36C24826Q0450 0003.docx
DOCX document 76 KB Posted
- Solicitation number
- 36C24826Q0450
About this file
This is Amendment 0003 to Solicitation 36C24826Q0450, issued by the Department of Veterans Affairs Network Contracting Office 8 (NCO 8) in Tampa, Florida for a construction project at VAMC Cape Coral. The amendment extends the quote due date to July 21, 2026 at 1:00 PM EDT, provides responses to 17 Requests for Information (RFIs) submitted by prospective offerors, and includes an updated Davis-Bacon wage determination dated May 18, 2026. The project involves installing alternate connections for steam and chilled water systems to support temporary/mobile equipment at the Lee County Health Care Clinic without disrupting hospital operations, with an estimated project value between $1,000,000 and $2,000,000.
Key RFI responses clarify construction specifications and requirements, including: use of new chilled water taps per plans rather than existing drops; work hours of 0700–1700; Johnson Controls as the preferred vendor; Davis-Bacon welder pay rates assigned by craft (ironworker for structural steel, sheet metal worker for HVAC, plumber/pipefitter for piping); nondestructive testing of 50 percent of the first 10 welds and 10 percent of additional welds; requirement for a dedicated Safety and Health Official (SSHO) and submission of a contract-specific Quality Assurance/Quality Control plan within 30 days of Notice to Proceed; piping routing specifications (below pergola deck, under awnings); and clarification on ATS pad installation and gas piping dimensions (4 inches, 130 feet). The project is not tax-exempt and requires compliance with FAR Clause 52.229-3 and applicable Davis-Bacon wage determinations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD-FL20260211-DATED 05-18-2026.pdf | ||
| 36C24826Q0450 0002.docx | DOCX document | |
| Sign in Sheet 1 1.pdf | ||
| 36C24826Q0450 0001.docx | DOCX document | |
| PPQ -Request form.docx | DOCX document | |
| EMR 1 page.pdf | ||
| Site Map Update.pdf | ||
| DRAWINGS 516-22-602 Cape Coral Alt Steam.pdf | ||
| 36C24826Q0450_1.docx | DOCX document | |
| WD-FL20260211 01-02-2026.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf | ||
| 01 00 00 - GENERAL REQUIREMENTS.docx | DOCX document | |
| VA ICRA.pdf | ||
| VA Handbook 6500.6 Appendix B.pdf | ||
| 516-22-602 - Cape Coral Alt Steam - Specifications.pdf | ||
| Base Offer Price Breakdown - 1 page.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 516-22-602 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Tampa FL 33637 To all Offerors/Bidders
36C24826Q0450 04-03-2026
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 07-21-2026 1:00PM EDT PROJECT NAME: BB Install Alternate Connections for Steam and Chilled Water – Lee County
PROJECT NUMBER: 516-22-602
This amendment provide answer to RFIs; an updated Wage determination dated 05/18/2026
Quotes due date CHANGE TO: 07/21/2026 at 1:00PM
DAVID HERNANDEZ
CONTRACTING OFFICER
PROJECT TITLE: BB Install Alternate Connections for Steam and Chilled Water – Lee County.
PROJECT NUMBER: 516-22-602
LOCATION VAMC - Cape Coral 2489 Diplomat Pkwy E, Cape Coral, Fl 33909 This modification:
· CHANGE THE QUOTE DUE DATE TO 07/21/2026 AT 1:00PM EST.
· PROVIDE ANSWERS TO RFIs
· PROVIDES UPDATED WAGE DETERMINATION DATED 05/18/2026
| 1 |
| Can we use the existing 6” chilled water drops near the pumps instead of adding new taps? |
Sigma
| AE |
| Add new taps as shown on plans. |
| 2 |
| Are work hours regular time? |
Sigma
| VA Response |
| Yes. 0700-1700 are the range of hours. |
| 3 |
| The drawings show the chilled water pipe splitting the overhang outside, do we go below the outdoor roof structure? |
Sigma
| AE |
| Pipe is mounted below the overhang |
| 4 |
| Is Johnson Controls the preferred vendor? |
Sigma
| VA Response |
| Yes. |
| 5 |
| Can you please see if we can clarify the welder pay rate? |
Sigma
| VA Response |
| IAW Davis-Bacon Determinations:” WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental” on page 2 of the WD- FL20260211 05/18/2026 Example: |
Assign welders to the relevant craft line based on where the welding is applied:
Structural steel welding → Ironworker rate HVAC duct welding → Sheet Metal Worker rate Piping systems welding → Plumber or Pipefitter rate Include applicable fringe benefits listed for that craft in the WD.
| 6 |
| We need to know what percentage of pipe we are testing and by what procedure. Hydrostatic, Ultrasound, or Xray |
Sigma
| AE |
| Nondestructive testing of 50% of first 10 welds and 10% for all additional welds per specification 23 21 11. Hydrostatic test pressure of 1.5 times the design pressure |
| 7 |
| In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles? |
MCA
| VA Response |
| Projects needs a dedicated SSHO |
| 8. |
| Are contractors required to issue a contract specific QA/QC Plan? |
MCA
| VA Response |
| Yes, Submit the CQC Plan no later than CO or Designee to determine during Constructability review |
– 30 days after receipt of Notice to Proceed (NTP)
| 9 |
| Are contractors required to issue a contract specific Safety Plan? |
MCA
| VA Response |
| Yes, There will be safety plans. Check specs. |
| 10 |
| Is this project tax exempt? |
MCA
| VA Response |
| No, FAR Clause 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (DEVIATION) is included in the Solicitation |
| 11 |
| Per Drawing MP101 in Quadrant B-6 what is the dimension of the wall as an overhead coiling dooring protrudes out, so piping will be needed to be held off the wall? |
MCA
| AE |
| Coil door protrudes out approximately 16” |
| 12 |
| Per Drawing MP101 in Quadrant D-8 it shows the supply and return piping tying into the same pipe. Please advise. |
MCA
| AE |
| HHWS supply from temp boiler need to connect to HHWS from (e) boilers |
| 13 |
| Per Drawing M-301 in Quadrant B-4 please confirm if the CHWR Piping is to be run below the pergola deck. |
MCA
| AE |
| Yes, run piping below the deck. |
| 14 |
| Per Drawing EP102 in Quadrant C-7 is the ATS intended to go on the open space on the existing housekeeping pad? |
MCA
| AE |
| No, ATS is to be installed adjacent to the existing pad. Contractor to provide new pad for ATS in the location indicated. |
| 15 |
| Is the intent for the new ATS to be tied into the existing FA System? |
MCA
| AE |
| No, not intended to be tied into the Fire Alarm system. |
| 16 |
| What is the gas piping size and distance? |
ALPHA
| AE |
| New Gas piping is 4”, the distance is 130’ |
| 17 |
| The piping going through the exterior wall to the cooling tower yard, Is the piping going under the awning or over the awning. If over, how will it be they be supported on the top of the awning, roof stands? If under, how would you |
ALPHA
| AE |
| Piping goes under the awning. For supports see section 4 on sheet S-301 for supports. |
See attached document: WD-FL20260211-DATED 05-18-2026.
image1.png