This document is a project description for a road improvement project in Brooks County, Georgia. The project consists of roadway improvements to Belfast Keller Road from the eastern roundabout of the I-95 interchange to the new high school site located approximately 6,100 feet east of I-95. The widening will be from an existing two-lane section to a six-lane up to Great Ogeechee Parkway, then transition to a four-lane divided section to the school. The improvements are being completed to accommodate the coming growth at the interchange and along the corridor. The design will include 2 full access intersections, a roundabout at Heartwood Avenue, and one RCUT at a future access location.

The document does not provide details on pricing terms, set-asides, incumbents, funding requirements and sources, or other salient commercial information. It focuses solely on the technical scope of the road improvement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z:\27691\27691.0083\Documents\Construction\Bid\Addenda\Addendum #3 Addendum # 3 Dated October 22, 2024

BELFAST KELLER ROAD IMPROVEMENTS

FROM INTERSTATE 95 TO CRANSTON BLUFF ROAD

PREPARED FOR:

BRYAN COUNTY BOARD OF COMMISSIONERS

T&H PROJECT NO.

J–27691.0083

ADDENDUM NO. 3 October 22, 2024

GENERAL

This Addendum has been issued on behalf of Bryan County Board of Commissioners. The following information should be considered by prospective bidders in preparation of their proposals and is hereby incorporated into the Proposal Documents. Bidders shall be responsible for acknowledging receipt of this addendum in the Bid Form, Document 00313. Failure to do so will result in the proposal being considered non responsive.

PART I – QUESTIONS AND CLARIFICATIONS

A. QUESTIONS:

1. Question: Can the concrete pavement at the I-95 Interchange be changed to all be the same depth?

Answer: The plans and bid form have been revised to incorporate the same depth of concrete pavement.

2. Question: Typically, GDOT will use 12.5mm Polymer for the final surface within the limits of Roundabouts, your typical sections only show 12.5mm. Are you sure you don’t want to go with 12.5mm Polymer?

Answer: 12.5mm Polymer will not be utilized at the Heartwood roundabout.

3. Question: Can Builders Risk Insurance be eliminated from the contract?

Answer: The bid documents have been revised to remove the requirement for builder’s risk insurance. See Part II of this addendum.

4. Question: The entire set of lighting drawings don't show any lights or circuits. Not sure what to do there.

For lighting in the area of the I-95/Belfast Keller interchange, existing lights are to be relocated. Retain all existing lighting equipment when possible, and replace parts in-kind if needed. Plan sheets from the original installation are being provided with this addendum. These sheets are not an addition to the plans, but should be used to establish the cost for lighting relocations.

All other lighting to be installed by the contractor are on signal poles. Refer to signal plans.

5. Question: Addendum #1. It seems that the bid item for the Rumble Strips has been completely removed for the updated bid schedule of values. Is this item going away? Also, Note #4 on GDOT detail T-19 state that "For approaches with speed limits less than 50 MPH, Thermoplastic Reflectorized Pavement Marking Compound

BELFAST KELLER ROAD FROM I–95 TO CRANSTON BLUFF ROAD ADDENDUM #3

Z:\27691\27691.0083\Documents\Construction\Bid\Addenda\Addendum #3 Addendum # 3 Dated October 22, 2024 may be used in lieu of the Asphaltic Concrete if approved by the District

Maintenance Engineer." As the engineer of record, are you giving us the go ahead to use thermoplastic rumble strips on this item if it is in fact remaining in the scope?

Answer: The item for Rumble Strips has been re-added to the bid form.

Thermoplastic Reflectorized Pavement Markings will be acceptable for T-19 rumble strips on this project.

6. Question: The signal drawings are missing the quantity list. I don't know what color the signal heads are. I need to know what type of push buttons system is being installed. The sheet that is supposed to show the roadname signs is blank."

Answer: The signal plans have been revised to include quantity list, signal head color, type of push-button system to be installed, and Road Name signs.

7. Question: It's unclear whether existing side roads are to be replaced or remain and just widened according to the typical sections for Belfast Keller. This will be a lot more demo if they are to be replaced.

Answer: Additional labels have been added to side road plan sheets and profiles to clarify which side roads are to be overlayed, widened, or full depth pavement.

8. Question: Note #4 for typical sections for Belfast Keller state that existing pavement under medians shall be removed, but the drawn typical sections show the median down the middle of Belfast Keller built on top of the existing roadway pavement. Which is correct?

Answer: Note #4 is correct. Typical Sections also state that existing pavement shifts from left to right of construction centerline.

9. Question: I didn't see where "Unclassified Excavation" was defined anywhere. Can

I assume that this item will only be used if unsuitable materials are found and need to be replaced?

Answer: Refer to general note #37.

10. Question: I'm not seeing profiles for the following runs of pipe. Could you check to see if I'm just overlooking them?

a) C-21A to C-21B

b) D-26 to D-28

c) C-232 to C234

d) D-38 to D-39

e) D-37 to D-40

f) D-141 to D-41

g) D-42 to D-43

h) D-42 to D-44B

i) D-50 to D-51

j) D-52 to D-53

Answer:

a) Provided in Addendum No. 2 on sheet 22-0003

b) Added in to sheet 22-0012

c) Added in to sheet 22-0012

For items d) through j), a table has been added to sheet 22-0012 to provide structure information. Additional labels have also been added to the 13 series to clarify where existing pipe is to be removed or retained.

11. Question: Is it your intention to Mill the Existing Pavement down about 8.5 inches to allow for all of the new typical section (asphalt depths) to be put back?

BELFAST KELLER ROAD FROM I–95 TO CRANSTON BLUFF ROAD ADDENDUM #3

Z:\27691\27691.0083\Documents\Construction\Bid\Addenda\Addendum #3 Addendum # 3 Dated October 22, 2024

Answer: Mill existing pavement at tie-ins to create a smooth joint in overlay areas.

12. Question: Do you want to follow GDOT Specs for Storm Drain and do post installation video inspections? If so, could you please establish a bid item for this work in accordance with the latest version of GDOT Spec Section 550.

Answer: Item 550-9000 Video Inspection has been added to the bid form.

PART II – CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

The Proposal Documents shall be changed in the following respects:

SECTION 00313 – BID FORM

Revised items in bid form.

Revised to add Addendum No. 3

SECTION 00710

Removed requirement for builder’s risk insurance.

SECTION 00815

Revised sheet 00815-2 to clarify that builder’s risk insurance is not required.

PART III – DRAWINGS

1. The plan sheets have been updated. Delete and replace the corresponding plan sheets with the attached:

• 04 Series

• 05 Series

• 13 Series

• 15 Series

• 22 Series

• 25 Series

• 26 Series

• 27 Series

All refenced documents are incorporated and made a part of the Specifications for the Project

Belfast Keller Road from I–95 To Cranston Bluff Road.

All other aspects of the project remain unchanged.

THOMAS & HUTTON

Doyle Kelley, P.E.

Project Manager

End of ADDENDUM NO. 3

00313 – 1

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024

DOCUMENT 00313

BID FORM

PROJECT IDENTIFICATION: BELFAST KELLER ROAD IMPROVEMENTS FROM

INTERSTATE 95 TO CRANSTON BLUFF ROAD

CONTRACT IDENTIFICATION

AND NUMBER: J –27691.0083

THIS BID IS SUBMITTED TO: Bryan County

1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening, or for such longer period of time BIDDER may agree to in writing upon request of OWNER.

3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:

a. BIDDER has examined and carefully studied the Plans and Specifications for the work and contractual documents relative thereto, and has read all Technical

Provisions, Supplementary Conditions, and General Conditions, furnished prior to the opening of Bids, and can fulfill the requirements of the work to be performed.

b. BIDDER further acknowledges hereby receipt of the following Addenda:

ADDENDUM NO. DATE

1 October 10,2024

2 October 15, 2024

3 October 22, 2024

c. BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions possibly affecting cost, progress, performance and furnishing of the Work;

d. BIDDER is familiar with and is satisfied to all federal, state, and local Laws and

Regulations possibly affecting cost, progress, performance and furnishing of the

Work.

00313 – 2

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024

e. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structure at or contiguous to the site

(except underground Facilities) have been identified in the Supplementary

Conditions. BIDDER acknowledges such reports and drawings are not Contract

Documents and may not be complete for BIDDER’s purposes. BIDDER acknowledges OWNER and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the

Bidding Documents with respect to Underground Facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions

(surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance and furnishing of the

Work in accordance with the times, price and other terms and conditions of the

Bidding Documents.

f. BIDDER is aware of the general nature of Work to be performed by Owner and others at the site relating to Work for which this Bid is submitted as indicated in the

Bidding Documents.

g. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the

Bidding Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

h. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies BIDDER has discovered in the Bidding Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

i. This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

4. BIDDER will complete the Work in accordance with the Contract Documents for the following price(s):

00313 – 3

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024

BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF

ITEM DESCRIPTION

QUANTITY COST

UNITS MEASURE

PER

UNIT

TOTAL COST

ROADWAY CONSTRUCTION

150-1000 Traffic Control 1 ls $ –

151-1000 Mobilization 1 ls $ –

163-0232 Temporary Grassing 50 ac $ –

163-0240 Mulch 460 tn $ –

163-0301 Construct and Remove Construction

Exits 4 ea $ –

163-0550 Construct and Remove Inlet Sediment

Trap 120 ea $ –

165-0010 Maintenance of Temporary Silt Fence, Type A 12,600 lf $ –

165-0030 Maintenance of Temporary Silt Fence, Type C 5,000 lf $ –

165-0101 Maintenance of Construction Exits 4 ea $ –

165-0105 Maintenance of Inlet Sediment Traps 120 ea $ –

167-1000 Water Quality Monitoring and Sampling 6 ea $ –

167-1500 Water Quality Inspections 18 mo $ –

171-0010 Temporary Silt Fence, Type A 12,600 lf $ –

171-0030 Temporary Silt Fence, Type C 5,000 lf $ –

205-0001 Unclassified Excavation 3,800 cy $ –

207-0203 Found Bkfill Matl, Tp 2 1,500 cy $ –

210-0100 Grading Complete 1 ls $ –

310-5120 Gr Aggr Base Crs, 12 Inch, Incl Material 42,200 sy $ –

402-1812 Recycled Asph Conc Leveling, Inc Bitum

Matl & H Lime 7,500 tn $ –

402-3121 Asph Conc 25 mm Superpave, GP 1 or 2

, Incl Bitum Matl & H Lime (3.5") 11,200 tn $ –

402-3130 Aph Conc 12.5 MM Superpave, GP 2

Only, Incl Bitum Matl & H Lime (2") 6,600 tn $ –

402-3190 Asph Conc 19mm Superpave, GP 1 or 2, Incl Bitum Matl & H Lime (2" & 3") 7,100 tn $ –

413-0750 Tack Coat 7,600 gl $ –

415-5000

Asphaltic Concrete Open Graded

Crack Relief Interlayer, GP2 Only, Incl

Bitum Matl & H Lime (1")

1,200 tn $ –

429-1000 Rumble Strips 18 ea $ –

432-5010 Mill Asph Conc Pvmt, Variable Depth 600 sy $ –

439-0020 Plain PC Conc Pvmt, CL 3 Conc, 9 Inch

Thk 2,500 sy $ –

439-0020 Plain PC Conc Pvmt, CL 3 Conc, 9 Inch

Thk - Colored and Stamped 800 sy $ –

441-0104 Conc Sidewalk, 4 In 5,500 sy $ –

441-0740 Concrete Median, 4 In 1,830 sy $ –

00313 – 4

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024

BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF

ITEM DESCRIPTION

QUANTITY COST

UNITS MEASURE

PER

UNIT

TOTAL COST

441-0748 Concrete Median, 6 In 300 sy $ –

441-5008 Concrete Header Curb, 6 In, TP 7 400 lf $ –

441-5025 Concrete Header Curb, 4 In, TP 9 600 lf $ –

441-6222 Conc Curb & Gutter, 8in X 30in, TP 2 15,400 lf $ –

441-6740 Conc Curb & Gutter, 8in X 30in, TP 7 14,600 lf $ –

446-1100 Pvmt Reinf Fabric Strips, TP2, 18 Inch

Width 7,000 lf $ –

456-2020 Indentation Edge Line Rumble Strips-

Ground In Place (Continuous)

0.20 glm $ –

500-3201 Class B Concrete, Retaining Wall 45 cy $ –

500-3900 Class B Concrete, Incl Reinf Steel 30 cy $ –

500-9999 Class B Conc, Base or Pvmt Widening 300 cy $ –

550-4218 FlaredEnd Section 18 In, Storm Drain 38 ea $ –

550-4224 FlaredEnd Section 24 In, Storm Drain 17 ea $ –

550-5180 Storm Drain Pipe, 18 In, Class III 7,100 lf $ –

550-5183 Storm Drain Pipe, 18 In, Class V 100 lf $ –

550-5240 Storm Drain Pipe, 24 In, Class III 850 lf $ –

550-5243 Storm Drain Pipe, 24 In, Class V 580 lf $ –

550-5423 Storm Drain Pipe, 42 In, Class V 580 lf $ –

550-9000 Video Inspection 9210 lf $ –

600-0001 Flowable Fill 32 cy $ –

603-2181 Stn Dumped Rip Rap, TP3, 18 In 500 sy $ –

603-7000 Plastic Filter Fabric 500 sy $ –

611-4003 Reconstruct Misc Drainage Structure 4 ea $ –

634-1200 Right Of Way Markers 62 ea $ –

636-1033 Highway Signs, TP1 Matl, Refl Sheeting, TP9

290 sf $ –

636-1036 Highway Signs, TP1 Matl, Refl Sheeting, TP11

499 sf $ –

636-1077 Highway Signs, Alum Extruded Panels, Refl Sheeting, TP 9 130 sf $ –

636-2070 Galv Steel Posts, TP7 1,378 lf $ –

636-2080 Galv Steel Posts, TP8 135 lf $ –

636-2090 Galv Steel Posts, TP9 355 lf $ –

639-3014 Steel Strain Pole, Type 4, Incl Luminaire

Arm 8 ea $ –

636-3010 Ground-Mounted Breakaway Sign

Support 9 ea $ –

641-1200 Guardrail, TP W 200 lf $ –

641-5001 Guardrail Anchorage, TP 1 4 ea $ –

643-0010 Field Fence Woven Wire 2,000 lf $ –

653-0110 Thermoplastic Pvmt Marking, Arrow, TP 1 10 ea $ –

653-0120 Thermoplastic Pvmt Marking, Arrow, TP 2 56 ea $ –

653-0130 Thermoplastic Pvmt Marking, Arrow, TP 3 1 ea $ –

00313 – 5

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024

BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF

ITEM DESCRIPTION

QUANTITY COST

UNITS MEASURE

PER

UNIT

TOTAL COST

653-0132 Thermoplastic Pvmt Marking, Arrow, TP

3A 1 ea $ –

653-0296 Thermoplastic Pvmt Marking, Word, TP 15 8 ea $ –

653-1501 Thermoplastic Solid Traf Stripe, 5in, White 22,100 lf $ –

653-1502 Thermoplastic Solid Traf Stripe, 5in, Yellow 19,000 lf $ –

653-1704 Thermoplastic Solid Traf Stripe, 24in, White 310 lf $ –

653-1804 Thermoplastic Solid Traf Stripe, 8 In, White 5,540 lf $ –

653-1906 Thermoplastic Solid Traf Stripe, 6 In, White 3,350 lf $ –

653-3501 Thermoplastic Skip Traf Stripe, 5 In, White 17,700 glf $ –

653-4503 Thermoplastic Skip Traf Stripe, 6 In, White 60 glf $ –

653-4830 Thermoplastic Skip Traf Stripe, 18 In, White 160 glf $ –

653-6004 Thermoplastic Traf Striping, White 1,250 sy $ –

653-6006 Thermoplastic Traf Striping, Yellow 100 sy $ –

654-1003 Raised Pvmt Markers TP3 350 ea $ –

654-1010 Raised Pvmt Markers TP10 12 ea $ –

655-6030 Preformed Plastic Pvmt Mkg Arrow, Contrast (Black-White), TP 3 2 ea $ –

657-5535 Preformed Plastic Pvmt Mkg Arrow, Contrast (Black-White), TP 3A 2 ea $ –

657-1085 Preformed Plastic Solid Pvmt Mkg, 8 In, Contrast (Black-White), TP PB 1,500 lf $ –

657-1110 Preformed Plastic Solid Pvmt Mkg, 11 In, Contrast (Black-White), TP PB 850 lf $ –

657-3085 Preformed Plastic Skip Pvmt Mkg, 8 In, Contrast (Black-White), TP PB 200 glf $ –

657-4998 Preformed Plastic Pavement Marking, Contrast (Black-White), TP PB 1,800 sy $ –

667-1000 Signal Installation No- 1 (Access

1/Access2) 1 ls $ –

667-1000 Signal Installation No- 2 (US 278 & Great

Ogeechee PkwyAccess3) 1 ls $ –

668-1100 Catch Basin, GP 1 79 ea $ –

668-1110 Catch Basin, GP 1, Addl Depth 20 lf $ –

668-2100 Drop Inlet, GP 1 34 ea $ –

668-2110 Drop Inlet, GP 1, Addl Depth 20 lf $ –

668-2200 Drop Inlet, GP 2 5 ea $ –

668-2210 Drop Inlet, GP 2, Addl Depth 20 lf $ –

680-6140 Luminaire, TP 4, LED 8 ea $ –

668-7018 Drain Inlet, 18 In 4 ea $ –

682-2120 Pull Box, Type 2 20 ea $ –

682-2130 Pull Box, Type 3 8 ea $ –

682-2150 Pull Box, Type 5 2 ea $ –

00313 – 6

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024

BELFAST KELLER ROAD IMPROVEMENTS FROM INTERSTATE 95 TO CRANSTON BLUFF

ITEM DESCRIPTION

QUANTITY COST

UNITS MEASURE

PER

UNIT

TOTAL COST

682-6219 Conduit, Nonmetl, TP 2, 1 In 200 lf $ –

682-6222 Conduit, Nonmetl, TP 2, 2 In 160 lf $ –

682-6233 Conduit, Nonmetl, TP 3, 2 In 1,710 lf $ –

682-9950 Directional Bore- Signal No 1 100 lf $ –

682-9950 Directional Bore- Signal No 2 90 lf $ –

700-6910 Permanent Grassing 19.00 ac $ –

700-7000 Agricultural Lime 75.00 tn $ –

700-8000 Fertilizer Mixed Grade 23.00 tn $ –

700-8100 Fertilizer Nitrogen Content 940 lb $ –

1001 Landscaping 1 ls $ –

1005 Lighting 1 ls $ –

1010 Handrail (42") 1 ls $ –

TOTAL

PROJECT

TOTAL BID:

and _____ /100 Dollars

Unit Prices have been computed in accordance with paragraph 11.03.C of the General

Conditions.

BIDDER acknowledges estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities determined as provided, determined as provided in the Contract Documents.

5. BIDDER agrees the Work in the area from Sta. 172+29.00 to 206+42.14 shall be substantially complete by September 1, 2025. The remainder of the project shall be substantially complete by July 1, 2026 and completed and ready for final payment by August 15, 2026.

6. BIDDER accepts provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within times specified in the Agreement.

7. The following documents are attached to and made a condition of this Bid:

a. Required Bid Security in the form of 10 percent of the Bid Total Price.

8. The undersigned further agrees in case of failure on his/her part to execute the said

00313 – 7

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications \00313 – Bid Form.DOC Revised per Addendum #3 dated 10/22/2024 contract and the Bond within 30 consecutive calendar days after written notice being given of the award of the contract, the check or bid bond accompanying this bid, and the monies payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure, otherwise, the check or bid bond accompanying this proposal shall be returned to the undersigned.

9. Communications concerning this Bid shall be addressed to:

Doyle D. Kelley, PE

Thomas & Hutton

50 Park of Commerce Way

Savannah, GA 31405

(912)721–4160 kelley.d@tandh.com

10. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions of Instructions.

SUBMITTED 2024.

CONTRACTOR'S NAME

ADDRESS:

BY:

State Contractor License No.

00710–1

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00710 – Special Conditions.doc Revised per Addendum #3 dated October, 22, 2024

DOCUMENT 00710

SPECIAL CONDITIONS

SC–1 DESCRIPTION OF THE WORK The project consists of roadway improvements to the eastern roundabout and along Belfast Keller Road from the eastern roundabout of the I-95 interchange to the new high school site located approximately 6,100’east of I–95. The widening will be from an existing two–lane section to a six–lane up to Great Ogeechee

Parkway then transition to a four–lane divided section to the school. The improvements are being completed to accommodate the coming growth at the interchange and along the corridor. The design will include 2 full access intersections, a roundabout at Heartwood and two R–CUTS at future access locations.

SC–2 COMMENCEMENT AND COMPLETION OF WORK: The Contractor shall commence work within

10 days after Notice to Proceed is issued. Work shall be completed and ready for final payment by August 15, 2026.

The area from Sta. 174+29.00 to 206+42.14 shall be substantially complete by September 1, 2025.

The area from Sta. 130+03.92 to 141+50.09 is undergoing GDOT final review with GDOT. No work shall be done in this area until instructed by the engineer.

If the Contractor fails to prosecute the work with such diligence as will insure the completion of each portion of the work within the time shown on the above schedule, plus any extensions made in accordance with Article 12 of the General Conditions; and, if the Owner does not exercise reservations as set forth in Article 13 of the General Conditions, the

Contractor shall continue the work in which event liquidated damages for the delay will be impossible to determine. In lieu, thereof, liquidated damages in the amount of $1,000.00 per each day of delay of the work until the work is completed.

SC–3 DRAWINGS: The work shall conform to the following drawings, all of which form a part of, and are included in, these specifications and are available in the office of Thomas & Hutton

Engineering Co., 50 Park of Commerce Way, Savannah, Georgia 31405. following general sections:

Section Description Job No.

1 Cover Sheet 27691.0083

2 Index 27691.0083

4 General Notes 27691.0083

5 Typical Sections 27691.0083

11 Construction Layout 27691.0083

13 Mainline Plan 27691.0083

15 Mainline Profile 27691.0083

16 Crossroad Profile 27691.0083

18 Special Grading Sheet 27691.0083

21 Drainage Area Map 27691.0083

22 Drainage Profiles 27691.0083

23 Cross Sections 27691.0083

24 Utility Plans 27691.0083

00710–2

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00710 – Special Conditions.doc Revised per Addendum #3 dated October, 22, 2024

Section Description Job No.

25 Lighting Plans 27691.0083

26 Signing and Marking Plans 27691.0083

27 Signal Plans 27691.0083

31 Retaining Wall Plans 27691.0083

38 Special Construction Details 27691.0083

44 Utility Relocation Plans 27691.0083

50 ESPCP Cover Plan 27691.0083

51 ESPCP General Notes 27691.0083

53 ESPCP Drainage Area Map 27691.0083

54 BMP Location Details 27691.0083

55 Watershed Map Site Monitoring Plan 27691.0083

SC–4 LAYOUT OF WORK: Control lines and master benchmarks will be furnished by the Owner. The

Contractor will lay out work and will be responsible for all measurements in connection therewith.

SC–5 OBSERVATIONS AND TESTS: Before acceptance of the whole or any part of the work, it shall be subjected to observation and tests to determine it is in accordance with the plans and specifications. The Contractor will be required to maintain all work in a first–class condition for a 30–day operating period after the same has been completed as a whole and the

Engineer has notified the Contractor in writing the work has been finished. The Contractor shall pay for all testing and shall engage a GDOT acceptable laboratory or qualified individual to conduct the tests in accordance with these specifications. No portion of the work will be accepted until tests prove it has been satisfactorily completed. The Contractor shall give the Project Engineer or Project Representative a minimum of 48 hours notice for all required observations or tests.

SC–6 BONDS: The Performance Bonds in the amount of 100% of the contract amount and

Payment Bonds in the amount of 100% of the contract amounts shall be furnished in accordance with Article 5 of the General Conditions.

SC–7 CONTRACTOR'S AND SUBCONTRACTOR'S INSURANCE: The Contractor shall not commence work under this contract until obtaining all the insurance required under this paragraph and such insurance has been accepted by the Owner, nor shall the Contractor allow any

Subcontractor to commence work on a subcontract until the insurance required of the

Subcontractor has been so obtained and accepted.

a. Compensation and Employer's Liability Insurance: The Contractor shall take out and maintain during the life of the contract the statutory Worker's

Compensation and Employer's Liability Insurance for all of its employees to be engaged in work on the project under the contract and, in case and such work is sublet, the Contractor should require the Subcontractor similarly to provide Worker's Compensation and Employer's Liability Insurance for all the latter's employees to be engaged in such work.

b. Bodily Injury Liability and Property Damage Liability Insurance: The

Contractor shall take out and maintain during the life of the contract Bodily

Injury Liability and Property Damage Liability Insurance to protect itself and any Subcontractor performing work covered by the contract from claims for damages or personal injury, including accidental death, as well as from claims for property damage, which may arise from operations under the

00710–3

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00710 – Special Conditions.doc Revised per Addendum #3 dated October, 22, 2024 contract, whether such operations be by the Contractor, Subcontractor, or anyone directly or indirectly employed by either of them and the amount of such insurance should be not less than:

(1) Bodily Injury Liability Insurance, in an amount not less than

$1,000,000.00 for injuries, including wrongful death to any one person and subject to the same limit for each person in an amount not less than $2,000,000.00 on account of one accident. Contractual liability should be endorsed on the policy.

(2) Property Damage Insurance in an amount not less than $1,000,000.00 for damages on account of any one accident, and in an amount not less than $2,000,000.00 for damages on account of all accidents.

c. Proof of Carriage of Insurance: The Contractor shall furnish the Owner with certificates showing the type, amount, class of operations, effective dates, and date of expiration of policies. Such certificates shall contain substantially the following statement: “The insurance covered by this certification shall not be cancelled or materially altered, except after ten

(10) days written notice has been received by the Owner.”

SC–8 HOLD HARMLESS CLAUSE: The Contractor agrees to hold harmless, indemnify and defend the Owner and its agents, architects, engineers and employees from and against any and all claims, losses, damages, demands, causes of action and any an all related costs and expenses, of every kind and character, growing out of, incidental to, or resulting directly or indirectly from the Contractor's performance of the work described herein, whether such loss, damage, injury, or liability is contributed to by the negligence of the Owner, its agents, architects, engineers, or employees, except the Contractor shall have no liability for damages or the costs incidental thereto caused by the sole negligence of the Owner, its agents, architects, engineers, or employees. The Contractor will require any and all subcontractors to conform with the provisions of this clause prior to commencing any work and agrees to ensure this clause is in conformity with the insurance provisions of the contract.

SC–9 CONTRACTOR'S STATUS: It is agreed the Contractor shall occupy the status of an

Independent Contractor and the Contractor's employees are not employees of the Owner.

SC–10 CONTRACTOR'S AFFIDAVIT: Upon completion of the work and prior to final payment and settlement of all sums due hereunder, Contractor will furnish to Owner a Contractor's

Affidavit in the usual form submitted by Contractor under the laws of the State of Georgia to the effect all bills for labor, materials and services in connection with said contract have been paid in full, acknowledging receipt of the contract price and averring there are no outstanding claims under said contract which could become a lien on the real estate arising out of said contract.

SC–11 RESIDENT PROJECT ENGINEER: The Owner reserves the right to furnish a Resident Project

Engineer as deemed necessary to ensure the Project quality control and conformance to

Plans and Specifications, who will act as the Owner's Representative on the Project and will have the authority of the Engineer as set forth in the Contract Documents.

SC–12 BARRICADES, DANGER AND WARNING SIGNS: The Contractor shall install and maintain barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices and shall take all necessary precautions for the protection of the work and safety of the public. Lanes closed to traffic shall be protected by effective barricades, lighted during

00710–4

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00710 – Special Conditions.doc Revised per Addendum #3 dated October, 22, 2024 hours of darkness. Suitable warning signs shall be provided to control, direct traffic, and warn pedestrians. Upon completion all barricades, signs and the like shall be removed.

SC–13 TOOLS, PLANT AND EQUIPMENT: If at any time before the commencement or during the progress of the work, tools, plant or equipment appear to the Engineer to be insufficient, inefficient or inappropriate to secure the quality of the work required or the proper rate of progress, the Engineer may order the Contractor to increase their efficiency, to improve their character, to augment their number, or to substitute new tools, plant, or equipment, as the case may be, and the Contractor must conform to such order; but a failure of the Engineer to demand such increase of efficiency, number, or improvement shall not relieve the

Contractor of its obligation to secure the quality of work and the rate of progress necessary to complete the work within the time required by the contract to the satisfaction of the

Owner.

SC–14 ACCIDENTS: The Contractor shall provide, at the site, such equipment, and medical facilities as are necessary to supply first–aid service to anyone who may be injured in connection with the work. The Contractor must report in writing to the Engineer all accidents whatsoever arising out of, or in connection with, the performance of the work, whether on or adjacent to the site, which causes death, personal injury, or property damages, giving full details and statement of witnesses. In addition, if death or serious injuries or serious damages are caused, the accident shall be reported immediately by telephone or messenger to both the

Contractor and any subcontractor on account of any accident, the Contractor shall promptly report the facts to the Engineer, giving full details in writing of the claim. The

Contractor shall advise its superintendent and foreman, who are on the site of the work, the name of the hospital and phone number and the name and phone number of the doctor to use in case of an accident.

SC–15 SANITARY PROVISIONS: The Contractor shall provide temporary sanitary facilities for the use of the workmen during the progress of the work. The sanitary facilities shall conform to the requirements of the County health Engineer. All facilities shall be removed at the completion of the contract.

SC–16 MODIFICATION OF QUANTITIES: The itemized quantities shall be considered by the

Contractor as the quantities required to complete the work for the purpose of bidding.

Should actual quantities required in the construction of the work be greater or less than the quantities shown on the items, an amount equal to the difference in quantities at the unit prices for the item will be added to or deducted from the contract price.

When itemized quantities are not given in the Proposal, the work shown on the plans or specified shall be considered by the Contractor to be included in the contract for the lump sum prices bid.

SC–17 RESPONSIBILITY REGARDING EXISTING UTILITIES AND STRUCTURES: The existence and location of underground utilities will be investigated and verified in the field by the Contractor before starting work. The Contractor shall call for underground utility locations. Underground utilities location service can be contacted at 1–800–282–7411 (GA). The location of all known interferences based on the best information available has been shown on the drawings, but this information may not be complete. Excavation in the vicinity of existing structures and utilities shall be carefully done by hand. The Contractor shall be held responsible for any damage to and for maintenance and protection of existing utilities and structures. The

Contractor is responsible for coordinating with the utility companies any relocation, adjustment, or replacement of utility facilities.

00710–5

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00710 – Special Conditions.doc Revised per Addendum #3 dated October, 22, 2024

SC–18 INTERRUPTION OF UTILITY SERVICE: The Contractor's operations shall be conducted to interfere as little as possible with utility services. Any proposed interruption by the Contractor must be accepted in advance by the Engineer.

SC–19 OMISSION: The drawings and specifications shall both be considered as a part of the contract. Any work and material shown in the one and omitted in the other or described in the one and not shown in the other, or which may fairly be implied by both or either, shall be furnished and performed as though shown in both, in order to give a complete and first– class job.

SC–20 MEASUREMENT AND PAYMENT: Measurement and payment shall be made for the units and at the lump sum contract prices shown on the Bid Schedule. Direct payment shall only be made for those items or work specifically listed in the proposal and the cost of any other work must be included in the contract price for the applicable items to which it relates.

SC–21 "OR EQUIVALENT," CLAUSE: Although the plans and specifications refer to particular manufacturers and model numbers for various products, such reference is made only to establish function and quality of such products. If it is desired to use materials or equipment of trade names or of manufacturer's names that are different from those mentioned in the contract documents, information pertaining to such items must reach the hands of the

Engineer at least 10 days prior to the date set for the opening of bids. The burden of proving equality of a proposed substitute to an item designated by trade name or by manufacturer's name in the contract document rests on the party submitting the request for acceptance.

The written application for review of a proposed substitute must be accompanied by technical data that the party requesting review desires to submit in support of its application.

The Engineer will give consideration to reports from reputable independent testing laboratories, verified experience records showing the reputation of the proposed product with previous users or any other written information that is reasonable in the circumstances.

The application to the Engineer for review of a proposed substitute must be accompanied by a schedule setting forth in what respects the material or equipment submitted for consideration differs from the materials or equipment designated in the contract documents. The degree of proof required for acceptance of a proposed substitute as equivalent to a named product is the amount of proof necessary to convince the Engineer beyond all doubt. To be acceptable, a proposed substitute must, in addition, meet or exceed all express requirements of the contract documents.

If submittal is accepted by the Engineer, an addendum will be issued to all prospective bidders at least five days prior to the date set for the opening of bids.

The Engineer shall be the final judge on questions of similarity and equality.

SC–22 SAFETY AND HEALTH REGULATIONS: The Contractor shall comply with the Department of

Labor Safety and Health Regulations for Construction promulgated under the Occupational

Safety and Health Act of 1970 as amended through January 1, 2004 (PL 91–596) and under

Section 107 of the Contract Work and Safety Standards Act (PL 91–54). The regulations are administered by the Department of Labor and the Contractor shall allow access to the project to personnel from that Department.

SC–23 RECORD DATA AND DRAWINGS: The Contractor shall keep accurate, legible records of the locations, types, and sizes of sanitary lines, service laterals, manholes, cleanouts, water lines, fittings, valves, hydrants, drainage pipes, drainage structures, and other related work performed under this project. Where proposed and existing utilities cross, the Contractor shall measure and record the horizontal location and vertical separation between each crossing. Separation shall be measured between exteriors of pipes. On a set of project

00710–6

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00710 – Special Conditions.doc Revised per Addendum #3 dated October, 22, 2024 prints provided by the Owner, the Contractor shall prepare a set of "record" drawings from the data stated above. The horizontal locations of all portions of items installed on this project shall be accurately tied down to features that are physical and visible, such as property corner markers and/or permanent type structures. Invert elevations of all manholes, storm sewers and structures, sanitary sewers and lift stations shall be clearly indicated. These "record" drawings shall be kept clean and dry and maintained in a current state with the progress of the work. If at any time, a copy of this plan or portion of it is requested by the Owner, such copy shall be made available within 24 hours after the request is made.

Before final acceptance of the completed installation and final payment by the Owner, the

Contractor shall deliver to the Engineer, four sets of “Record” Drawings accurately depicting the horizontal and vertical as–built data described in the above paragraph. “Record" drawings for the items installed on this project shall be certified by a licensed surveyor, other than Thomas & Hutton, registered in Georgia. The size of the drawings shall be 24” x 36”. The

“Record” drawings shall have a coordinate system based on the Georgia State Plane

Coordinate System, East Zone, North American Datum of 1983 (NAD83). Elevations shall be based on the North American Vertical Datum of 1988 (NAVD 88). All measurements and coordinates shown shall use the U.S. Survey flood definition. Coordinates shall be shown on all drainage structures, sanitary sewer manholes, storm manholes/boxes, valve boxes/vaults, valve manholes, valves, fire hydrants, fittings, and all other related work performed under this contract. Vertical data including but not limited to, structure and manhole frame and inverts, pipe inverts, lift station frame, inverts, control levels, bottom, site grading, and as–built grading shall be shown. In addition to the “Record” drawings, Contractor shall deliver to

Engineer electronic AutoCAD (v. 14 or later) files of all the data described above on a CD–

ROM.

SC–24 PROPERTY CORNERS: The Contractor shall be responsible for restoring any property corners or monuments disturbed during construction. They shall be restored by a professional surveyor registered in the State of Georgia.

SC–25 VIDEO: A video showing existing site conditions shall be made by the Contractor prior to start of construction. Contractor shall provide Owner and Engineer a copy of the video.

Contractor is encouraged to record any existing damaged facilities that could be questioned later by property owners. A written or recorded narrative shall be provided with the video. Engineer shall be notified 72 hours in advance making the video. Contractor is responsible for all costs associated with video and shall be considered a subsidiary part of the contract.

END OF SECTION 00710

00815–1

Z:\27691\27691.0083\Documents\Construction\Bid\Specifications\00815 – Supplementary Conditions.DOC

DOCUMENT 00815

SUPPLEMENTARY CONDITIONS

These Supplementary Conditions amend or supplement the Standard General Conditions of the

Construction Contract (EJCDC C–700, 2007 Edition) and other provisions of the Contract

Documents as indicated below. All provisions that are not so amended or supplemented remain in full force and effect.

SC–1 The terms used in these Supplementary Conditions which are defined in the Standard

General Conditions of the Construction Contract (EJCDC C–700, 2007 Edition) have the meanings assigned to them in the General Conditions.

SC–2.05.A.4 Add the following new paragraph to the General Conditions after paragraph

2.05.A.3:

4. “A schedule of anticipated shipping dates for materials and equipment.

It is intended that equipment and materials be so scheduled as to arrive at the job site just prior to time for installation to prevent excessive materials on hand for inventory and necessity for extensive storage facilities at the job site.”

SC–5.04.B.7 Add the following new paragraph to the General Conditions after paragraph

5.04.B.6:

7. Bonding surety shall be located in the state in which the work is being performed.

The Contractor shall not commence work under this contract until it has obtained all the insurance required under this paragraph and such insurance has been accepted by the Owner, nor shall the Contractor allow any Subcontractor to commence work on its subcontract until the insurance required of the Subcontractor has been so obtained and accepted.

a. Compensation and Employer's Liability Insurance: The Contractor shall take out and maintain during the life of the contract, the statutory Worker's Compensation and Employer's Liability Insurance for all of its employees to be engaged in work on the project under the contract and, in case such work is sublet, the Contractor should require the Subcontractor similarly to provide Worker's

Compensation and Employer's Liability Insurance for all the latter's employees to be engaged in such work.

b. Bodily Injury Liability and Property Damage Liability Insurance: The

Contractor shall take out and maintain during the life of the contract, Bodily Injury Liability and Property Damage Liability

Insurance. The policy shall protect Contractor and any

Subcontractor performing work covered by the contract from claims for damages or personal injury, including accidental death, a well as from claims for property damage, which may arise from operations under the contract, whether such operations be by

00815–2

Contractor, Subcontractor, or by anyone directly or indirectly employed by either of them and the amount of such insurance should be not less than:

(1) Bodily Injury Liability Insurance, in an amount not less than

$1,000,000.00 for injuries, including wrongful death to any one person and subject to the same limit for each person in an amount not less than $2,000,000.00 on account of one accident. Contractual liability should be endorsed on the policy.

(2) Property Damage Insurance in an amount not less than

$1,000,000.00 for damages on account of any one accident, and in an amount not less than $2,000,000.00 for damages on account of all accidents.

c. Builder's Risk Insurance (Fire and Extended Coverage): Builder’s

Risk Insurance is not required on this project.

d. Proof of Carriage of Insurance: The Contractor shall furnish the

Owner with certificates showing the type, amount, class of operations, effective dates, and date of expiration of policies.

Such certificates shall contain substantially the following statement: "The insurance covered by this certification shall not be canceled or materially altered, except after 10 days written notice has been received by the Owner."

SC–6.02.B Add the following:

The Contractor shall provide in writing any requests to work on weekends.

Requests shall be submitted to the Owner and Engineer for consideration a minimum of 48 hours prior to the requested weekend.

SC–6.05.E Replace with the following:

Engineer’s Cost Reimbursement: Engineer will record Engineer’s costs in evaluating a substitute proposed or submitted by Contractor pursuant to

Paragraphs 6.05.A.2 and 6.05.B. Whether or not Engineer approves a substitute so proposed or submitted by Contractor, Contractor shall reimburse Owner and

Owner shall pay Engineer for the reasonable charges of Engineer for evaluating each such proposed substitute. Contractor shall also reimburse Owner and

Owner shall pay Engineer for the reasonable charges of Engineer for making changes in the Contract Documents (or in the provisions of any other direct contract with Owner) resulting from the acceptance of each proposed substitute.

SC–6.08 Add the following:

The Contractor shall not proceed until all encroachment permits, curb cut permits, highway crossing permits, and railroad crossing permits have been secured. Contact Owner to ascertain status of permits.

00815–3

SC–6.09.D Add a new paragraph after paragraph 6.09.C of the General Conditions that reads as follows:

“D. The Contractor shall comply with the Department of Labor Safety and

Health Regulations for Construction promulgated under the Occupational

Safety and Health Act of 1970 as amended through January 1, 2004 (PL

91–596) and under Section 107 of the Contract Work and Safety

Standards Act (PL 91–54). The regulations are administered by the

Department of Labor and the Contractor shall allow access to the project to personnel from that Department.

The Bidder’s attention is directed to the fact all applicable State laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout and they will be deemed to be included in the contract the same as though herein written in full.

The Contractor shall keep fully informed of all laws, ordinances and regulations of Federal, State, City and County, in any manner affecting those engaged or employed in the work, or the materials used in the work, or in any way affecting the conduct of the work, and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over same. Contractor shall at all times, observe and comply with all such existing and future laws, ordinances, and regulations.”

SC–6.12.B Add a new paragraph after paragraph 6.12.A of the General Conditions that is to read as follows:

“B. Record Data Drawings:

1. The Contractor shall keep accurate, legible records of the elevations, locations, types, and sizes of sanitary sewage lines, service laterals, manholes, cleanouts, water lines, fittings, valves, hydrants, drainage pipes, drainage structures, and other related work performed under this project. Where proposed and existing utilities cross, the Contractor shall measure and record the horizontal location and vertical separation between each crossing. Separation shall be measured between exteriors of pipes. On a set of project prints provided by the

Owner, the Contractor shall prepare a set of “record” drawings from the data stated above. The horizontal locations of all portions of items installed on this project shall be accurately tied down to [features that are physical and visible, such as property corner markers and/or permanent type structures] [the State Plane Coordinate System].

Invert and frame elevations of all manholes, storm sewers and structures, sanitary sewers and lift stations shall be clearly indicated.

These “record” drawings shall be kept clean and dry and maintained in a current state with the progress of the work. If at any time, a copy of this plan or portion of it is requested by the Owner, such copy shall be made available within 24 hours after the request is made.

2. Before final acceptance of the completed installation and before final payment by the Owner, the Contractor shall deliver to the

00815–4

Engineer a completed set of “record” drawings accurately depicting the data described above. The horizontal and vertical locations as shown on the “record” drawings for the items installed on this project shall be certified by a licensed surveyor, other than Thomas & Hutton, registered in the State in which the project is located. “Record”

Drawings shall be submitted on a marked up set of project construction prints or electronically. Thomas & Hutton shall prepare original “record” drawings from the submitted data. When completed, Thomas & Hutton shall have the licensed surveyor stamp and sign the original “record” drawings before making copies available to the Owner or other appropriate agencies.”

SC–6.13.A.3 Add the following:

“Safely guard the Owner’s property from damages, injury, or loss in connection with this contract.