This is a Scope of Work document for the Washington Suburban Sanitary Commission (WSSC) in Maryland for the Batson Road Demolition project located at 16616 Batson Road, Spencerville, Maryland. The project requires comprehensive demolition and site restoration services including complete demolition of existing structures, removal of debris, environmental remediation through asbestos abatement, well and septic tank abandonment, universal waste removal, and site preparation consisting of grading, backfilling, seeding, and stabilization. Sealed electronic responses must be submitted via WSSC's eProcurement Portal by 2:00 p.m. on Tuesday, February 3, 2026, with a question submission deadline of January 20, 2026. The contract term is one year from the Notice to Proceed, with all work to be completed within twelve months and permit acquisition required within six months.
Contractor qualifications mandate a minimum of five years of demolition experience with two-story or larger structures, all required Maryland state and local licenses, and an Experience Modification Rate below 1.0. Payment will be made on a lump sum basis with 5% retainage held per the Maryland Little Miller Act, and final payment processed within 30 days of closeout documentation submission. The project has a 0% MBE/SLBE subcontracting goal with no set-aside requirements for disadvantaged enterprises. Contractors must provide substantial bonding including a 5% bid guarantee, 100% performance and payment bonds, and 100% maintenance bond. Insurance requirements include workers' compensation, commercial general liability of $1,000,000 per occurrence, business auto liability of $1,000,000, umbrella liability of $1,000,000, and pollution liability of $1,000,000. The project is subject to Maryland prevailing wage requirements and the Maryland Buy American Steel Act and operates under the Mid-Atlantic Purchasing Team's Intergovernmental & Cooperative Purchasing Clause.
Text of this file
SCOPE OF WORK
Batson Road Demolition and Construction General WSSC recently acquired the property at Batson Road bordering the T. Howard Duckett Reservoir. The site after it is restored shall be used for future WSSC plantings.
The Contractor will perform the following demolition services in accordance with the supporting specification documents that define the scope requirement:
| Pump out, plug and remove oil tanks @ main house (recycle fuel oil) |
| Manually clean out structure; books and magazines; mattresses, clothing, furniture, food items, building materials, etc. Can be recycled or treated as general debris and disposed of at an approved MDE landfill. |
| Demolition of house based on attached site plan. Debris will be disposed of at an MDE approved landfill. |
| Erosion + sediment control; silt fence and stone construction entrance (installation and removal) |
| Septic tank backfill with approved permit |
| Well abandonment with approved permit |
| Asbestos removal (to include boiler abatement) with approved permit |
| Universal waste removal and disposal |
| TCLP lead testing - sampling @ debris stream |
| Grading, backfill (material from WSSC) |
| Seeding and mulch |
Coordination Contractor shall notify the Watershed Section Manager at least two (2) working days prior to when the Contractor intends to commence work on-site.
Preservation of materials WSSC will install tree protection fence to delineate the limits of disturbance around these trees prior to the construction start date.
Public Utilities
The electric to be disconnected
Inspection The Watershed Manager and his assignees have the right to inspect all material and equipment at all stages of removal and shall be allowed access to the site. On-site work will be subject to continual inspection. Inspection by the Watershed Manager will not release Contractor from responsibility or liability for material or equipment.
Schedule Provide one baseline schedule that indicates start date, completion date and any ancillary items in between needed to complete this task order. Provide the schedule within 15 days after notice to proceed.
Submittals General: Submit each under separate cover with Commission Job Number; project name; Product Identification; Subcontractor's, Vendor's and/or Manufacturer's name, address, and phone number; and applicable Task Drawing(s). With each submission, furnish Engineer specific written notation and justification of each deviation from Specification requirements. Adobe Acrobat, AutoCAD, MS Excel, or MS Word format as appropriate.
Review and Approval Process: Watershed Section Manager will return submittal within 30 days. Submittals will be returned, marked with one of the following classifications:
INFORMATION ONLY: Copies of all required permits, i.e. demolition, electric disconnect, well abandonment, septic abandonment and asbestos abatement and removal.
Specification Requirements Contractor will perform services consistent with the following supporting documents that define the scope requirements:
In accordance with terms 1, 3 and 4 of the above referenced contract for Demolition Services.
The following is ordered:
| Scope of work: Per the attached Scope of Work, the Contractor will perform demolition services located on WSSC property at 16616 Batson Road in Spencerville, MD. | |
| Compensation shall be: Upset limit of: $ | . Compensation for these services will be through a lump sum method of payment. |
| Schedule: All permits are required within 6 months of NTP and all work shall be completed by 12 months after NTP |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .