Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation - Sikorsky Memorial Airport
This Invitation for Bid (IFB APB034263) is issued by the City of Bridgeport, Connecticut, for comprehensive construction services at Sikorsky Memorial Airport (BDR) in Stratford, Connecticut. The project includes mill and overlay rehabilitation of Runway 11-29, rehabilitation of Taxiways D, H, E, K, J, and A, removal of deteriorated runway shoulders, replacement of runway light fixtures and electrical infrastructure, installation of underground electrical duct banks and power cables, runway and taxiway markings, drainage improvements, and mill and overlay of the terminal loop road and five parking lot areas across seven phased construction zones. The base bid work encompasses 33 pay items with six additional bid alternates for loop road and parking lot rehabilitation. Electronic bid submissions through the City's OpenGov Procurement Portal are due by 2:00 p.m. Eastern Standard Time on Thursday, March 19, 2026. A mandatory pre-bid conference is required to discuss material requirements, quality control procedures, construction safety and phasing plans, and airport access procedures. Bidders must conduct site visits during normal working hours by appointment. The base bid work is scheduled for 90 consecutive calendar days from the Notice to Proceed, with optional alternates adding a maximum of 30 additional days for a total possible duration of 120 calendar days. The contract includes a one-year construction warranty from the date of final acceptance.
Bid security equal to 10 percent of the maximum bid price is required in the form of certified check, bank money order, or bid bond, with performance bonds, payment bonds, and maintenance bond each at 100 percent of the contract amount (except maintenance bond at 25 percent). The project is subject to an eight percent Disadvantaged Business Enterprise (DBE) program set-aside, with federal requirements superseding state and local requirements. Liquidated damages are assessed at $500 per day for individual phase milestones and $1,500 per day for overall construction completion delays, with mobilization limited to 10 percent of total project cost. Qualified contractors must be Connecticut-licensed, possess valid SAM, DUNS, Connecticut, and Federal Tax ID numbers, perform at least 25 percent of work with their own organization, and maintain comprehensive insurance coverage including $2,000,000 general liability aggregate and $5,000,000 umbrella/excess liability. Connecticut prevailing wage rates, effective January 26, 2026, apply to all on-site workers, ranging from $21.42 to $59.91 per hour plus fringe benefits of $13.95 to $43.62 per hour. Monthly progress payments include 5 percent retainage until final acceptance. The contract award will be made to the responsible bidder submitting the lowest responsive bid most advantageous to the City considering cost, resources, equipment availability, and other specified factors. The written question submission cutoff is 4:00 p.m. on Friday, February 20, 2026, with all answers published as addenda.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DOCUMENTS
AND SPECIFICATIONS
RUNWAY 11-29 REHABILITATION AND AIRPORT
TERMINAL PARKING LOT REHABILITATION
AT
SIKORSKY MEMORIAL AIRPORT
STRATFORD, CONNECTICUT
Issued for Bid
JANUARY 2026
BID NUMBER: APB034263
PREPARED BY:
PROJECT NO.: 056200
Sikorsky Memorial Airport (BDR) Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation Stratford, CT Issued for Bid – January 2026
Table of Contents TOC-1
TABLE OF CONTENTS
SECTION
I. INVITATION TO BID – NOT INCLUDED IN THIS SUBMISSION
II. BID BOND
III. CITY OF BRIDGEPORT COMPLIANCE DOCUMENTS
1. Contractor’s Designation of Compliance Officer
2. Contractor’s Good Standing Certification
3. Contractor’s MWBE Utilization Form – INTENTIONALLY OMITTED
4. Contractor’s Wage Certification Form
5. Equal Opportunity Policy Statement
6. Mandatory Good Faith Efforts; Waivers; Exceptions
7. No Conflicts/Disclosure Form
IV. PROPOSAL AND ITEMIZED PROPOSAL
V. QUALIFICATION STATEMENT
VI. OWNERS INSTRUCTIONS BONDS INSURANCE
VII. NOTICE OF AWARD – NOT INCLUDED IN THIS SUBMISSION
VIII. NOTICE TO PROCEED – NOT INCLUDED IN THIS SUBMISSION
IX. PERFORMANCE BOND – NOT INCLUDED IN THIS SUBMISSION
X. PAYMENT BOND – NOT INCLUDED IN THIS SUBMISSION
Sikorsky Memorial Airport (BDR) Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
Table of Contents TOC-2
XI. GENERAL PROVISIONS
Section 10 Definition of Terms
Section 20 Proposal Requirements and Conditions
Section 30 Award and Execution of Contract
Section 40 Scope of Work
Section 50 Control of Work
Section 60 Control of Materials
Section 70 Legal Regulations and Responsibility to Public
Section 80 Execution and Progress
Section 90 Measurement and Payment
XII. FAA TECHNICAL PROVISIONS
C-100 Contractor Quality Control Program (CQCP) C-102 Temporary Air and Water Pollution, Soil Erosion, & Siltation Control C-105 Mobilization C-110 Method of Estimating Percentage of Materials Within Specification Limits (PWL) P-101 Site Preparation P-401 Asphalt Mix Pavement P-603 Emulsified Asphalt Tack Coat P-605 Joint Sealants for Pavements P-606 Adhesive Compounds, Two-Component for Sealing Wire and Lights in Pavement P-610 Concrete for Miscellaneous Structures P-620 Runway and Taxiway Marking D-751 Manholes, Catch Basins, Inlets, and Inspection Holes T-901 Seeding T-905 Topsoil T-908 Mulching L-108 Underground Power Cable for Airports L-109 Airport Transformer Vault and Vault Equipment L-110 Airport Underground Electrical Duct Banks and Conduit L-125 Installation of Airport Lighting System
XIII. SUPPLEMENTAL TECHNICAL PROVISIONS
MST-01 Field Office and Laboratory MST-02 Maintenance of Traffic MST-03 Construction Engineering MST-04 Project Security
Sikorsky Memorial Airport (BDR) Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
Table of Contents TOC-3
XIV. CTDOT TECHNICAL PROVISIONS
1.20-9.75 Mobilization and Project Closeout for Facilities Construction
2.02 Roadway Excavation, Formation of Embankment and Disposal of Surplus Material
2.19 Sedimentation Control System
4.06 Bituminous Concrete
4.09 Milling, Removal of Existing Wearing Surface
9.71 Maintenance and protection of Traffic
12.08 Sign Face – Sheet Aluminum
12.09 Painted Pavement Markings
XV. ATTACHMENTS
Bridgeport Connecticut Prevailing Wage Rates FAA AC 150/5370-2G – Operational Safety on Airports During Construction Sample Erosion Control Inspection Report Agreement for Release of Electronic Files Suggested Instructions to Bidders Construction Services Insurance Rider City of Bridgeport Contract for Construction Services City of Bridgeport General Conditions for Construction Geotechnical Engineering Report
Runway 11-29 Rehabilitation and Airport Terminal Parking Rehabilitation Sikorsky Memorial Airport Seals Page Seals Page Stratford, Connecticut
Seals Page - 1
SEALS PAGE
Civil Engineer Todd Schultheis, P.E.
CHA Consulting, Inc.
201 N. Illinois Street Suite 800 Indianapolis, IN 46204 (317)-786-0461
This Seal Covers the following Technical Specifications:
Sections: C-100, C-102, C-105, C-110, P-101, P-401, P-603, P-605, P-606, P-610, P-620, D-751, T-901, T-905, T-908, L-108, L-109, L-110, L-125, MST-01, MST-02, MST-03, MST-04
END OF SEALS PAGE
12/17/2025
INVITATION TO BID
BID BOND
CITY OF BRIDGEPORT
COMPLIANCE
DOCUMENTS
City Attorney—December 7, 2015
CONTRACTOR’S DESIGNATION OF COMPLIANCE OFFICER
Project Name: _______________________________________________
Bid Number: ______________________
Contractor: __________________________________________________
Contract Amount: __________________
Date: ____________________________
THE UNDERSIGNED hereby certifies:
THAT it is the general contractor for the ________________________________ (trade) in connection with the above Project and that it has appointed ________________________, who signature appears below, to supervise the payment of the contractor’s employees for the duration of the Project;
THAT the Undersigned is in a position to have full knowledge of the facts set forth in all payroll-related documents and compliance documents (Compliance Officer); and
THAT the Undersigned has full power and authority, until such time as the contractor submits a notice that it has appointed a new Compliance Officer.
CONTRACTOR
By: _______________________________ Name:
Title:
Duly-authorized
Compliance Officer:
Title:
City Attorney—December 7, 2015
CONTRACTOR’S GOOD STANDING CERTIFICATION
Project Name: _______________________________________________
Bid Number: ______________________
Contractor: __________________________________________________
Contract Amount: __________________
Date: ____________________________
THE CONTRACTOR, including its owners/members, officers and directors, hereby certify, jointly and severally:
THAT he/she/it is not now debarred from public bidding or contracting or subject to a debarment proceeding (or the equivalent) in any federal, State or local jurisdiction.
THAT the he/she/it has not been disqualified or deemed a non-responsible contractor or bidder (or the equivalent) in any federal, State or local jurisdiction.
THAT he/she/it is not delinquent in any real or personal property taxes, fines or other obligations to the City of Bridgeport.
CONTRACTOR
By: _______________________________
Title:
Duly-authorized
STATE OF CONNECTICUT )
) ss. At:
COUNTY OF )
On , 20__, before me personally appeared , to me known, who, being by me duly sworn, did depose and say that s/he is the duly authorized ______________ of , and that s/he executed this instrument as her/his free act and deed in such capacity.
Commissioner of the Superior Court
Notary Public My Commission expires
Line
Text Box
INTENTIONALLY OMITTED
Line
City Attorney—December 7, 2015 1
CONTRACTOR’S WAGE CERTIFICATION FORM
THE UNDERSIGNED, _______________________________ (Company) does hereby certify that the Company and all of its subcontractors will pay all workers on the
___________________________________________________ (Project) the wages listed in the attached schedule of prevailing wage rates in effect at the time the work of the Project commenced.
Date: CONTRACTOR
By:_____________________________ Name:
Title:
Duly-authorized
STATE OF CONNECTICUT )
) ss. At:
COUNTY OF )
On , 20__, before me personally appeared , to me known, who, being by me duly sworn, did depose and say that s/he is the duly authorized ______________ of , and that s/he executed this instrument as her/his free act and deed in such capacity.
Commissioner of the Superior Court Notary Public
My Commission expires:
[Attach DOL wage rates]
City Attorney—December 7, 2015 1
City of Bridgeport
Office of Contract Compliance Margaret E. Morton Government Center 999 Broad Street Bridgeport, Connecticut 06604 Phone: (203) 576-7755
EQUAL OPPORTUNITY POLICY STATEMENT
Project Name: Bid Number:
General Contractor: Contract Amount:
Date of Award:
The City of Bridgeport Office of Contract Compliance (“OCC”) requires that all contractors engaged in the construction, demolition, renovation or rehabilitation of City projects shall take affirmative action to provide equal opportunity for employment.
The general contractor agrees that it shall not discriminate or permit discrimination against any person or group of persons on the basis of race, color, religion, creed, age, marital status, national origin, ancestry, sex, gender, gender identity or expression, sexual orientation, intellectual disability, mental disability or physical disability including, but not limited to, blindness (unless such disability, even with reasonable accommodation, prevents the applicant from being able to perform the work involved), or in any manner prohibited by the laws of the United States, the State of Connecticut and the City of Bridgeport. Further, the general contractor agrees that it shall not retaliate against or condone retaliation against any person or group of persons who oppose actions, treatment or conduct that they believe to be discriminatory.
No contract shall be awarded to any contractor until the OCC Officer is satisfied with the general contractor’s Equal Employment Opportunity policies and practices.
No general contractor shall be permitted on the Project site until the necessary pre-construction compliance information has been submitted and reviewed by the OCC Officer.
During the performance of any contract, the undersigned general contractor further agrees:
City Attorney—December 7, 2015 2
1. The general contractor agrees to adhere to the terms of the City of Bridgeport Minority Business
Enterprise Ordinance, Chapter 3, Section 3.12.130 as outlined below:
African-American-Owned Business 6% of Total Contract Value (construction only)
Minority-Owned Business 15% of Total Contract Value (inclusive of 6% AA-MBE)
Woman-Owned Business 15% of Total Contract Value
2. The General contractor represents that its policy and practice is to ensure that no person will be discriminated against, or be denied the benefit of any activity, program or employment process, in areas including but not limited to recruiting, advertising, hiring, promotion, transfer, demotion, layoff, termination, rehiring, employment, rates of pay and/or other compensation or any other terms and conditions of employment on the basis of race, color, religion, creed, age, marital status, national origin, ancestry, sex, gender, gender identity or expression, sexual orientation, intellectual disability, mental disability or physical disability including, but not limited to, blindness, unless such disability, even with reasonable accommodation, prevents performance of the work involved.
3. The general contractor assumes full responsibility for compliance with appropriate City, State and
Federal non-discrimination and labor standards regulations and designates the person signing below as the Affirmative Action Officer for such signer, to ensure that the signer’s EEO Policy is executed and that reports are submitted to the City of Bridgeport.
4. The general contractor agrees to post in conspicuous places available to employees and applicants for employment, notices setting forth its EEO Policy and all other non-discrimination clauses required by law.
5. The general contractor agrees to utilize the Connecticut Department of Labor, The Workplace, and/or any other training programs as sources of job recruitment.
6. The general contractor agrees to adopt and use such appropriate and applicable prevailing wage rate determinations and labor standards requirements as they become applicable by the
Connecticut Department of Labor and/or the Secretary of Labor of the United States under the provisions of the Davis-Bacon Act and related Acts, as amended.
7. The general contractor agrees that, on HUD-assisted projects, it will abide by Section 3 of the
HUD Act of 1968, as amended, and shall include provisions for compliance with respect to employment and other economic opportunities to low-income persons within the City of
Bridgeport.
8. The general contractor shall keep, maintain, and provide access for a minimum of three (3) years to records relating to the wages and hours worked by each employee and a schedule of the
Line
Line
City Attorney—December 7, 2015 3 occupation or work classification at which each mechanic, laborer or worker on the Project is employed during each work day and week in such manner and form as the City of Bridgeport, State and federal labor departments establish, to assure the proper payment due to such employees or employee welfare funds as prescribed by law.
9. The general contractor shall keep and maintain weekly payroll reports including the appropriate
State and/or federal statement of compliance signed by a company official and shall provide certified monthly employment utilization reports that demonstrate actual performance among minorities, women, apprentices and other targeted workforce members as may be required by the
City of Bridgeport, State or federal law or funding sources. The timely submission of complete and accurate payroll reports shall be a pre-condition for payment of invoices.
The undersigned understands that failure to adhere to these responsibilities may result in the City of
Bridgeport exercising its right to (a) withhold payment until the undersigned’s EEO compliance obligations are met; (b) cancel the contract; (c) refuse of award future bids on the grounds that the undersigned is a non-responsible contractor; (d) recover specified monetary penalties as provided in the contract; and/or
(e) seek debarment of the undersigned.
I hereby agree at and accept these terms and conditions for accepting a contract award.
Company Name____________________________
By:_______________________________________
Name:
Date:_____________________________________
Revised 10/2018
Reformatted 02-2025 1
NO CONFLICTS / DISCLOSURE FORM
EVERY BUSINESS OR INDIVIDUAL THAT IS ISSUED A NOTICE OF
INTENT TO AWARD PURSUANT TO THE CITY’S PURCHASING
ORDINANCE (Section 3.08.070, AS AMENDED), MUST FULLY
AND ACCURATELY COMPLETE THIS DISCLOSURE FORM. IF
THERE IS INSUFFICIENT SPACE FOR ANY ANSWER, ATTACH
ADDITIONAL SHEETS.
Name of Individual or Business: __________________________________________
Person signing this form: ________________________________________________
Title:__________________________________________________________________
Phone Number: ( ) ______-_______ Email: _____________________________
The undersigned hereby represents and warrants that the following statements are true, correct and complete, to the best of his/her knowledge and belief, and that the City of Bridgeport is entitled to rely thereon:
1. Business is (check one)
� a corporation � a general partnership � a limited liability company � a sole proprietorship � a limited liability partnership � other _____________.
2. Business Address: __________________________________________________
3. State of incorporation or organization: � Connecticut
� Other ______________
4. What other trade names does the Business use, if any?
5. Fed. ID or SS #______________ CT State ID # ______________
DUNS # ______________ SAM # ______________
CT Contractors # ____________ Other pertinent license #s (if any)
Reformatted 02-2025 2
6. (a) Identify all officers, directors, managing or general partners, or managing members.
Name Address Title
(b) Identify owners of 5% or more interest in the Business:
7. Identify any parent, affiliate or subsidiary organization of the Business.
(a) Company’s name ___________________________________, a
� a corporation � a general partnership � a limited liability company � a sole proprietorship � a limited liability partnership � other _____________
State of Incorporation or organization: ______________
Relationship to your company:_____________________
(b) Company’s name ___________________________________, a
� a corporation � a general partnership � a limited liability company � a sole proprietorship � a limited liability partnership � other _____________
State of Incorporation or organization: ______________ Relationship to your company:____________________
Reformatted 02-2025 3
8. Has the Business, any parent, affiliate or subsidiary company, or any of their respective officers, directors, owners, general partners, managing members, within the past three (3) years been convicted of, entered a plea of guilty, entered a plea of nolo contendere, concluded or served a sentence imposed for, or otherwise admitted to:
Yes No
a) the commission of a criminal offense as an incident to obtaining or attempting to obtain a public or private contract or subcontract, � � or in the performance of such contract or subcontract?
b) the violation of any state or federal law for embezzlement, theft, forgery, bribery, falsification or destruction of records, receiving stolen property � � or any other offense indicating a lack of business integrity or business honesty which affects responsibility as a municipal contractor?
c) the violation of any state or federal antitrust, collusion or conspiracy law arising out of the submission of bids or proposals to a public or � � private contract or subcontract?
d) fraudulent, criminal or other seriously improper conduct while � � participating in a joint venture or similar arrangement.
e) willfully failing to perform in accordance with the terms of one or � � more public contracts, agreements or transactions?
f) having a history of failure to perform or a history of unsatisfactory performance of one or more public contracts, agreements or � � transactions?
g) willfully violating a statutory or regulatory provision or requirement applicable to a public contract, agreement or transaction? � �
IF YOU ANSWER YES TO ANY PART OF SECTION 8,
PLEASE EXPLAIN IN DETAIL ON AN ATTACHED SHEET.
9. Initial as appropriate below:
None of the persons listed herein is related by blood or marriage to any City of Bridgeport government official or employee. ________ (Initial)
OR
One or more of the persons listed herein is related by blood or marriage to a City of Bridgeport government official or employee. (Explain in detail below or attach additional sheet if necessary). ________ (Initial)
Reformatted 02-2025 4
10. Does the Business, any parent, affiliate or subsidiary company, or any of their respective officers, directors, owners, general partners, managing members, employees, or agents have any business or familial relationship, through ownership, directorship, contractual arrangement, control, or other arrangement with any of the subcontractors to be used on the work involved in the bid for which this form is being submitted? _____YES or _____NO
IF YOU ANSWER YES TO ANY PART OF SECTION 10,
PLEASE EXPLAIN IN DETAIL ON AN ATTACHED SHEET.
11. Read and initial at the end of the following paragraph:
BY INITIALING BELOW, THE UNDERSIGNED REPRESENTS THAT
THERE EXISTS NO KNOWN OR SUSPECTED CONFLICTS OF INTEREST
BETWEEN THE BUSINESS, ITS PARENT, AFFILIATES OR SUBSIDIARIES
AND THE CITY OF BRIDGEPORT. ________ (Initial)
12. Read and initial at the end of the following paragraph:
BY INITIALING BELOW, THE UNDERSIGNED UNDERSTANDS THAT THE
DUTY TO PROVIDE THE INFORMATION REQUESTED IN THIS FORM IS A
CONTINUING OBLIGATION AND THAT THE INFORMATION REQUIRED
BY THIS FORM MUST AND WILL BE PROMPTLY UPDATED UPON ANY
CHANGE. ________ (Initial)
WARNING: Falsifying information on this form, or failing to promptly notify the City of changes to the information contained in it during the course of the Business’ performance of the work will constitute a default under any contract or purchase order awarded to the Business, and will permit the City to terminate its contract with the Business and pursue its legal rights and remedies as to such Business or persons associated therewith.
Dated:________________________ _________________________ duly-authorized
NOTARIZE NEXT PAGE PLEASE
Reformatted 02-2025 5
STATE OF ___________}
}ss. ________ ________ ___, 20__
COUNTY OF _________}
Personally appeared before me, ______________________(name), the __________________________(title) of __________________________(name of Business), who swore to the truth of the foregoing as his/her free act and deed and the free act and deed of _______________________(name of Business) before me.
Notary Public:
My commission expires on:
Commissioner of the Superior Court
PROPOSAL AND
ITEMIZED PROPOSAL
Proposal P - 1 1/16/2026
BID PROJECT NO. APB049256
PROPOSAL
Submitted By:
(CONTRACTOR)
TO: FOR: Runway 11-29 Rehabilitation and
Airport Terminal Parking Lot Rehabilitation
Sikorsky Memorial Airport
Ladies and/or Gentlemen:
The undersigned Bidder has carefully examined the form and content of the Contract, has examined the site of the work, and hereby proposes to furnish all necessary plant, labor, materials, equipment, and tools required to perform and complete the work in strict accordance with the Contract.
The undersigned Bidder agrees to submit to all conditions reported, intended, or implied, both particularly and generally by the Contract at the prices herein stated.
The undersigned Bidder also agrees as follows:
FIRST: If this Proposal is accepted, to execute the Contract within ten (10) calendar days of date of "Notice of Award” of Contract, and furnish to the OWNER satisfactory insurance certificates, performance and payment bonds, each in the sum of one-hundred percent (100%) of the amount of the Contract awarded as security for the faithful performance of the work, and for the payment of all persons performing labor and furnishing materials in connection with the work.
SECOND: To begin work within seven (7) calendar days of the date of the "Notice to Proceed”. The anticipated “Notice of Award” and “Notice to Proceed” dates are as follows:
Anticipated Date, Notice of Award:
Anticipated Date, Notice to Proceed:
Work shall be progressed to meet the following schedule (“No. of Days” represents the number of calendar days from the date of the Start of each Work Area):
Milestone: Phase 1 No. of Days: 37
Milestone: Phase 2 No. of Days: 21
Milestone: Phase 3A No. of Days: 2
Milestone: Phase 3B No. of Days: 2
Milestone: Phase 4 No. of Days: 28
Proposal P - 2
Milestone: Phase 5 No. of Days: 7
Milestone: Phase 6A (Alt 1) No. of Days: TBD*
Milestone: Phase 6B (Alt 1) No. of Days: TBD*
Milestone: Phase 7 (Alt 2) No. of Days: TBD*
Milestone: Phase 7 (Alt 3-6) No. of Days: TBD*
* If Bid Alternates are awarded, the work is to be completed after the base bid work (with the exception of Phase 7 Alternate 2 through 6 which may be completed simultaneously with the base bid) and with a maximum of 30 days allotted for completion of all phases. The contractor shall supply a schedule outlining the number of calendar days required to complete each work area.
THIRD: To pay the OWNER the following liquidated damages for each calendar day of delay in completing the work beyond the specified times of completion or within the times to which such completion may have been extended in accordance with the Contract Documents:
Milestone: Phase 1 Liq. Damages: $500/day
Milestone: Phase 2 Liq. Damages: $500/day
Milestone: Phase 3A Liq. Damages: $500/day
Milestone: Phase 3B Liq. Damages: $500/day
Milestone: Phase 4 Liq. Damages: $500/day
Milestone: Phase 5 Liq. Damages: $500/day
Milestone: Phase 6A (Alt 1) Liq. Damages: $500/day
Milestone: Phase 6B (Alt 1) Liq. Damages: $500/day
Milestone: Phase 7 (Alt 2) Liq. Damages: $500/day
Milestone: Phase 7 (Alt 3-6) Liq. Damages: $500/day
FOURTH: To certify as follows: Pursuant to Section 103d. of the General Municipal Law:
(a) By submission of this bid, each Bidder and each person signing on behalf of any
Bidder certifies, and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of his knowledge and belief:
(1) The prices in this bid have been arrived at independently without collusion, consultation, communication, or agreement, for the purposes of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor;
(2) Unless otherwise required by law, the prices which have been quoted in this bid
Proposal P - 3 have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or to any competitor; and
(3) No attempt has been made or will be made by the Bidder to induce any other person, partnership or corporation to submit or not to submit a bid for the purpose of restricting competition.
FIFTH:
(a) It is the intent of the OWNER to obtain a proposal for all work to be performed under this Contract.
Unit price(s) or lump-sum bid shall not include any Sales Tax levied by the following governmental agencies:
(1) The State of Connecticut
(2) Bridgeport, CT
(3) Any other town or governing agency
The total unit price shall be the sum of all material and installation cost for each bid item as defined herein.
(b) The undersigned submits herewith bid guaranty for the specified amount of the deposit required in the Instructions to Bidders. In case this Proposal is accepted by the OWNER, and the undersigned shall refuse or neglect, within ten (10) calendar days after date of receipt of Notice of Award, to execute and deliver an Agreement in the form provided herein, or to execute and deliver a performance bond and a labor and material bond in the amounts required and in the form prescribed, or to provide satisfactory insurance certificate(s), the amount of bid security shall be forfeited and will be retained by the OWNER as liquidated damages. Otherwise the total amount of the bid security will be returned to the depositor in accordance with provisions set forth in the Instructions to Bidders.
(b) The undersigned acknowledges the receipt of the following Addenda, but he agrees that he is bound by all Addenda whether or not listed herein:
ADDENDA NUMBERS AND DATES
Number 1 - dated ________________________________________
Number 2 – dated ________________________________________
Number 3 – dated ________________________________________
Number 4 – dated ________________________________________
BIDDERS SHOULD CONTACT THE CITY OF BRIDGEPORT TO VERIFY THEY HAVE ALL
ADDENDA.
Proposal P - 4
PROPOSAL SUBMITTED
Dated: ________________________________________
(if an Individual, Partnership, or Non-Incorporated Organization)
Name of Bidder
By: ____________________________________________________________________________ (Signature) (Title)
Address of Bidder: __________________________________________________________ (Street)
(City, State) (Zip Code)
Names and Addresses of Members of the Firm
(if a Corporation) Name of Bidder:
By: ____________________________________________________________________________
(Signature) (Title)
Address of Bidder:
(Street)
(City, State) (Zip Code)
Proposal P - 5
Incorporated Under the Laws of the State of
Name of President:
(Name) (Address)
Officer (Secretary):
(Name) (Address)
(Treasurer): ______________________________________________________________ (Name) (Address)
Corporate Seal
Bidder’s Telephone Number: ________________________________
Fax Number: ______________________________________
Cell Phone Number: _________________________________
Email Address: _____________________________________
Proposal P - 6
Performance Bond Information Form
Project Title:
Construction Contract: _______________________________________________________________
Name of Contractor: _________________________________________________________________
Address: ____________________________________________________________________
Bonding Company or Person Issuing Security Bond ______________________________________________________________
Address: ____________________________________________________________________________
Bonding Company Agent: Telephone No. (_____)____________
Address:
Amount of Bond: $_______________________
Duration of Bond: From Date of Contract To Final Payment
The Bidder shall complete the information above regarding the performance bond proposed to be provided for the contract. This information will be used by the OWNER and/or CONSULTANT to verify the bonding prior to award of the contract.
Project Milestone:
Date:
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 C-100 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) LS 1
2 C-102-5.1E INSTALLATION AND REMOVAL OF 12" FILTER SOCK LF 11,350
3 C-105 MOBILIZATION LS 1
4 P-101-5.1 JOINT AND CRACK REPAIR (1/4" TO 3/4") LF 7,500
5 P-101-5.2 ASPHALT MILLING, 0" TO 4" DEPTH SY 50,000
6 P-101-5.3 ASPHALT MILLING, 4" TO 5" DEPTH SY 39,500
7 P-101-5.4 REMOVE ELEVATED LIGHT FIXTURE EA 59
8 P-101-5.5 REMOVE IN-PAVEMENT LIGHT FIXTURE AND BASE CAN TOP SECTION EA 12
9 P-101-5.6 PAVEMENT REMOVAL SY 40,000
10 P-401-8.1A ASPHALT SURFACE COURSE - GRADATION 2 TON 14,700
11 P-401-8.1B ASPHALT BASE COURSE - GRADATION 1 TON 7,100
12 P-603-5.1 BITUMINOUS TACK COAT GAL 12,250
13 P-605-5.1 TYPE I CRACK REPAIR (1/4" TO 3/4") LF 7,000
14 P-605-5.2 TYPE II CRACK REPAIR (GREATER THAN 3/4") LF 3,000
15 P-620-5.1 SURFACE PREPARATION SF 14,000
16 P-620-5.2 RUNWAY AND TAXIWAY PAVEMENT MARKINGS (100% APPLICATION) SF 148,700
17 P-620-5.3 TEMPORARY RUNWAY AND TAXIWAY PAVEMENT MARKINGS (50% APPLICATION) SF 148,700
18 D-751-5.4 ADJUST INSPECTION HOLE TO GRADE EA 11
19 T-901-5.1 SEEDING ACRE 9
20 T-905-5.1 TOPSOILING (OBTAINED FROM ON-SITE) CY 4,750
21 T-908-5.1 MULCHING ACRE 9
22 L-108-5.1 REMOVE NO. 8 CABLE FROM EXISTING DUCT BANK OR CONDUIT LF 21,500
23 L-108-5.2 INSTALL NO. 8 AWG, 5 KV, L-824, TYPE C CABLE, IN EXISTING DUCT BANK OR CONDUIT LF 21,500
24 L-109-7.1 REMOVAL OF EQUIPMENT WITHIN EXISTING AIRFIELD ELECTRICAL VAULT LS 1
25 L-109-7.2 INSTALLATION OF EQUIPMENT WITHIN EXISTING AIRFIELD ELECTRICAL VAULT LS 1
26 L-125-5.1 L-862, LED, HIGH INTENSITY RUNWAY EDGE LIGHT ON EXISTING BASE EA 35
27 L-125-5.2 L-850C, LED, HIGH INTENSITY FLUSH MOUNT RUNWAY EDGE LIGHT ON EXISTING BASE EA 11
28 L-125-5.3 L-850C, LED, HIGH INTENSITY FLUSH MOUNT RUNWAY EDGE LIGHT ON NEW BASE CAN EA 1
29 L-125-5.4 L-862E, LED, HIGH INTENSITY THRESHOLD/END LIGHT ON EXISTING BASE EA 24
30 MST-01 FIELD OFFICE AND LABORATORY LS 1
31 MST-02 MAINTENANCE OF TRAFFIC LS 1
32 MST-03 CONSTRUCTION ENGINEERING LS 1
33 MST-04 PROJECT SECURITY LS 1
ISSUED FOR BID
December 3, 2025
BASE BID
Base Bid Pay Item Subtotal =
ITEMIZED PROPOSAL
SIKORSKY MEMORIAL AIRPORT (BDR)
Runway 11-29 Rehabilitation & Airport Terminal Parking Lot Rehabilitation
ISSUED FOR BID
December 3, 2025
ITEMIZED PROPOSAL
SIKORSKY MEMORIAL AIRPORT (BDR)
Runway 11-29 Rehabilitation & Airport Terminal Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 1.20-9.75 MOBILIZATION FOR FACILITIES CONSTRUCTION LS 1
2 2.19 SEDIMENTATION CONTROL SYSTEM -12" FILTER SOCK LF 1,300
3 2.19 SEDIMENTATION CONTROL SYSTEM - INLET PROTECTION EA 7
4 4.09 FINE MILLING OF BITUMINOUS CONCRETE, 1.5" DEPTH SY 16,600
5 4.09 REMOVE ASPHALT CURB LF 290
6 4.06 BITUMINUS CONCRETE TON 1,450
7 4.06 MATERIAL FOR TACK COAT GAL 800
8 9.71 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1
9 12.08 SIGN FACE - SHEET ALUMINUM EA 4
10 12.09 PAINTED PAVEMENT MARKINGS SF 2,020
11 4.06 CLEANING AND SEALING JOINTS AND CRACKS (BETWEEN 1/4" AND 3/4") LF 1,350
12 4.06 CLEANING AND SEALING JOINTS AND CRACKS (GREATER THAN 3/4") LF 600
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 1.20-9.75 MOBILIZATION FOR FACILITIES CONSTRUCTION LS 1
2 2.19 SEDIMENTATION CONTROL SYSTEM - INLET PROTECTION EA 2
3 4.09 FINE MILLING OF BITUMINOUS CONCRETE, 1.5" DEPTH SY 8,600
4 4.06 BITUMINUS CONCRETE TON 750
5 4.06 MATERIAL FOR TACK COAT GAL 400
6 9.71 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1
7 12.08 SIGN FACE - SHEET ALUMINUM EA 2
8 12.09 PAINTED PAVEMENT MARKINGS SF 2,200
9 4.06 CLEANING AND SEALING JOINTS AND CRACKS (BETWEEN 1/4" AND 3/4") LF 700
10 4.06 CLEANING AND SEALING JOINTS AND CRACKS (GREATER THAN 3/4") LF 300
Bid Additive No. 1 - Pay Item Subtotal =
BID ALTERNATE NO. 1 - LOOP ROAD
Bid Additive No. 2 - Pay Item Subtotal =
BID ALTERNATE NO. 2 - PARKING LOT 1
ISSUED FOR BID
December 3, 2025
ITEMIZED PROPOSAL
SIKORSKY MEMORIAL AIRPORT (BDR)
Runway 11-29 Rehabilitation & Airport Terminal Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 1.20-9.75 MOBILIZATION FOR FACILITIES CONSTRUCTION LS 1
2 2.19 SEDIMENTATION CONTROL SYSTEM - INLET PROTECTION EA 3
3 4.09 FINE MILLING OF BITUMINOUS CONCRETE, 1.5" DEPTH SY 6,800
4 4.06 BITUMINUS CONCRETE TON 600
5 4.06 MATERIAL FOR TACK COAT GAL 320
6 9.71 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1
7 12.08 SIGN FACE - SHEET ALUMINUM EA 8
8 12.09 PAINTED PAVEMENT MARKINGS SF 1,650
9 4.06 CLEANING AND SEALING JOINTS AND CRACKS (BETWEEN 1/4" AND 3/4") LF 550
10 4.06 CLEANING AND SEALING JOINTS AND CRACKS (GREATER THAN 3/4") LF 250
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 1.20-9.75 MOBILIZATION FOR FACILITIES CONSTRUCTION LS 1
2 2.19 SEDIMENTATION CONTROL SYSTEM - INLET PROTECTION EA 1
3 4.09 FINE MILLING OF BITUMINOUS CONCRETE, 1.5" DEPTH SY 4,900
4 4.06 BITUMINUS CONCRETE TON 430
5 4.06 MATERIAL FOR TACK COAT GAL 230
6 9.71 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1
7 12.08 SIGN FACE - SHEET ALUMINUM EA 6
8 12.09 PAINTED PAVEMENT MARKINGS SF 1,500
9 4.06 CLEANING AND SEALING JOINTS AND CRACKS (BETWEEN 1/4" AND 3/4") LF 400
10 4.06 CLEANING AND SEALING JOINTS AND CRACKS (GREATER THAN 3/4") LF 175
BID ALTERNATE NO. 3 - PARKING LOT 2
Bid Additive No. 3 - Pay Item Subtotal =
BID ALTERNATE NO. 4 - PARKING LOT 3
Bid Additive No. 4 - Pay Item Subtotal =
ISSUED FOR BID
December 3, 2025
ITEMIZED PROPOSAL
SIKORSKY MEMORIAL AIRPORT (BDR)
Runway 11-29 Rehabilitation & Airport Terminal Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 1.20-9.75 MOBILIZATION FOR FACILITIES CONSTRUCTION LS 1
2 2.19 SEDIMENTATION CONTROL SYSTEM - INLET PROTECTION EA 1
3 4.09 FINE MILLING OF BITUMINOUS CONCRETE, 1.5" DEPTH SY 3,850
4 4.06 BITUMINUS CONCRETE TON 340
5 4.06 MATERIAL FOR TACK COAT GAL 180
6 9.71 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1
7 12.08 SIGN FACE - SHEET ALUMINUM EA 6
8 12.09 PAINTED PAVEMENT MARKINGS SF 1,630
9 4.06 CLEANING AND SEALING JOINTS AND CRACKS (BETWEEN 1/4" AND 3/4") LF 300
10 4.06 CLEANING AND SEALING JOINTS AND CRACKS (GREATER THAN 3/4") LF 150
ITEM NO. SPECIFICATION DESCRIPTION OF ITEM UNIT QUANTITY UNIT PRICE UNIT PRICE (WORDS) TOTAL
1 1.20-9.75 MOBILIZATION FOR FACILITIES CONSTRUCTION LS 1
2 2.19 SEDIMENTATION CONTROL SYSTEM - INLET PROTECTION EA 1
3 4.09 FINE MILLING OF BITUMINOUS CONCRETE, 1.5" DEPTH SY 4,850
4 4.06 BITUMINUS CONCRETE TON 430
5 4.06 MATERIAL FOR TACK COAT GAL 230
6 9.71 MAINTENANCE AND PROTECTION OF TRAFFIC LS 1
7 12.08 SIGN FACE - SHEET ALUMINUM EA 3
8 12.09 PAINTED PAVEMENT MARKINGS SF 1,950
9 4.06 CLEANING AND SEALING JOINTS AND CRACKS (BETWEEN 1/4" AND 3/4") LF 400
10 4.06 CLEANING AND SEALING JOINTS AND CRACKS (GREATER THAN 3/4") LF 175
SUBMITTED BY:
TITLE:
ADDRESS:
END OF ITEMIZED PROPOSAL
Bid Additive No. 5 - Pay Item Subtotal =
BID ALTERNATE NO. 5 - PARKING LOT 4
BID ALTERNATE NO. 6 - PARKING LOT 5
Bid Additive No. 6 - Pay Item Subtotal =
TOTAL BID AMOUNT =
QUALIFICATIONS
STATEMENT
EJCDC® C-451, Qualifications Statement.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
QUALIFICATIONS STATEMENT
1. SUBMITTED BY:
Official Name of Firm:
Address:
2. SUBMITTED TO:
3. SUBMITTED FOR:
Owner:
Project Name:
TYPE OF WORK:
4. CONTRACTOR'S CONTACT INFORMATION
Contact Person:
Title:
Phone:
Email:
5. AFFILIATED COMPANIES:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies,
6. TYPE OF ORGANIZATION:
SOLE PROPRIETORSHIP
Name of Owner:
Doing Business As:
Date of Organization:
PARTNERSHIP
Date of Organization:
Type of Partnership:
Name of General Partner(s):
CORPORATION
State of Organization:
Date of Organization:
Executive Officers:
- President:
- Vice President(s):
- Treasurer:
- Secretary:
LIMITED LIABILITY COMPANY
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, State of Organization:
Date of Organization:
Members:
JOINT VENTURE
Sate of Organization:
Date of Organization:
Form of Organization:
Joint Venture Managing Partner
- Name:
- Address:
Joint Venture Managing Partner
Joint Venture Managing Partner
7. LICENSING
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Jurisdiction:
Type of License:
License Number:
Jurisdiction:
Type of License:
License Number:
8. CERTIFICATIONS CERTIFIED BY:
Disadvantage Business Enterprise:
Minority Business Enterprise:
Woman Owned Enterprise:
Small Business Enterprise:
Other ( ):
9. BONDING INFORMATION
Bonding Company:
Bonding Agent:
Contact Name:
Aggregate Bonding Capacity:
Available Bonding Capacity as of date of this submittal:
10. FINANCIAL INFORMATION
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Financial Institution:
Account Manager:
INCLUDE AS AN ATTACHMENT AN AUDITED BALANCE SHEET FOR EACH OF THE
LAST 3 YEARS
11. CONSTRUCTION EXPERIENCE:
Current Experience:
List on Schedule A all uncompleted projects currently under contract (If Joint Venture list each participant's projects separately).
Previous Experience:
List on Schedule B all projects completed within the last 5 Years (If Joint Venture list each participant's projects separately).
Has firm listed in Section 1 ever failed to complete a construction contract awarded to it?
YES NO
If YES, attach as an Attachment details including Project Owner's contact information.
Has any Corporate Officer, Partner, Joint Venture participant or Proprietor ever failed to complete a construction contract awarded to them in their name or when acting as a principal of another entity?
YES NO
If YES, attach as an Attachment details including Project Owner's contact information.
Are there any judgments, claims, disputes or litigation pending or outstanding involving the firm listed in Section 1 or any of its officers (or any of its partners if a partnership or any of the individual entities if a joint venture)?
YES NO
If YES, attach as an Attachment details including Project Owner's contact information.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies,
12. SAFETY PROGRAM:
Name of Contractor's Safety Officer:
Include the following as attachments:
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and
Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) OSHA No. 500- Log & Summary of Occupational Injuries & Illnesses for the past 5 years.
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and
Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) list of all OSHA Citations & Notifications of Penalty (monetary or other) received within the last 5 years (indicate disposition as applicable) - IF NONE SO STATE.
Provide as an Attachment Contractor's (and Contractor's proposed Subcontractors and
Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) list of all safety citations or violations under any state all received within the last 5 years (indicate disposition as applicable) - IF NONE SO STATE.
Provide the following for the firm listed in Section V (and for each proposed Subcontractor furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) the following (attach additional sheets as necessary):
Workers' compensation Experience Modification Rate (EMR) for the last 5 years:
YEAR EMR
YEAR EMR
YEAR EMR
YEAR EMR
YEAR EMR
Total Recordable Frequency Rate (TRFR) for the last 5 years:
YEAR TRFR
YEAR TRFR
YEAR TRFR
YEAR TRFR
YEAR TRFR
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, Total number of man-hours worked for the last 5 Years:
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
YEAR TOTAL NUMBER OF MAN-HOURS
Provide Contractor's (and Contractor's proposed Subcontractors and Suppliers furnishing or performing Work having a value in excess of 10 percent of the total amount of the Bid) Days
Away From Work, Days of Restricted Work Activity or Job Transfer (DART) incidence rate for the particular industry or type of Work to be performed by Contractor and each of
Contractor's proposed Subcontractors and Suppliers) for the last 5 years:
YEAR DART
YEAR DART
YEAR DART
YEAR DART
YEAR DART
13. EQUIPMENT:
MAJOR EQUIPMENT:
List on Schedule C all pieces of major equipment available for use on Owner's Project.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, I HEREBY CERTIFY THAT THE INFORMATION SUBMITTED HEREWITH, INCLUDING ANY ATTACHMENTS, IS
TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF.
NAME OF ORGANIZATION:
BY:
TITLE:
DATED:
NOTARY ATTEST:
SUBSCRIBED AND SWORN TO BEFORE ME
THIS DAY OF , 20___
NOTARY PUBLIC - STATE OF
MY COMMISSION EXPIRES:
REQUIRED ATTACHMENTS
1. Schedule A (Current Experience).
2. Schedule B (Previous Experience).
3. Schedule C (Major Equipment).
4. Audited balance sheet for each of the last 3 years for firm named in Section 1.
5. Evidence of authority for individuals listed in Section 7 to bind organization to an agreement.
6. Resumes of officers and key individuals (including Safety Officer) of firm named in Section 1.
7. Required safety program submittals listed in Section 13.
8. Additional items as pertinent.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, SCHEDULE A
CURRENT EXPERIENCE
Project Name Owner's Contact Person Design Engineer Contract Date Type of Work Status Cost of Work
Telephone:
Name:
Company:
Telephone:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, SCHEDULE B
PREVIOUS EXPERIENCE (Include ALL Projects Completed within last 5 years)
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, SCHEDULE B
PREVIOUS EXPERIENCE (Include ALL Projects Completed within last 5 years)
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Telephone:
Name:
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, SCHEDULE C - LIST OF MAJOR EQUIPMENT AVAILABLE
ITEM PURCHASE DATE CONDITION ACQUIRED VALUE
OWNERS
INSTRUCTIONS
BONDS INSURANCE
EJCDC® C-052, Owner’s Instructions to Engineer Concerning Construction Bonds and Insurance for Construction.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, OWNER’S INSTRUCTIONS TO ENGINEER CONCERNING
BONDS AND INSURANCE
PROJECT: Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
FROM: The City of Bridgeport (Owner) (Owner’s Contract No.)
TO: CHA Consulting 056200 (Engineer) (Engineer’s Project No.)
This is in response to your letter dated , 20 . The following are the Owner’s instructions with respect to the requirements for bonds and insurance to be included in the bidding documents and construction contract for the Project. Owner-required revisions to the proposed standard General Conditions and Supplementary Conditions regarding bonds and insurance are attached, or transmitted under separate cover.
I. BID SECURITY
Bid security is required.
Bid security is not required.
When bid security is required, such security shall be in the amount of 10 percent of the Bidder’s maximum bid price, in the following form(s):
The following form of bid bond:
EJCDC® C-430, Bid Bond (Penal Sum Form) (2013 edition) EJCDC® C-435, Bid Bond (Damages Form) (2013 edition) Other bid bond form, as follows:
EJCDC® C-052, Owner’s Instructions to Engineer Concerning Construction Bonds and Insurance for Construction.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Other forms of bid security acceptable to the Owner are:
Certified check.
Bank money order Other, as follows:
II. CONSTRUCTION BONDS
Construction security is required in the following forms:
Construction performance bond in an amount equal to the Contract Price is required in the following form:
EJCDC® C-610, Performance Bond (2013 edition) Other performance bond: .
Construction payment bond in an amount equal to the Contract Price is required in the following form:
EJCDC® C-615, Payment Bond (2013 edition) Other payment bond: .
Maintenance bond (sometimes referred to as a warranty bond) in an amount of 25 percent of the Contract Price at completion and readiness for final payment form (if any): . Maintenance bond shall be in effect from the end of the one-year correction period specified in General Conditions Paragraph 15.08 and shall remain in effect for 1 year. Wording to include in the Supplementary Conditions for this type of bond is enclosed.
Construction security is not required.
III. CONTRACTOR’S LIABILITY INSURANCE
The limits of liability for the insurance required by Paragraph 6.03 of the General Conditions shall not be less than the following amounts. See various Notes to User in EJCDC® C-800, Guide to the Preparation of Supplementary Conditions, Article 6.
A. Workers’ Compensation and related coverages:
1. State: Statutory
2. Applicable Federal (e.g. Longshoreman’s): Statutory
3. Jones Act coverage, if applicable
a. Worker’s Compensation Insurance $100,000
b. Bodily injury by disease, aggregate $500,000
4. Employer's Liability
a. Bodily injury, each accident $100,000
b. Bodily injury by disease, each employee $100,000
c. Bodily injury/disease aggregate $500,000
5. Foreign voluntary worker compensation: Statutory
EJCDC® C-052, Owner’s Instructions to Engineer Concerning Construction Bonds and Insurance for Construction.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, B. Contractor’s Comprehensive General Liability Insurance:
1. General Aggregate $2,000,000
2. Each Occurrence (Bodily Injury and Property Damage) $1,000,000
C. Automobile Liability Insurance:
1. a combined single limit of $ 2,000,000
D. Required Environmental Liability Insurance:
1. General Aggregate $ 1,000,000
E. Additional insured coverage under the Contractor’s Commercial General Liability policy(ies) for Owner and Engineer, and others listed in the Supplementary Conditions, will be provided, subject to customary exclusions for professional liability :
1. By endorsement as additional insureds on Contractor's Commercial General
Liability policy.
2. OR by a separate Protective Liability policy covering all of them, issued by Contractor's general liability carrier.
Indicate coverage amount(s): $ 1,000,000
F. List here by name and address any additional individuals or entities (in addition to Owner and Engineer) to be identified in the Supplementary Conditions as additional insureds under the required liability policies:
IV. PROPERTY INSURANCE:
A. Property insurance in the form of “Builder’s Risk” insurance is required.
Property insurance in the form of an installation floater, to be purchased by Contractor, is required.
Property insurance is not required for this Project.
B. Builder’s risk insurance to the full replacement cost of the Work in accordance with Paragraph 6.05 of the General Conditions will be furnished by:
Owner Contractor
C. Such builder’s risk insurance will be subject to a maximum deductible amount of
$ 1,000,000
EJCDC® C-052, Owner’s Instructions to Engineer Concerning Construction Bonds and Insurance for Construction.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
D. Other Property Insurance (e.g. terrorism, Owner-furnished equipment, equipment breakdown):
Provided By: Type of Coverage:
E. List here by name and address all individuals or entities (in addition to Owner, Contractor, and Subcontractors) to be identified in the Supplementary Conditions as insureds under builder’s risk and other property insurance policies:
IIV. UMBRELLA/EXCESS COVERAGE:
A. Umbrella/Excess Coverage will be required in the amount of $ 5,000,000
We acknowledge the Engineer’s recommendation that the Owner obtain advice from a knowledgeable construction insurance consultant, and with legal counsel, prior to providing these instructions to the Engineer. We affirm that we have not relied on the Engineer for advice or recommendations regarding the coverages and limits included in these instructions. We expressly agree to defend and hold harmless the Engineer and any of its officers, shareholders, partners, members, or employees from and against any claim, loss, damage or action related to Owner’s insurance and bond requirements, including the Engineer’s involvement with preparing or specifying such insurance and bond requirements, or to any determination or decision regarding insurance coverages and limits for the Work or the Project.
By: OWNER
(Name)
(Title)
NOTICE OF AWARD
NOTICE TO PROCEED
PERFORMANCE
BOND
PAYMENT BOND
GENERAL PROVISIONS
Sikorsky Memorial Airport (BDR) Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
GENERAL PROVISIONS TOC
Table of Contents
Section 10 Definition of Terms Section 20 Proposal Requirements and Conditions Section 30 Award and Execution of Contract Section 40 Scope of Work Section 50 Control of Work Section 60 Control of Materials Section 70 Legal Regulations and Responsibility to Public Section 80 Execution and Progress Section 90 Measurement and Payment
Sikorsky Memorial Airport (BDR) Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
GENERAL PROVISIONS TOC
Page Intentionally Blank
Sikorsky Memorial Airport (BDR) Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
Section 10 Definition of Terms 10-1
Part 1 – General Contract Provisions
Section 10 Definition of Terms
W…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .