This notice provides information about an upcoming federal construction contract solicitation. The solicitation will be for the renovation and new construction of Bechtel Elementary School located at Camp McTureous in Okinawa, Japan. The project includes renovating approximately 6,550 square meters of existing facilities and constructing a new addition of approximately 7,525 square meters. The contract value is estimated between 100 and 250 million US dollars. The solicitation is anticipated to be issued in late September 2022 as a request for proposal on beta.SAM.gov. The response due date will be specified in the solicitation. Only firms licensed and registered to conduct construction work in Japan will be considered as local sources under this solicitation, which is not set aside for small businesses.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovate Bechtel Elementary School PA00106 Camp McTureous, Okinawa, Japan
SECTION 31 00 00
EARTHWORK
08/08
PART 1 GENERAL
1.1 CRITERIA FOR BIDDING
Base bids on the following criteria:
a. Surface elevations are as indicated.
b. Pipes or other artificial obstructions, except those indicated, will not be encountered.
c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.
d. Material character is indicated by the boring logs.
e. Hard materials and rock will be encountered at excavations.
Refer to boring logs.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
JAPANESE INDUSTRIAL STANDARDS (JIS)
JIS A 1102 (2014) Method of Test for Sieve Analysis of Aggregates
JIS A 1103 (2014) Method of Test for Amount of Material Passing Test Sieve 75 µm in Aggregates
JIS A 1205 (2009) Test Method for Liquid Limit and Plastic Limit of Soils
JIS A 1210 (2009) Test Method for Soil Compaction Using a Rammer
JIS A 1211 (2009) Test Methods for the California Bearing Ratio (CBR) of Soils in laboratory
JIS A 1214 (2013) Test Method for Soil Density by the Sand Replacement Method
JIS A 5001 (2008) Crushed Stone for Road Construction
JIS A 5005 (2020) Crushed Stone and Manufactured Sand for Concrete
SECTION 31 00 00 Page 1 sgoshi Text Box
DRAFT
JAPAN MINISTRY OF THE ENVIRONMENT (MOE)
Notification No.46 (2001) Environmental Quality Standards for Soil Contamination
JAPANESE GEOTECHNICAL SOCIETY (JGS)
JGS 0051 (2000) Method of Classification of Geomaterials for Engineering Purposes
JGS 1521 (2012) Method for Plate Load Test
JGS 1614 (2003) Test Method for Soil Density Using Nuclear Gauge
U.S. DEPARTMENT OF DEFENSE HEADQUARTERS, U.S. FORCES JAPAN (USFJ)
JEGS (2022) Japan Environmental Governing Standards
1.3 DEFINITIONS
1.3.1 Satisfactory Materials
Satisfactory materials comprise any materials classified by JGS 0051 as G, G-M, G-C, GM, GC, S, S-M, S-C, SM, SC, ML, MH, CL, CH. Satisfactory materials for grading comprise stones less than 200 mm, except for fill material for pavements which comprise stones less than 75 mm in any dimension.
1.3.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. Notify the Contracting Officer when encountering any contaminated materials.
1.3.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in JGS 0051 as G, G-M, G-C, S, S-M, S-C. Cohesive materials include materials classified as GC, SC, ML, CL, MH, CH. Materials classified as GM, SM will be identified as cohesionless only when the fines are nonplastic. Perform testing, required for classifying materials, in accordance with JIS A 1205 , JIS A 1102 and JIS A 1103 .
1.3.4 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in JIS A 1210 (Methods C,D,E - non repeating method) abbreviated as a percent of laboratory maximum density (Modified Proctor Test).
1.3.5 Topsoil
Material suitable for topsoils obtained from offsite areas and excavations
SECTION 31 00 00 Page 2 sgoshi is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than 25 mm diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
1.3.6 Hard/Unyielding Materials
Hard/Unyielding materials comprise weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" with stones greater than 300 mm in any dimension or as defined by the pipe manufacturer, whichever is smaller. These materials usually require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.
1.3.7 Rock
Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 0.375 cubic meter in volume.
Removal of hard material will not be considered rock excavation because of intermittent drilling that is performed merely to increase production.
1.3.8 Unstable Material
Unstable materials are too wet to properly support the utility pipe, conduit, or appurtenant structure.
1.3.9 Select Granular Material or Engineered Granular Fill
1.3.9.1 General Requirements
Select granular material consist of materials classified as G, G-M, G-C, S, S-M, S-C or JIS standarized C-40, RC-40, M-40 or RM-40 by JGS 0051 where indicated. The liquid limit of such material must not exceed 35 percent when tested in accordance with JIS A 1205 . The plasticity index must not be greater than 12 percent when tested in accordance with JIS A 1205 , and not more than 35 percent by weight may be finer than 75 micrometers sieve when tested in accordance with JIS A 1103 . CBR shall be greater than 50 in accordance with JIS A 1211.
1.3.9.2 California Bearing Ratio Values
Bearing Ratio: Provide Design CBR ratio in accordance with JIS A 1211 for a laboratory soaking period of not less than 4 days. Provide 1 percent maximum expansion. Conform the combined material to the following sieve analysis:
Sieve Size Percent Passing by Weight
63 mm 100
4.75 mm 40 - 85
SECTION 31 00 00 Page 3 sgoshi
Sieve Size Percent Passing by Weight
2.00 mm 20 - 80
425 µm 10 - 60
75 µm 5 - 25
1.3.10 Initial Backfill Material
Initial backfill consists of select granular material or satisfactory materials free from rocks 200 mm or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller. When the pipe is coated or wrapped for corrosion protection, free the initial backfill material of stones larger than 75 mm in any dimension or as recommended by the pipe manufacturer, whichever is smaller.
1.3.11 Expansive Soils
Expansive soils are defined as soils that have expansion/swelling ratios equal to or greater than 1% when tested in accordance with JIS A 1211 .
1.3.12 Pile Supported Structure
As used herein, a structure where both the foundation and floor slab are pile supported.
1.4 SYSTEM DESCRIPTION
Subsurface soil boring logs are shown on the drawings. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.
1.4.1 Classification of Excavation
No consideration will be given to the nature of the materials, and all excavation will be designated as unclassified excavation.
1.4.2 Dewatering Work Plan
Submit procedures for accomplishing dewatering work.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Shoring and Underpinning; G , Dewatering Work Plan; G , SECTION 31 00 00 Page 4 sgoshi
SD-06 Test Reports
Testing
Borrow Site Testing
Field Plate Bearing Tests
Within 24 hours of conclusion of physical tests, submit 4 copies of test results, including calibration curves and results of calibration tests.
SD-07 Certificates
Testing
PART 2 PRODUCTS
2.1 REQUIREMENTS FOR OFFSITE SOILS
Test offsite soils brought in for use as backfill for Total Petroleum Hydrocarbons (TPH), Benzene, Toluene, Ethyl Benzene, and Xylene (BTEX) and full Toxicity Characteristic Leaching Procedure (TCLP) including ignitability, corrosivity and reactivity. Perform tests and verify threshold values in accordance with JAPAN Ministry of the Environment Notification No.46 guidelines and JEGS. Provide Borrow Site Testing for TPH, BTEX and TCLP from a composite sample of material from the borrow site, with at least one test from each borrow site. Do not bring material onsite until tests have been approved by the Contracting Officer.
2.2 BURIED WARNING AND IDENTIFICATION TAPE
Provide polyethylene plastic and metallic core or metallic-faced, acid-and alkali-resistant, polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines.
Provide tape on rolls, 75 mm minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Provide permanent color and printing, unaffected by moisture or soil.
Warning Tape Color Codes
Red Electric
Yellow Gas, Oil; Dangerous Materials
Orange Telephone and Other Communications
Blue Water Systems
Green Sewer Systems
White Steam Systems
SECTION 31 00 00 Page 5 sgoshi
Warning Tape Color Codes
Gray Compressed Air
2.2.1 Warning Tape for Metallic Piping
Provide acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.08 mm and a minimum strength of 10.3 MPa lengthwise, and 8.6 MPa crosswise, with a maximum 350 percent elongation.
2.2.2 Detectable Warning Tape for Non-Metallic Piping
Provide polyethylene plastic tape conforming to the width, color, and printing requirements specified above, with a minimum thickness of 0.10 mm, and a minimum strength of 10.3 MPa lengthwise and 8.6 MPa crosswise.
Manufacture tape with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 920 mm deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.
2.3 DETECTION WIRE FOR NON-METALLIC PIPING
Insulate a single strand, solid copper detection wire with a minimum of 12
AWG.
2.4 CAPILLARY WATER BARRIER
Provide capillary water barrier of clean, poorly graded crushed rock, crushed gravel, or uncrushed gravel placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below. Conform to JIS A 5005 for fine aggregate grading with a maximum of 3 percent by weight passing JIS A 1103 , 75 micrometers sieve, or coarse aggregate with "S-x" designation (where x is the maximum nominal gravel size) in accordance with JIS A 5001 .
PART 3 EXECUTION
3.1 STRIPPING OF TOPSOIL
Where indicated or directed, strip topsoil to a depth of 100 mm. Spread topsoil on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified.
Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 50 mm in diameter, and other materials that would interfere with planting and maintenance operations. Remove from the site any surplus of topsoil from excavations and gradings.
3.2 GENERAL EXCAVATION
Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections
SECTION 31 00 00 Page 6 sgoshi shown and the tolerances specified in paragraph FINISHING. Transport satisfactory excavated materials and place in fill or embankment within the limits of the work. Excavate unsatisfactory materials encountered within the limits of the work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation. Dispose surplus satisfactory excavated material not required for fill or embankment in areas approved for surplus material storage or designated waste areas. Dispose unsatisfactory excavated material in designated waste or spoil areas. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.
Excavate material required for fill or embankment in excess of that produced by excavation within the grading limits from the borrow areas indicated or from other approved areas selected by the Contractor as specified.
3.2.1 Ditches, Gutters, and Channel Changes
Finish excavation of ditches, gutters, and channel changes by cutting accurately to the cross sections, grades, and elevations shown on drawings.
Do not excavate ditches and gutters below grades shown. Backfill the excessive open ditch or gutter excavation with satisfactory, thoroughly compacted, material or with suitable stone or cobble to grades shown.
Dispose excavated material as shown or as directed, except in no case allow material be deposited a maximum 1 meter from edge of a ditch.
Maintain excavations free from detrimental quantities of leaves, brush, sticks, trash, and other debris until final acceptance of the work.
3.2.2 Drainage Structures
Make excavations to the lines, grades, and elevations shown, or as directed. Provide trenches and foundation pits of sufficient size to permit the placement and removal of forms for the full length and width of structure footings and foundations as shown. Clean rock or other hard foundation material of loose debris and cut to a firm, level, stepped, or serrated surface. Remove loose disintegrated rock and thin strata. Do not disturb the bottom of the excavation when concrete or masonry is to be placed in an excavated area. Do not excavate to the final grade level until just before the concrete or masonry is to be placed.
3.2.3 Drainage
Provide for the collection and disposal of surface and subsurface water encountered during construction. Completely drain construction site during periods of construction to keep soil materials sufficiently dry.
Construct storm drainage features (ponds/basins) at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed.
SECTION 31 00 00 Page 7 sgoshi
3.2.4 Dewatering
Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Do not permit French drains, sumps, ditches or trenches within 0.9 m of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Take control measures by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. Operate dewatering system continuously until construction work below existing water levels is complete. Submit performance records weekly.
3.2.5 Trench Excavation Requirements
Excavate the trench as recommended by the manufacturer of the pipe to be installed. Slope trench walls below the top of the pipe, or make vertical, and of such width as recommended in the manufacturer's printed installation manual. Provide vertical trench walls where no manufacturer's printed installation manual is available. Shore trench walls more than 1.5 meters high, cut back to a stable slope, or provide with equivalent means of protection for employees who may be exposed to moving ground or cave in. Shore vertical trench walls more than 1.5 meters high. Excavate trench walls which are cut back to at least the angle of repose of the soil. Give special attention to slopes which may be adversely affected by weather or moisture content. Do not exceed the trench width below the pipe top of 600 mm plus pipe outside diameter (O.D.) for pipes of less than 600 mm inside diameter, and do not exceed 900 mm plus pipe outside diameter for sizes larger than 600 mm inside diameter. Where recommended trench widths are exceeded, provide redesign, stronger pipe, or special installation procedures by the Contractor. The Contractor is responsible for the cost of redesign, stronger pipe, or special installation procedures without any additional cost to the Government.
3.2.5.1 Bottom Preparation
Grade the bottoms of trenches accurately to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Excavate bell holes to the necessary size at each joint or coupling to eliminate point bearing. Remove stones of 75 mm or greater in any dimension, or as recommended by the pipe manufacturer, whichever is smaller, to avoid point bearing.
3.2.5.2 Removal of Unyielding Material
Where unyielding material is encountered in the bottom of the trench, remove such material 150 mm below the required grade and replaced with suitable materials as provided in paragraph BACKFILLING AND COMPACTION.
3.2.5.3 Removal of Unstable Material
Where unstable material is encountered in the bottom of the trench, remove such material to the depth directed and replace it to the proper grade with select granular material as provided in paragraph BACKFILLING AND COMPACTION. When removal of unstable material is required due to the Contractor's fault or neglect in performing the work, the Contractor is responsible for excavating the resulting material and replacing it without
SECTION 31 00 00 Page 8 sgoshi additional cost to the Government.
3.2.5.4 Excavation for Appurtenances
Provide excavation for manholes, catch-basins, inlets, or similar structures of sufficient size to permit the placement and removal of forms for the full length and width of structure footings and foundations as shown. Clean rock or loose debris and cut to a firm surface either level, stepped, or serrated, as shown or as directed. Remove loose disintegrated rock and thin strata. Specify removal of unstable material. When concrete or masonry is to be placed in an excavated area, take special care not to disturb the bottom of the excavation. Do not excavate to the final grade level until just before the concrete or masonry is to be placed.
3.2.5.5 Jacking, Boring, and Tunneling
Unless otherwise indicated, provide excavation by open cut except that sections of a trench may be jacked, bored, or tunneled if, in the opinion of the Contracting Officer, the pipe, cable, or duct can be safely and properly installed and backfill can be properly compacted in such sections.
3.2.6 Underground Utilities
The Contractor is responsible for movement of construction machinery and equipment over pipes and utilities during construction. Excavation made with power-driven equipment is not permitted within 600 mm of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer.
3.2.7 Structural Excavation
Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement. Backfill and compact over excavations and changes in grade to 95 percent of JIS A 1210 maximum density. Excavation to adjacent existing structures should not compromise the stability of existing foundations. Use engineered granular fill for backfill operations.
3.3 SELECTION OF BORROW MATERIAL
Select borrow material to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Obtain borrow material from approved private sources. Unless otherwise provided in the contract, the Contractor is responsible for obtaining the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling from the owners. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, do not obtain borrow within the limits of the project site without prior written approval. Consider necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon related operations to the borrow excavation.
SECTION 31 00 00 Page 9 sgoshi
3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS
Except as otherwise permitted, excavate borrow pits and other excavation areas providing adequate drainage. Transport overburden and other spoil material to designated spoil areas or otherwise dispose of as directed.
Provide neatly trimmed and drained borrow pits after the excavation is completed. Ensure that excavation of any area, operation of borrow pits, or dumping of spoil material results in minimum detrimental effects on natural environmental conditions.
3.5 SHORING AND UNDERPINNING
3.5.1 General Requirements
Submit a Shoring, Underpinning and Sheeting plan for approval 15 days prior to starting work. Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring, underpinning and sheeting of excavations. Finish shoring and underpinning, including sheet piling, and install as necessary to protect workmen, banks, adjacent paving, structures, and utilities. Remove shoring, bracing, and sheeting as excavations are backfilled, in a manner to prevent caving.
3.6 GRADING AREAS
Where indicated, divide work into grading areas within which satisfactory excavated material will be placed in embankments, fills, and required backfills. Do not haul satisfactory material excavated in one grading area to another grading area except when so directed in writing. Place and grade stockpiles of satisfactory as specified. Keep stockpiles in a neat and well drained condition, giving due consideration to drainage at all times. Clear, grub, and seal by rubber-tired equipment, the ground surface at stockpile locations; separately stockpile excavated satisfactory and unsatisfactory materials. Protect stockpiles of satisfactory materials from contamination which may destroy the quality and fitness of the stockpiled material. If the Contractor fails to protect the stockpiles, and any material becomes unsatisfactory, remove and replace such material with satisfactory material from approved sources.
3.7 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE
Do not excavate to final grade until just before concrete is to be placed.
Only use excavation methods that will leave the foundation rock in a solid and unshattered condition. Roughen the level surfaces, and cut the sloped surfaces, as indicated, into rough steps or benches to provide a satisfactory bond. Protect shales from slaking and all surfaces from erosion resulting from ponding or water flow.
3.8 GROUND SURFACE PREPARATION
3.8.1 General Requirements
Remove and replace unsatisfactory material with satisfactory materials, as directed by the Contracting Officer, in surfaces to receive fill or in excavated areas. Scarify the surface to a depth of 150 mm before the fill is started. Plow, step, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so that the fill material will bond with the existing material. When subgrades are less than the specified density, SECTION 31 00 00 Page 10 sgoshi break up the ground surface to a minimum depth of 150 mm, pulverizing, and compacting to the specified density. When the subgrade is part fill and part excavation or natural ground, scarify the excavated or natural ground portion to a depth of 300 mm and compact it as specified for the adjacent fill.
3.9 UTILIZATION OF EXCAVATED MATERIALS
Dispose unsatisfactory materials removing from excavations into designated waste disposal or spoil areas. Use satisfactory material removed from excavations, insofar as practicable, in the construction of fills, embankments, subgrades, shoulders, bedding (as backfill), and for similar purposes. Do not waste any satisfactory excavated material without specific written authorization. Dispose of satisfactory material, authorized to be wasted, in designated areas approved for surplus material storage or designated waste areas as directed. Clear and grub newly designated waste areas on Government-controlled land before disposal of waste material thereon. Stockpile and use coarse rock from excavations for constructing slopes or embankments adjacent to streams, or sides and bottoms of channels and for protecting against erosion. Do not dispose excavated material to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.
3.10 BURIED TAPE AND DETECTION WIRE
3.10.1 Buried Warning and Identification Tape
Provide buried utility lines with utility identification tape. Bury tape 300 mm below finished grade; under pavements and slabs, bury tape 150 mm below top of subgrade.
3.10.2 Buried Detection Wire
Bury detection wire directly above non-metallic piping at a distance not to exceed 300 mm above the top of pipe. Extend the wire continuously and unbroken, from manhole to manhole. Terminate the ends of the wire inside the manholes at each end of the pipe, with a minimum of 0.9 m of wire, coiled, remaining accessible in each manhole. Furnish insulated wire over it's entire length. Install wires at manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, terminate the wire in the valve pit at the pump station end of the pipe.
3.11 BACKFILLING AND COMPACTION
Place backfill adjacent to any and all types of structures, in successive horizontal layers of loose materia not more than 200 mm in depth. Compact to at least 90 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials in accordance with JIS A 1210 , to prevent wedging action or eccentric loading upon or against the structure. Backfill material must be within the range of -2 to +2 percent of optimum moisture content at the time of compaction.
Prepare ground surface on which backfill is to be placed and provide compaction requirements for backfill materials in conformance with the applicable portions of paragraphs GROUND SURFACE PREPARATION. Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
SECTION 31 00 00 Page 11 sgoshi
3.11.1 Trench Backfill
Backfill trenches to the grade shown and provide compaction as indicated in paragraph 3.11 of this specification.
3.11.1.1 Replacement of Unyielding Material
Replace unyielding material removed from the bottom of the trench with select granular material or initial backfill material.
3.11.1.2 Replacement of Unstable Material
Replace unstable material removed from the bottom of the trench or excavation with select granular material placed in layers not exceeding 150 mm loose thickness.
3.11.1.3 Bedding and Initial Backfill
Provide bedding of the type and thickness shown. Place initial backfill material and compact it with approved tampers to a height of at least 300 mm above the utility pipe or conduit. Bring up the backfill evenly on both sides of the pipe for the full length of the pipe. Take care to ensure thorough compaction of the fill under the haunches of the pipe.
Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with as shown in design drawings, except as specified herein. Compact backfill to top of pipe to 90 percent of JIS A 1210 maximum density. Provide plastic piping with bedding to spring line of pipe. Provide materials as follows:
3.11.1.3.1 Class I
Angular, 6 to 40 mm, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shells.
3.11.1.3.2 Class II
Coarse sands and gravels with maximum particle size of 40 mm, including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types G, G-M, G-C, S, S-M, S-C are included in this class as specified in JGS 0051 .
3.11.1.3.3 Sand
Clean, coarse-grained sand classified as S, S-M by JGS 0051 for bedding and backfill as indicated.
3.11.1.3.4 Gravel and Crushed Stone
Clean, coarsely graded natural gravel, crushed stone or a combination thereof identified G, G-M, G-C in accordance with JGS 0051 for bedding and backfill as indicated. Do not exceed maximum particle size of 75 mm.
3.11.1.4 Final Backfill
Fill the remainder of the trench, except for special materials for roadways, railroads and airfields, with satisfactory material. Place backfill material and compact as follows:
SECTION 31 00 00 Page 12 sgoshi
3.11.1.4.1 Roadways
Place backfill up to the required elevation as specified. Do not permit water flooding or jetting methods of compaction.
3.11.1.4.2 Sidewalks, Turfed or Seeded Areas and Miscellaneous Areas
Deposit backfill in layers of a maximum of 300 mm loose thickness, and compact it to 85 percent maximum density for cohesive soils and 90 percent maximum density for cohesionless soils. Apply this requirement to all other areas not specifically designated above.
3.11.2 Backfill for Appurtenances
After the manhole, catchbasin, inlet, or similar structure has been constructed and the concrete has been allowed to cure for 7 days or until the concrete design strength is reached, place backfill in such a manner that the structure is not be damaged by the shock of falling earth.
Deposit the backfill material, compact it as specified for final backfill, and bring up the backfill evenly on all sides of the structure to prevent eccentric loading and excessive stress.
3.12 SPECIAL REQUIREMENTS
Special requirements for both excavation and backfill relating to the specific utilities are as follows:
3.12.1 Water Lines
Excavate trenches to a depth that provide a minimum cover as indicated in drawings.
3.12.2 Electrical Distribution System
Provide a minimum cover of 600 mm from the finished grade to direct burial cable and conduit or duct line, unless otherwise indicated.
3.13 EMBANKMENTS
3.13.1 Earth Embankments
Construct earth embankments from satisfactory materials free of organic or frozen material and rocks with any dimension greater than 75 mm. Place the material in successive horizontal layers of loose material not more than 200 mm in depth. Spread each layer uniformly on a soil surface that has been moistened or aerated as necessary, and scarified or otherwise broken up so that the fill will bond with the surface on which it is placed. After spreading, plow, disk, or otherwise break up each layer;
moisten or aerate as necessary; thoroughly mix; and compact to at least 90 percent laboratory maximum density in accordance with JIS A 1210 for cohesive materials or 95 percent laboratory maximum density for cohesionless materials. Backfill material must be within the range of -2 to +2 percent of optimum moisture content at the time of compaction, when required.
Compaction requirements for the upper portion of earth embankments forming subgrade for pavements are identical with those requirements specified in paragraph SUBGRADE PREPARATION. Finish compaction by sheepsfoot rollers, SECTION 31 00 00 Page 13 sgoshi pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
3.14 SUBGRADE PREPARATION
3.14.1 Construction
Shape subgrade to line, grade, and cross section, and compact as specified. Include plowing, disking, and any moistening or aerating required to obtain specified compaction for this operation. Remove soft or otherwise unsatisfactory material and replace with satisfactory excavated material or other approved material as directed. Excavate rock encountered in the cut section to a depth of 150 mm below finished grade for the subgrade. Bring up low areas resulting from removal of unsatisfactory material or excavation of rock to required grade with satisfactory materials, and shape the entire subgrade to line, grade, and cross section and compact as specified. After rolling, the surface of the subgrade for roadways shall not show deviations greater than 13 mm when tested with a 4 mstraightedge applied both parallel and at right angles to the centerline of the area. Do not vary the elevation of the finish subgrade more than 15 mm from the established grade and cross section.
3.14.2 Compaction
Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, vibratory compactors, or other approved equipment.
Except for paved areas, compact each layer of the embankment to at least 90 percent of laboratory maximum density for fine-grained materials and to at least 95 percent for granular materials.
3.14.2.1 Subgrade for Pavements
Compact subgrade for pavements to at least 90 percent of laboratory maximum density for fine-grained materials and to at least 95 percent for granular materials in accordance with JIS A 1210 for the depth below the surface of the pavement shown. When more than one soil classification is present in the subgrade, thoroughly blend, reshape, and compact the top 300 mm of subgrade.
3.15 FINISHING
Finish the surface of excavations, embankments, and subgrades to a smooth and compact surface in accordance with the lines, grades, and cross sections or elevations shown. Provide the degree of finish for graded areas within 30 mm of the grades and elevations indicated except that the degree of finish for subgrades specified in paragraph SUBGRADE PREPARATION. Finish gutters and ditches in a manner that will result in effective drainage. Finish the surface of areas to be turfed from settlement or washing to a smoothness suitable for the application of turfing materials. Repair graded, topsoiled, or backfilled areas prior to acceptance of the work, and re-established grades to the required elevations and slopes.
3.15.1 Subgrade and Embankments
During construction, keep embankments and excavations shaped and drained.
Maintain ditches and drains along subgrade to drain effectively at all times. Do not disturb the finished subgrade by traffic or other operation. Protect and maintain the finished subgrade in a satisfactory
SECTION 31 00 00 Page 14 sgoshi condition until ballast, subbase, base, or pavement is placed. Do not permit the storage or stockpiling of materials on the finished subgrade.
Do not lay subbase, base course, ballast, or pavement until the subgrade has been checked and approved, and in no case place subbase, base, surfacing, pavement, or ballast on a muddy, spongy, subgrade.
3.15.2 Capillary Water Barrier
Place a capillary water barrier under concrete floor and area-way slabs grade directly on the subgrade and compact with a minimum of two passes of a hand-operated plate-type vibratory compactor.
3.15.3 Grading Around Structures
Construct areas within 1.5 m outside of each building and structure line true-to-grade, shape to drain, and maintain free of trash and debris until final inspection has been completed and the work has been accepted.
3.16 PLACING TOPSOIL
On areas to receive topsoil, prepare the compacted subgrade soil to a 50 mm depth for bonding of topsoil with subsoil. Spread topsoil evenly to a thickness of 50 mm and grade to the elevations and slopes shown. Do not spread topsoil when frozen or excessively wet or dry. Obtain material required for topsoil in excess of that produced by excavation within the grading limits from offsite areas.
3.17 TESTING
Perform testing by a Corps validated commercial testing laboratory or the Contractor's validated testing facility. Submit qualifications of the Corps validated commercial testing laboratory or the Contractor's validated testing facilities. If the Contractor elects to establish testing facilities, do not permit work requiring testing until the Contractor's facilities have been inspected, Corps validated and approved by the Contracting Officer.
a. Determine field in-place density in accordance with JIS A 1214 or JGS 1614 . When JGS 1614 is used, check the calibration curves and adjust using only the sand cone method as described in JIS A 1214 .
results in a wet unit weight of soil in determining the moisture content of the soil when using this method. Since JGS 1614 uses equipment that contains radiactive materials, notify the Base BioEnvironmental and/or Environmental Office and the Contracting Officer if this method is used.
b. Check the calibration curves furnished with the moisture gauges along with density calibration checks as described in JGS 1614 ; check the calibration of both the density and moisture gauges at the beginning of a job on each different type of material encountered and at intervals as directed by the Contracting Officer. When test results indicate, as determined by the Contracting Officer, that compaction is not as specified, remove the material, replace and recompact to meet specification requirements.
c. Perform tests on recompacted areas to determine conformance with specification requirements. Appoint a registered professional civil engineer to certify inspections and test results. These certifications shall state that the tests and observations were
SECTION 31 00 00 Page 15 sgoshi performed by or under the direct supervision of the engineer and that the results are representative of the materials or conditions being certified by the tests. The following number of tests, if performed at the appropriate time, will be the minimum acceptable for each type operation.
3.17.1 Fill and Backfill Material Gradation
One test per 5,000 cubic meters stockpiled or in-place source material.
Determine gradation of fill and backfill material in accordance with JIS A 1102 and JIS A 1103 .
3.17.2 In-Place Densities
a. One test per 1,000 square meters, or fraction thereof, of each lift of fill or backfill areas compacted by other than hand-operated machines.
b. One test per 500 square meters, or fraction thereof, of each lift of fill or backfill areas compacted by hand-operated machines.
c. One test per 200 linear meters, or fraction thereof, of each lift of embankment or backfill for roads.
3.17.3 Check Tests on In-Place Densities
If JGS 1614 is used, check in-place densities by JIS A 1214 as follows:
a. One check test for each 10 Field Tests performed using ASTM D6938 or
JGS 1614.
3.17.4 Optimum Moisture and Laboratory Maximum Density
Perform tests for each type material or source of material including borrow material to determine the optimum moisture and laboratory maximum density values. One representative test per 5,000 cubic meters of fill and backfill, or when any change in material occurs which may affect the optimum moisture content or laboratory maximum density.
3.17.5 Field Plate Bearing Tests
Perform field loading tests in accordance with JGS 1521 to verify the allowable bearing pressure of 150 kPa for building locations at locations indicated in design drawings. Perform tests on the subgrade prior placement of engineered granular fill.
3.17.6 Tolerance Tests for Subgrades
Perform continuous checks on the degree of finish specified in paragraph SUBGRADE PREPARATION during construction of the subgrades.
3.17.7 Displacement of Sewers
After other required tests have been performed and the trench backfill compacted to 0.6 meters above the top of the pipe, inspect the pipe to determine whether significant displacement has occurred. Conduct this inspection in the presence of the Contracting Officer. Inspect pipe sizes
SECTION 31 00 00 Page 16 sgoshi larger than 900 mm, while inspecting smaller diameter pipe by shining a light or laser between manholes or manhole locations, or by the use of television cameras passed through the pipe. If, in the judgment of the Contracting Officer, the interior of the pipe shows poor alignment or any other defects that would cause improper functioning of the system, replace or repair the defects as directed at no additional cost to the Government.
3.18 Contractor's Geotechnical Engineer
Hire a Professional Geotechnical Engineer to provide inspection of excavations and soil/groundwater conditions and subgrade preparation throughout construction. The Geotechnical Engineer is responsible for performing pre-construction and periodic site visits throughout construction to assess site conditions. The Geotechnical Engineer is responsible for updating the excavation, sheeting, underpinning and dewatering plans as construction progresses to reflect changing conditions and submit an updated plan if necessary. Submit a monthly written report, informing the Contractor and Contracting Officer of the status of the plan and an accounting of the Contractor's adherence to the plan addressing any present or potential problems. The Contracting Officer is responsible for arranging meetings with the Geotechnical Engineer at any time throughout the contract duration.
3.19 DISPOSITION OF SURPLUS MATERIAL
Remove surplus material or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber from Government property and delivered to a licensed/permitted facility or to a location approved by the Contracting Officer.
-- End of Section --
SECTION 31 00 00 Page 17 sgoshi
SECTION 31 11 00
CLEARING AND GRUBBING
11/18
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a designation following the "G" identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Nonsaleable Materials
SD-04 Samples
Tree Wound Paint
1.2 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Tree Wound Paint
Submit samples in cans with manufacturer's label of bituminous based paint of standard manufacture specially formulated for tree wounds.
2.1.2 Herbicide
Comply with local Insecticide, Fungicide, and Rodenticide Act for requirements on Contractor's licensing, certification and record keeping.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Protection
3.1.1.1 Roads and Walks
Keep roads and walks free of dirt and debris at all times.
SECTION 31 11 00 Page 1 sgoshi
3.1.1.2 Trees, Shrubs, and Existing Facilities
Provide protection in accordance with Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. Protect trees and vegetation to be left standing from damage incident to clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.
3.1.1.3 Utility Lines
Protect existing utility lines that are indicated to remain from damage.
Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor is responsible for the repair of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service. Refer to Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS for additional utility protection.
3.2 CLEARING
Clearing consists of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing also includes the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such as tress and vegetation as may be indicated or directed to be left standing. Trees designated to be left standing within the cleared areas shall be trimmed of dead branches 40 mm or more in diameter and shall be trimmed of all branches the heights indicated or directed. Limbs and branches to be trimmed shall be neatly cut close to the hole of the tree or main branches. Cuts more than 40 mm in diameter shall be painted with an approved tree-wound paint. Apply herbicide in accordance with the manufacturer's label to the top surface of stumps designated not to be removed.
3.2.1 Tree Removal
Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work shall include the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING.
Trees shall be disposed of as specified in paragraph DISPOSAL OF MATERIALS.
3.2.2 Pruning
Prune trees designated to be left standing within the cleared areas of dead branches 40 mm or more in diameter; and trim branches to heights and in a manner as indicated. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches. Paint cuts more than 32 mm in diameter with an approved tree wound paint.
3.2.3 Grubbing
Grubbing consists of the removal and disposal of stumps, roots larger than 75 mm in diameter, and matted roots from the designated grubbing areas.
SECTION 31 11 00 Page 2 sgoshi
Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 455 mm below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.
3.3 DISPOSAL OF MATERIALS
3.3.1 Nonsaleable Materials
Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations, except for salable timber, shall be disposed of in the designated waste disposal area outside the limits of Government-controlled land at the Contractor's responsability. Such directive will state the conditions covering the disposal of such products and will also state the areas in which they may be placed.
-- End of Section --
SECTION 31 11 00 Page 3 sgoshi
SECTION 31 21 13
RADON MITIGATION
08/11
PART 1 GENERAL
1.1 SUMMARY
Provide all work necessary to minimize indoor radon levels by installing a passive system that can be converted into an active system should the need arise. Building floor plans and radon design are shown in the Contract Drawings.
Protect in place existing radon mitigation systems as indicated on the Contract Drawings.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM D2665 (2014) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
ASTM E1465 (2008) Standard Practice for Radon Control Options for the Design and Construction of New Low-Rise Residential Buildings
INTERNATIONAL CODE COUNCIL (ICC)
ICC IMC (2012) International Mechanical Code
ICC UMC (1997; Errata 2 & 3 1997) Uniform Mechanical Code
JAPANESE STANDARDS ASSOCIATION (JSA)
JIS K 6741 (2016) Unplasticized Poly (Vinyl Chloride) (PVC-U) Pipes
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2018) Motors and Generators
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2022) National Electrical Code
SECTION 31 21 13 Page 1 sgoshi
U.S. DEPARTMENT OF DEFENSE (DOD), Marine Corps Camp Smedley D.
Butler Environmental Management System (EMS)
EMP 16.3 (2017) Radon Resistant New Construction Design Criteria
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 402-R-93-078 (1993; R 1994) Radon Mitigation Standards
EPA 625-R-92-016 (1993; Am 1994) Radon Prevention in Design and Construction of Schools and Other Large Buildings
EPA 625-R-93-011 (1993) Radon Reduction Technique for Existing Detached Houses: Technical Guidance for Active Soil Depressurization Systems
1.3 DEFINITIONS
1.3.1 Contract Documents
Documents furnished to prospective bidders/proposers containing…