FA9300-14-C-0005.pdf

PDF 6 MB Posted

Attached to
BAA - Motor Aging and Surveillance Technology Development and Demonstration Federal contract opportunity
Solicitation number
BAA-RQR-2014-0002
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to BAA - Motor Aging and Surveillance Technology Development and Demonstration, newest first.
File Type Posted
MAST_Call_3_Industry_Day_Questions_and_Answers_for_FBO_5_Jun_17.pdf PDF
MAST_CALL_3_Preliminary_April_2017_PA17208.pdf PDF
MAST_BAA_Call_3_Questions_for_Release.pdf PDF
Industry_Day_Letter.pdf PDF
Q A_2.pdf PDF
Q A_1.pdf PDF
MAST_CALL_2_Final_PA_15286_June_2015_Amendment_1.pdf PDF
MAST_CALL_2_Final_PA_15286_June_2015.pdf PDF
MAST_Ansi-Based_Format_Guidelines.pdf PDF
CDRLs.pdf PDF
Model.pdf PDF
MAST_Call_2_Industry_Day_Q As.pdf PDF
Industry_Day_Announcement.pdf PDF
MAST_DRAFT_CALL_2_PA15048_February_2015.pdf PDF
MAST_BAA_Amendment_1.pdf PDF
Administrative_QandA_posted_03_JUN_14.pdf PDF
Administrative_QandA_posted_30MAY14.docx DOCX document
Section_K_Reps_and_Certs_FA9300-14-C-0005.pdf PDF
1_MAST_BAA_with_Calls_-_v8.1-amendment_2.docx DOCX document
MAST_Q A_.pdf PDF
1_MAST_Model_Contract_-amendment_1.pdf PDF
1_MAST_BAA_with_Calls_-_v8.1-amendment_1.docx DOCX document
MAST_BAA_with_Calls.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MODEL CONTRACT-

CALL 1

AWARD / CONTRACT

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING

DO-A2

PAGE of PAGES

1 20

2. CONTRACT (PROC. INST. IDENT.) NO. 3. EFFECTIVE DATE 4. REQUISITION / PURCHASE REQUEST / PROJECT NO.

FA9300-14-C-0005 See Section G

5. ISSUED BY AFTC/PZRA CODE FA9300 6. ADMINISTERED BY (IF OTHER THAN ITEM 5) CODE FA9300

DIRECTORATE OF CONTRACTING

5 SOUTH WOLFE AVE, BLDG 2800

EDWARDS AFB CA 93524-1185

CYNTHIA J. RANDALL 661-277-3986

cynthia.randall@edwards.af.mil

AFTC/PZR

DIRECTORATE OF CONTRACTING

5 SOUTH WOLFE AVE. BLDG. 2800

EDWARDS AFB, CA 93524-1185

SCD: C PAS: (NONE)

7. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, CITY, COUNTY, STATE AND ZIP CODE)

8. DELIVERY

FOB Origin Other (see below)

9. DISCOUNT FOR PROMPT PAYMENT

N

10. SUBMIT INVOICES

(4 COPIES UNLESS OTHERWISE

SPECIFIED) TO

ITEM

See Block

12 CAGE CODE FACILITY CODE THE ADDRESS SHOWN IN

11. SHIP TO / MARK FOR CODE 12. PAYMENT WILL BE MADE BY CODE F03000

See Section F

DFAS-COLUMBUS

DFAS-JAIQB/CO

3990 EAST BROAD STREET

BLD 21

COLUMBUS, OH 43213-1152

EFT: T

13. AUTHORITY FOR OTHER THAN FULL AND OPEN COMPETITION 14. ACCOUNTING AND APPROPRIATION DATA

15A. ITEM NO 15B. SUPPLIES/SERVICES 15C. QUANTITY 15D. UNIT 15E. UNIT PRICE 15F. AMOUNT

See Section B

15G. TOTAL AMOUNT OF CONTRACT

$15,000.00

16. Table of Contents

SEC DESCRIPTION PAGE(S) SEC DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES 13

B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS & ATTACHMENTS

C DESCRIPTION/SPECS./WORK STATEMENT 5 J LIST OF ATTACHMENTS 20

D PACKAGING AND MARKING 6 PART IV - REPRESENTATIONS AND INSTRUCTIONS

E INSPECTION AND ACCEPTANCE 7 K REPRESENTATIONS, CERTIFICATIONS

AND

F DELIVERIES OR PERFORMANCE 8 OTHER STATEMENTS OF OFFERORS

G CONTRACT ADMINISTRATION DATA 10 L INSTRS., CONDS., AND NOTICES TO

OFFERORS

H SPECIAL CONTRACT REQUIREMENTS 12 M EVALUATION FACTORS FOR AWARD

CONTRACTING OFFICER WILL COMPLETE ITEM 17 OR 18 AS APPLICABLE

17. Contractor’s Negotiated Agreement 18. Award (Contractor is not required to sign this document).

(Contractor is required to sign this document and return 1 copies to issuing office).

Contractor agrees to furnish and deliver all items or perform all services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)

Your offer on solicitation number including the additions or changes made by you which additions or changes set forth in full above, is hereby accepted as to items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your offer, and (b) this award/contract. No further contractual document is necessary.

19A. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 20A. NAME OF CONTRACTING OFFICER

19B. Name of Contractor 19C. Date Signed 20B. United States of America

20C. Date Signed by _________________________________ (signature of person authorized to sign) by ____________________________________ (signature of Contracting Officer)

NSN 7540-01-152-8069 STANDARD FORM 26 (Rev 4-85) Previous Editions unusable Prescribed by GSA FAR (48 CFR) 53.214(a) ConWrite Version 6.14.0 Created 22 Apr 2014 3:04 PM

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION B FA9300-14-C-0005

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

Noun: CALL 1 Descriptive Data:

The contractor shall accomplish the work in accordance with Motor Aging & Surveillance Technology (MAST) 1.1 Physics-Based Models and 1.2 Analysis for Embedded Sensor Flaw Detection, Statement of Objectives, dated 18 MAR 2014 as described in Attachments 1 and 2.

0001AA

U Noun: 1.1 PHYSICS-BASED MODELS Contract type: J - FIRM FIXED PRICE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:

The contractor shall accomplish the work in accordance with Motor Aging & Surveillance Technology (MAST) 1.1 Physics-Based Models, Statement of Objectives, dated 18 MAR 2014 as described in Attachment 1.

0001AB

U Noun: 1.2 ANALYSIS OF EMBEDDED SENSOR FLAW DETECTION Contract type: J - FIRM FIXED PRICE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:

The contractor shall accomplish the work in accordance with Motor Aging & Surveillance Technology (MAST) 1.2 Analysis of Embedded Sensor Flaw Detection, Statement of Objectives, dated 18 MAR 2014 as described in Attachment 2.

NSP

Noun: RESIDUAL HARDWARE DD1423 is Exhibit: B Contract type: J - FIRM FIXED PRICE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:

The contractor shall furnish data in accordance with Exhibit B, Contract Data

Requirements List (CDRL), DD Form 1423, CDRL Item B002. The price of this item is included in CLIN 0001.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

NSP

Noun: SOFTWARE Contract type: J - FIRM FIXED PRICE Start Date: ASREQ Completion Date: ASREQ Descriptive Data:

The contractor shall furnish data in accordance with Exhibit B, Contract Data Requirements List (CDRL), DD Form 1423, CDRL Item B003. The price of this item is included in CLIN 0001.

0004 1 NSP

Lot NSP Noun: EXHIBIT A NSN: N - Not Applicable DD1423 is Exhibit: A Contract type: U - COST PLUS FIXED FEE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

The contractor shall furnish data in accordance with Contract Data Requirements List (CDRL), DD Form 1423-1, Exhibit A, Items A001 through A006, attached hereto. The price of this item is included in CLIN 0001.

0005 1 EST $15,000.00

Each EST $15,000.00 Noun: FINAL REPORT NSN: N - Not Applicable DD1423 is Exhibit: B Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

The contractor shall furnish data in accordance with Contract Data Requirements List (CDRL), DD Form 1423-1, Exhibit A, Items B001, attached hereto.

0006 1 NSP

Lot NSP Noun: EXHIBIT B NSN: N - Not Applicable DD1423 is Exhibit: B Contract type: U - COST PLUS FIXED FEE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

The contractor shall furnish data in accordance with Contract Data Requirements List (CDRL), DD Form 1423-1, Exhibit B, Items B001 through B003, attached hereto. The price of this item is included in CLIN 0001.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

B054 IMPLEMENTATION OF LIMITATION OF FUNDS (DEC 2005) (TAILORED)

Pursuant to the clause FAR 52.232-22 in Section I, entitled, "Limitation of Funds", the total amount available for payment and allotted to this contract for CLIN 0001 and 0002 is TBD. It is estimated that this amount is sufficient to cover performance through TBD.

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

B058 CONTRACT TYPE: COST-PLUS-FIXED-FEE (DEC 2005)

The estimated cost and fee for this contract are shown below. The applicable fixed fee set forth below may be increased or decreased only by negotiation and modification of the contract for added or deleted work. As determined by the contracting officer, it shall be paid as it accrues, in regular installments based upon the percentage of completion of work (or the expiration of the agreed-upon period(s) for term contracts).

Estimated Cost TBD Fixed Fee TBD Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

SECTION C - DESCRIPTION/SPECS./WORK STATEMENT

SECTION C FA9300-14-C-0005

NO CLAUSES OR PROVISIONS IN THIS SECTION

SECTION D - PACKAGING AND MARKING

SECTION D FA9300-14-C-0005

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

D002 PACKAGING AND MARKING (AUG 2005) (TAILORED)

(a) All hardware deliverable contract items shall be packaged in accordance with established commercial practices.

(b) All hardware, software, equipment or systems are to be initially delivered to:

SHIP TO: AFRL/RQRM

4 Draco Drive Edwards AFB, CA 93524 Phone: 661-275-5004 E-mail: erik.weber@us.af.mil Marked for: FA9300-14-C-0005

(c) When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters:

INSTRUCTION TO RECEIVING OFFICE - DO NOT OPEN;

CONTENTS ARE SENSITIVE TO DAMAGE WHEN IMPROPERLY OPENED OR

HANDLED.

CONTACT THE RESPONSIBLE TECHNICAL PROJECT OFFICER IMMEDIATELY UPON

RECEIPT.

CONTACT: AFRL/RQRM

ATTN: Dr. Erik Weber 4 Draco Drive Edwards AFB, CA 93524 Phone: 661-275-5004 E-mail: erik.weber@us.af.mil Marked for: FA9300-14-C-0005

SECTION E - INSPECTION AND ACCEPTANCE

SECTION E FA9300-14-C-0005

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.246-07 INSPECTION OF RESEARCH AND DEVELOPMENT -- FIXED-PRICE (AUG 1996)

Applies to Firm-Fixed-Price CLIN(s) only.

52.246-08 INSPECTION OF RESEARCH AND DEVELOPMENT -- COST-REIMBURSEMENT

(MAY 2001)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

Applies to Firm-Fixed-Price CLIN(s) only.

B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

SECTION F - DELIVERIES OR PERFORMANCE

SECTION F FA9300-14-C-0005

SHIP MARK TRANS

ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE

0004 1 F1SRQR F1SRQR ASREQ

Noun: EXHIBIT A

0005 1 F1SRQR F1SRQR ASREQ

Noun: FINAL REPORT

0006 1 F1SRQR F1SRQR ASREQ

Noun: EXHIBIT B

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.211-11 LIQUIDATED DAMAGES -- SUPPLIES, SERVICES, OR RESEARCH AND

DEVELOPMENT (SEP 2000)

Para (a), Liquidated damages per calendar day. 'TBD' Applies to Firm-Fixed-Price CLIN(s) only.

52.242-15 STOP-WORK ORDER (AUG 1989)

Applies to Firm-Fixed-Price CLIN(s) only.

52.242-15 STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984)

52.247-34 F.O.B. DESTINATION (NOV 1991)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

F002 PERIOD OF PERFORMANCE (FEB 1997)

Period of performance under this contract shall be from TBD to TBD.

F005 DELIVERY OF REPORTS (OCT 1998) (TAILORED)

(a) All data shall be delivered in accordance with the delivery schedule shown on the Contract Data Requirements List, attachments, or as incorporated by reference.

(b) All reports and correspondence submitted under this contract shall include the contract number FA9300-14-C-0005 and be forwarded prepaid. All address(es) and code(s) for consignee(s) are as follows:

AFRL/RQRM, Attn: Dr. Erik Weber, 4 Draco Drive, Edwards AFB, CA 93524

SECTION F - DELIVERIES OR PERFORMANCE

SECTION F FA9300-14-C-0005

AFRL/RZOI (STINFO Office), Attn: Deborah Spotts, 5 Pollux Drive, Edwards AFB, CA 93524 (Distribution of Final Report Only)

AFTC/PZR, Attn: Cynthia Randall, 5 Sourth Wolfe Avenue, Edwards AFB, CA 93524 (Letter Only Notification for Final Report)

DCMA, TBD

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION G FA9300-14-C-0005

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

A. DEFENSE FAR SUPP CONTRACT CLAUSES IN FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause-

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

Cost Voucher.

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Not applicable

SECTION G - CONTRACT ADMINISTRATION DATA

SECTION G FA9300-14-C-0005

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD Issue By DoDAAC TBD Admin DoDAAC TBD Inspect By DoDAAC F1SRQR Ship To Code TBD Ship From Code TBD Mark For Code None Service Approver (DoDAAC) TBD Service Acceptor (DoDAAC) F1SRQR Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC TBD Other DoDAAC(s) TBD

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Erik.Weber@us.af.mil Nicole.Mckeon@us.af.mil

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Kelly Kayser, kelly.kayser@us.af.mil, 661-277-8356

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

B. OTHER CONTRACT CLAUSES IN FULL TEXT

G005 PAYMENT INSTRUCTIONS FOR MULTIPLE ACCOUNTING CLASSIFICATION CITATIONS

(MAR 2001) (TAILORED)

252.204-0012 OTHER (SEP 2009)

The payment office shall make payment from each ACRN in accordance with the amounts invoiced by CLIN/SLIN/ACRN as referenced on the contractor's invoice in Wide Area Workflow (WAWF).

This requirement includes support for multiple programs with independent budgets and funding lines.

These funding lines are NOT interchangeable and it is critical that the Paying Office pay in accordance with the ACRNs and SLINs noted on the contractor's invoices. To do otherwise could result in a misappropriation of funds.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

SECTION H FA9300-14-C-0005

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

H025 INCORPORATION OF SECTION K (OCT 1998)

Section K of the solicitation is hereby incorporated by reference.

H028 IMPLEMENTATION OF DISCLOSURE OF INFORMATION (AUG 2013) (TAILORED)

To comply with DFARS 252.204-7000, Disclosure of Information, the contractor should submit two copies of the information to be released to the Air Force Program Manager at least 10 days prior to the scheduled release date.

The TBD (insert appropriate office symbol) is hereby designated as the approval authority for the Contracting Officer.

H033 PRINCIPAL INVESTIGATOR (MAR 2006)

The TBD Principal Investigator(s) for this effort is(are) TBD. No substitution shall be made without the prior written approval of the Air Force Procuring Contracting Officer (PCO).

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

SECTION I FA9300-14-C-0005

Contract Clauses in this section are from the FAR, Defense FAR Sup, Air Force FAR Sup, and the Air Force Materiel Command FAR Sup, and are current through the following updates:

Database_Version: 6.14.x.1700; Issued: 3/18/2014; FAR: FAC 2005-72; DFAR: DPN 20140311; DL.: DL 98- 021; Class Deviations: CD 2014-O0012; AFFAR: 2002 Edition; AFAC: AFAC 2013-0827; IPN: 98-009

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.202-01 DEFINITIONS (NOV 2013)

52.203-03 GRATUITIES (APR 1984)

52.203-05 COVENANT AGAINST CONTINGENT FEES (APR 1984)

52.203-06 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

52.203-07 ANTI-KICKBACK PROCEDURES (OCT 2010)

52.203-08 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (JAN 1997)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST (DEC 2011)

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO

INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)

52.204-04 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT

PAPER (MAY 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUL 2013)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)

52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(AUG 2013)

52.209-09 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (JUL 2013)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(MAY 2012)

52.210-01 MARKET RESEARCH (APR 2011)

52.211-05 MATERIAL REQUIREMENTS (AUG 2000)

52.215-02 AUDIT AND RECORDS -- NEGOTIATION (OCT 2010)

52.215-08 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (AUG

2011)

52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT 2010)

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.216-07 ALLOWABLE COST AND PAYMENT (JUN 2013)

52.216-08 FIXED FEE (JUN 2011)

52.219-07 NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE (JUN 2003)

52.219-08 UTILIZATION OF SMALL BUSINESS CONCERNS (JUL 2013)

52.219-09 SMALL BUSINESS SUBCONTRACTING PLAN (JUL 2013) - ALTERNATE II (OCT

2001)

52.219-16 LIQUIDATED DAMAGES -- SUBCONTRACTING PLAN (JAN 1999)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

52.222-02 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

Para (a), Dollar amount is 'TBD' Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.222-03 CONVICT LABOR (JUN 2003)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)

52.222-26 EQUAL OPPORTUNITY (MAR 2007)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (SEP 2010)

52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)

52.222-37 EMPLOYMENT REPORTS ON VETERANS (SEP 2010)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS

ACT (DEC 2010)

52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)

52.223-06 DRUG-FREE WORKPLACE (MAY 2001)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (AUG 2011)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

52.227-01 AUTHORIZATION AND CONSENT (DEC 2007) - ALTERNATE I (APR 1984)

52.227-02 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (DEC 2007)

52.228-07 INSURANCE -- LIABILITY TO THIRD PERSONS (MAR 1996)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.229-03 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

Applies to Firm-Fixed-Price CLIN(s) only.

52.230-02 COST ACCOUNTING STANDARDS (MAY 2012)

52.230-06 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)

52.232-02 PAYMENTS UNDER FIXED-PRICE RESEARCH AND DEVELOPMENT CONTRACTS

(APR 1984)

Applies to Firm-Fixed-Price CLIN(s) only.

52.232-09 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

52.232-17 INTEREST (OCT 2010)

52.232-22 LIMITATION OF FUNDS (APR 1984)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986) - ALTERNATE I (APR 1984)

52.232-25 PROMPT PAYMENT (JUL 2013)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD

MANAGEMENT (JUL 2013)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

52.233-01 DISPUTES (JUL 2002)

52.233-03 PROTEST AFTER AWARD (AUG 1996)

Applies to Firm-Fixed-Price CLIN(s) only.

52.233-03 PROTEST AFTER AWARD (AUG 1996) - ALTERNATE I (JUN 1985)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.242-01 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.242-03 PENALTIES FOR UNALLOWABLE COSTS (MAY 2001)

52.242-04 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

52.242-13 BANKRUPTCY (JUL 1995)

52.243-01 CHANGES -- FIXED-PRICE (AUG 1987) - ALTERNATE V (APR 1984)

Applies to Firm-Fixed-Price CLIN(s) only.

52.243-02 CHANGES -- COST-REIMBURSEMENT (AUG 1987) - ALTERNATE V (APR 1984)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.243-06 CHANGE ORDER ACCOUNTING (APR 1984)

52.243-07 NOTIFICATION OF CHANGES (APR 1984)

Para (b), Number of calendar days is (insert 30 for RDSS/C) '30 days' Para (d), Number of calendar days is (insert 30 for RDSS/C) '30 days'

52.244-02 SUBCONTRACTS (OCT 2010)

Para (d), approval required on subcontracts: 'TBD' Para (j), Insert subcontracts evaluated during negotiations. 'TBD' Applies to Firm-Fixed-Price CLIN(s) only.

52.244-02 SUBCONTRACTS (OCT 2010) - ALTERNATE I (JUN 2007)

Para (d), Contractor shall obtain the Contracting Officer's written consent before placing the following subcontracts: 'TBD' Para (j), the following subcontracts which were evaluated during negotiations: 'TBD' Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.244-05 COMPETITION IN SUBCONTRACTING (DEC 1996)

52.244-06 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2013)

52.245-01 GOVERNMENT PROPERTY (APR 2012)

52.245-01 GOVERNMENT PROPERTY (APR 2012) - ALTERNATE I (APR 2012)

Applies to Firm-Fixed-Price CLIN(s) only.

52.245-09 USE AND CHARGES (APR 2012)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.246-23 LIMITATION OF LIABILITY (FEB 1997)

52.247-01 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.249-02 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR

2012) Applies to Firm-Fixed-Price CLIN(s) only.

52.249-06 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.249-09 DEFAULT (FIXED-PRICE RESEARCH AND DEVELOPMENT) (APR 1984)

Applies to Firm-Fixed-Price CLIN(s) only.

52.249-14 EXCUSABLE DELAYS (APR 1984)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

52.253-01 COMPUTER GENERATED FORMS (JAN 1991)

B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-

CONTRACT-RELATED FELONIES (DEC 2008)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP

2013)

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

252.203-7004 DISPLAY OF FRAUD HOTLINE POSTER(S) (DEC 2012)

Para (b)(2). C.O. enters contact information.

'http://www.oig.dhs.gov/assets/Hotline/DHS_OIG_Hotline-optimized.jpg'

252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013)

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

252.204-7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION

(NOV 2013)

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC

1991)

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A TERRORIST COUNTRY (DEC 2006)

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (DEC 2013)

Para (c)(1)(i). Line Item exceptions or n/a. 'TBD' Para (c)(1)(ii). If items are identified in the Schedule, insert "See Schedule" 'TBD' Para (c)(1)(iii). Attachment Nr. 'TBD' Para (c)(1)(iv). Attachment Nr. 'TBD' Para (f)(2)(iii). Line item number or n/a. 'TBD'

252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)

252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS (SEP 2010)

252.215-7000 PRICING ADJUSTMENTS (DEC 2012)

252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)

252.216-7009 ALLOWABILITY OF LEGAL COSTS INCURRED IN CONNECTION WITH A

WHISTLEBLOWER PROCEEDING (SEP 2013)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS) (AUG 2012) -

ALTERNATE I (OCT 2010)

252.223-7001 HAZARD WARNING LABELS (DEC 1991)

252.223-7002 SAFETY PRECAUTIONS FOR AMMUNITION AND EXPLOSIVES (MAY 1994)

252.223-7003 CHANGE IN PLACE OF PERFORMANCE -- AMMUNITION AND EXPLOSIVES (DEC

1991)

252.225-7008 RESTRICTION ON ACQUISITION OF SPECIALTY METALS (MAR 2013)

252.225-7009 RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES CONTAINING SPECIALTY

METALS (JUN 2013)

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)

252.225-7030 RESTRICTION ON ACQUISITION OF CARBON, ALLOY, AND ARMOR STEEL PLATE

(DEC 2006)

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)

252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS (JUN 2013)

252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL

COMPUTER SOFTWARE DOCUMENTATION (MAY 2013)

252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2011)

252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT (MAR 2000)

252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA (JUN 2013)

252.227-7038 PATENT RIGHTS--OWNERSHIP BY THE CONTRACTOR (LARGE BUSINESS) (JUN

2012)

252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(JUN 2012)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

252.235-7010 ACKNOWLEDGMENT OF SUPPORT AND DISCLAIMER (MAY 1995)

Para (a), name of contracting agency(ies): 'United States Air Force' Para (a), contract number(s): 'FA9300-14-C-0005' Para (b), name of contracting agency(ies): 'United States Air Force'

252.235-7011 FINAL SCIENTIFIC OR TECHNICAL REPORT (NOV 2004)

252.239-7018 SUPPLY CHAIN RISK (NOV 2013)

252.242-7005 CONTRACTOR BUSINESS SYSTEMS (FEB 2012)

252.242-7006 ACCOUNTING SYSTEM ADMINISTRATION (FEB 2012)

Applies to Cost-Plus-Fixed-Fee CLIN(s) only.

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

Applies to Firm-Fixed-Price CLIN(s) only.

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

252.244-7001 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION (JUN 2012)

252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY

(APR 2012)

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (APR 2012)

252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)

252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (MAY 2013)

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (JUN 2013)

C. AIR FORCE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (NOV 2012)

Para (c). Ombudsmen names, addresses, phone numbers, fax, and email addresses.

'Air Force Test Center Vice Commander, 1 South Rosamond Blvd, Edwards AFB, CA93524-103, phone number (661) 277-2810, facsimile number (661) 277-7593'

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES IN FULL TEXT

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

52.252-02 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/

52.252-06 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter

1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

B. DEFENSE FAR SUPP CONTRACT CLAUSES IN FULL TEXT

252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION (MAY 2006) - ALTERNATE I (MAY

2006) (TAILORED)

ALTERNATE I (MAY 2006).

(a) Contract line item _____ is incrementally funded. The sum of ______ is presently available for payment and allotted to this contract. An allotment schedule is contained in paragraph (j) of this clause.

(b) For item(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "Termination for Convenience of the Government." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit, and estimated termination settlement costs for those item(s).

(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state

(1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "Termination for Convenience of the Government."

(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraphs (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.

(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "Disputes."

(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph (a) of this clause.

(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "Default." The provisions of this clause are limited to the work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) and (e) of this clause.

(h) Nothing in this clause affects the rights of the Government to terminate this contract pursuant to the clause of this contract entitled "Termination for Convenience of the Government."

(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.

(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:

On execution of contract TBD

TBD TBD

TBD TBD

TBD TBD

PART III - LIST OF DOCUMENTS, EXHIBITS & ATTACHMENTS

SECTION J - LIST OF ATTACHMENTS

SECTION J FA9300-14-C-0005

DOCUMENT PGS DATE TITLE

EXHIBIT A 14 25 FEB 2014 CONTRACT DATA REQUIREMENTS LIST A001 -

A007

EXHIBIT B 8 25 FEB 2014 CONTRACT DATA REQUIREMENTS LIST B001 -

B003

ATTACHMENT 1 6 18 MAR 2014 STATEMENT OF OBJECTIVES - PHYSICS-BASED

MODELS

ATTACHMENT 2 6 18 MAR 2014 STATEMENT OF OBJECTIVES - ANALYSIS OF

EMBEDDED SENSOR FLAW DETECTION

ATTACHMENT 3 TBD DFARS 252.227-7013 RIGHTS IN TECHNICAL

DATA - NONCOMMERCIAL ITEMS

ATTACHMENT 4 10 25 FEB 2014 ANSI-BASED FORMAT GUIDELINES

AFRL AEROSPACE SYSTEMS DIRECTORATE

EDWARDS SITE

Exhibit-A: “Contract Data Requirements List”

For

FA9300-14-C-0005

Motor Aging & Surveillance Technology (MAST)

Dated: 25 FEB 20114

This exhibit including the cover page consists of 14 pages.

Attachment 1 FA9300-14-C-0005 Page 1 of 6

Attachment-1: Statement of Objectives

“1.1 Physics-Based Models”

Date: 18 Mar 2014

This attachment including the cover page consists of 6 pages

Attachment 1 FA9300-14-C-0005 Page 2 of 6

Statement of Objectives (SOO)

1-1 Physics-Based Models

TABLE OF CONTENTS:

1. Statement of Need:

2. Topic 1 Requirements: A&S Technology Development

2.1. Technology Development Objectives:

2.2. All the technology development efforts shall:

2.3. All technology development efforts that contain computer code/software shall:

2.4. Subtopic 1-1 Requirements: Physics-based modeling and their validation and verification

3. Other Requirements:

3.1. Data Rights:

3.2. Integrated Product Team (IPT):

4. Deliverable Items:

4.1. Data Requirements:

4.2. Residual Hardware:

4.3. Software:

1. Statement of Need:

Development of technologies to determine the state of solid rocket motors (SRMs) on an individual basis at any point within their service life (past, present, and future) with an acceptable confidence level in order to enable safe and successful mission completion.

These technologies must reduce the predictive uncertainty of the service life estimate, with negligible impact to other RP21 goals.

2. Topic 1 Requirements: A&S Technology Development

2.1. Technology Development Objectives:

Technology Development Objective: This effort focuses on developing technologies including physics-based models and embedded sensor analysis technologies to meet the RP21 A&S goals. These technologies will appreciably increase our detection, prediction, and/or understanding of aging in SRMs and their safe operation.

2.2. All the technology development efforts shall:

2.2.1. Illustrate reduction of reliance on dissection of motors and depot operations to determine asset viability, and logically lead to the ability to predict the lifetime of an individual solid rocket motor with greater fidelity

2.2.2. Primarily apply to large scale monolithic and segmented SRMs such as may be used for strategic, space launch, and ballistic missile systems, and ideally to tactical missile systems with minimal alterations

2.2.3. Designed for use in environments for tactical and strategic missile systems to include, but not limited to, manufacturing, operational (for example: cyclic temperatures, vibrational loads, wind shear), motor handling, storage, and transport

2.2.4. Be designed taking into account other factors to include, but not limited to, size constraints, data transfer, and other operational constraints https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379702 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379703 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379704 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379705 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379706 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379707 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379707 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379708 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379709 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379710 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379711 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379712 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379713 https://org.eis.afmc.af.mil/sites/1210/PKT/AS_BAA/Project%20Documents/AFRL%20Documentation/06%20SOO%20(initial)/MAST%20SOO%20-%20Physics-Based%20Models%20v2.0.docx#_Toc382379714

Attachment 1 FA9300-14-C-0005 Page 3 of 6

2.2.5. Surpass accuracy of previously funded efforts (for example: Service Life Prediction Technology [SLPT], Critical Defect Assessment [CDA], Sensors and Applications Modeling [SAM], Non-Destructive Evaluation Data Processing [NDE- DP], and various Advance Missile Propulsion Technology [AMPT] and Missile Component Advanced Technology [MCAT] Task Orders) in the area of SRM health modeling including, but not limited to, AFRL funded efforts.

2.2.6. Develop individual technology derived requirements from program requirements and methods to verify them (inspection, demonstration, test, analysis). The requirements and method are subject to approval by the integrated product team

(IPT)

2.2.7. Exit the Call 1 technology development effort at a minimum of TRL 4

2.2.8. Use open, well documented, and industry accepted standards

2.2.9. Confirm the proposed quantifiable improvement over the current state of the art along with how much they contribute to meeting the RP21 A&S goal and any impacts to other RP21 goals

2.2.10. Develop a proposed concept of operation (CONOPs) for the technology as well as the method that will be used to integrate the technology into the operational system – not just the missile but the overall weapon system

2.2.11. Design technology that is operable, sustainable, supportable, interoperable, modular, and reliable over the expected life time of the system for the operational users

2.2.12. Disseminate the results at JANNAF and/or other relevant forums

2.2.13. Estimate the payoffs to the operational system

2.2.14. Develop a plan to validate and verify technology for a future RP21 demonstration effort

2.3. All technology development efforts that contain computer code/software shall:

2.3.1. Develop a sustainable code following modern software development practices such as version control; modular code; source code documentation; theory, developer, and user manuals; administrator guide; graphical user interfaces (as required); regression suites; verification; and validation.

2.3.2. The code shall be capable of satisfactorily completing functional user testing to include installation and operation on current DoD standard desktop configuration client or DoD server core configuration connected AFRL’s SATURN enclave.

2.3.3. The code shall comply with AFI 33-210 certification and accreditation to including:

2.3.3.1. No CAT I or II finding of Security Technical Implementation Guides

(STIG)

2.3.3.2. Documentation of CAT III finding of STIGs that will be recommended for risk acceptance and the reasoning

Attachment 1 FA9300-14-C-0005 Page 4 of 6

2.4. Subtopic 1-1 Requirements: Physics-based modeling and their validation and verification

All the modeling efforts shall:

2.4.1. Clearly define sources of error

2.4.2. Perform a detailed uncertainty and sensitivity analysis of the model

2.4.3. Develop a usable and highly automated code for distribution to the Government and their contractors

2.4.4. Develop a code usable on a high power workstation – either Linux or Windows based

2.4.5. Develop and document the necessary inputs for models throughout the life of the system including test methods for all modeling efforts

2.4.6. Document all outputs from the codes

2.4.7. Validate and verify codes, including development of experimental techniques as necessary

3. Other Requirements:

3.1. Data Rights:

In exchange for paying for development of the data, the Government expects technical data, Non-Commercial Software (NCS), and NCS documentation developed entirely at Government expense to be delivered with unlimited rights. Technical data, NCS, and NCS documentation developed with mixed funding are expected to be delivered with Government purpose rights at minimum.

3.2. Integrated Product Team (IPT):

All efforts resulting from this BAA will operate within an integrated product team (IPT) arrangement led by AFRL. All offerors awarded contracts under this BAA are required to participate in the IPT. In addition to AFRL and all organizations awarded contracts under this effort, participants in the IPT will consist of representatives from academia, other government entities with an interest in this technology, Federally Funded Research, and Development Centers (FFRDC), and other qualified commercial and non-commercial entities upon their request or invitation. The IPT will meet as necessary but at least once per quarter alternating between Edwards AFB and remote meetings (via teleconference, video conferencing, Defense Connect Online [DCO], or other technical means). The nature of the IPT meetings is variable; some IPT meetings are expected to be highly detailed technical briefings, while others are anticipated to be focused on coordinating activities between the Government and each offeror with few formal presentations. It is EXCEEDINGLY desirable that offerors share information at IPT meeting to the greatest extent possible including but not limited to development, technical results, and demonstration plans. In addition to IPT meeting, individual awarded contractors will need to have as needed (based on sized and level of effort) but routines meeting with the Government to discuss progress, schedule, and any ongoing issues.

Attachment 1 FA9300-14-C-0005 Page 5 of 6

4. Deliverable Items:

4.1. Data Requirements:

ALL program technical and financial progress shall be reported. The baseline Contract Data Requirements List (CDRL) list is provided in Error! Reference source not found..

The items below or similar items shall be incorporated into each proposed effort as applicable. Relevant CDRL items shall then be incorporated into each effort. The Data Item Descriptions (DID) are given as references only. All reports are to be divided into sections with appropriate markings for distinguishing proprietary versus non-proprietary information.

Table 1 - Contract Data Requirements List (CDRL)

CDRL Authority Description Frequency A001 DI-ADMN-81373/T Presentation Material As Required

A002 DI-MGMT-81468/T Contract Funds Status Report (CFSR) Quarterly

A003 DI-FNCL-80331A/T Funds and Man-Hour Report (FMHR) Monthly

A004 DI-MGMT-80227/T Contractor’s Progress, Status & Management Report Monthly

A005 DI-SESS-81785/T Systems Engineering Management Plan (SEMP) Once &

Revisions

A006 DI-MISC-80711A/T Scientific and Technical Reports, Subtitle Interim Report As required *(1)

B001 DI-MISC-80711A/T Scientific and Technical Reports, Subtitle Final Report Once & Revision

B002 DI-IPSC-81443A/T Software User Manual Once, if necessary

B003 DI-SESS-81002E/T

Developmental Design Drawings/Models and Associated

Lists Once, if necessary

*Notes

(1) CDRL A007 will be submitted annually and at the end of the technical effort.

4.2. Residual Hardware:

Residual hardware deliveries may be required. If applicable, residual hardware will be identified for individual efforts and delivered to AFRL/RQRM upon the completion of the technical effort. Delivery due thirty days after end of technical effort of each contract if there is residual hardware developed.

4.3. Software:

All efforts that develop computer code shall deliver the source and compiled code thirty days after end of technical effort of each contract.

5. Contractor Full-time Equivalent Reporting Addendum:

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force via secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Reporting Period: Reporting inputs will be for labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be

Attachment 1 FA9300-14-C-0005 Page 6 of 6 reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals are available at the Army link at http://www.ecmra.mil.

Draft

Draft BAA-14-01-PZRA

Attachment-2: Statement of Objectives

“1.2 Analysis of Embedded Sensor Flaw Detection”

Date: 18 Mar 2014

This attachment including the cover page consists of 6 pages

Statement of Objectives (SOO)

1-2 Analysis of Embedded Sensor Flaw Detection

TABLE OF CONTENTS:

1. Statement of Need:

2. Topic 1 Requirements: A&S Technology Development

2.1. Technology Development Objectives:

2.2. All the technology development efforts shall:

2.3. All technology development efforts that contain computer code/software shall:

2.4. Subtopic 1-2 Requirements: Embedded sensors for propellant, liner, and insulation (PLI) flaw detection…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .