Base_Camp_Spreadsheet_500-1000_person.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- 2026-2027 Storm Response Services-Base Camp
- Solicitation number
- 2026-04
- Issued by
- Florida
About this file
This is a base camp pricing spreadsheet for 2026-2027 Storm Response Services in Florida, developed for the Coastal Florida Environmental Consortium (CFEC) to support disaster recovery operations. The document provides comprehensive pricing structures for establishing and maintaining turn-key base camp operations in storm-impacted areas throughout the CFEC jurisdiction. The spreadsheet includes three distinct base camp configurations sized for 500, 800, and 1,000 personnel, each with detailed line-item pricing for one-week and two-week deployment periods. The scope encompasses complete base camp logistics including sleeping facilities, dining operations, sanitation systems, water distribution, laundry facilities, waste management, personnel support, electrical infrastructure, and site management services.
The pricing structure breaks down all base camp components into individual line items with separate costs for equipment, mobilization, demobilization, delivery/pickup, and operational expenses. Major service categories include sleep trailers and tents with air conditioning and generators, catering services with food costs, sanitation facilities (portable toilets and restroom trailers), water systems (fresh water tankers and pressure systems), gray water management, laundry operations, shower facilities, lighting towers, dumpster services, ice provision, and on-site labor for site managers, electricians, and plumbers. Multiple line items are marked as "TBD" (to be determined), indicating that pricing for generator usage, propane tanks, and certain operational costs will be finalized during contract negotiation. The spreadsheet includes subtotal calculations for each major service category and grand totals with sales tax application, providing a flexible framework for bidders to submit comprehensive pricing proposals based on specific deployment scenarios and personnel requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-2027_Base_Camp_Services_RFP.pdf | ||
| 2026-2027_Base_Camp_Services_RFP.pdf | ||
| Base_Camp_Spreadsheet_500-1000_person.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
500 Person
| Base Camp Pricing | |||
| Categories | Quantity | One Week | Two Weeks |
| Sleep trailers | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Distribution System Junction Box | |||
| Mobilization | |||
| Demobilization |
| Sleep Tent (including lighting), 80X160 | |||
| Sidewall for tent | |||
| Raised flooring for tent | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| AC for Tent | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Cots | |||
| Set up | |||
| Take down | |||
| Cot trailer | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Linens | |||
| Price per bag | |||
| Linen Trailer |
Sub Total
| Dining Tent (including lighting) | |||
| Sidewall for tent | |||
| Raised flooring | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| AC for Tent | |||
| Mobilization | |||
| Demobilization | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Furniture | |||
| Tables | |||
| Chairs | |||
| Mobilization | |||
| Demobilization |
| Catering Service (doesn’t include the food cost) | |||
| Breakfast Catering | |||
| Box Lunch | |||
| Breakfast Dinner | |||
| Food Cost (all food needed for the site) | |||
| Mobilization-Caterer | |||
| Demobilization-Caterer | |||
| Delivery/Pick up-Caterer | |||
| Generator usage | TBD | TBD | TBD |
| Generator usage | TBD | TBD | TBD |
| Propane Tank | |||
| Refrigerated Trailers | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Snack Trailer | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Gray Water Holding Tanks Camper | |||
| Mobilization | |||
| Demobilization | |||
| Service of tanks |
Sub Total
| Laundry Facility-Washers & Dryers | |||
| Tent-20X40 | |||
| Sidewall for total tents | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Tables | |||
| Chairs | |||
| Genertor usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Propane Tank | |||
| Soap | |||
| Laundry Personnel | |||
| Support Campers for Labor | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Support Vehicle-all pickup & cars per day | |||
| Bladder Bag | |||
| Gray/Black Water Pressure System | |||
| Mobilization | |||
| Demobilization |
Sub Total
| Showers | |||
| Daily Cleaning-Labor | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Shave stations | |||
| Towels | |||
| Washcloths | |||
| Propane tank | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Bladder Bag | |||
| Mobilization | |||
| Demobilization | |||
| Gray Water Removal Pumper Truck | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Gray Water Disposal-includes truck & driver | |||
| Fresh Water Pressure System | |||
| Mobilization | |||
| Demobilization | |||
| Gray/Black Water Pressure System | |||
| Mobilization | |||
| Demobilization | |||
| Fresh Water Tanker | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Sanitation | |||
| Portable Toilets-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Handwash Station-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Restroom Trailer-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Service of tanks |
Sub Total
| Dumpster |
| Mobilization |
| Demobilization |
| Roll Off Dumpster Disposal Fee Landfill Pull Charge |
| Roll Off Dumpster Truck |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Ice (truckload) |
| Bags of ice per pound |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Pallet Charge |
| Refrigerated Trailers |
| Light Towers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
Sub Total
Miscellaneous
| Labor at Site |
| Site Manager |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Electrician |
| Mobilization |
| Demobilization |
| Freight |
| Support Truck-Electrician |
| Plumbers |
| Mobilization |
| Demobilization |
| Freight |
| Support Truck-Electrician |
| RV/Office for Site Managers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Support Campers for Labor |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Support Sleep Trailers for Labor |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Distribution System Junction Box |
| Support Equipment Trailers |
| Mobilization |
| Demobilization |
| Part Supply Trailers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Safety Package |
| Orange cones, drope cable protectors, triangle barriers |
| Mobilization |
| Demobilization |
Sub Total
Grand Sub Total
Sales Tax
Grand Total
800 Person
| Base Camp Pricing | |||
| Categories | Quantity | One Week | Two Weeks |
| Sleep trailers | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Distribution System Junction Box | |||
| Mobilization | |||
| Demobilization |
| Sleep Tent (including lighting), 80X160 | |||
| Sidewall for tent | |||
| Raised flooring for tent | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| AC for Tent | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Cots | |||
| Set up | |||
| Take down | |||
| Cot trailer | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Linens | |||
| Price per bag | |||
| Linen Trailer |
Sub Total
| Dining Tent (including lighting) | |||
| Sidewall for tent | |||
| Raised flooring | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| AC for Tent | |||
| Mobilization | |||
| Demobilization | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Furniture | |||
| Tables | |||
| Chairs | |||
| Mobilization | |||
| Demobilization |
| Catering Service (doesn’t include the food cost) | |||
| Breakfast Catering | |||
| Box Lunch | |||
| Breakfast Dinner | |||
| Food Cost (all food needed for the site) | |||
| Mobilization-Caterer | |||
| Demobilization-Caterer | |||
| Delivery/Pick up-Caterer | |||
| Generator usage | TBD | TBD | TBD |
| Generator usage | TBD | TBD | TBD |
| Propane Tank | |||
| Refrigerated Trailers | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Snack Trailer | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Gray Water Holding Tanks Camper | |||
| Mobilization | |||
| Demobilization | |||
| Service of tanks |
Sub Total
| Laundry Facility-Washers & Dryers | |||
| Tent-20X40 | |||
| Sidewall for total tents | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Tables | |||
| Chairs | |||
| Genertor usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Propane Tank | |||
| Soap | |||
| Laundry Personnel | |||
| Support Campers for Labor | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Support Vehicle-all pickup & cars per day | |||
| Bladder Bag | |||
| Gray/Black Water Pressure System | |||
| Mobilization | |||
| Demobilization |
Sub Total
| Showers | |||
| Daily Cleaning-Labor | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Shave stations | |||
| Towels | |||
| Washcloths | |||
| Propane tank | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Bladder Bag | |||
| Mobilization | |||
| Demobilization | |||
| Gray Water Removal Pumper Truck | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Gray Water Disposal-includes truck & driver | |||
| Fresh Water Pressure System | |||
| Mobilization | |||
| Demobilization | |||
| Gray/Black Water Pressure System | |||
| Mobilization | |||
| Demobilization | |||
| Fresh Water Tanker | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Sanitation | |||
| Portable Toilets-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Handwash Station-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Restroom Trailer-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Service of tanks |
Sub Total
| Dumpster |
| Mobilization |
| Demobilization |
| Roll Off Dumpster Disposal Fee Landfill Pull Charge |
| Roll Off Dumpster Truck |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Ice (truckload) |
| Bags of ice per pound |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Pallet Charge |
| Refrigerated Trailers |
| Light Towers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
Sub Total
Miscellaneous
| Labor at Site |
| Site Manager |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Electrician |
| Mobilization |
| Demobilization |
| Freight |
| Support Truck-Electrician |
| Plumbers |
| Mobilization |
| Demobilization |
| Freight |
| Support Truck-Electrician |
| RV/Office for Site Managers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Support Campers for Labor |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Support Sleep Trailers for Labor |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Distribution System Junction Box |
| Support Equipment Trailers |
| Mobilization |
| Demobilization |
| Part Supply Trailers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Safety Package |
| Orange cones, drope cable protectors, triangle barriers |
| Mobilization |
| Demobilization |
Sub Total
Grand Sub Total
Sales Tax
Grand Total
1000 Person
| Base Camp Pricing | |||
| Categories | Quantity | One Week | Two Weeks |
| Sleep trailers | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Distribution System Junction Box | |||
| Mobilization | |||
| Demobilization |
| Sleep Tent (including lighting), 80X160 | |||
| Sidewall for tent | |||
| Raised flooring for tent | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| AC for Tent | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Cots | |||
| Set up | |||
| Take down | |||
| Cot trailer | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Linens | |||
| Price per bag | |||
| Linen Trailer |
Sub Total
| Dining Tent (including lighting) | |||
| Sidewall for tent | |||
| Raised flooring | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| AC for Tent | |||
| Mobilization | |||
| Demobilization | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Furniture | |||
| Tables | |||
| Chairs | |||
| Mobilization | |||
| Demobilization |
| Catering Service (doesn’t include the food cost) | |||
| Breakfast Catering | |||
| Box Lunch | |||
| Breakfast Dinner | |||
| Food Cost (all food needed for the site) | |||
| Mobilization-Caterer | |||
| Demobilization-Caterer | |||
| Delivery/Pick up-Caterer | |||
| Generator usage | TBD | TBD | TBD |
| Generator usage | TBD | TBD | TBD |
| Propane Tank | |||
| Refrigerated Trailers | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Snack Trailer | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Gray Water Holding Tanks Camper | |||
| Mobilization | |||
| Demobilization | |||
| Service of tanks |
Sub Total
| Laundry Facility-Washers & Dryers | |||
| Tent-20X40 | |||
| Sidewall for total tents | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Tables | |||
| Chairs | |||
| Genertor usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Propane Tank | |||
| Soap | |||
| Laundry Personnel | |||
| Support Campers for Labor | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Support Vehicle-all pickup & cars per day | |||
| Bladder Bag | |||
| Gray/Black Water Pressure System | |||
| Mobilization | |||
| Demobilization |
Sub Total
| Showers | |||
| Daily Cleaning-Labor | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Shave stations | |||
| Towels | |||
| Washcloths | |||
| Propane tank | |||
| Generator usage | TBD | TBD | TBD |
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Bladder Bag | |||
| Mobilization | |||
| Demobilization | |||
| Gray Water Removal Pumper Truck | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Gray Water Disposal-includes truck & driver | |||
| Fresh Water Pressure System | |||
| Mobilization | |||
| Demobilization | |||
| Gray/Black Water Pressure System | |||
| Mobilization | |||
| Demobilization | |||
| Fresh Water Tanker | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Sanitation | |||
| Portable Toilets-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Handwash Station-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Restroom Trailer-includes service | |||
| Mobilization | |||
| Demobilization | |||
| Delivery/Pick up | |||
| Service of tanks |
Sub Total
| Dumpster |
| Mobilization |
| Demobilization |
| Roll Off Dumpster Disposal Fee Landfill Pull Charge |
| Roll Off Dumpster Truck |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Ice (truckload) |
| Bags of ice per pound |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Pallet Charge |
| Refrigerated Trailers |
| Light Towers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
Sub Total
Miscellaneous
| Labor at Site |
| Site Manager |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Electrician |
| Mobilization |
| Demobilization |
| Freight |
| Support Truck-Electrician |
| Plumbers |
| Mobilization |
| Demobilization |
| Freight |
| Support Truck-Electrician |
| RV/Office for Site Managers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Support Campers for Labor |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Support Sleep Trailers for Labor |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Distribution System Junction Box |
| Support Equipment Trailers |
| Mobilization |
| Demobilization |
| Part Supply Trailers |
| Mobilization |
| Demobilization |
| Delivery/Pick up |
| Safety Package |
| Orange cones, drope cable protectors, triangle barriers |
| Mobilization |
| Demobilization |
Sub Total
Grand Sub Total
Sales Tax
Grand Total
File details come from the government source that posted it. Updated .