Attachment_J.2.pdf

PDF 44 KB Posted

Attached to
Operations and Maintenance of the Robert E. Kamosa Transmitting Station (REKTS) Facility
Solicitation number
BBG50-R-15-0006
Issued by

About this file

J.2 Listing of Transmitting Station Instructions (TSI's) January 20 2015 pg. 1.

View the file

Other files

File Type Posted
Questions_and_Answers_Final_for_BBG50-R-15-0006.docx DOCX document
SF-33.pdf PDF
NMI_REKTS_Drawings.zip ZIP file
Attachment_J._1.pdf PDF
BBG50-R-15-0006_FBO.pdf PDF
Attachment_J.5.pdf PDF
Attachment_J.4.pdf PDF
Attachment_J._6.pdf PDF
Attachment_J._7.pdf PDF
Attachment_J.9.pdf PDF
Attachment_J.3.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J . 2

The following is a list of the TSI's that pertain to the transmitting plants.

TSI 101 Robert E. Kamosa Transmitting Station, October 04, 2013, pg. 1-4.

TSI 102 Reports Calendar, November 19, 2009, pg. 5-10.

TSI 103 Budget, May 15, 2000, pg. 11-33.

TSI 104 Purchasing, May 15, 2000, pg. 34-44.

TSI 105 TSIs, May 15, 2000, pg. 45-46.

TSI-106 T/EO FAXFAX System, September 28, 2011, pg. 47-48.

TSI 107 Travel and Other Absences from the Station, June 05, 2013, pg. 49-63.

TSI 108 Property Accountability, November 01, 2010, pg 64-92.

TSI 109 Training, March 13, 2014, pg. 93-94.

TSI 110 Station Safety Plans, June 18, 2014, pg. 94-118.

TSI 111 Motor Vehicles, May 16, 2011, pg. 119-122.

TSI 112 Subsidiary Site Operations, July 6, 2005, pg. 123-131.

TSI 115 Payroll Processing Procedures, April 16, 2008, pg. 132-136.

TSI 116 Annual Report on Leases, October 05, 2009, pg. 137-140.

TSI 201 Washington Funded M&R Program, October 02, 2012, pg. 141-146.

TSI 202 Lubricating and Fuel Oil Analysis, June 12, 2006, pg.147-148.

TSI 203 Equipment Performance Specifications, July 16, 2010, pg. 149-159.

TSI 204 Energy Management Program, May 11, 2011, pg. 160-193.

TSI 301 Computers, Software, PBX, March 24, 2005, pg. 194-202.

TSI 302 Management of Large Power Tubes, May 17, 2007, pg. 203-214.

TSI 303 Management of Vacuum Capacitors, March 14, 2014, pg. 215-218.

TSI 304 Requisitioning, Returning Items for Warranty, May 25, 2011, pg. 219-231.

TSI 305 Transmitting Station Maintenance Program, July 23, 2014, pg. 232-236.

TSI-306 Planned Maintenance Affecting Broadcast Schedule, April 30, 2014, pg. 237-239.

TSI 401 Irregularity Reporting, March 25, 2014, pg. 240-261.

TSI 402 Transmitting Station Monthly Operations Reporting, April 27, 2011, pg. 262-270.

TSI 403 Quarterly and Annual Statistical Reports, July 01, 2014, pg. 271-288.

TSI 404 Station Emergency Plans, July 06, 2004, pg. 289-292.

TSI 405 Station Announcements, June 02, 2011, pg. 293-296.

TSI 406 Program Feed Dial Back-up Procedures, May 15, 2000, pg. 297-298.

TSI 407 Broadcasting Contingencies, September 07, 2010, pg. 299.

TSI 408 Simultaneous Transmissions, June 01, 2011, pg. 300.

TSI 409 Transmitter Tune-Up, May 31, 2011, pg. 301-303.

TSI 410 Emergency Programming Procedure, May 31, 2011, pg. 304.

TSI 411 Tracking and Reporting on Tubes and Capacitors, April 02, 2012, pg. 305-321.

TSI 412 IT Disaster Recovery Plan, November 25, 2014, pg. 322-325.

File details come from the government source that posted it. Updated .