OF 7 FEET ABOVE THE SIDEWALK.
SIDEWALK IS PROPOSED OR EXISTING, THE SIGNS SHALL BE ERECTED AT A HEIGHT
THE NORMAL EDGE OF PAVEMENT TO THE BOTTOM OF THE SIGN OR ASSEMBLY. IF
3. ALL STANDARD HIGHWAY SIGNS SHALL BE ERECTED AT A HEIGHT OF 7 FEET ABOVE
OPERATIONS.
PROJECT ENGINEER WITHOUT PRIOR APPROVAL FROM THE OFFICE OF TRAFFIC
EDITION. NO SIGN LOCATION SHALL BE CHANGED BY THE CONTRACTOR OR BY THE
SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT
FIELD CONDITIONS WHERE NECESSARY, BUT SHALL BE WITHIN THE LIMITATIONS
2. SIGN ERECTION STATIONS ARE APPROXIMATE AND MAY BE ADJUSTED TO MEET
SUPPLEMENTAL SPECIFICATIONS, AND/OR SPECIAL PROVISIONS.
TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND THE GEORGIA SPECIFICATIONS,
ACCORDANCE WITH THE DETAILS SHOWN IN THE PLANS, THE MANUAL ON UNIFORM
1. ALL STANDARD HIGHWAY SIGNS SHALL BE FABRICATED AND ERECTED IN
OR ARE CONTRARY TO THESE SIGN PLANS.
ENGINEER, BE REQUIRED TO REMOVE ANY EXISTING SIGNS THAT ARE DUPLICATED
17. THE CONTRACTOR WILL, AS REQUESTED BY THE DISTRICT TRAFFIC OPERATIONS
BE SHOWN ON ALL R552-1 (LIMITED ACCESS) SIGNS IN THIS PROJECT, IF ANY.
16. REFER TO PLAN SHEETS FOR LOCATION OF THE DISTRICT ENGINEERS OFFICE TO
MISCELLANEOUS SIGNS.
15. FOR DETAILS OF SPECIAL DESIGN HIGHWAY SIGNS, SEE DETAILS OF
UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION, FOR DETAILS.
OR SPUR SHALL USE 4 INCH SERIES "D" LETTERS. REFER TO THE MANUAL ON
14. ALL INTERSTATE, U.S., AND GEORGIA SHIELDS REQUIRING ALT, BUS, CONN, LOOP,
PUNCHED, SHALL BE REQUIRED TO PROPERLY MOUNT THE ASSEMBLY.
ON THE POST(S), ADDITIONAL⅜INCH DIAMETER HOLE(S), DRILLED OR
13. WHERE SIGNS WITHIN AN ASSEMBLY EXTEND BELOW THE STANDARD MOUNTING HOLES
WITHIN AN ASSEMBLY.
12. A ½ INCH MINIMUM AIR SPACE SHALL BE REQUIRED BETWEEN ALL SIGN PLATES
SIGNING SHALL HAVE TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING.
PORTION OF THE S5-1) SIGNS. ALL REGULATORY SIGNS WITHIN THE SCHOOL ZONE
SHALL BE USED FOR SCHOOL ZONE (S1-1, S2-1, S3-1, S4-3, AND THE TOP
11. TYPE 11 (VERY HIGH INTENSITY) FLUORESCENT YELLOW GREEN REFLECTIVE SHEETING
BE USED FOR ALL WARNING SIGNS.
10. TYPE 11 (VERY HIGH INTENSITY) FLUORESCENT YELLOW REFLECTIVE SHEETING SHALL
RED SERIES SIGNS (R1-1, R1-2, R1-3P, R5-1, R5-1A, R5-1B).
9. TYPE 11 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR ALL
OR CLASS 2 ADHESIVE BACKING IS PERMISSIBLE.
AS SPECIFIED BELOW OR SPECIFIED OTHERWISE IN THE PLANS. EITHER CLASS 1
ALL STANDARD HIGHWAY SIGNS REQUIRING REFLECTORIZED BACKGROUNDS EXCEPT
8. TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR
TYPICAL FRAMING DETAILS.
FRAMES. FOR DETAILS AND STRAP SPECIFICATIONS REFER TO SIGN ASSEMBLY-
7. SIGN ASSEMBLIES SHALL BE MOUNTED ON ALUMINUM OR GALVANIZED STEEL STRAP
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0002-04
Savannah, GA 31405 • 912.234.5300
50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
T-19 Rumble Strips: Roundabouts and Stop Controlled Intersections - 11/04/2020
Details of Raised Pavement Markers - 9/22/2011T-15c
Details of Raised Pavement Marker Location Non-Limited Access Roadway - 9/15/2016T-15a
- 11/21/2008 Details of Pavement Marking HatchingT-14
T-13a Pavement Markings: Words (Sheet 1 of 2) - 11/04/2020
- 11/04/2020 Details of Pavement Marking - ArrowsT-12b
- 1/1/2000 Details of Pavement Marking Arrow LocationT-12a
Details of Pavement Marking Placement on Non-Limited Access Roadway - 9/15/2016T-11a
T-05b Details of Regulatory Signs (Sheet 2 of 2) - 1/01/2000
T-05a Details of Regulatory Signs (Sheet 1 of 2) - 1/01/2003
T-04 Details of Cardinal Direction Signs - 1/01/2000
T-03a Type 7,8 and 9 Square Tube Post Installation Detail - 7/1/2002
Details For Typical Framing - 3/1/2000T-02
Sign Plates - 1/1/2000T-01
RA-2 Roundabout Typical Section Asphaltic Concrete Circulatory Roadway - 1/31/2012
RA-1 Roundabout Landscaping Details - 9/01/2022
Pavement Edge Treatment Asphalt and Concrete Pavement - 11/17/2011P-7
D-6 Fabrication Details for Safety Grates - 10/01/1972
D-5 Safety Inlets with Grates - 6-21-1995
A-4 Detectable Warning Surface Truncated Dome Size, Spacing and Alignment Requirements - 6/18/2009
A-3 Concrete Sidewalk Details Curb Cut (Wheelchair) Ramps - 9/15/2016
A-2 Concrete Valley Gutter at Street Intersection 6 - 7/21/2011
A-1 Driveways With Tapered Entrances Concrete Valley Gutters - 7/21/2011
CONSTRUCTION DETAILS
Traffic Control Detail for Lane Closure on Two-Lane Highway - 3/30/20069102
Traffic Control General Notes, Standard Legend, and Miscellaneous Details - 3/30/20069100
Concrete Curb and Gutter, Concrete Curbs, Concrete Medians - 7/01/20229032b
GRAVITY Wall Typical Sections, Raising Headwall And Typical Pipe Plug - 9/30/20169031l
Delineators & Object Markers and Alternate Post - 7/01/20229030c
Federal Aid and State Project Markers; Right of Way Markers; County Line Marker - 4/10/20069003
01/18/2018Joint Details For Portland Cement Concrete Paving5046H
Guardrail Location (On Roads with Curb & Gutter, Header Curb or Integral Curb) 31 Inch Guardrail Height - 01/29/20164391
Guardrail Location Details for Multi-Lane Divided Highways (With Shoulders Adjacent to Roadway) 31 Inch Guardrail Height - 01/29/20164387
Guardrail Locations In Medians, Guardrail Locations at Turnouts 31 Inch Guardrail Height - 01/29/20164386
Guardrail Anchorage Type 1 31 Inch Guardrail Height - 09/01/20114383
Posts and Offset Blocks For "W" & "T" Beam Guardrail 31 Inch Guardrail Height - 01/29/20164381
01/29/2016"W" Beam Guardrail 31 Inch Guardrail Height4380
Reflectorized Guardrail Washers, Delineator and Anchorage Nose Striping - 07/01/20234360
- 01/29/2016Guardrail Warrant Guides, Length of Advancemnt, Clear Zone Distances, Fill Height Embankments4000w
Pavement Patching Details (Storm Drain or Utility Installations by Open cut Across Existing Pavement) - 8/01/19991401
Safety End Section (Concrete) (for Side Drain Pipe-or Storm Drain Pipe Parallel to Mainline) (Sheet 3 of 3) - 1/28/20051122-1
Safety End Section (Metal) (for Side Drain Pipe-or Storm Drain Pipe Parallel to Mainline) (Sheet 2 of 3) - 1/01/20051122-2
Safety End Section (Metal) (for Side Drain Pipe-or Storm Drain Pipe Parallel to Mainline) (Sheet 1 of 3) - 1/28/20051122-1
Flared End Sections for Pipes. - 6/09/20061120
Drain Inlet (Elbow type) - 11/01/19991035
Precast Catch Basins (For use with 6'' or 8'' curb and Precast gutter in sags or low points) - 9/01/19821034dp
Catch Basins (For use with 6'' or 8'' curb and gutter in sags orlow points) - 8/01/19821034d
- 9/01/1982Precast Catch Basins (For use with 6'' or 8'' Precast Ht. curb and gutter)1033dp
Catch Basins (For use with 6'' or 8'' Ht. curb and gutter) - 8/01/19821033d
Concrete and Metal Pipe Culverts Sheet 3 of 3 - 9/26/20011030d3
Concrete and Metal Pipe Culverts Sheet 2 of 3 - 9/26/20011030d2
Concrete and Metal Pipe Culverts Sheet 1 of 3 - 9/01/20011030d1
Precast Drop Inlets - 8/01/19991019ap
Drop Inlets - 8/01/19991019a
Precast Reinforced Concrete Manhole - 06/01/19751011AP
Brick Manholes - 10/01/19811011A
Pipe Culvert Concrete Headwall - 9/01/19991001B
GEORGIA STANDARDS
PAYMENT WILL BE MADE FOR BENCHING.
AND NO ADDITIONAL MEASUREMENT OF QUANTITY OR
GRADING COMPLETE IN CONSTRUCTION OF THE EBANKMENT
THE ITEM OF UNCLASSIFIED EXCAVATION AND BORROW OR
3. THE PROCESS OF BENCHING IS CONSIDERED INCIDENTAL TO
THE HORIZONTAL DISTANCE TO VARY.
PART REACHES A MAXIMUM OF 4 FEET ALLOWING
THEN THE ACTUAL CUT STOPS WHEN THE VERTICAL
4 FEET IF A 8 FEET HORIZONTAL CUT IS MADE,
THE VERTICAL PART OF THE STEP WILL EXCEED
LAYERS ARE AGAIN PLACED. IF IT IS ANTICIPATED THAT
CUT 8 FEET INTO THE SLOPE AND SUCCESSIVE
BEFORE LAYER "E" IS PLACED, THE SECOND STEP IS
SUCCESSIVE LAYERS B, C, AND D ARE THEN PLACED
THE WIDTH OF THE TYPICAL D-8 BULDOZER BLADE).
A MAXIMUM DISTANCE OF ABOUT 8 FEET (ABOUT¾
PLACED THE FIRST STEP IS TO (1) CUT INTO THE SLOPE
2. THE DIAGRAM SHOWS THAT BEFORE LAYER "A" IS
(SEE DIAGRAM AT LEFT.)
BEING MADE.
MUST BE BENCHED WHILE THE EMBANKMENT IS
A SLOPE OF 3 TO 1 OR STEEPER. THE FOUNDATION
HILLSIDE OR ANOTHER EXISTING EMBANKMENT HAVING
1. WHERE THE EMBANKMENT IS TO BE PLACED ON A
4' MAX.
STEP 3
STEP 2
STEP 1
8' MAX. 8' MAX.
F
E
D
C
B
A
4' MAX.
4' MAX.
BENCHING DETAIL
4.5.28 NO SCALERevised 9/29/08
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0003-04
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
B
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 1 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
CL
Profile Grade
2%
4% 4%
2:1 MAX
2:
MAX
2:
MAX
2:1 MAX
Sidewalk
Shoulder
2%
H G
I
R
D
2%2%
2'-6"
2'-6"
4'0"
2'-0"
24'-0" to 10'-0" 0'-6" to 14'-0"
Varies
Travel Lane
0'-0" to 24'-2"
2%
R
D
2'-6" 2'-6"
I I
0'-0" to 14'-5"
Slip Lane
12'-0" to 23'-4"
VARIES
Varies
8'-0" 2'-0"
16'-0"
PAY LIMITS FOR GAB
PAY LIMITS FOR GAB
Q
Varies
Median
Raised Concrete
Varies
Median
Raised Grassed
Varies
TURN LANE
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
TURN LANES ALSO APPLY TO OPPOSITE-HAND SECTIONS. SEE
TYPICAL SECTIONS ILLUSTRATING SUPERELEVATION AND 1.
NOTES:
NOT to SCALE
BELFAST KELLER ROAD/CR90
TANGENT SECTION
WIDENING & FULL DEPTH CONCRETE
TYPICAL SECTION #1
STA. 139+81.00 to STA. 141+50.00
STA. 130+03.92 to STA 133+78.19 NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
M M
Existing Pavement Existing Pavement
2%
2'-0" 2'-0"
R
D
M
2%
2'-0"
Travel Lane
12'-0"
Varies
PAVEMENT WIDENING
28'-4" to 90'-5"
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0027691_5.dgn
12:03:05 PM
0001-05
TYPICAL SECTIONS
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 1 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
BELFAST KELLER ROAD/CR90
ROUNDABOUT
TYPICAL SECTION #2
STA. 139+00.00 to STA. 139+80.74
Circulatory Roadway WidthIsland Radius
LC
Inscribed Circle Radius
CENTER OF ROUNDABOUT
2'-6"
K
18'-0"
79' 6.6" to 95'6"
VARIES
8"6"
J
PAY LIMITS FOR GAB
PAY LIMITS FOR GAB
42'-3" 9'-0" to 17'-0"
6"
Truck Apron Circulatory Roadway Width
19'-0" to 21'-8.2"
VARIES
Divider Raised Lane
2'-0" to 5'-0"
Varies
L
D
1% to 2% 1% (Typ)1% to 2%
1% (Typ)1% to 2% 1% (Typ)
6:1 to 10:1 (Typ)
Type 9 Curb Face Concrete Median
Monolithic Integral
H
Q
0' to 7'-0"
Varies
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
M
D
2:
MAX
2:1 MAX
2%
Q
7'-6"
10'-0"
Shoulder
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0002-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 1 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
SINCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
RAMP SECTION
TYPICAL SECTION #3
STA. 716+50 to STA. 718+22.50
RAMP C
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
2:
MAX
4:1
C L
Existing Ramp C
O
PAY LIMITS FOR GAB
4'-0"
VARIES
0'-0" to 28'-0"
2% or SE
VARIES
12'-2" to 44'-0"
4% or SE
Slip Lane
Existing Pavement
2:
MAX
2:1 MAX
Sidewalk
Shoulder
2%2%2%
2'-6"
4'0"
2'-6"
Slip Lane
18'
8'-0" 2'-0"
16'-0"
4'-0"
N R
D
S
C L
Existing Ramp C
PAY LIMITS FOR GAB
2% or SE Existing Pavement
R
D
S
2'-6"
0'-0" to 34'-0"
Varies
Median
Raised Concrete
STA. 718+22.50 to STA. 718+89.27
RAMP C
Varies
G
HQ
II
G
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0003-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 1 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
GADOT
LOWNDES
GADOT
LOWNDES
NOT to SCALE
BELFAST KELLER ROAD/CR90
TANGENT SECTION
WIDENING & FULL DEPTH ASPHALT
TYPICAL SECTION #4
STA. 141+50.00 to STA. 166+61.72
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
24'-0" TO 48'-0"
VARIES
20'-0" 36'-0" to 60'-0"
VARIES
CL
Profile Grade
2% 2%
12'-0"12'-0" 12'-0"
Travel LaneTravel LaneTravel Lane
2'-6" 2'-6"
4% 4%
16'-0"
5'-0"4'-0"
2:
MAX
2:1 MAX
2'-6"
Sidewalk
Shoulder
2%
13'-0"
2%
5'-0" 4'-0"
2:1 MAX
2:
MAX
2'-6"
Sidewalk
Shoulder
OF CONSTRUCTION CENTERLINE
SHIFTS FROM LEFT TO RIGHT
24' EXISTING PAVEMENT
0'-0" TO 10'-0"
VARIES
MEDIAN
0'-0" TO 10'-0"
VARIES
0'-0" TO 12'-0"
VARIES
Turn Lane
PAY LIMITS FOR GAB PAY LIMITS FOR GAB
A
B
C
D
N
E
A
B
F
P
C
G
G
Existing Pavement
A
B
C
D
N
H I
H
I
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
12'-0"
Travel Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
12'-0"
Travel Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
2.5%
24'-0"
Clear Zone
0'-0" TO 12'-0"
VARIES
Turn Lane
16'-0"
5'-0"4'-0"
2:1 MAX
2'-6"
Sidewalk
Shoulder
2%
Q G H
2:
MAX
VARIES 4'-0"
4:1 TYP
4:
TY
P
DITCH SECTION
2%
5'-0" 4'-0"
2'-6"
Sidewalk
Q
G
H
13'-0"
Shoulder
4:1
MAX
2:
MAX
2:1 MAX
24'-0"
Clear Zone
E d g e o f T r a v e l
L a n e
DITCH SECTION
VARIES4'
NOTE: END SIDEWALK STA 150+55.20NOTE: END SIDEWALK STA 163+49.59
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
12:03:06 PM
0004-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 1 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
GADOT
LOWNDES
NOT to SCALE
BELFAST KELLER ROAD/CR90
TANGENT SECTION
WIDENING & FULL DEPTH ASPHALT
TYPICAL SECTION 5
STA. 179+35.26 to STA. 203+00.00
STA. 166+61.72 to STA. 176+62.52
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
24'-0" TO 48'-0"
VARIES
20'-0" 36'-0" to 60'-0"
VARIES
CL
Profile Grade
2% 2%
12'-0"12'-0" 12'-0"
Travel LaneTravel LaneTravel Lane
2'-6" 2'-6"
4% 4%
16'-0"
2:
MAX
2:1 MAX
2'-6"
Shoulder
2%
13'-0"
2%
2:1 MAX
2:
MAX
2'-6"
Shoulder
OF CONSTRUCTION CENTERLINE
SHIFTS FROM LEFT TO RIGHT
24' EXISTING PAVEMENT
0'-0" TO 10'-0"
VARIES
MEDIAN
0'-0" TO 10'-0"
VARIES
0'-0" TO 12'-0"
VARIES
Turn Lane
PAY LIMITS FOR GAB PAY LIMITS FOR GAB
A
B
C
D
N
E
A
B
F
P
C
Existing Pavement
A
B
C
D
N
H I
H
I
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
12'-0"
Travel Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
0'-0" TO 12'-0"
VARIES
Turn Lane
24'-0"
Clear Zone
0'-0" TO 12'-0"
VARIES
Turn Lane
16'-0"
5'-0"4'-0"
2:1 MAX
2'-6"
Sidewalk
Shoulder
2%
Q G H
2:
MAX
VARIES 4'-0"
4:1 TYP
4:
TY
P
DITCH SECTION
24'-0"
Clear Zone
2%
5'-0" 4'-0"
2'-6"
Sidewalk
Q
G
H
13'-0"
Shoulder
4:1
MAX
2:
MAX
2:1 MAX
24'-0"
Clear Zone
E d g e o f T r a v e l
L a n e
DITCH SECTION
VARIES0'-0" to 4'-0"
VAREIS
NOTE: BEGIN SIDEWALK STA 189+50.64
NOTE: BEGIN SIDEWALK STA 199+08.90
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0005-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
C
D
E
F
G
H
I
J
K
L
M
O
P
Q
N
PLAIN PC CONC PVMT, CL 1 CONC. 8 INCH THICK
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 330 LB/SY
GRASSED MEDIAN/ SHOULDER
MILLING ASPH. CONC. PVMT - VARIABLE DEPTH
SAFETY EDGE (GA CONSTRUCTION DETAIL P-7)
PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
PLAIN PC CONC PVMT, CL 3 CONC, 9 INCH THK
PLAIN PC CONC PVMT, CL 3 CONC, 9 IN THK (COLORED INSIGNIA RED # 31136 AND STAMPED)
CONCRETE HEADER CURB , 4 IN, TP 9
CONCRETE HEADER CURB , 6 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 7
CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
CONC SIDEWALK, 4 IN
1" OPEN GRADED INTERLAYER (OG1)
RECYCLED ASPHALT CONC LEVELING, INCL BITUM & H LIME
GRADED AGGREGATE BASE COURSE - 12 IN
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 385 LB/SY
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM & H LIME - 220 LB/SY
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY, INCL BITUM & H LIME - 220 LB/SY
REQUIRED PAVEMENT
R
S
INCLUDED IN LUMP SUM BID FOR GRADING COMPLETE.
EXISTING PAVEMENT UNDER MEDIAN AREAS SHALL BE REMOVED. COST4.
FOR GRADING COMPLETE.
THE EXISTING PAVEMENT. COST INCLUDED IN OVERALL COST
MILLING WILL BE REQUIRED TO CREATE A SMOOTH TIE TO 3.
OF NORMAL CROWN AND S.E. SECTIONS.
SUPERELEVATION RATES AND TRANSITIONS, AND LOCATIONS
SEE ROADWAY PLANS FOR METHOD OF SUPERELEVATION, 2.
EACH.
PLANS FOR LOCATION, DIRECTION AND COMPLETE DETAILS OF
BELFAST KELLER ROAD/CR90
ROUNDABOUT
TYPICAL SECTION #6
STA. 176+62.52 to STA. 179+35.26
Circulatory Roadway WidthIsland Radius
LC
Inscribed Circle Radius
CENTER OF ROUNDABOUT
2'-6"
K
18'-0"
107'-6"
8"6"
J
PAY LIMITS FOR GAB
PAY LIMITS FOR GAB
46'-6" 18'-0"
6"
Truck Apron Circulatory Roadway Width
18'-0"
Divider Raised Lane
2'-0" to 5'-0"
Varies
L
D
1% to 2% 1% (Typ)1% to 2%
1% (Typ)1% to 2% 1% (Typ)
6:1 to 10:1 (Typ)
Type 9 Curb Face Concrete Median
Monolithic Integral
H
Q
2'-0" to 7'-0"
Varies
NO SCALE
CLASS "B" CONCRETE BASE FOR PAVEMENT WIDENING
Item Code 500-9999 - CY Unit of Measure
CLASS "B" CONCRETE BASE FOR WIDENING DETAIL
be placed in lieu of the paving between the GAB and surface courses specified by the typical section.
top of the GAB and the bottom of the surface course is 5 inches or greater, Class B concrete shall Where GAB is required under the new Curb and Gutter and the depth of proposed paving between the Case 1:
whichever is greater.
base course, the bottom of the Base specified by the typical section, or to a depth of 6 inches:
be placed beneath the proposed surface course to the depth of either the bottom of the existing the top of the Base and the bottom of the surface course is less than 5 inches, Class B concrete shall Where GAB is not required under the new Curb and Gutter and/or the depth of proposed paving between Case 2:
new Curb and Gutter <= 5.0' 0.0' < Width of excavation to
Case 2 Case 1
Case 2 Case 1
Pavement Existing
Course Surface
6" minimum
5" minimum
Base existing Bottom of
Concrete Class B
Class B Concrete by Typical Section when required Proposed GAB
A
B
C
D
2:
MAX
2:1 MAX
2%
Q
7'-6"
10'-0"
Shoulder
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0006-05
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
SCALE IN FEET
0 10 20
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
B
E X
I T
R
A M
P C
N B
E N
T R
A N
C E
R
A M
P D
720+00 800+00
805+00
TO I-95
STA 130+03.92
BEGIN CONSTRUCTION
BEGIN PROJECT
ELEV: 29.36
E 914302.55254
N 678180.38332
LOCATION CONTROL DELTA
TRV/PK@CL CAPPED IPS
CONTROL POINT 1511
D R
A W
IN
G
N o
.0
M
A T
H
L I
S
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
100 200
SCALE IN FEET
0 50
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
0027691_11.dgn
12:03:07 PM
0001-11
CONSTRUCTION LAYOUT
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
O
A D
A C
C E
S S
R
O A
D A
C C
E S
S
10+00
11+00
12+00
20+00
21+00
22+00
ELEV: 17.18
E 914924.56847
N 677183.90163
LOCATION CONTROL DELTA
TRV/ CAPPED IPS
CONTROL POINT 1512
20+00.00
ROAD 2
STA 12+50.00
ROAD 1
STA 151+00.51
BELFAST KELLER
INTERSECTION0
D R
A W
I N
G N o
.0
M A
T C
H L
I N
E S
T A
D R
A W
I N
G N o
.0
M
A T
C H
L I N
E S
T A
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
100 200
SCALE IN FEET
0 50
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
12:03:07 PM
0002-11
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
U
T F
IT
T
E R
S P
A R
K D
R
IV
E
G R
E A
T O
G E
E C
H E
E P
A R
K W
A Y
R O
C E S S
0 1
30+00
31+00
32+00
33+00
40+00
41+00
42+00
50+00
51+00
ELEV: 17.57
E 915638.25042
N 676233.32752
LOCATION CONTROL DELTA
TRV/PKF @CL
CONTROL POINT 1513
ELEV: 19.69
E 916131.67292
N 675421.58619
LOCATION CONTROL DELTA
TRV/CAPPED IPS
CONTROL POINT 1515
STA 33+22.49
ROAD 3
STA 162+97.42
BELFAST KELLER
INTERSECTION
STA 40+00.00
GREAT OGEECHEE PARKWAY
STA 162+98.97
BELFAST KELLER
INTERSECTION
STA 50+00.00
OUTFITTERS PARK DRIVE
STA 170+04.15
BELFAST KELLER
INTERSECTION
D R
A W
I N
G N o
.0
M A
T C
H L
I N
E S
T A
D R
A W
IN
G
N o
.0
M
A T
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
& MAINTENANCE OF SLOPES
EASEMENT FOR CONSTR
100 200
SCALE IN FEET
0 50
ORANGE BARRIER FENCE
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
ESA - ENV. SENSITIVE AREA
REQ'D LIMIT OF ACCESS
EXISTING LIMIT OF ACCESS & R/W
REQ'D LIMIT OF ACCESS & R/W
EXISTING LIMIT OF ACCESS
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
11/05/2020
REVISION DATES
9/26/2024 anderson.v
GPLOT-ORD
12:03:08 PM
0003-11
Savannah, GA 31405 • 912.234.5300 50 Park of Commerce Way •
B
ID
S E
T
N O
T F
O R
C O
N S
T R
U C
T
E
A R T
W O
V E
N U E
H E
A R T
W O
E
N U E
R O
C E S S
R O
C E S S
80+00
81+00
90+00
91+00
60+00
61+00
62+00
63+00
70+00
71+00
72+00
73+00
74+00
ELEV: 21.49
E 916708.62161
N 674683.88692
LOCATION CONTROL DELTA
TRV/PK
CONTROL POINT 1516
STA 63+80.00
HEARTWOOD AVENUE
STA 177+48.16
BELFAST…