Base Offer Price Breakdown - 1 page.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Z2DA--FY26: NRM (PROJ: 516-22-602) BB Install Alternate Connections for Steam and Chilled Water – Lee County
Solicitation number
36C24826Q0450
Issued by

About this file

This is a Base Offer Price Breakdown template for a federal construction project. The spreadsheet is designed for offerors to submit pricing for the Department of Veterans Affairs solicitation 36C24826Q0450, titled "BB Install Alternate Connections for Steam and Chilled Water – Lee County" (Project Number 516-22-602). The template requires offerors to itemize labor and material costs across 26 construction divisions, including General Requirements, Concrete, Masonry, Metals, Wood and Plastic, Thermal & Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, Utilities, and Transportation. Each division row requires separate labor cost and material cost entries, with automatic calculation of total division costs.

The template further requires offerors to calculate overhead as a percentage of total division costs, profit as a percentage of division costs plus overhead, and bond as a percentage of division costs plus overhead and profit. The total base offer cost is automatically computed as the sum of all divisions, overhead, profit, and bond. The solicitation, issued by the Department of Veterans Affairs Network Contracting Office on April 3, 2026, has a quote due date of May 11, 2026 at 1:00 PM EST. The project magnitude is between $1,000,000.00 and $2,000,000.00, and work will be performed at VAMC Cape Coral in Cape Coral, Florida. Offerors are instructed to provide detailed price breakdowns avoiding lump sum submissions, as this pricing template serves as the basis for government price analysis. A mandatory site visit is scheduled for April 15, 2026 at 11:00 AM EST, and offers must provide at least 120 calendar days for government acceptance.

View the file

Other files

File Type Posted
WD-FL20260211-DATED 05-18-2026.pdf PDF
36C24826Q0450 0003.docx DOCX document
36C24826Q0450 0002.docx DOCX document
Sign in Sheet 1 1.pdf PDF
36C24826Q0450 0001.docx DOCX document
WD-FL20260211 01-02-2026.pdf PDF
VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
PPQ -Request form.docx DOCX document
EMR 1 page.pdf PDF
Site Map Update.pdf PDF
DRAWINGS 516-22-602 Cape Coral Alt Steam.pdf PDF
36C24826Q0450_1.docx DOCX document
01 00 00 - GENERAL REQUIREMENTS.docx DOCX document
VA ICRA.pdf PDF
VA Handbook 6500.6 Appendix B.pdf PDF
516-22-602 - Cape Coral Alt Steam - Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number: N/A Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements
Division 2Existing Conditions- 0
Division 3Concrete- 0- 0
Division 4Masonry- 0
Division 5Metals- 0- 0
Division 6Wood and Plastic- 0
Division 7Thermal & Moisture Protect- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .