This is a Questions and Answers document for Solicitation #N6339426Q4059 addressing an Eaton UPS procurement and installation project.

The document clarifies four key operational and compliance requirements for the UPS replacement work. The contractor will have an 8-hour maintenance window to complete the temporary and new UPS swap-out. The existing battery room in Building 1524 will not provide backup power during the planned outage, as those batteries are dedicated exclusively to Local Vendor equipment and do not support critical building systems. The UPS maintenance must be performed after hours on the weekend to minimize operational impact on building activities. Davis Bacon prevailing wage requirements apply to this project, indicating it is a federal construction or service contract subject to prevailing wage compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EATON UPS Questions and Answers Solicitation #N6339426Q4059

How much down time can this building load sustain during the swap out of the temp and new UPS?

We have 8-hour maintenance window for this operation.

We noticed you had a large battery room, will those batteries carry your critical equipment during a planned outage?

No. The existing batteries in Building 1524 do not supply backup power to our critical equipment. Those batteries are dedicated exclusively to the Local Vendor equipment.

Will the planned outages take place during normal working hours or after house?

The UPS maintenance will need to be performed after hours on the weekend to minimize impact.

Will Davis Bacon / prevailing wages be required for the project?

Yes