1 - BVU Sewage Interceptor Specifications.pdf
PDF 12 MB Posted
- Attached to
- BC SEWAGE INTERCEPTOR RPLCMNT - VERMONT TO MARY
- Solicitation number
- IFB-121708
- Issued by
- Bristol City, Virginia
About this file
This is a comprehensive bidding document package and contract specification for the Beaver Creek Sewage Interceptor Replacement Project prepared by The Lane Group for the BVU Authority in Bristol, Virginia, with funding through the Virginia Department of Environmental Quality. The project involves construction of approximately 1,900 linear feet of gravity sewer line ranging from 8 inches to 42 inches in diameter, along with associated manholes, junction boxes, stream crossing encasements, service connections, and structural streambank stabilization work in the Vermont Avenue to Mary Street segment. The work is divided into lump sum items for mobilization and erosion/sediment control measures, and unit price items for various sewer line installations, precast concrete structures, and related improvements. Sealed bids were to be received by June 18, 2026, at 10:00 a.m., either in hard copy at the BVU Authority offices or electronically through Virginia's eVA procurement system. Prospective bidders were required to conduct mandatory site visits and could examine bidding documents at The Lane Group's office in Abingdon, Virginia, or through online platforms including QuestCDN and eVA; printed documents cost $200 per set while electronic copies cost $50. The contract specifies a substantial completion timeline of 180 calendar days from the notice to proceed, with an additional 30 days for final completion, with liquidated damages of $500 per day assessed for delays beyond the substantial completion date.
Bidders were required to submit bid security equal to 5 percent of their maximum bid price and evidence of Virginia contractor licensure at either Class A or Class B level depending on contract value thresholds. All bidders must comply with federal requirements including the Davis-Bacon Act wage determinations, American Iron and Steel provisions, and Equal Employment Opportunity regulations. The bid form required lump sum pricing for mobilization (not to exceed 5 percent of total bid) and erosion control measures, plus unit prices for 16 classified work items including gravity sewer pipe in various diameters and materials, precast concrete manholes and junction boxes, concrete stream crossing encasements, sewer service connections, asphalt repairs, and streambank stabilization. Progress payments were established at 95 percent of completed work value with 5 percent retainage prior to substantial completion, with final payment adjustments based on actual unit price quantities as determined by the Engineer. The project is funded exclusively through Virginia's Clean Water State Revolving Fund (CWSRF) program under DEQ project number C-515657. Bid security of unsuccessful bidders would be released within seven days after bid opening, while the apparent low bidder's security would be retained until contract execution and bonding requirements were satisfied within 15 days of the notice of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement for Re-Bid.pdf | ||
| Beaver Creek 23APR2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
310 West Valley Street · Abingdon, Virginia 24210 p: 276.206.8571
CONTRACT DOCUMENTS & TECHNICAL SPECIFICATIONS
for the
BEAVER CREEK SEWAGE INTERCEPTOR REPLACEMENT PROJECT
VERMONT AVENUE TO MARY STREET SEGMENT
DEQ CWSRF PROJECT NO. C-515657
prepared for:
BVU AUTHORITY
15022 LEE HIGHWAY
BRISTOL, VIRGINIA 24202
prepared by:
THE LANE GROUP
NOW A PART OF RDA
310 WEST VALLEY STREET
ABINGDON, VIRGINIA 24210
JANUARY 2026
REVISED JUNE 2026
BEAVER CREEK SEWAGE INTERCEPTOR REPLACEMENT PROJECT
VERMONT AVENUE TO MARY STREET SEGMENT
TABLE OF CONTENTS
BIDDING REQUIREMENTS
Advertisement for Bids
Information for Bidders
Bid Form *
Bid Bond *
Contractor’s Qualification Statement
- Note: All items marked with an asterisk, *, are required to be submitted with Contractor's Bid.
CONTRACT DOCUMENTS
Notice of Award
Notice to Proceed
Agreement
Performance Bond
Payment Bond
Certificate of Substantial Completion
Notice of Acceptability of Work
CONDITIONS AND PROVISIONS
EJCDC Standard General Conditions
Supplementary Conditions
Work Change Directive
Contract Change Order Form
Application for Payment Form
Affidavit of Payment of Claims
VCWRLF CONTRACT INSERTS
Subpart A – Equal Employment Opportunity
Subpart B – Notice to Prime Contractor of Requirement for Certification of Nonsegregated Facilities
Subpart C – Construction Contractors Affirmative Action Requirements
Subpart D – Civil Rights Act of 1964
Subpart E – Section 13 of PL 92-500 Under Federal Water Pollution Control Act, Rehabilitation Act of 1973, and
Age Discrimination Act of 1975
Subpart F - Compliance with Section 306 of Clean Air Act & Section 508 of Clean Water Act
Subpart G - Utilization of Small Businesses in Rural Areas
Subpart H – Procurement Practices of All Public Bodies
Subpart I – Compliance with Davis-Bacon Act Payroll Review
Subpart J – American Iron and Steel Requirements
Attachment No. 1 – Instructions to Bidders/Offerers
Attachment No. 2 – Certification regarding EEO Compliance
Attachment No. 3 – MBE/WBE Utilization Report
Attachment No. 4 – Wage Determination(s)
Attachment No. 5 – Davis-Bacon Payroll Certification – WHD 347
Attachment No. 6 – American Iron and Steel Initial Certification Statement
Attachment No. 7 – American Iron and Steel Waiver Request
Attachment No. 8 – American Iron and Steel Waiver Request Review Checklist
Attachment No. 9 – American Iron and Steel Final Certification Statement
Sample Escrow Agreement
TECHNICAL SPECIFICATIONS
Division 1 - General Requirements
General Requirements
Sequence of Construction
Summary of Work
Mobilization
Method of Measurement and Payment
Project Meetings
Submittals
Temporary Facilities
Division 2 - Existing Conditions
Excavating and Backfilling for Utilities
Siltation and Erosion Control
Topsoiling and Seeding
Division 3 - Concrete
Cast-in-Place Concrete
Division 33 – Utilities
Gravity Sewer Line
APPENDICES
Appendix A – Erosion & Sediment Control Plan Narrative
Appendix B – Nationwide Permit
Appendix C – VPDES General Stormwater Permit
Appendix D – Previous Bid - Addendum
BIDDING REQUIREMENTS
ADVERTISEMENT FOR BIDS
BEAVER CREEK SEWAGE INTERCEPTOR REPLACEMENT PROJECT
VERMONT AVENUE TO MARY STREET SEGMENT
BVU AUTHORITY
Separate sealed bids for construction of the Beaver Creek Sewage Interceptor Replacement Project- Vermont Avenue To
Mary Street Segment will be received by the BVU Authority located at 15022 Lee Highway, Bristol, Virginia or electronically at https://eva.virginia.gov (instructions will be in bid documents) at 10:00 a.m. on Thursday, June 18, 2026 and then at said location publicly opened and read aloud. No bids submitted via email shall be deemed responsive and shall not be opened or read aloud.
Construction includes approximately 1,900 LF of 42” and smaller gravity sewer line, manholes, and related improvements.
The Project is funded through the Virginia Department of Environmental Quality.
The Issuing Office for the Bidding Documents is: The Lane Group, Inc., 310 West Valley Street, Abingdon, Virginia 24210, Phone 276.206.8571, e-mail state@thelanegroupinc.com. Prospective Bidders may examine and obtain the Bidding
Documents at the Issuing Office on Monday through Thursday between the hours of 7:30 am – 5:30 pm and Friday between the hours of 8:00 am – 12:00 pm. Prospective Bidders may also examine copies of the Bidding Documents provided by the
Issuing Office at the locations identified below.
• BVU Authority Administrative Office, 15022 Lee Highway, Bristol, Virginia 24202
Online at:
• QuestCDN
• eVA
Printed copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon payment of $ 200.00 , (non-refundable) for each set. Contractors have the option to purchase an electronic set of bidding documents (Adobe PDF Format) for a $50.00 non-refundable fee. Checks for Bidding Documents shall be payable to The
Lane Group, Inc. Upon request and receipt of the document deposit indicated above, the Issuing Office will transmit the
Bidding Documents via delivery service. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither the Owner nor the Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.
The procedure for withdrawal of bids shall be according to provision "(ii)" contained in 11-54, Code of Virginia (1950) as amended.
If a contract is for one hundred twenty thousand dollars ($120,000) or more, or if the total value of all construction, removal, repair, or improvements undertaken by the bidder within any twelve-month period is seven hundred fifty thousand dollars
($750,000) or more, the bidder is required under Title 54, Chapter 11, Code of Virginia (1950) as amended, to show evidence of being licensed as a "Class A Contractor." If a contract is seven thousand five hundred dollars ($7,500) or more, but less than one hundred twenty thousand dollars ($120,000), the bidder is required to show evidence of being licensed as a "Class
B Contractor." The bidder shall place on the outside of the envelope containing the bid and shall place in the bid over his signature whichever of the following notations is appropriate:
"Licensed Class A Virginia Contractor No. "
"Licensed Class B Virginia Contractor No. "
The BVU Authority is an Equal Opportunity Employer and will not discriminate on the basis of race, creed, color, sex, national origin, age, handicap or familiar status. MBE/WBE firms are encouraged to submit bids. Bidders must comply with the following: the President’s Executive Order # 11246 prohibiting discrimination in employment regarding race, color, creed, sex, or national origin; the President’s Executive Orders # 12138 and 11625 regarding utilization of MBE/WBE firms; the
President’s Executive Order 13658 regarding minimum wages on federal funded construction contracts, the Civil Rights Act of 1964, the Davis-Bacon Act and Section 436 of P. L. 113-76, American Iron and Steel. Bidders must certify that they do not or will not maintain or provide for their employees any facilities that are segregated on the basis of race, color, creed, or national origin.
No Pre-Bid Conference will be held for the project.
This advertisement is issued by:
Owner: BVU Authority
By: Vicki Warren
Title: Purchasing Agent
Date: June 3, 2026 https://eva.virginia.gov/ mailto:state@thelanegroupinc.com
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
TOC Page1 of 1
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other
Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Contracts to Be Assigned
Article 23 – Federal Requirements
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page1 of 11
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office.
Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination.
Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.
2.05 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page2 of 11
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five (5) days of Owner’s request, Bidder must submit the following information:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier qualification information.
E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page3 of 11 lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.
C. Bidders visiting the Site are required to arrange their own transportation to the Site.
D. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the following Owner or Engineer contact for visiting the Site: [provide contact information]. Bidder must conduct the required Site visit during normal working hours.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page4 of 11
E. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
F. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
G. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
H. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page5 of 11
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5.00% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. Bid security must be at least 5% of the Bidder’s maximum Bid price.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer within 10 days of the issuance of the Advertisement for Bids or invitation to Bidders. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. Each such request shall include the Manufacturer’s Certification for Compliance with AIS. Refer to the Manufacturer’s Certification form provided in these construction Contract Documents. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page6 of 11
Bidders cannot rely upon approvals made in any other manner. Substitutes and “or-equal” materials and equipment may be proposed by Contractor in accordance with Paragraphs 7.05 and 7.06 of the General Conditions after the Effective Date of the Contract. Each such request shall include Manufacturer’s Certification letter to document compliance with AIS requirements of Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference, if applicable. Refer to Manufacturer’s Certification Letter provided in these Contract Documents.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening.
11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
11.04 The Contractor shall not award work to Subcontractor(s) in excess of the limits stated in SC 7.07A.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page7 of 11
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Lump Sum
Bidders must submit a Bid on a lump sum basis as set forth in the Bid Form.
13.02 Base Bid with Alternates
A. Bidders must submit a Bid on a lump sum basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page8 of 11
The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form.
13.03 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
ARTICLE 14—SUBMITTAL OF BID
14.01 Bidders have the option of submitting either a hard copy bid at the location designated in the Advertisement for bids or electronically at https://eva.virginia.gov. The Bidding Documents include the Bid Form, and, if required, the Bid Bond Form. The Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
14.04 Electronic Bid Submissions
1.) Bidder shall provide (1) one electronic copy of the bid to Virginia’s electronic procurement system (eVA) at https://eva.virginia.gov by the deadline date and time for submittal of bids.
To respond to sealed solicitations, vendors will need to be registered suppliers on the (eVA) website. To register as a new supplier, visit: https://eva.virginia.gov/register-now.html . If you need supplier training, please visit https://eva.virginia.gov/supplier-training-materials.html .
If you have questions or issues during the process of submitting a bid, contact (eVA) customer care at 1-866-289-7367. Please ensure you have allotted ample time to submit your bid document(s).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page9 of 11
If you have questions or issues during the process of submitting a bid, contact (eVA) customer care at 1-866-289-7367. Please ensure you have allotted ample time to submit your bid document(s).
2.) Electronic document size shall be no larger than 25 mb. The (eVA) website will allow for a bigger document size but the county’s system will not be able to download from (eVA) anything larger than 25mb. Zip files are not accepted. All documents shall be in pdf format.
3.) Each bidder or offeror shall include a scanned copy of their bid bond along with their bid documents, if applicable for this project, on or before the deadline for submittal of bid in (eVA).
4.) It is the responsibility of the bidder to call our office prior to deadline date and time to verify that we received their electronic bid. Bid submissions will not be opened in advance of the closing date therefore the county will only be able to confirm that (eVA) received their bid, not if the files are accessible. If there are any computer/eVA issues, corrupted files, power outages, etc. The Town will not be held responsible and will not accept any bids past the designated date and time for bids to be received.
5.) Faxed bids will not be accepted and electronic bids will only be accepted through (eVA).
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page10 of 11
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For determination of the apparent low Bidder(s) when sectional bids are submitted, Bids will be compared on the basis of the aggregate of the Bids for separate sections and the Bids for combined sections that result in the lowest total amount for all of the Work.
D. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
Page11 of 11 those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Not Applicable
ARTICLE 22—CONTRACTS TO BE ASSIGNED
22.01 Not Applicable
ARTICLE 23 – FEDERAL REQUIREMENTS
23.01 If the contract price is in excess of $100,000, provisions of the Contract Work Hours and Safety
Standards Act at 29 CFR 5.5(b) apply.
23.02 Federal requirements at Article 19 of the Supplementary Conditions apply to this Contract.
23.03 American Iron and Steel requirements apply to this project.
EJCDC® C-410, Bid Form for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
BID FORM FOR CONSTRUCTION CONTRACT
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1 - OWNER AND BIDDER
This Bid is submitted to: BVU Authority
15022 Lee Highway
Bristol, Virginia 24202
1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 - ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids;
C. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids;
ARTICLE 3 - BASIS OF BID—LUMP SUM BID AND UNIT PRICES
3.01 Lump Sum Bids
A. Bidder will complete the Work in accordance with the Contract Documents for the following lump sum (stipulated) price(s):
PART A – LUMP SUM ITEMS
The following items shall be paid for on a Lump Sum price basis for work completed.
1A. Mobilization: This item shall include the out-of-pocket expenses necessary to start work. It shall include, but not be limited to, the cost for bonds, insurance, general permits, equipment and materials movement to the project site, and the establishment of an office. The amount shall not exceed 5% of the total bid.
LUMP SUM PART 1A
AND /100 DOLLARS ($ )
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
2A. Erosion and Sediment Control Measures: This item includes all costs to install and maintain as required all erosion and sediment control measures shown on the plans and/or specified and/or required by authorized officials during the term of the construction contract.
LUMP SUM PART 2A
AND /100 DOLLARS ($ ).
TOTAL PART A (SUM PARTS 1A-2A)
AND /100 DOLLARS ($ ).
PART B - UNIT PRICE ITEMS
The following items shall be paid for on a unit price basis for the quantities installed, as defined in the specifications.
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
1B 42” Gravity Sewer, Ductile Iron 292 L.F.
2B 42” Gravity Sewer, PVC or Ductile Iron 1,066 L.F.
3B 42” Equivalent Elliptical Gravity Sewer, Class III RCP
67 L.F.
4B 24” Gravity Sewer, Ductile Iron 266 L.F.
5B 8” Gravity Sewer, PVC or Ductile Iron 203 L.F.
6B Rectangular Precast Concrete Sewer Junction Box Manhole for 42” Sewer, Waterproof Frame & Cover
2 EA.
7B Circular Precast Concrete Sewer Manhole for 42” Sewer, Waterproof Frame & Cover
9 EA.
8B Circular Precast Concrete Sewer Manhole for 8” Sewer, Standard Frame & Cover
2 EA.
9B Concrete Encasement for 42” Equivalent Elliptical Sewer Line Stream Crossing
67 L.F.
10B Concrete Encasement for Two Parallel 24” Sewer Line Stream Crossing
60 L.F.
11B Manhole Vent Assembly 2 EA.
12B 6” Sewer Service Connection & Cleanout @ Edge of R/W
16 EA.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
13B 6” Private Sewer Lateral Replacement & Reconnection
16 EA.
14B City Street Asphalt Repair 340 SY
15B Demolish/Remove Manhole to be Abandoned
8 EA.
16B Structural Streambank Stabilization w/ Rip- Rap
650 L.F.
TOTAL PART B (1B TO 16B)
AND /100 DOLLARS ($ ).
TOTAL BASE BID (Sum A and B)
AND /100 DOLLARS ($ ).
ARTICLE 4 - TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
4.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 5 - BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF
ADDENDA
5.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
5.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
5.03 Receipt of Addenda
A. Bidder hereby acknowledges receipt of the following Addenda: [Add rows as needed. Bidder is to complete table.]
Addendum Number Addendum Date
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Modified to include RD edits from RUS Bulletin 1780-26 (6/16/2020).
ARTICLE 6 - BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work, including all American Iron and Steel requirements.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating…