Beaver Creek 23APR2026.pdf
PDF 8 MB Posted
- Attached to
- BC SEWAGE INTERCEPTOR RPLCMNT - VERMONT TO MARY
- Solicitation number
- IFB-121708
- Issued by
- Bristol City, Virginia
About this file
Summary
This is a project specification document for the Beaver Creek Sewage Interceptor Replacement Project in Virginia, specifically for the Vermont Avenue to Mary Street segment. The project involves the construction and replacement of a sewage interceptor system serving the Beaver Creek area. The document outlines the technical requirements, design specifications, and construction standards necessary for the interceptor replacement work. The project scope includes demolition of existing infrastructure, installation of new sewage lines, and related site restoration activities. Specific details regarding bidder meetings, site visits, response deadlines, and contract award dates would be contained within the complete bidding documents; the file name references an April 23, 2026 date, which may indicate a significant project timeline milestone.
The project represents a critical infrastructure improvement aimed at upgrading the sewage collection system in the specified geographic area. Funding sources, pricing structures, and any contractor set-asides or incumbent requirements would be detailed in the formal solicitation and contract documents. The replacement of aging sewage infrastructure indicates this is likely a utility maintenance and improvement project managed by the Virginia locality responsible for water and wastewater services in the Beaver Creek area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement for Re-Bid.pdf | ||
| 1 - BVU Sewage Interceptor Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
S U
PP
O
R T.
D W
G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
88BEAVER CREEK SEWAGE INTERCEPTOR
REPLACEMENT - VERMONT AVENUE TO
MARY STREET SEGMENT - BVU AUTHORITY
CITY OF BRISTOL, VIRGINIA
BIDDING SET: JANUARY 2026
REVISED: APRIL 2026
OWNER:
BVU AUTHORITY
15022 LEE HIGHWAY
BRISTOL, VA 24202
PH: 1.866.835.1288
FUNDING PROVIDED BY:
VIRGINIA DEPARTMENT OF
ENVIRONMENTAL QUALITY
P.O. BOX 1105
RICHMOND, VA 23218
804.698.4000 DEQ Project No. C-515657
C001
C O
VE
R
VICINITY MAP
SCALE: 1" = 1000'
PROJECT
LOCATION
ENLARGED LOCATION MAP
SCALE: 1" = 250'
GOODSO
N S
T
W MARY ST
E MARY ST
M
AR
TI
N
LU
TH
ER
K
IN
G JR
B
LV
D
VI
RG
IN
IA
S T
W
AS
HI
NG
TO
N
ST
GOODS
ON
ST
FA
IR
VI
EW
S T
W
AS
HI
NG
TO
N
ST
DANVILLE AVE
NO
RF
OLK
A
VE
NO
RF
OLK
A
VE
WILLIAMS ST
VERMONT AVE
PORTSMOUTH AVE
MASSACHUSETTS AVE NEW
PORT AVE
SU
FF
OLK
A
VE
DIXIE ST
SUMMIT ST
C O
R
PO
R
AT
IO
N
S T
EASTRIDGE RD
W
IN
ST
ON S
T
EDMOND ST
BUCHANAN ST
RU
SS
EL
L
ST
FUTURE FLOW
EQ FACILITY
PROP. SEWAGE
INTERCEPTOR
CP-60d NAIL N:3397852.1353 E:10405326.4056
EL:1694.005
CP-60d NAIL N:3397877.1226
E:10405298.2071
EL:1694.353
1/2" RBR FND
N:3398268.4216
E:10404807.2148
EL:1706.760
3/8" PIN FND
N:3398260.2754
E:10405128.9599
EL:1686.762
3/8" PIN FND
N:3398247.6435 E:10405150.6660
EL:1685.143
5/8" REBAR SET
N:3398888.6070 E:10405800.3357
EL:1681.549
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
S U
PP
O
R T.
D W
G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
C2
C2
C002
PL
AN
S H
EE
T
LO
C
AT
IO
N M
AP
SH
EE
T
IN
D
EX
SHEET INDEX MAP
SCALE: 1" = 100'
C2
GOODS
ON
ST
W MARY ST
E MARY ST
FA
IR
VI
EW
S T
DANVILLE AVE
NO
RF
OL
K
AV
E
WILLIAMS ST
VERMONT AVE
PO
RT
SM
OU
TH
A
VE
NO
RF
O
LK
A
VE
FA
IR
VI
EW
S T
PLAN SHEET INDEX:
C001 - COVER
C002 - PLAN SHEET LOCATION MAP & SHEET INDEX
C003 - GENERAL CONSTRUCTION NOTES & LEGENDS
C101 - EXISTING SITE CONDITIONS - FUTURE FLOW EQUALIZATION FACILITY SITE
C201 - PLAN & PROFILE SEWER LINES 101 & 102
C202 - PLAN & PROFILE SEWER LINE 101
C203 - PLAN & PROFILE SEWER LINES 101 & 103
C401 - STANDARD UTILITY CONSTRUCTION DETAILS
C402 - STANDARD UTILITY CONSTRUCTION DETAILS
C403 - STANDARD UTILITY CONSTRUCTION DETAILS
C501 - EROSION & SEDIMENT CONTROL NOTES & DETAILS
C502 - EROSION & SEDIMENT CONTROL NOTES & DETAILS
FUTURE FLOW
EQ FACILITY
EASEMENT LEGEND
PROPOSED SEWER LINE
EXISTING RIGHT-OF-WAY/PROPERTY LINE
Property Owner Tax Parcel Number
Deed Book & Page Number Type Of Easement
20'
PERMANENT
EASEMENT
40'
TEMPORARY
EASEMENT
SPECIAL NOTES (APPLIES TO ALL WORK PERFORMED ON CITY OF BRISTOL
STREET RIGHTS-OF-WAY)
1. ALL OUTRIGGERS SHALL HAVE RUBBER PADS IF PLACED ON PAVEMENT.
2. IF AN OPEN CUT IS APPROVED ON ANY PAVED ROADWAY BY THE RESIDENT ENGINEER, THE OPEN CUT AREA SHALL BE BACKFILLED WITH 21A / 21B STONE AND PATCHED WITH ASPHALT. THE AREA SHALL BE PAVED 25 FEET ON EACH SIDE OF THE OPEN CUT TO INCLUDE THE OPEN CUT AREA. NO AREA SHALL BE PAVED ON AN ANGLE AND SHALL HAVE A SMOOTH TRANSITION WITH THE EXISTING PAVEMENT. ALSO, A TEMPORARY ASPHALT PATCH SHALL BE MADE THE SAME DAY AS THE OPEN CUT. IF THE ROADWAY IS ASPHALT THE AREA
SHALL BE SAW CUT.
3. OPEN CUTS ON ANY STABILIZED ROADWAY SHALL BE BACKFILLED WITH #25/ #26 STONE AND COMPACTED.
WHEN OPEN CUTS ARE APPROVED AT LEAST ONE - HALF OF THE ROADWAY SHALL REMAIN OPEN AT ALL TIMES FOR THE TRAVELING PUBLIC UNLESS THE CONTRACTOR SECURES APPROVAL FOR STREET CLOSURE
TRAFFIC DETOUR.
4. WHERE SEWER LINES CROSS DRAINAGE CULVERTS, THE SEWER LINES MUST BE INSTALLED UNDER ALL
DRAINAGE STRUCTURES WITH A MINIMUM CLEARANCE OF 18''.
5. THE MAXIMUM PERMISSIBLE LENGTH OF OPEN SEWER LINE TRENCH AT ANY TIME SHALL BE LESS THAN 500
FEET.
6. THE CONTRACTOR SHALL HAVE CERTIFIED FLAGGERS ON THE JOB AT ALL TIMES WEARING ALL NECESSARY
SAFETY ATTIRE INCLUDING FLUORESCENT VESTS, HARD HATS AND PADDLES.
7. AT THE END OF EACH WORK DAY, THE ROADWAY SHALL BE CLEANED OF ANY MUD AND DEBRIS. THIS MAY
INCLUDE SWEEPING AND/ OR WASHING.
8. A MINIMUM OF 3 FEET SHALL BE MAINTAINED FOR SHOULDERS WHILE WORKING NEAR THE PAVEMENT.
9. APPROVED SAFETY DEVICES (BARRELS, CONES, ETC.) SHALL BE USED TO ENSURE SAFETY FOR THE
TRAVELING PUBLIC.
10. TRAFFIC FLOW SHALL BE MAINTAINED AT ALL TIMES.
11. AT NO TIME WILL ANY AREA BE LEFT OPEN AFTER WORK HAS BEEN CONCLUDED FOR THE DAY, THIS INCLUDES
BORE PITS.
12. ANY AREAS WHICH HAVE BEEN DISTURBED DURING CONSTRUCTION SHALL BE RESTORED. THIS INCLUDES
SEEDING, STONE, ETC.
13. IF THE EDGE OF THE PAVEMENT HAS BEEN BROKEN OR DAMAGED DURING THE CONSTRUCTION PROCESS, THAT AREA SHALL BE REPAIRED AND THE ENTIRE WIDTH OF THE ROADWAY FOR THE LENGTH OF THE BROKEN
OR DAMAGED PAVEMENT.
14. CITY OF BRISTOL STRUCTURES ON THE ROADWAY THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER, THIS INCLUDES DAMAGES TO THE OUTLET OR INLET END OF STORM PIPES, DRAINAGE STRUCTURES, RIGHT-OF-WAY MARKERS, SIGNS, OR OTHER STREET-RELATED ITEMS.
15. ALL GUARDRAILS SHALL BE PROTECTED FROM DAMAGE. IF DURING CONSTRUCTION, THE GUARDRAIL IS DAMAGED, UNDERMINED, ETC., IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO EMPLOY A CERTIFIED GUARDRAIL COMPANY TO RESTORE THE GUARDRAIL TO ITS ORIGINAL STATE OR ERECT A NEW
GUARDRAIL.
16. ANY DRAINAGE STRUCTURES THAT ARE DAMAGED AT A PRIVATE ENTRANCE SHALL BE REPLACED TO MATCH EXISTING PIPE WITH A MINIMUM OF 15" PIPE. ROAD CROSSINGS ARE MINIMUM OF 18" PIPE.
17. ALL UTILITY LINES SHALL BE PLACED A MINIMUM OF 36" DEEP ON ALL PUBLIC STREET RIGHTS-OF-WAY. IF THE PLACEMENT OF THE UTILITY LINE IS IN THE EXISTING DITCH LINE, IT SHALL BE PLACED A MINIMUM OF 36"
BELOW THE BOTTOM OF THE DITCH LINE.
18. THE CITY OF BRISTOL WILL REQUIRE A SET OF "AS BUILT PLANS" BEFORE THE HIGHWAY SURETY BOND WILL
BE RELEASED.
19. AN ACCOUNTS RECEIVABLE MAY BE SET UP ON THIS PROJECT IN THE EVENT THAT IT BECOMES NECESSARY FOR CITY OF BRISTOL TO PERFORM NECESSARY REPAIRS THAT THE CONTRACTOR FAILS TO DO IN A TIMELY MANNER AND TO CITY OF BRISTOL'S SATISFACTION. UPON AWARDING OF THE CONTRACT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE THE CITY OF BRISTOL PERMIT SPECIALIST WITH THE NAME, BILLING ADDRESS, PHONE NUMBER, AND FEDERAL TAX ID SO THE ACCOUNTS RECEIVABLE CAN BE ESTABLISHED. ADDITIONALLY, IN THE EVENT THAT ACTIONS ON THE PART OF THE CONTRACTOR MAKE IT NECESSARY FOR CITY OF BRISTOL TO ASSIGN AN INSPECTOR TO THE PROJECT, THE COSTS OF INSPECTION
AND ASSOCIATED ADDITIVES WILL BE CHARGED AGAINST THE ACCOUNTS RECEIVABLE.
20. THE PERMITTEE SHALL SEE THAT DUSTY ROAD CONDITIONS ARE KEPT TO A MINIMUM, EITHER BY THE
ADDITION OF WATER OR CALCIUM CHLORIDE AT ALL TIMES.
21. ALL ROAD CROSSINGS SEWER LINE CROSSINGS DESIGNED TO BE ENCASED SHALL BE ENCASED FROM BACK
OF SHOULDER TO BACK OF SHOULDER. THIS INCLUDES ALL LATERAL LINE CROSSINGS.
22. ALL DRIVEWAY AND MAILBOX TURNOUTS SHALL BE MAINTAINED ON A DAILY BASIS DURING CONSTRUCTION OF THE PROJECT. PAVED DRIVEWAYS SHALL BE RESTORED TO THEIR ORIGINAL STATE. ALL MAILBOXES (IF REMOVED) SHALL BE PLACED AT A HEIGHT OF 42" FROM THE GROUND TO THE BOTTOM OF THE BOX AT THE
END OF THE WORK DAY.
23. THE CONTRACTOR SHALL HAVE A CERTIFIED EROSION AND SEDIMENT CONTROL PERSON ON THE PROJECT
AT EACH WORK LOCATION DURING ANY LAND DISTURBING ACTIVITIES.
24. NO WATER, SEWER, OR GAS LINE SHALL BE PLACED WITHIN 10 FEET PARALLEL TO ANY DRAINAGE
STRUCTURE ON THE CITY OF BRISTOL RIGHT-OF-WAY.
25. IF PLACEMENT OF THE UTILITY IS ON THE SHOULDER OF THE ROADWAY, THE FINAL 10" OF THE TRENCH SHALL
BE BACKFILLED WITH #25/ #26 STONE.
26. IF PLACEMENT OF THE UTILITY IS ON THE SHOULDER OF THE ROADWAY, COMPACTION TESTING SHALL BE
PERFORMED TO 95% AND COPIES OF THE TEST FORWARDED TO THE CITY OF BRISTOL OFFICE.
27. ALL OSHA AND ENVIRONMENTAL RULES AND REGULATIONS SHALL BE ADHERED TO DURING THE
CONSTRUCTION PROJECT.
28. ALL ENVIRONMENTAL PERMITS WILL BE THE RESPONSIBILITY OF THE PERMITTEE.
29. TRAFFIC CONTROL DEVICES SHALL BE PLACED IN ACCORDANCE TO THE VIRGINIA WORK AREA PROTECTION
MANUAL; CURRENT EDITION.
30. IF CHANGES FOR THE ORIGINAL PLANS ARE MADE WHILE WORKING ON CITY OF BRISTOL RIGHT-OF-WAY, THESE CHANGES SHALL BE SUBMITTED FOR CITY OF BRISTOL APPROVAL BEFORE ANY CONSTRUCTION IS
STARTED.
31. ALL UNSUITABLE MATERIAL EXCAVATED FOR A UTILITY LINE INSTALLATION WITHIN CITY STREET
RIGHTS-OF-WAY SHALL BE REMOVED AND REPLACED WITH SUITABLE MATERIALS.
32. IF ANY APPURTENANCE IS PLACED IN THE PAVEMENT OF THE ROADWAY, IT SHALL BE PLACED A MAXIMUM OF 1/2" BELOW FINAL GRADE OF THE PAVEMENT AND IF IN THE SHOULDER OF THE ROAD, SHALL BE A MAXIMUM
OF 2" BELOW FINISHED GRADE OF THE SHOULDER.
33. ANY APPURTENANCE PLACED ABOVE GROUND LEVEL ON CITY OF BRISTOL RIGHT-OF-WAY, SHALL BE MARKED.
THE MARKER SHALL BE PLACED NEXT TO THE APPURTENANCE, A MINIMUM OF 5 FEET ABOVE GROUND AND THE TOP 4 FEET PAINTED WITH ORANGE FLUORESCENT PAINT. THE PURPOSE OF THESE MARKERS ARE TO
PREVENT DAMAGE DURING SNOW REMOVAL AND MOWING.
34. THE CONTRACTOR SHALL CLEANUP, PULL DITCHES, SEED, ETC. EVERY 1000 L.F. OF THE DISTURBED AREA.
35. NO UTILITY APPURTENANCES SHALL BE PLACED DIRECTLY IN THE DITCH LINE.
36. IN THOSE LOCATIONS WHERE PIPE WILL BE INSTALLED LONGITUDINALLY IN THE TRAVELWAY, THE PIPE SHALL
BE DUCTILE IRON MATERIAL.
GENERAL CONSTRUCTION NOTES:
1. THE EXISTING SEWER LINES THAT ARE BEING REPLACED ARE CURRENTLY IN SERVICE. THE CONTRACTOR IS
REQUIRED TO PROVIDE AND MAINTAIN TEMPORARY BYPASS PUMPING DURING THE CONSTRUCTION PERIOD IN
ORDER TO KEEP EXISTING LINES IN OPERATION.
2. ALL CONSTRUCTION WITHIN CITY OF BRISTOL STREET RIGHT-OF-WAY SHALL BE COMPLETED IN ACCORDANCE WITH VDOT ROAD AND BRIDGE SPECIFICATIONS; CURRENT EDITION; THE ROAD AND BRIDGE STANDARDS;
CURRENT EDITION; THE WORK AREA PROTECTION MANUAL: CURRENT EDITION; AND, AS AMENDED, BY
CONTRACT PROVISIONS AND THE APPROVED CONSTRUCTION PLAN ASSEMBLY.
3. THE EXACT LOCATION AND QUANTITY OF EXISTING UNDERGROUND UTILITIES IS UNKNOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT MISS UTILITY AND/ OR ALL EXISTING UTILITY OWNERS PRIOR TO
START OF CONSTRUCTION AND HAVE UTILITIES MARKED IN THE FIELD.
4. EXISTING UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE AND ARE BASED UPON SURVEY INFORMATION
AND OWNER-PROVIDED UTILITY MAPS.
5. EXISTING UTILITY LINES SHALL BE KEPT IN SERVICE AT ALL TIMES.
6. ALL UTILITY CONSTRUCTION SHALL BE COORDINATED WITH THE BVU AUTHORITY AND THE CITY OF BRISTOL, VIRGINIA. PROVIDE 48 HOURS NOTIFICATION PRIOR TO CONSTRUCTION.
7. LINEAR FEET DESIGNATIONS FOR UTILITIES ARE BASED UPON HORIZONTAL PLANE SURVEY AND ARE FOR LAYOUT AND PAYMENT PURPOSES ONLY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE
QUANTITY OF MATERIALS REQUIRED TO CONSTRUCT THE PROPOSED WORK.
8. THESE PLANS HAVE BEEN PREPARED BASED UPON THE USE OF AN AERIAL SURVEY COMPLETED BY TUCK ENGINEERING OF BIG STONE GAP, VIRGINIA AND SUPPLEMENTED BY A FIELD SURVEY COMPLETED BY
CUMBERLAND PARTNERS OF JONESVILLE, VIRGINIA.
9. ALL CONSTRUCTION SHALL CONFORM TO THE ENGINEER'S PLANS AND SPECIFICATIONS AND/OR CITY OF
BRISTOL SPECIFICATIONS AS APPLICABLE.
10. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS TO PRECLUDE THE PONDING OF WATER AND
SHALL BE RESTORED TO AS NEAR AS POSSIBLE TO ORIGINAL CONDITION.
11. ALL UTILITY PIPING AND RELATED APPURTENANCES SHALL BE INSTALLED PER MATERIAL MANUFACTURER'S
SPECIFICATIONS.
12. ALL AREAS WITHIN THE PUBLIC STREET RIGHT-OF-WAY WITH SLOPES OF 3:1 OR GENTLER SHALL BE CONSIDERED TRAFFIC BEARING AREAS, AND ANY UTILITY VAULTS/ MANHOLES/ INLETS SHALL BE INSTALLED
WITH TRAFFIC BEARING COVERS.
13. FINAL RIM ELEVATIONS OF UTILITY APPURTENANCES WITHIN CITY OF BRISTOL RIGHT-OF-WAY SHALL NOT BE
HIGHER THAN FINISHED GRADE.
14. THE CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL MEASURES AS NECESSARY TO PREVENT/ MINIMIZE EROSION IMMEDIATELY FOLLOWING CONSTRUCTION. ALL EROSION CONTROL MEASURES SHALL BE INSTALLED WITH THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK. REFER TO THE EROSION AND SEDIMENT CONTROL NARRATIVE IN THE PROJECT SPECIFICATIONS FOR MORE SPECIFIC INFORMATION.
15. INSPECTION AND TESTING OF ALL FILL EMBANKMENTS, STORM SEWER AND UTILITY TRENCH BACKFILL SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE SECTIONS OF CITY OF BRISTOL'S MOST CURRENT
EDITION OF ROAD AND BRIDGE SPECIFICATIONS.
16. A LICENSED GEOTECHNICAL ENGINEER (OR CERTIFIED TECHNICIAN UNDER THE DIRECTION OF A LICENSED
GEOTECHNICAL ENGINEER) SHALL OBSERVE THE PLACEMENT OF ALL FILL EMBANKMENTS.
17. THE PERMITTEE SHALL BE RESPONSIBLE FOR CORRECTING ANY SETTLEMENT OF BACKFILL OR PAVEMENT
FOR A PERIOD OF THREE (3) YEARS AFTER COMPLETION OF WORK.
18. SHOULD EXISTING DRAINAGE PIPES BECOME SILTED AS A RESULT OF CONSTRUCTION OF THIS PROJECT, IT WILL BE THE RESPONSIBILITY OF THE PROJECT CONTRACTOR TO CLEAN THE PIPES TO THE SATISFACTION OF
CITY OF BRISTOL.
19. ANY EXISTING DRAINAGE OR PAVEMENT STRUCTURE ON THE CITY OF BRISTOL RIGHT-OF-WAY THAT IS DAMAGED DURING THE COURSE OF THE PERMITTED WORK SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF CITY OF BRISTOL. REPLACEMENT SHALL BE THE SELECTED METHOD UNLESS FIELD
CONDITIONS DICTATE REPAIRS, AS APPROVED BY CITY OF BRISTOL.
20. THE DISTURBED AREA FOR THIS PROJECT IS ANTICIPATED TO BE GREATER THAN ONE ACRE. THEREFORE, THE CONTRACTOR SHALL ADHERE TO THE STORMWATER MANAGEMENT REQUIREMENTS NOTED ON THIS SHEET.
21. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO CITY OF BRISTOL FOR APPROVAL, A TRAFFIC MANAGEMENT PLAN DETAILING THE PROPOSED SEQUENCE OF CONSTRUCTION AND
MEANS OF TRAFFIC CONTROL MEASURES TO BE IMPLEMENTED IN ORDER TO SAFELY COMPLETE
CONSTRUCTION AND MAINTAIN TRAFFIC FLOW.
22. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL SITE AND UTILITY CONDITIONS PRIOR TO
SUBMITTING BIDS.
23. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL AND
SAFETY REGULATIONS.
24. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ANY UNDERGROUND UTILITIES, STRUCTURES, OR
OTHER IMPROVEMENTS WITHIN THE LIMITS OF THE PROJECT. SHOULD A PREVIOUSLY UNKNOWN
UNDERGROUND TANK BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE ENGINEER BEFORE ANY
FURTHER EXCAVATION OR OTHER ACTION IS TAKEN.
25. CONTACT MISS UTILITY AT 1.800.552.7001 AND/ OR LOCAL UTILITY OWNERS/ OPERATORS AND HAVE ALL UTILITIES MARKED AT LEAST 72 HOURS PRIOR TO ANY EXCAVATION IN THE AREA OF EXISTING IMPROVEMENTS.
26. THE CONTRACTOR SHALL MARK DRAWINGS AND KEEP A RECORD OF PREVIOUSLY UNKNOWN UTILITIES ENCOUNTERED DURING CONSTRUCTION, NOTING WORKING SIZE, TYPE, DEPTH, MATERIALS, AND ANY OTHER
PERTINENT INFORMATION.
27. ALL DEMOLITION MATERIAL SHALL IMMEDIATELY BE PROPERLY CONTAINERIZED, REMOVED, TRANSPORTED FOR PROPER DISPOSITION. WASTE SOIL AND/OR ROCK MATERIALS MAY BE DISPOSED AT THE BVU AUTHORITY
CAMPUS AT 15022 LEE HIGHWAY, BRISTOL, VIRGINIA.
28. THE CONTRACTOR SHALL NOT BURN ANY MATERIALS NOR HAVE FIRES ON THE PROJECT SITE AT ANY TIME.
29. THE CONTRACTOR SHALL OBTAIN, AT ITS SOLE EXPENSE, ALL REQUIRED PERMITS.
30. THE CONTRACTOR SHALL KEEP ALL ADJACENT STREETS, SIDEWALKS, ALLEYS, AND OTHER TRAVEL WAYS
OPEN AND SAFE FOR USE BY VEHICULAR AND PEDESTRIAN TRAFFIC.
31. ANY DAMAGE TO ROADS/ STREETS, CURB, SIDEWALKS, OR OTHER IMPROVEMENTS NOT SHOWN TO BE DEMOLISHED SHALL BE REPAIRED TO ITS PRE-EXISTING CONDITION OR BETTER AT NO EXPENSE TO THE
OWNER.
32. BEFORE STORMWATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE AND RECEIVING STREAM, AS
APPLICABLE.
33. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL COMPLY WITH THE MOST CURRENT EDITION OF THE VIRGINIA DEPARTMENT OF CONSERVATION AND RECREATION VIRGINIA STORMWATER MANAGEMENT
HANDBOOK.
34. ALL EXCAVATION AND TRENCHING SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT OCCUPATIONAL, SAFETY, AND HEALTH ADMINISTRATION (OSHA) REQUIREMENTS AND GUIDELINES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROVIDING ADEQUATE EQUIPMENT AND ASSURING ALL
CONSTRUCTION ACTIVITIES ARE IN FULL COMPLIANCE WITH THE OSHA REGULATIONS.
35. THE CONTRACTOR SHALL PROCURE AND PAY FOR TESTING SERVICES.
36. PIPE BACKFILL COMPACTION TESTS ARE REQUIRED, WITH ONE TEST PER 100 LINEAR FEET OR PIPE INSTALLED.
LEGEND
PROPOSED GRAVITY SEWER LINE
PROPOSED MANHOLE
PROPOSED SERVICE LATERAL & CLEANOUT
PROPOSED UTILITY ENCASEMENT
PROPOSED CONCRETE ENCASEMENT
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
LIMITS OF DISTURBANCE
SURVEY HUB & TRAVERSE
STREAM
EXISTING FENCE
DIRECTIONAL FLOW ARROW
EXISTING TREELINE
EXISTING VEGETATION
EXISTING PAVEMENT
EXISTING GRAVEL ROAD
EXISTING RAILROAD
EXISTING GATE VALVE
EXISTING WELL
PLUG EXISTING SEWER LINE
EXISTING FIRE HYDRANT
EXISTING WATER METER
EXISTING MANHOLE
EXISTING STORM SEWER MANHOLE
EXISTING FIBER OPTIC MARKER
EXISTING WATER ELEVATION
EXISTING GRAVITY SEWER LINE
EXISTING FORCE MAIN
EXISTING STORM DRAIN
EXISTING PROPERTY LINE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING WATER LINE
EXISTING BURIED TELEPHONE CABLE
EXISTING BURIED FIBER OPTIC CABLE
EXISTING BURIED ELECTRIC
EXISTING BURIED GAS
EXISTING GUARD RAIL
SEWER LINE TO BE ABANDONED IN PLACE
OPEN CUT & OVERLAY ASPHALT
EXISTING MANHOLE TO BE DEMOLISHED & FILLED
EXISTING LIGHT POLE
EXISTING POWER POLE
EXISTING SIGN POST
EXISTING TELEPHONE PEDESTAL
PLAN SHEET OUTLINE
C101
CO
TOP ELEVATION OF FRAME
& COVER SET FLUSH WITH
GRADE
V D MH 2 WP TF
VENT DROP MH ID # WATERPROOF
MANHOLE IDENTIFICATION
STORMWATER MANAGEMENT REQUIREMENTS:
1. THIS PROJECT SHALL NOT SIGNIFICANTLY ALTER THE PREDEVELOPMENT RUNOFF
CHARACTERISTICS OF THE LAND SURFACE AFTER THE COMPLETION OF CONSTRUCTION AND
FINAL STABILIZATION.
2. THE PROJECT SHALL BE MANAGED SUCH THAT LESS THAN ONE (1) ACRE OF LAND
DISTURBANCE OCCURS ON A DAILY BASIS.
3. THE DISTURBED LAND WHERE WORK HAS BEEN COMPLETED SHALL BE ADEQUATELY
STABILIZED ON A DAILY BASIS.
4. THE ENVIRONMENT SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION DAMAGE
ASSOCIATED WITH THE LAND- DISTURBING ACTIVITY.
5. THE CONSTRUCTION ACTIVITY OPERATOR SHALL DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN
POLLUTION PREVENTION MEASURES TO:
a.) MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS;
b.) MINIMIZE THE EXPOSURE OF BUILDING MATERIALS, BUILDING PRODUCTS, CONSTRUCTION WASTES, TRASH, LANDSCAPE MATERIALS, FERTILIZERS, PESTICIDES, HERBICIDES, DETERGENTS, SANITARY WASTE, AND OTHER MATERIALS PRESENT
ON-SITE TO PRECIPITATION AND TO STORMWATER;
c.) MINIMIZE THE DISCHARGE OF POLLUTANTS FROM SPILLS AND LEAKS AND IMPLEMENT
CHEMICAL SPILL AND LEAK PREVENTION AND RESPONSE PROCEDURES;
d.) PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT OF CONCRETE;
e.) PROHIBIT THE DISCHARGE OF WASTEWATER FROM THE WASHOUT AND CLEANOUT OF
STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER
CONSTRUCTION MATERIALS; AND
f.) PROHIBIT THE DISCHARGE OF FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE
AND EQUIPMENT OPERATION AND MAINTENANCE.
CD
B/M
♦ SF
RR C-ECM-13 - RIPRAP
C-ECM-15 - OUTLET PROTECTIONOP
EROSION CONTROL MEASURES
SEDIMENT CONTROL MEASURES
CIP
IP
C-SCM-03 - TEMPORARY STONE CONSTRUCTION ENTRANCE
C-SCM-04 - INLET PROTECTION
C-SCM-05 - CULVERT INLET PROTECTION
C-SCM-07 - ROCK CHECK DAMS
C-SCM-11 - TEMPORARY SEDIMENT TRAP
CE
SURFACE STABILIZATION METHODS
C-SSM-05 - SOIL STABILIZATION BLANKET & MATTING
C-SSM-09 - TEMPORARY SEEDING
C-SSM-10 - PERMANENT SEEDING
C-SSM-11 - MULCHING
PERIMETER CONTROL MEASURES
C-PCM-04 - SILT FENCE
VIRGINIA DEQ STORMWATER
MANAGEMENT HANDBOOK LEGEND
TS
PS
MU
ST
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
S U
PP
O
R T.
D W
G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
C003
G
EN
ER
AL
C O
N
ST
R U
C
TI
O N
N O
TE
S
LE
G
EN
D
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
WV
AutoCAD SHX Text
WM
AutoCAD SHX Text S
AutoCAD SHX Text
SIGN
AutoCAD SHX Text T
AutoCAD SHX Text
TELE
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text 0+00
AutoCAD SHX Text 1+00
AutoCAD SHX Text S
<<< BEAVER CREEK <<<
AR
Y ST
M
AR
Y ST
W
ILLIAM
S ST
NORFOLK AVE
HADDON STREET
APPROX. FEMA FIRM
FLOODWAY BOUNDARY
APPROX. FEMA FIRM
100-YEAR FLOODPLAIN
BOUNDARY - 100 YR FLOOD
ELEVATION = 1683'
<<< BEAVER CREEK <<<
M
AR
Y ST
APPROX. FEMA FIRM
100-YEAR FLOODPLAIN
BOUNDARY - 100 YR FLOOD
ELEVATION = 1683'APPROX. FEMA FIRM
FLOODWAY BOUNDARY
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
B
AS
E.
D
W G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
SCALE IN FEET
030 30 60 120
C101
EX
IS
TI
N
G S
IT
E
C O
N D
IT
IO
N S
FU
TU
R
E
FL
O W
E Q
U
AL
IZ
AT
IO
N
FA
C
IL
IT
Y
SI
TE
TRACT 2
2.105 ACRES
0.317 ACRES TO BEACQUIRED FROM NSRR
TRACT 4
3.184 ACRES
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text
4" TCP
AutoCAD SHX Text
12" DIP
AutoCAD SHX Text
12"TCP ABAN? ABOVE THE 12"DIP
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text
24" STL
AutoCAD SHX Text
24" STEEL
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
8" TCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text
10" TCP INV: 1668.87
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
WV
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WM
AutoCAD SHX Text S
WM
AR
Y ST
W
ILLIAM
S ST
HADDON STREET
EX. 8" GRAVITY SEWER
TO REMAIN IN SERVICE
DEMO/REMOVE EX.
MANHOLE TO BE
ABANDONED (TYP)
OPEN
CUT ROAD
CROSSING
- PATCH
ASPHALT
EX. 8"GRAVITY SEWER
TO REMAIN IN SERVICE
EX. SEWER TO
BE ABANDONED
SSWR101-4 WP DROP
STA:2+60.86
SSWR101-3 WP
STA:2+10.63
<<< BEAVER CREEK <<<
CO
CO
CO
CO CO CO
REPLACE EX. SEWER LATERAL W/ NEW 6" SERVICE
LINE INSTALLED FROM PROP. MAIN LINE TO
OUTSIDE OF EX. CUSTOMER HOME (TYP) - INSTALL
CLEANOUT @ EDGE OF R/W & AT CONNECTION
POINT TO EXISTING CUSTOMER PLUMBING (TYP)
M
AR
Y ST
TWO (2) PARALLEL
24" SEWER LINES
CONCRETE ENCASE
60 LF STREAM CROSSING
CO
CO
CO
DEMO/REMOVE EX.
MANHOLE TO BE
ABANDONED (TYP)
SSWR101-1 WP
STA:0+00.00
SSWR101-2 WP
STA:0+78.09
SSWR102-1
STA:0+78.67
RECONNECT EX. 8"
SEWER TO SSWR101-6
INSTALL RIP-RAP SLOPE
PROTECTION @ DISTURBED
STREAMBANKS (TYP)
FUTURE FLOW
EQUALIZATION FACILITY
FUTURE FLOW
EQUALIZATION FACILITY
FUTURE FLOW
EQUALIZATION FACILITY
EX. 24" GRAVITY SEWER LINE
TO BE ABANDONED IN PLACE
EX. 10" GRAVITY SEWER
TO REMAIN IN SERVICE
APPROX. ESTIMATED
LIMITS OF DISTURBANCE
= 1.17 ACRES
INSTALL RIP-RAP SLOPE
PROTECTION ON DISTURBED
STREAM BANKS
ELEVATIO
N
EL
EV
AT
IO
N
STATION
-0+25 0+00 1+00 2+00 2+75
LEN=50.23'
SLOPE=0.08%
DIA=42"
SS
W
R
1-
W P
ST
A:
2+
.6
R
IM
:1
9.
IN
V
IN
:1
9.
S
SW
R
IN
V
IN
:1
1.
E X.
IN
V
O U
T:
.6
SS
W
R
1-
W P
D R
O P
ST
A:
2+
.8
R
IM
:1
0.
IN
V
IN
:1
9.
S
SW
R
IN
V
IN
:1
1.
E X.
0"
IN
V
O U
T:
.7
EX.
GROUND
DUCTILE IRON
REQ'D MANHOLE
TO MANHOLE
EX
. 6
" W
AT
ER
BE
AV
ER
C
R
EE
K
CONCRETE
ENCASE 60 LF
STREAM CROSSING
ELEVATIO
N
EL
EV
AT
IO
N
STATION
0+00 0+88
SS
W
R
1-
W P
ST
A:
0+
.0
R
IM
:1
4.
IN
V
IN
:1
9.
S
SW
R
IN
V
IN
:1
2.
S
SW
R
- 8
IN
V
O U
T:
.0
SS
W
R
1-
W P
ST
A:
0+
.0
R
IM
:1
2.
IN
V
IN
:1
8.
IN
V O
U T:
.9
EX
. G
AS
L
IN
E
M
AR
Y
ST
LEN=78.67'
SLOPE=6.14%
DIA=8"
SS
W
R
-2
W P
ST
A:
0+
.0
R
IM
:1
4.
IN
V
IN
:1
2.
S
SW
R
IN
V
IN
:1
9.
S
SW
R
- 2 x2
4"
IN
V O
U T:
.0
SS
W
R
2-
ST
A:
0+
.6
R
IM
:1
6.
IN
V
IN
:1
8.
E
X.
IN
V
IN
:1
7.
E X.
IN
V
O U
T:
.0
EX.
GROUND
LEN=78.09'
SLOPE=0.08%
DIA=42"
LEN=132.54'
SLOPE=0.40%
DIA=2 x 24"
LINE 101 LINE 102
EX
. 2
4" S
TO
R
M
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
B
AS
E.
D
W G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
SCALE IN FEET
030 30 60 120
PLAN VIEW - SEWER LINES 101 & 102
PROFILE VIEW - SEWER LINES 101 & 102
C201
PL
AN
P
R O
FI
LE
SE
W
ER
L
IN
ES
TS
M
PS
USC
APPROX. 100-YEAR
FLOOD PLAIN
BOUNDARY (TYP)
DW
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
12" DIP
AutoCAD SHX Text
12"TCP ABAN? ABOVE THE 12"DIP
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text
24" STL
AutoCAD SHX Text
24" STEEL
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
APPROX 6" PVC?
AutoCAD SHX Text
8" TCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" TCP
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WM
AutoCAD SHX Text S
AutoCAD SHX Text
WM
4" PVC
<<< BEAVER CREEK <<<
M
AR
Y ST
NORFOLK AVE
NORFOLK AVE
40' TEMPORARY
EASEMENT
20' PERMANENT
EASEMENT
OPEN
CUT ROAD
CROSSING
- PATCH
ASPHALT
OPEN CUT &
PATCH ASPHALT
DEMO/REMOVE EX.
MANHOLE TO BE
ABANDONED (TYP)
EX. SEWER TO
BE ABANDONED
FIELD LOCATE & RECONNECT
EX. GRAVITY CUSTOMERS
TO PROP. NEW LINE -
6" LATERAL & CLEANOUT (TYP)
SSWR103-1
STA:1+13.79
SSWR101-8 WP
STA:11+25.58
SSWR101-7 WP
STA:8+67.29
SSWR101-6 WP
STA:6+86.80
SSWR101-5 WP VENT
STA:5+02.39
SSWR101-4 WP DROP
STA:2+60.86
<<< BEAVER CREEK <<<
CO
CO
CO
CO CO CO CO
CO
CO
COCO
REPLACE EX. SEWER LATERAL W/ NEW 6" SERVICE
LINE INSTALLED FROM PROP. MAIN LINE TO
OUTSIDE OF EX. CUSTOMER HOME (TYP) - INSTALL
CLEANOUT @ EDGE OF R/W & AT CONNECTION
POINT TO EXISTING CUSTOMER PLUMBING (TYP)
CO
CO
CO
CO
CO
CO
CO CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
REPLACE EX. SEWER LATERAL W/ NEW 6" SERVICE
LINE INSTALLED FROM PROP. MAIN LINE TO
OUTSIDE OF EX. CUSTOMER HOME (TYP) - INSTALL
CLEANOUT @ EDGE OF R/W & AT CONNECTION
POINT TO EXISTING CUSTOMER PLUMBING (TYP)
M
AR
Y ST
TS MPS
SF
SF
TEMP. SILT
FENCE (TYP)
SF
TEMP. SILT
FENCE (TYP)
CE
TEMP. CONSTRUCTION
ENTRANCE (TYP)
TS MPS
TS
M
PS
TS MPS
SF
TEMP. SILT
FENCE (TYP)
CO
CO
CO
CO
DEMO/REMOVE EX.
MANHOLE TO BE
ABANDONED (TYP)
EX. LOT OWNED BY BVU
- CAN BE USED FOR
CONSTRUCTION
ACCESS & STAGING
160 LF STRUCTURAL
STREAMBANK STABILIZATION
REQ'D USING VDOT CLASS II RIP-RAP
SSS
SSS
415 LF STRUCTURAL
STREAMBANK STABILIZATION
REQ'D USING VDOT CLASS II RIP-RAP
EX. 24" GRAVITY SEWER LINE
TO BE ABANDONED IN PLACE
EX. 10" GRAVITY SEWER
TO REMAIN IN SERVICE
APPROX. ESTIMATED
LIMITS OF DISTURBANCE
= 1.17 ACRES
ELEVATIO
N
EL
EV
AT
IO
N
STATION
2+50 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 11+50
LEN=241.53'
SLOPE=0.08%
DIA=42"
SS
W
R
1-
W P
VE
N
T
ST
A:
5+
.3
R
IM
:1
1.
IN
V
IN
:1
0.
IN
V
O U
T:
.9
LEN=184.41'
SLOPE=0.08%
DIA=42"
LEN=180.48'
SLOPE=0.08%
DIA=42"
SS
W
R
1-
W P
ST
A:
6+
.8
R
IM
:1
0.
IN
V
IN
:1
0.
IN
V O
U T:
.1
SS
W
R
1-
W P
ST
A:
8+
.2
R
IM
:1
0.
IN
V
IN
:1
0.
IN
V O
U T:
.3
LEN=258.30'
SLOPE=0.08%
DIA=42"
SS
W
R
1-
W P
ST
A:
+2
5.
R
IM
:1
1.
IN
V
IN
:1
0.
S
SW
R
IN
V
IN
:1
3.
S
SW
R
IN
V
O U
T:
.5
EX.
GROUND
SS
W
R
1-
W P
D R
O P
ST
A:
2+
.8
R
IM
:1
0.
IN
V
IN
:1
9.
S
SW
R
IN
V
IN
:1
4.
E
X.
2" T
C
IN
V O
U T:
.7
LINE 101
DUCTILE IRON
REQ'D MANHOLE
TO MANHOLE
EX
. G
AS
L
IN
E
M
AR
Y
ST
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
B
AS
E.
D
W G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
SCALE IN FEET
030 30 60 120
PLAN VIEW - SEWER LINE 101
PROFILE VIEW - SEWER LINE 101
C202
PL
AN
P
R O
FI
LE
SE
W
ER
L
IN
E
APPROX. 100-YEAR
FLOOD PLAIN
BOUNDARY (TYP)
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
APPROX 6" PVC?
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" STEEL
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WM
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
24" STEEL
NORFOLK AVE
<<< BEAVER CREEK <<<
REMOVE & REPLACE
EX. MANHOLE
40' TEMPORARY
EASEMENT
20' PERMANENT
EASEMENT
OPEN CUT &
PATCH ASPHALT
REPLACE EX. 24" GRAVITY
SEWER W/ NEW 42"
DEMO/REMOVE EX.
MANHOLE TO BE
ABANDONED (TYP)
ANOUT (TYP)
SSWR103-1
STA:1+13.79
SSWR101-11 WP
STA:15+57.25
SSWR101-10 VENT
STA:12+53.46
SSWR101-9 WP
STA:11+86.48SSWR101-8 WP
STA:11+25.58
SSWR101-7 WP
STA:8+67.29
CO
CO CO
CO CO
CO
CO
CO
CO
CO
CO
CO
COCO
CO
CO
REPLACE EX. SEWER LATERAL W/ NEW 6" SERVICE
LINE INSTALLED FROM PROP. MAIN LINE TO
OUTSIDE OF EX. CUSTOMER HOME (TYP) - INSTALL
CLEANOUT @ EDGE OF R/W & AT CONNECTION
POINT TO EXISTING CUSTOMER PLUMBING (TYP)
INSTALL RIP-RAP SLOPE
PROTECTION ON DISTURBED
STREAM BANKS
CONCRETE ENCASE 67 LF
MANHOLE TO MANHOLE
- STREAM CROSSING
TS MPS
SF
TS MPS
SF
TEMP. SILT
FENCE (TYP)
TEMP. SILT
FENCE (TYP)
TS MPS
TS MPS
VERM
O
NT AVE
NORFOLK AVE
160 LF STRUCTURAL
STREAMBANK STABILIZATION
REQ'D USING VDOT CLASS II RIP-RAP
SSS
APPROX. ESTIMATED
LIMITS OF DISTURBANCE
= 1.17 ACRES
APPROX. ESTIMATED
LIMITS OF DISTURBANCE
= 1.17 ACRES
CE
TEMP. CONSTRUCTION
ENTRANCE (TYP)
42" EQUIVALENT
DIAMETER ELLIPTICAL
CONCRETE PIPE -
CONCRETE ENCASED
MANHOLE TO MANHOLE
N O
R
FO
LK
A
VE
ELEVATIO
N
EL
EV
AT
IO
N
STATION
0+00 1+00 1+50
EX.
GROUND
CONCRETE ENCASE 67 LF
MANHOLE TO MANHOLE
- STREAM CROSSING
BE
AV
ER
C
R
EE
K
EX.
GROUND
INSTALL RIP-RAP SLOPE
PROTECTION ON DISTURBED
STREAM BANKS
LEN=113.79'
SLOPE=3.56%
DIA=8"
SS
W
R
3-
ST
A:
1+
.7
R
IM
:1
6.
IN
V
IN
:1
7.
E
X.
IN
V
IN
:1
7.
E X.
IN
V
O U
T:
.1
SS
W
R
-1
W
P
ST
A:
0+
.0
R
IM
:1
1.
IN
V
IN
:1
3.
S
SW
R
IN
V
IN
:1
0.
S
SW
R
IN
V O
U T:
.5
ELEVATIO
N
EL
EV
AT
IO
N
STATION
11+25 12+00 13+00 14+00 15+00 15+75
SS
W
R
1-
W P
ST
A:
+2
5.
R
IM
:1
1.
IN
V
IN
:1
0.
S
SW
R
IN
V
IN
: 1
3.
S
SW
R
IN
V
O U
T:
.5
LEN=60.90'
SLOPE=0.08%
DIA=42"
SS
W
R
1-
W P
ST
A:
+8
6.
R
IM
:1
1.
IN
V
IN
:1
0.
IN
V O
U T:
.6
LEN=66.98'
SLOPE=0.08%
DIA=42" EQUIVALENT
ELLIPTICAL RCP PIPE"
LEN=303.79'
SLOPE=0.08%
DIA=42"
SS
W
R
1-
V
EN
T
ST
A:
+5 3.
R
IM
:1
5.
IN
V
IN
:1
0.
IN
V
O U
T:
.8
SS
W
R
1-
W P
ST
A:
+5
7.
R
IM
:1
6.
IN
V
IN
: 1
3.
E
X.
6"
IN
V
IN
: 1
3.
E X.
4"
IN
V
O U
T:
.0
LINE 101 LINE 103
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
B
AS
E.
D
W G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
SCALE IN FEET
030 30 60 120
PLAN VIEW - SEWER LINES 101 & 103
PROFILE VIEW - SEWER LINES 101 & 103
C203
PL
AN
P
R O
FI
LE
SE
W
ER
L
IN
ES
DW
APPROX. 100-YEAR
FLOOD PLAIN
BOUNDARY (TYP)
USC
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" RCP
AutoCAD SHX Text
24" STEEL
AutoCAD SHX Text
24" STEEL
AutoCAD SHX Text
42" STEEL
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
NOTES:
1. EXCAVATE AND REMOVE EXISTING MANHOLE
FRAME, COVER AND RISER SECTION TO 24"
MINIMUM BELOW GRADE.
2. PLUG ALL PIPES INTO AND OUT OF MANHOLE
WITH GROUT.
3. BACKFILL MANHOLE INTERIOR WITH NO. 57
STONE.
4. IN PAVED LOCATIONS, POUR FLOWABLE FILL
ONTO STONE FILLER MATERIAL, FULL DEPTH.
5. BACKFILL UPPER 2' OF EXCAVATED AREA.
USE CLEAN SOIL OR GRAVEL IN GRASSED
AREAS. USE NO. 57 STONE IN PAVED AREAS.
RESURFACE TO MATCH EXISTING
CONDITIONS.MANHOLE ABANDONMENT DETAIL
NOT TO SCALE
4' MIN. 4' MIN.
2' MIN.
EX. MANHOLE TO
BE ABANDONED
PLUG EX. PIPES
W/ GROUT
EX. PIPE TO BE
ABANDONED
EX. GROUND
SURFACE VARIES
FILL MANHOLE
INTERIOR W/
NO. 57 STONE
REMOVE EX.
MANHOLE COVER &
TOP RISER SECTION
BACKFILL UPPERMOST 2
FT OF EXCAVATED AREA
& RESTORE SURFACE
C
B A & D
NOTES:
1. USE WATER TIGHT F&C ONLY WHEN SHOWN AS "WT", VENT REQ'D. WHEN SHOWN "V".
2. THE TOP ELEVATION OF F&C SHALL BE SET BY THE FOLLOWING CONDITIONS UNLESS NOTED ON
PLAN "TF"
A. 6" BELOW VDOT ROAD SHOULDERS
B. FLUSH W/ GRADE IN PAVEMENT OR LAWNS
C. 12"-24" ABOVE GRADE (WHEN NOT SUBLECT TO VEHICULAR TRAFFIC.)
D. 12" BELOW NORMAL DITCH ELEVATION
3. USE ECCENTRIC TAPER TOP UNLESS ELEVATIONS REQUIRE A FLAT SLAB TOP.
4. COORDINATE ANCHOR BOLT HOLE SIZE & LOCATIONS WITH MANHOLE FRAMES, GRADE RINGS
AND PRECAST MANHOLE CONE OR FLAT TOP SECTIONS. USE MASTIC BETWEEN M.H. FRAME
AND EACH GRADE RING AND EACH MANHOLE SECTION. BOLT ALL WATER TIGHT FRAMES ! BOLT
STANDARD FRAMES LOCATED IN OR IMMEDIATELY ADJACENT TO ROADWAYS OR OTHER AREAS
SUBJECT TO LATERAL FORCES. INSTALL ANCHOR BOLTS IN EPOXY GROUT OR WITH AN
ADHESIVE ANCHOR BOLT SYSTEM.
5. IF WATER TIGHT MANHOLE IS INDICATED TO BE FLUSH WITH GRADE (TF), INSTALL VENT PIPE USING FITTINGS AND ADDITIONAL PIPE AS NEEDED TO EXTEND VENT UP TO 12" (MIN.) ABOVE
THE FINISHED GRADE. PROVIDE "GOOSENECK" AND INSTALL SCREEN AT END OF PIPE ABOVE
GRADE. COORDINATE LOCATION OF VENT PIPE WITH LAND OWNER AND/OR FIELD CONDITIONS.
ALL EXPOSED PIPE ABOVE GRADE SHALL BE ULTRAVIOLET LIGHT RESISTANT.
6. WHEN CONSTRUCTING CLOSE TO EDGE OF PAVEMENT, FRAME & COVER SHALL BE ROTATED
100 % CLEAR OF PAVEMENT (AVOID PART IN AND IF POSSIBLE PART OUT)
STANDARD PRECAST MANHOLE
NOT TO SCALE
24" MANHOLE
FRAME & COVER
INSTALL MASTIC BETWEEN
M.H. FRAME AND GRADE
RINGS AND EACH JOINT
PROVIDE ANCHOR BOLTS
SIZE & SPACING AS REQ'D. BY
F & C MANUF. (3 BOLTS MIN.)
5" MIN.
SEAL ALL MANHOLE
JOINTS WITH MASTIC
GROUT INSIDE AND
OUT AS REQ'D.
1-1/2 : 12 SLOPE
INVERT SHALL BE
SHAPED IN ACCORD.
W/VDOT DETAIL IS-1
4" MIN. COMPACTED
CRUSHED STONE
OPENINGS FOR PIPES SHALL
BE PRECAST & SUPPLIED W/
FLEXIBLE CONNECTIONS PER
THE PROJECT SPECIFICATIONS
COPOLYMER
POLYPROPYLENE PLASTIC
COVERED MANHOLE STEP
(PSI-PF MANHOLE STEP BY
M.A. IND. INC. OR EQUAL)
4'-0" I.D.
UNLESS NOTED
OTHERWISE
12" MAX. REINFORCED
CONCRETE GRADE RINGS
IF REQ'D. TO MATCH GRADE
SEE NOTE NO. 2
12" TYP.
16" MAX.
TYPICAL
MARKING
MANHOLE FRAME
MANHOLE COVER
NOTE : WATERTIGHT MANHOLE
FRAME & COVER TO BE AS
DESCRIBED IN SPECIFICATIONS
OR APPROVED EQUAL.
NOTE : MANHOLE FRAME & COVER TO BE AS
DESCRIBED IN SPECIFICATIONS OR APPROVED EQUAL.
STANDARD SECTION
MANHOLE FRAME & COVER DETAILS
NOT TO SCALE
WATERTIGHT SECTION
FLEXIBLE
MASTIC
INNER COVER W/
RUBBER GASKET
HOLD DOWN BAR &
TIGHTENING SCREW
FOUR BOLTS @ 90°
CAST-IN-PLACE 4"x3/4"
BOLTS W/ DOUBLE NUTS25-1/2"
24"
36" ±
8"
PLAN
24"
36" ±
CONCRETE-20"x20"x12"
2% MIN. SLOPE
45° BEND
45° BEND
STANDARD WYE
METAL CLEANOUT
FINISHED GRADE
R/W OR EASEMENT
INSTALL CLEANOUT
@ EDGE OF R/W OR
EASEMENT (TYP)
SEWER
MAIN
CAP END OF
LATERAL W/
THREADED PLUG
6" BRANCH TEE IN
MAIN - INSTALL AT
45° ANGLE
6" SERVICE
LATERAL
DEPTH AS REQ'D
TO SERVE USER
THREADED
PVC LID
SEWER SERVICE CLEANOUT ASSEMBLY
NOT TO SCALE
18" MIN. PREFERRED
SEWER LINE
NOTE: IN LOCATIONS WHERE WATER LINES CANNOT BE INSTALLED A MINIMUM OF
18" ABOVE A SEWER LINE, THE SEWER LINE SHALL BE CONSTRUCTED OF D.I. CL50
WATER LINE AND PRESSURE TESTED PRIOR TO BEING PLACED IN SERVICE, WATER
LINE JOINTS ARE TO BE LOCATED EQUIDISTANT FROM THE SEWER LINE, AND A
CONCRETE CRADLE IS TO BE POURED BETWEEN THE WATER AND SEWER LINES.
10'-0"
MINIMUM
18" MIN. PREFERRED
SEWER
LINE
WATER
LINE
SEWER
LINE 18" MINIMUM
10'
MIN.
10'
MIN.
WATER LINE
WATER LINE
10'
MIN.
10'
MIN.
ALTERNATE CROSSING METHOD
10'
MIN.
10'
MIN.
HORIZONTAL SEPARATION
18"
MIN.
12"
MIN. WATER
LINE
SEWER
LINE
VERTICAL SEPARATION
SEWER LINE
WATER
LINE
18" MIN. PREFERRED
ALTERNATE CROSSING METHOD
WATER & SEWER CROSSING DETAILS
PREFERRED CROSSING METHOD
TYPICAL SEWER ON ROAD
RIGHT-OF-WAY
EDGE OF PAVEMENT
ENCASEMENT
WATER
LINE
VALVE BOX
IF ON PLAN
FINISHED GRADE
5'-0"
MIN.
36" MIN.
COVER
5'-0"
MIN.
EDGE OF PAVEMENT
FINISHED GRADE
WATER PIPE
RUNNING
WITH ROAD
36" MIN.
COVER
SEWER CROSSING ROAD
INVERT IN
C
B A & D
STANDARD INSIDE DROP MANHOLE
NOT TO SCALE
24" MANHOLE
FRAME & COVER
INSTALL MASTIC BETWEEN
M.H. FRAME AND GRADE
RINGS AND EACH JOINT
PROVIDE ANCHOR BOLTS
SIZE & SPACING AS REQ'D. BY
F & C MANUF. (3 BOLTS MIN.)
5" MIN. WALLS
SEAL ALL MANHOLE
JOINTS WITH MASTIC,
THEN GROUT INSIDE
AND OUT AS REQ'D.
INVERT SHALL BE
SHAPED IN ACCORD.
W/ VDOT DETAIL IS-1
1-1/2:12
SHELF
SLOPE
OPENINGS FOR PIPES SHALL
BE PRECAST & SUPPLIED W/
FLEXIBLE CONNECTIONS PER
THE PROJECT SPECIFICATIONS
COPOLYMER
POLYPROPYLENE PLASTIC
COVERED MANHOLE STEP
(PSI-PF MANHOLE STEP BY
M.A. IND. INC. OR EQUAL)
4'-0" I.D.
UNLESS NOTED
OTHERWISE
12" MAX. REINFORCED
CONCRETE GRADE RINGS
IF REQ'D. TO MATCH GRADE
SEE NOTE NO. 2
12" TYP.
16" MAX.
DUCTILE IRON DROP
PIPE - SAME SIZE AS
MAIN SEWER LINE
4" MIN. COMPACTED
CRUSHED STONE
PVC PIPE PLUG INSTALLED
IN END OF PIPE - SAW
PLUG IN HALF
DUCTILE IRON
ELBOW
NOTES:
1. USE WATER TIGHT F&C ONLY WHEN SHOWN AS "WT", VENT REQ'D.
WHEN SHOWN "V".
2. THE TOP ELEVATION OF F&C SHALL BE SET BY THE FOLLOWING
CONDITIONS UNLESS NOTED ON PLAN "TF"
A. 6" BELOW VDOT ROAD SHOULDERS
B. FLUSH W/ GRADE IN PAVEMENT OR LAWNS
C. 12"-24" ABOVE GRADE (WHEN NOT SUBLECT TO VEHICULAR
TRAFFIC.)
D. 12" BELOW NORMAL DITCH ELEVATION
3. USE ECCENTRIC TAPER TOP UNLESS ELEVATIONS REQUIRE A FLAT
SLAB TOP.
4. COORDINATE ANCHOR BOLT HOLE SIZE & LOCATIONS WITH
MANHOLE FRAMES, GRADE RINGS AND PRECAST MANHOLE CONE
OR FLAT TOP SECTIONS. USE MASTIC BETWEEN M.H. FRAME AND
EACH GRADE RING AND EACH MANHOLE SECTION. BOLT ALL
WATER TIGHT FRAMES ! BOLT STANDARD FRAMES LOCATED IN OR
IMMEDIATELY ADJACENT TO ROADWAYS OR OTHER AREAS
SUBJECT TO LATERAL FORCES. INSTALL ANCHOR BOLTS IN EPOXY
GROUT OR WITH AN ADHESIVE ANCHOR BOLT SYSTEM.
5. IF WATER TIGHT MANHOLE IS INDICATED TO BE FLUSH WITH GRADE
(TF), INSTALL VENT PIPE USING FITTINGS AND ADDITIONAL PIPE AS
NEEDED TO EXTEND VENT UP TO 12" (MIN.) ABOVE THE FINISHED
GRADE. PROVIDE "GOOSENECK" AND INSTALL SCREEN AT END OF
PIPE ABOVE GRADE. COORDINATE LOCATION OF VENT PIPE WITH
LAND OWNER AND/OR FIELD CONDITIONS. ALL EXPOSED PIPE
ABOVE GRADE SHALL BE ULTRAVIOLET LIGHT RESISTANT.
6. WHEN CONSTRUCTING CLOSE TO EDGE OF PAVEMENT, FRAME &
COVER SHALL BE ROTATED 100 % CLEAR OF PAVEMENT (AVOID
PART IN AND IF POSSIBLE PART OUT)
ALTERNATE VENTED MANHOLE
NOT TO SCALE
8" MIN. COMPACTED
CRUSHED STONE
1'-0"
PLACE ON UNDISTURBED
EARTH OR COMPACTED
FILL MATERIAL
MIN. 1/2 CU.YD. CONCRETE
ANCHOR AROUND BOTTOM
VENT PIPE
4" DIA. GALV.
STEEL PIPE (TYP)
PAINTED GREEN
4" FLANGED ALUMINUM SEWER VENT
CHECK VALVE W/INSECT SCREEN -
EQUAL TO WAGER COMPANY SERIES
1700 SEWER VENT CHECK VALVE
BURY MIN. 3'
DEPTH - GROUND
ELEVATION VARIES
SEAL AROUND
VENT PIPE
THROUGH MH
WATERTIGHT,
BOLT-DOWN
FRAME & COVER
BENCH
WALL
CONCRETE
INVERT
NOTE:
SEWER VENTS SHALL BE CONSTRUCTED USING
THIS DETAIL IN LOCATIONS WHERE THE REQUIRED
VENT LOCATION IS MORE THAN 5' ABOVE GRADE.
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
S U
PP
O
R T.
D W
G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
C401
ST
AN
D
AR
D U
TI
LI
TY
C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
PROFILE
PLAN
DUCTILE IRON CARRIER
PIPE & CONCRETE
ENCASEMENT
BACKFILL STREAMBEAD
TO ORIGINAL GRADE W/
MATERIAL EXCAVATED
FROM STREAM
STREAM
TEMPORARY SAND OR
AGGREGATE FILL-REMOVE
FOLLOWING PIPE INSTALLATION
24" MIN. COVER
BELOW STREAMBED
WHERE POSSIBLE
NON-ERODIBLE
BARRIER
VDOT CLASS A1
EROSION CONTROL
STONE RIP-RAP, OR
SANDBAGS
TEMPORARY DEWATERING STRUCTURE
SHALL CONFORM TO THE LATEST
VIRGINIA EROSION AND SEDIMENT
CONTROL HANDBOOK STANDARD 3.13
GROUND
STREAM
TEMPORARY SILT FENCE
EDGE OF WATER
CREEK BANK BEYOND
STEP #2
STEP #1
REINFORCE/REPLACE
EXCAVATED WORK
AREA & STREAMBANK
W/CLASS A1 RIP-RAP
DUCTILE IRON
CARRIER PIPE
CONCRETE
ENCASEMENT
NON-ERODIBLE
BARRIER
VDOT CLASS A1
EROSION CONTROL
STONE RIP-RAP, OR
SANDBAGS
CONSTRUCTION SEQUENCE NOTES:
STEP 1) CONSTRUCTION SHALL BE DONE IN LOW FLOW PERIODS.
STEP 2) CROSSING SHALL BE ACCOMPLISHED IN A MANNER THAT WILL NOT PROHIBIT FLOW OF STREAM.
COMPLETE HALF OF CROSSING THEN REPEAT WITH REMAINING HALF.
STEP 3) INSTALL TEMPORARY SILT FENCES TO CONTROL APPROACH AREAS.
STEP 4) INSTALL NON-ERODIBLE BARRIER WITH FILTER CLOTH AROUND CROSSING.
STEP 5) PLACE A SAND OR COARSE AGGREGATE (NCDOT #57) FILL INSIDE BARRIER.
STEP 6) DEWATER WORK AREA INTO SEDIMENT TRAPPING DEVICE.
STEP 7) EXCAVATE TRENCH, INSTALL CARRIER PIPE & CONCRETE ENCASEMENT FROM BANK TO BARRIER.
CAP END OF CARRIER PIPE.
STEP 8) BACKFILL WITH EXCAVATED MATERIAL TO ORIGINAL PROFILE.
STEP 9) REMOVE EXCESS FILL MATERIAL.
STEP 10) REMOVE BARRIER AND FILTER FABRIC.
STEP 11) RELOCATE TO OPPOSITE SIDE OF STREAM AND REPEAT STEPS 1-7.
STEP 12) REPEAT STEPS 8-10.
STEP 13) IMMEDIATELY STABILIZE & REVEGETATE STREAM BANKS W/ SEED, MULCH, & STRAW.
COFFERDAM STREAM CROSSING - TYPICAL DETAIL
NOT TO SCALE
STEEL ENCASEMENT DETAIL
END VIEW
SPIDER TYPE PIPE
SPACERS STRAPPED
AROUND PIPE - 3 SPIDERS
MIN. PER FULL PIPE JOINT
STEEL
CASING
PIPE
STEEL
CASING
PIPE
MECHANICAL JOINT PIPE
RESTRAINTS REQ'D
THROUGH CASING (TYP)
NOTES:
1. PIPE SKIDS SHALL BE FABRICATED FROM MANUFACTURED "SPIDER-TYPE"
SPACERS.
2. PIPE SKIDS SHALL BE FIRMLY ATTACHED TO THE CARRIER PIPE TO PREVENT
PIPE DEFLECTION AND PREVENT CARRIER PIPE FROM COMING IN CONTACT
WITH CASING PIPE.
3. MULTIPLE JOINTS OF STEEL ENCASEMENT PIPE SHALL BE JOINED BY WELDING -
PIPE ALIGNMENT SHALL BE STRAIGHT AND TRUE.
4. ENCASEMENT PIPE SHALL BE USED FOR ALL VDOT UTILITY ROAD CROSSINGS,
WITH 36" MIN. COVER. THE MIN. THICKNESS FOR ENCASEMENT PIPE SHALL BE IN
ACCORDANCE WITH EP-1 OF THE LATEST EDITION OF THE VDOT ROAD AND
BRIDGE STANDARDS.
5. 3/4" AND I" SERVICE LINE ROAD CROSSINGS SHALL BE ENCLOSED USING 2"
GALVANIZED STEEL, BLACK STEEL, METALLIC ELECTRICAL CONDUIT, SCH 40
PVC, OR DR9 HDPE.
PLAN VIEW
2'-0" MIN. TYP
END OF CASING TO
EDGE OF PAVEMENT
MINIMUM CASING SIZE
CARRIER PIPE STEEL CASING PIPE MIN. WALL THICKNESS
3/4", 1" 2" PVC, SCH40 OR
SDR-13.5 0.154"
2" 4" 0.250"
4" 12" 0.250"
6" 14" 0.250"
8" 16" 0.250"
10" 18" 0.312"
12" 20" 0.312"
16" 30" 0.375"
18" 30" 0.375"
CARRIER
PIPE
SPIDER TYPE PIPE
SPACERS STRAPPED
AROUND PIPE
ENCLOSE CASING PIPE
ENDS WATERTIGHT W/
RUBBER BOOT & CLAMP
CARRIER
PIPE
PIPE BELL
JOINT
BEYOND
36" MIN. COVER
PAVED ROADWAY
SIDE VIEW
SECURE ENCASEMENT TO
ANCHOR BLOCK W/ 3" MIN.
WIDTH STAINLESS STEEL STRAP
& ANCHOR BOLTS
STEEL ENCASEMENT-
SIZED PER DETAIL
CARRIER PIPE-
SIZED PER PLANS
PROVIDE RUBBER OR
NEOPRENE CUSHION
BETWEEN STRAP &
ENCASEMENT PIPE
3,000 psi
CONCRETE
#4 REBAR @ 12" O.C.
EQUAL SPACING-3" MIN.
COVER
EMBED ANCHOR
BLOCK 24" MIN. INTO
UNDISTURBED EARTH
36" MIN. ENCASEMENT
DIAMETER 36" MIN.
" M
IN
SEAL BOTH ENDS
OF CASING
3/4" MIN. ANCHOR BOLT-
EMBED 24" MIN. INTO
CONCRETE
SECURE ENCASEMENT TO
ANCHOR BLOCK W/ 3" MIN.
WIDTH STAINLESS STEEL
STRAP & ANCHOR BOLTS
CARRIER PIPE-
SIZED PER PLANS
3/4" MIN. ANCHOR
BOLT-EMBED 24"
MIN. INTO CONCRETE
ENCASEMENT END ANCHOR DETAIL
END VIEW
#4 REBAR @ 12" O.C.
EQUAL SPACING-3" MIN.
COVER
3,000 psi CONCRETE
24" MIN.
24" MIN.
1. END ANCHOR BLOCKS REQUIRED ON EACH END OF
AERIAL OR BELOW-GRADE STREAM CROSSINGS.
2. EMBED ANCHOR BLOCK 24" MIN. INTO UNDISTURBED
EARTH.
3. ALTERNATE PRECAST CONCRETE ANCHOR BLOCKS
WILL BE CONSIDERED ON A CASE-BY-CASE BASIS.
MANUFACTURER SHOP DRAWING SUBMITTALS
REQUIRED FOR REVIEW AND APPROVAL.
12"
**FOR PIPE LESS THAN 12" THE TRENCH
WIDTH MAY BE 36" MAXIMUM
(FOR PIPES LESS THAN 12",
6" MIN. BOTH SIDES OF PIPE)
(FOR PIPES LESS THAN 12",
6" MIN. BOTH SIDES OF PIPE)
FINAL BACKFILL
- COMPACTED
INITIAL HAND
TAMPED
BACKFILL
(CLASS I OR II)
4" MIN. STONE
OR SAND
BEDDING
UTILITY LINE
MARKING TAPE
INITIAL HAND TAMPED
BACKFILL (CLASS III -
SUITABLE SOIL, SAND,
OR CRUSHED STONE)
FINAL BACKFILL
- COMPACTED
36" MIN.
COVER
SHAPE TRENCH
BOTTOM TO
MATCH PIPE
UTILITY LINE
MARKING TAPE
36" MIN. COVER
4" MIN.
(CLASS I OR II)
O.D./2
O.D. O.D.
O.D./2
CLASS C - FOR D.I. PIPE
UTILITY LINE BEDDING DETAILS
CLASS B - FOR PVC PIPE
O.D. + 12" MIN.**
12"
O.D. + 12" MIN.**
NOTES:
1. INSTALL STREAM CROSSING IN ACCORDANCE WITH STREAM PERMIT REQUIREMENTS.
2. DUCTILE IRON CARRIER PIPE REQUIRED THROUGH CONCRETE ENCASEMENT.
3. CONCRETE SHALL EXTEND 6" MIN. BEYOND OUTSIDE DIAMETER OF PIPE BELLS.
4. EXTEND PIPE TRENCH BOTTOM INTO BEDROCK IF PRESENT.
5. UNLESS SPECIFIED OTHERWISE, IT SHALL BE THE CONTRACTOR'S OPTION TO UTILIZE EITHER
CONCRETE ENCASEMENT OR STEEL ENCASEMENT (REFER TO ROAD BORE DETAIL) FOR ALL
OPEN CUT/ENCASED STREAM CROSSINGS.
CONCRETE ENCASEMENT DETAIL
NOT TO SCALE
BACKFILL EXCAVATED PIPE
TRENCH BACK TO ORIGINAL
STREAMBED LEVEL USING
ORIGINAL STREAMBED MATERIAL
2500psi MIN.
CONCRETE
FOUR #4 REBARS IN
CORNERS OF
CONCRETE
DUCTILE IRON
CARRIER PIPE
WATER
STREAM BOTTOM
6" MIN.
EXCAVATE PIPE
TRENCH INTO
BEDROCK IF PRESENT
2500psi MIN.
CONCRETE
FOUR #4 REBARS IN
CORNERS OF CONCRETE
STREAM BOTTOM
WATER
12" MIN. IF
AVAILABLE
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
S U
PP
O
R T.
D W
G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
C402
ST
AN
D
AR
D U
TI
LI
TY
C
O N
ST
R
U C
TI
O
N D
ET
10' MAX., ALL POST SPACING10' MAX.
4" MAX 3" MAX
CHAIN LINE FENCE WITH TOP RAIL
NOT TO SCALE
GATE DETAIL
NOT TO SCALE
TENSION BANDS &
STRETCHER BAR AT
EACH SIDE, (TYP. FOR
ALL GATES SHOWN)
STRAIN
POST
HINGE
HINGE
END POST
LATCH
DROP ROD
6" STRAIN
POST
HINGE
HINGE
8'-0" EACH GATE
6"
12" DIA. x 12" DEEP
TENSION
BAND
FABRIC
HEIGHT
8'-0"
3" CLR.
3" MAX.
H/2
BRACE BAND RAIL
BAND
ROUND PIPE
LINE POST (TYP)
BRACE &
TRUSS BAND
BRACE
RAIL
3/8Ø
TRUSS ROD
12" DIA.
CONCRETE
BASE (TYP)
3'-0" MIN.
7 GAUGE
TENSION
WIRE
9 GAUGE HOG
RINGS (TYP)
11 GAUGE WIRE
FASTENERS
ROLL-FORMED
STEEL LINE POST
END POST
RAIL SPLICE
CORNER POST
TOP RAIL
3/8Ø
TRUSS ROD
BRACE
RAIL
TENSION
BAND &
STRETCHER
BAR
FERRULE
LINE
POST
SHEET:
DATE:
NO. REVISION DATE
Fi le
: H :\A
H E
PR
O
JE
C
TS
\B
R
IS
TO
LV
IR
G
IN
IA
U
TI
LI
TI
ES
(B
VU
)\2
- B
EA
VE
R
C R
EE
K
IN
TE
R C
EP
TO
R \A
U
TO
C
AD
\P
LA
N
P R
O
FI
LE
\E
Q B
AS
IN
S U
PP
O
R T.
D W
G
DRAWN BY CHECKED BY
THE LANE GROUP INC.
PROJECT NO.
BE
AV
ER
C
R
EE
K
SE
W
AG
E
IN
TE
R
C
EP
TO
R
R
EP
LA
C
EM
EN
T
VE
R M
O N
T
AV
EN
U
E
TO
M
AR
Y
ST
R
EE
T
SE
G M
EN
T
BV
U
A U
TH
O
R
IT
Y
16JAN2026
23APR2026
MSA EEL
TLG-2017
th e LA
N E
G R
O U
P no w a p ar t o f
N or th M ai n
St re et G al ax
, V irg in ia
6.
6.
C403
ST
AN
D
AR
D U
TI
LI
TY
C
O N
ST
R
U C
TI
O
N D
ET
IT IS THE CONTRACTOR'S RESPONSIBILITY TO
SECURE A CERTIFIED RESPONSIBLE LAND
DISTURBER FOR THIS PROJECT. THIS NAME
MUST BE PROVIDED TO THE CITY OF BRISTOL
EROSION & SEDIMENT CONTROL DEPARTMENT
BEFORE A GRADING PERMIT MAY BE OBTAINED.
Total Disturbed Area = 0.56 Ac.
Responsible Land Disturber:
Certificate No.:
GENERAL EROSION AND SEDIMENT CONTROL NOTES
1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE
CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA DEQ STORMWATER
MANAGEMENT HANDBOOK.
2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
5. ANY OFF-SITE AREAS THAT THE CONTRACTOR UTILIZES FOR BORROW OR DISPOSAL, OTHER THAN AN APPROVED LANDFILL OR AREA CURRENTLY COVERED BY AN APPROVED EROSION AND SEDIMENT CONTROL PLAN, WILL REQUIRE AN EROSION AND SEDIMENT CONTROL PLAN AND MUST BE CONDUCTED AND STABILIZED ACCORDING TO THE VIRGINIA DEQ STORMWATER MANAGEMENT HANDBOOK. PRIOR TO COMMENCING THESE ACTIVITIES, THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTAL EROSION CONTROL PLAN TO THE OWNER FOR
REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT
EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES
AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE
IMMEDIATELY.
10. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN UNDISTURBED FOR LONGER THAN 14 DAYS. THE TEMPORARY SOIL STABILIZATION SHALL BE INSTALLED IN ACCORDANCE WITH SURFACE STABILIZATION METHOD C-SSM-09. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO DISTURBED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. THE PERMANENT SOIL STABILIZATION SHALL BE INSTALLED
IN ACCORDANCE WITH SURFACE STABILIZATION METHOD C-SSM-10.
11. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DISTURBED AREAS NOT OTHERWISE PERMANENTLY STABILIZED.
PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IN THE OPINION OF THE LOCAL PROGRAM ADMINISTRATOR OR HIS DESIGNATED AGENT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
12. EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS SHALL BE STABILIZED IMMEDIATELY AFTER INSTALLATION.
13. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS
CORRECTED.
14. ALL STORM DRAIN INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL HAVE INLET PROTECTION SO THAT SEDIMENT-LADEN WATER CANNOT ENTER THE STORM SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. ALL EXISTING STORM DRAIN INLETS AND CULVERTS IMPACTED BY THE PROJECT SHALL HAVE INLET PROTECTION.
15. ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .