Batson_Road_16616_Demolition_Work-Scope.rtf

RTF text file 107 KB Posted

Attached to
Batson Road Demolition
Solicitation number
91584
Issued by
Prince George's County, Maryland

About this file

This is a Scope of Work document for the Washington Suburban Sanitary Commission (WSSC) in Maryland for the demolition and construction project at Batson Road, bordering the T. Howard Duckett Reservoir. The project encompasses comprehensive demolition services including the removal and recycling of oil tanks at the main house, manual cleanout of all interior materials, structural demolition of the house based on an attached site plan, installation and removal of erosion and sediment control measures, septic tank backfill, well abandonment, asbestos and boiler abatement, universal waste removal, lead testing of debris, and site restoration through grading, backfill, seeding, and mulching. The contractor must provide a baseline schedule within 15 days of the Notice to Proceed (NTP), with all permits required within 6 months of NTP and all work completed by 12 months after NTP. The sealed responses must be submitted via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater prior to 2:00 pm on Tuesday, February 3, 2026. The contractor is required to coordinate with the Watershed Section Manager at least two working days prior to commencing on-site work and must submit required permits and other documentation for approval within 30 days.

Compensation for the demolition services will be provided through a lump sum payment method with an upset limit amount specified in the contract terms. The contractor must obtain all required permits including demolition, electric disconnect, well abandonment, septic abandonment, and asbestos abatement and removal permits. Work is subject to continual inspection by the Watershed Manager and his assignees, and the WSSC will install tree protection fencing prior to construction to delineate disturbance limits around existing trees. Submittals must be provided in Adobe Acrobat, AutoCAD, MS Excel, or MS Word format and include the Commission Job Number, project name, product identification, and subcontractor or vendor information, with any deviations from specification requirements requiring written justification.

Text of this file

SCOPE OF WORK

Batson Road Demolition and Construction General WSSC recently acquired the property at Batson Road bordering the T. Howard Duckett Reservoir. The site after it is restored shall be used for future WSSC plantings.

The Contractor will perform the following demolition services in accordance with the supporting specification documents that define the scope requirement:

Pump out, plug and remove oil tanks @ main house (recycle fuel oil)
Manually clean out structure; books and magazines; mattresses, clothing, furniture, food items, building materials, etc. Can be recycled or treated as general debris and disposed of at an approved MDE landfill.
Demolition of house based on attached site plan. Debris will be disposed of at an MDE approved landfill.
Erosion + sediment control; silt fence and stone construction entrance (installation and removal)
Septic tank backfill with approved permit
Well abandonment with approved permit
Asbestos removal (to include boiler abatement) with approved permit
Universal waste removal and disposal
TCLP lead testing - sampling @ debris stream
Grading, backfill (material from WSSC)
Seeding and mulch

Coordination Contractor shall notify the Watershed Section Manager at least two (2) working days prior to when the Contractor intends to commence work on-site.

Preservation of materials WSSC will install tree protection fence to delineate the limits of disturbance around these trees prior to the construction start date.

Public Utilities

The electric to be disconnected

Inspection The Watershed Manager and his assignees have the right to inspect all material and equipment at all stages of removal and shall be allowed access to the site. On-site work will be subject to continual inspection. Inspection by the Watershed Manager will not release Contractor from responsibility or liability for material or equipment.

Schedule Provide one baseline schedule that indicates start date, completion date and any ancillary items in between needed to complete this task order. Provide the schedule within 15 days after notice to proceed.

Submittals General: Submit each under separate cover with Commission Job Number; project name; Product Identification; Subcontractor's, Vendor's and/or Manufacturer's name, address, and phone number; and applicable Task Drawing(s). With each submission, furnish Engineer specific written notation and justification of each deviation from Specification requirements. Adobe Acrobat, AutoCAD, MS Excel, or MS Word format as appropriate.

Review and Approval Process: Watershed Section Manager will return submittal within 30 days. Submittals will be returned, marked with one of the following classifications:

INFORMATION ONLY: Copies of all required permits, i.e. demolition, electric disconnect, well abandonment, septic abandonment and asbestos abatement and removal.

Specification Requirements Contractor will perform services consistent with the following supporting documents that define the scope requirements:

In accordance with terms 1, 3 and 4 of the above referenced contract for Demolition Services.

The following is ordered:

Scope of work: Per the attached Scope of Work, the Contractor will perform demolition services located on WSSC property at 16616 Batson Road in Spencerville, MD.
Compensation shall be: Upset limit of: $. Compensation for these services will be through a lump sum method of payment.
Schedule: All permits are required within 6 months of NTP and all work shall be completed by 12 months after NTP

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .