This solicitation is for renovation work at Building 77 at Fort Leavenworth, Kansas. The work includes renovating six existing toilet rooms and creating two new unisex toilet rooms and a lactation room. The required scope of work includes demolition, new walls, flooring, plumbing fixtures, and finishes. The estimated value is between $100,000 and $250,000. The solicitation was issued by the Department of the Army Mission and Installation Contracting Command at Fort Eustis. The response due date is April 15, 2022. The period of performance is 90 calendar days from award. The contract will be a firm-fixed-price award. The solicitation sets aside the procurement for small business concerns only.

View the file

Other files for this federal contract opportunity

Other files attached to BLDG 77 Latrines and Room Addition, newest first.
File Type Posted
IFB_Questions Answers_24Aug21.pdf PDF
Amend 02_Sol_W91QF4-21-B-0004_Questions_Answers.pdf PDF
W91QF4-21-B-0004_IFB_B-77_Latrines_Add_Room.pdf PDF
WD-KS20200053-Building_09JUL2021.pdf PDF
Amend 01_Sol_W91QF4-21-B-0004 Bldg_77_Latrines_Room_Addition.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABA Architectural Barriers Act ADA Americans with Disabilities Act AFF Above Finish Floor

Bldg Building CL Centerline Clg Ceiling CFM Cubic Feet per Minute CMU Concrete Masonry Unit CO Clean Out Conc Concrete

Ea Each Eq Equal

FD Floor Drain Ft Feet

Galv Galvanized GypBd Gypsum Board

HM Hollow Metal Ht Height

Insul Insulation

Mas Masonry Max Maximum Min Minimum

OC On Center Opp Opposite

N North NTS Not To Scale

Sched Schedule SF Square feet Sim Similar SS Solid Surface SS Stainless Steel

- Door Number

North Arrow

ROOM

NAME

Room Name Room Number

Graphic Scale

Detail Number

Origin Sheet Number

Scale

Detail Number

Sheet Number

Elevation Mark

Detail Reference

Detail Number

Sheet Number

Interior ElevationDetail Number

Sheet Number

Revision Reference

9' - 0" Ceiling Height

A

Wall Tag

Annotations and Symbols

Section Reference

A1 30.01

A1/30.01

A1 30.01

View Name 1/8" = 1'-0" View Title

NORTH

Name Elevation

0 2' 4' 8'

A1 30.01

See Mechanical, Electrical and Plumbing Sheets for related symbols

A-000 Cover Sheet

INDEX OF DRAWINGS

A-109 Specifications

A-101 Overall Floor Plans A-102 Demolition Plans A-103 Wall Types, Details A-104 Construction Plans A-105 Reflected Ceiling Plans A-106 ABA Elevations, Sections, Details A-107 Interior Elevations A-108 Schedules, Legends

P-101 First Floor A Section

PLUMBING

ARCHITECTURAL

GENERAL

P-105 Second Floor Section

P-102 First Floor A Section P-103 First Floor B Section P-104 First Floor B Section

MECHANICAL

M-101 HVAC Plans M-102 HVAC Plans

ELECTRICAL

E-001 General Information - Electrical ED-101 Demolition Plan - Electrical

EP-101 Power Plan New Work - Electrical E-501 Electrical Details and Schedules

A-110 Wall and Floor Finish Plans

P-602 Plumbing Sections

P-106 Second Floor Section P-501 Plumbing Details

EL-101 Lighting Plan New Work - Electrical

M-102 HVAC Plans

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-000

C ov er S he et

B7

La tri ne s

R ep ai r

JM JM

Architectural Symbols Legend Address: 290 Grant Avenue

Leavenworth, KS 66027

Scope of Work Summary: Renovation of six (6) existing toilet rooms and Break Room. Creation of two (2) unisex toilet rooms and a lactation room.

Applicable Codes: Univorm Fire Code (UFC) 2018 International Building Code (IBC) 2018 International Plumbing Code (IPC) 2018 International Mechanical Code (IMC) NFPA 70, National Electrical Code - UFC 3-501-01

Building Area: First Floor 42,230 SF (Exist to remain) Second Floor 24,844 SF

Total 67,074 SF

Project Area: Area 1A 309 SF Area 1B 814 SF Area 2 602 SF Total 1,725 SF

Occupancy Type: Business Group - B (Office)

Construction Type: IIIA

Sprinklered: Yes

Occupancy Count: 67,074 / 150 SF/P = 448 People (224 Men, 224 Women)

Plumbing Count:

Required Existing Proposed

Toilets/Urinals 1/25p first 50, 1/50 Men's: 9 toilets/5 urinals 5 toilets/5 urinals 6 toilets (and urinals* for Men) Women's: 7 toilets 8 toilets

Unisex/Family: 0 toilets 2 toilets

* Note: Urinals may be substituted for up to 1/2 of Men's required toilets. IPC 424.2

Lavatories 1/40p first 40, 1/80 Men's: 8 lavatories 5 lavatories - (M) 4 Lavatories (Men & Women) Women's: 6 lavatories 5 lavatories - (W)

Unisex/Family: 0 lavatories 2 lavatories

Drinking Fountains - 1/100 people Total: 0 drinking fountains 4 drinking fountains 5 Drinking Fountains

NOTE: Sprinkler adjustments to be design-build by the Contractor.

FORT LEAVENWORTH

DIRECTORATE OF PUBLIC WORKS

BUILDING 77 - 290 GRANT AVENUE

PROJECT SITE: Building 77 (B77) 290 Grant Ave.

Fort Leavenworth, KS

Gr an t A ve nu e

Mi ss ou ri R ive r

Reynolds Ave.

Gi bb on A ve

Cody Road

Stimson Ave.

Merritt Lake

Smith Lake

LOCATION MAP

Abbreviations Code Information Summary

Sh er ma n A ve nu e

100% DRAWINGS

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

A-102 C1

A-104 C1

A-102 C3

A-104 C3

AREA 1A

AREA 1B

Areas of Work

A-102 A1

A-104

A1AREA 2

Area of Work

1/16" = 1'-0"

A1 First Floor Overall Plan 1/16" = 1'-0"

A3 Second Floor Overall Plan

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-101

O ve ra ll

Fl oo r P la ns

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

N N

Floor to Building Key:

First Floor Areas Hatched

Floor to Building Key:

Second Floor Areas Hatched

M

AR

K D

ES

C

R

IP

TI

O

N D

Remove existing toilet, patch floor. Re: Plumbing

Remove existing toilet.

Prepare for new toilet. Re: Plumbing

Remove existing lavatory.

Carefully remove limted masonry for installation of new toilet. Re: Plumbing.

Remove existing toilet partition screens, posts, bars and all related appurtenances

Remove existing urinal

Remove existing 2'-10" x 7'-0" door and frame. Carefully cut opening 1" on either side for new 36" door.

Carefully remove masonry for new plumbing connection.

Re: Plumbing Dwgs.

Remove existing lavatories, Re: Plumbing

Remove existing damaged steam piping insulation, Re:

Construction Plan

Remove existing steam radiator cover. Prepare steam fintube for new covers. Protect all existing to remain from damage during project. Re: Mechanical.

Remove existing 2'-10" x 7'-0" door and frame. Carefully cut opening 1" on either side for new 36" door.

Remove existing toilet, patch floor. Re: Plumbing.

Remove existing toilet partition screens, posts, bars and all related appurtenances

Remove existing toilet.

Prepare for new toilet. Re: Plumbing

Existing floor tile flush with concrete to remain

Remove existing counter, cabinets, sink and related piping. Re: Plumbing Drawings

Remove existing modular walls and related doors

Care must be taken in demolition to not damage existing wall, double doors and finishes to remain. Brace existing wall to remain till new construction is in place

Remove existing toilets, urinals and lavatories, typical all. Re: Plumbing dwgs.

Remove existing toilet partitions and all related appurtenances

Remove door, frame and related masonry wall through new ABA stall. Re:

Construction Plan

Carefully remove existing masonry walls; protect existing walls to remain. Re: Construction Plan

Remove existing door and frame. Prepare opening for new door.

Re: Construction Plan

Remove existing toilets, urinals and lavatories, typical all. Re: Plumbing dwgs.

Remove existing toilet partitions and all related appurtenances

Remove existing entry partitions and all related appurtenances

Existing VCT flooring (verify) to be removed throughout existing Break Room

Existing floor tile flush with concrete to remain.

Protect existing carpet to remain in "Chief Plans & Op" room

Existing electrical cabinet to remain.

Protect throughout construction

Protect and maintain existing electrical conduit attached to wall and ductwork above

Protect existing "Air Handler Room" wall and door to remain

9' - 8 3/4" 3 3/4" 9' - 4" 2' - 0 1/2" 10' - 5 1/4" 3 3/4" 7' - 3 3/4"

1/

2"

Existing door to remain Remove wall full height for new 36" doors and frames

Existing fin-tube steam heaters and piping to remain, protect during project. Remove existing metal steam heater cover, typical in all three (3) rooms.

In both Men's and Womens toilet rooms, remove existing 8" thick clay tile/concrete flooring and related ramp ABOVE existing primary structural floor.

Contractor to take special care so as not to damage existing concrete floor.

Existing column to remain

NOTE: Contractor has option to leave wall in place and furr-out both sides within new restrooms and Mothers room (corridor would remain masonry). If option is taken, ABA tolerances will be tight in Mother's and Unisex toilet. Contractor to work with architect to ensure tolerances are met.

Remove existing lavatories, Re: Plumbing

Remove existing toilets (typical of 6)

Remove existing door and frame

Remove existing urinal

General Demolition Notes:

1. Contractor to remove all existing floor coverings. Anticipate +/- 5% subfloor replacement for bidding purposes.

2. Remove all toilets, urinals, lavatories (Re: Plumbing) and lighting (Re:

Electrical). Remove all toilet partitions and related appurtenances, mirrors, paper towel dispensers, soap dispensers, toilet paper dispensers, furniture and trashcans.

3. Protect all flooring, walls, ceiling surfaces, windows, steam heating elements, and any oother items existing to remain during demolition and construction activities.

4. Hazardous materials procedures.

5. All demolished materials will be removed from the site unless specifically noted to be salvaged or reused. Protect and store all items to be reused. Protect and store items where directed by Owner where noted to be salvaged.

6. Existing columns to remain and be protected. Refer to as-built structural drawings for locations.

7. Remove all interior suspended ceiling systems, light fixtures, toilet fixtures, toilet partitions, walls where noted, baseboard and miscelaneous appurtenances in their entirety where noted to be removed. Demolish where not shown or intended to be reused.

8. Mechanical, electrical and plumbing equipment to be removed as noted. Re: mechanical, electrical and plumbing plans.

9. All existing measurements are to be considered "+/-". All to be field verified by contactor.

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-102

D em ol iti on P la ns

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

1/4" = 1'-0"A-101

C1 Area 1A - Demolition Plan 1/4" = 1'-0"A-101

C3 Area 1B - Demolition Plan

1/4" = 1'-0"A-101

A1 Area 2 - Demolition Plan

N N

N

M

AR

K D

ES

C

R

IP

TI

O

N D

5/8" gypsum board over shimmed 7/8" metal furring. Prime and paint gypsum where exposed.

New Suspended Ceiling System, aluminum slat or lay-in cloud.

(Re: Finish Schedule)

Terrazo flooring over existing concrete floor

Description Wall tile over 5/8" gypsum on shimmed 7/8" metal furring at 24" on center over existing 3 5/8" masonry to remain. Provide blocking for new grab bars where located. Furred out walls to be built up to 6" above bottom of slat ceiling system (or 2" above ceiling in Area 1B).

WALL TYPE "1"

Interior Non-Load Bearing Partition to Deck

Existing 3 5/8" masonry to remain unless noted otherwise (approx.

1/4"+/- out of verticle plumb in some locations, verify)

Tile over 5/8" gypsum board, Re: Finish Schedule

Shimmed, 7/8" metal furring chanels Existing concrete structure above to remain

5/8" 7/8"

1/4"

5/8" gypsum board up to top of adjacent ceiling system; Prime and paint. Re:

Finish Schedule

Existing concrete floor to remain

Wainscot height wall tile over new shimmed 5/8" gypsum board.

Re: Finish Schedule. Re: Elevations

5 3/8"

3 5/8"Prime and paint (P6) items above ceiling.

Re: Room Finish Schedule Notes.

Slope to drain

Terrazzo wall base

5/8" gypsum board over shimmed 7/8" metal furring. Prime and paint gypsum where exposed.

New Suspended Ceiling System (Re: Finish Schedule)

Straight wall base flush with 3/4" Terrazo cove at edge of flooring

Description Wall tile over 5/8" gypsum on 5 1/2" metal studs at 24" on center over existing 3 5/8" masonry to remain. Provide blocking for new grab bars where located.

WALL TYPE "2"

Interior Non-Load Bearing Partition to Deck

Existing 3 5/8" masonry to remain unless noted otherwise (approx.

1/4"+/- out of verticle plumb in some locations, verify)

Tile over 5/8" gypsum board, Re: Finish Schedule

5 1/2" metal studs (for plumbing fixture carriers and Horiz. waste piping) Existing concrete structure above to remain

5/8" 5 1/2" 1/4"

3 5/8"

5/8" gypsum board; Prime and paint. Re: Finish Schedule

Existing concrete floor to remain

Wainscot height wall tile over new shimmed 5/8" gypsum board.

Re: Finish Schedule. Re: Elevations

10"

5 1/2" metal studs (for plumbing fixture carriers and waste piping)

As described above.

Prime and paint (P6) items above ceiling.

Re: Room Finish Schedule Notes.

5/8" gypsum board

3 5/8" metal studs

Acoustical insulation

5/8" gypsum board

Finish Floor

Description 3 5/8" metal stud to underside of concrete structure above, spaced max. 16" o.c. 5/8" gypsum board, staggered, each side of studs.

Acoustical batt insulation between studs to deck. Continue gypsum board to the underside of the deck. Use acoustical sealant to seal around openings and at the floor and deck. At walls above 12'-0" in height, use 20ga. metal studs.

WALL TYPE "3"

Interior Non-Load Bearing Partition to Deck

Acoustical insulation

Slip joint metal stud top track

3A

Acoustical Sealant

Acoustical Sealant

5/8" gypsum board

Resilient channel

3B

As described above.

As described above, but with 5 1/2” metal studs

As described above, but with only one (1) side of gypsum board

3C

As described above, but with 5 1/2” metal studs and only one (1) side of gypsum board3D

Existing masonry to remain to be widened for new door and frame.

Contractor's Option:

1) Replace 1 1/4" finish blocking with 3/4" thick blocking for 35" custom door and frame (Shown in THIS SECTION drawing); OR

2) overcut opening by 1" each side for new 36" wide door. Replace trim frame, blocking and stop with either solution. If cutting masonry, verify structural integrity of masonry jambs and lintel to remain prior to work.

Existing glazed masonry block to remain

Existing blocking to be replaced, verify. Provide treated wood blocking

Contractor to carefully remove frame, trim and door stop. Corridor Side

Room Side

New door, Re: Door and Frame Schedule

Pre-primed 16 gage hollow metal knock down frame with door stop. Bondo and sand smooth corner seams. Prime corners and paint all. Fill frame voids with batt insulation. Re: Finish Schedule.

Shimmed metal furring to make flush and true vertial face wall

5/8" Type "X" gypsum, prime and paint, typical. Re: Finish Schedule.

Sealant continous around both sides. Color to match door frame

3 5 /8"

1 3 /4"

5 3 /8"

Fill frame voids solid with sound batt insulation, typical

Metal studs with sound batt insulation, Re: Wall Types

New treated 2x wood blocking

Pre-primed 16 gage hollow metal knock down frame with door stop.

Bondo and sand smooth corner seams. Prime corners and paint all.

Re: Finish Schedule.

Corridor Side

Room Side New door, Re: Door and Frame Schedule

5/8" Type "X" gypsum, prime and paint, typical.

Re: Finish Schedule.

Sealant continous around both sides. Color to match door frame

Fill frame voids solid with sound batt insulation, typical

Partition per floor plan.

Provide continuous sealant both sides

Existing stone sill to remain. Protect during construction. Do not penetrate nor damage with attachments. typical.

Prefinished aluminum break metal cap to match window system, match building standard

Neoprene filler, color to match window system

3" 6"

Existing exterior glass to remain, protect during construction, typical.

Existing annodized aluminum frame sill to remain

Existing exterior sill to remain General Construction Notes:

1. The Contractor's Bid is based solely upon the Construction Contract Documents and properly issued Addenda and not upon any other written or oral representation.

2. All construction is to be in accordance with the Building Codes of the authorities having jurisdiction. Re: Cover Sheet.

3. All work shall be done in accordance with the highest quality industry standards for material and installation. All work will be warranted for one year unless stated otherwise. Repair or replacement of warranted work and any area affected by failure of warranted item, shall be the Contractor's responsibility.

4. The Contractor shall be responsible for verifying all dimensions, elevations and details shown on the drawings with existing conditions. Any discrepancies which will prevent the accomplishment of the intent shown on the drawings shall be brought to the immediate attention of the Architect.

Indicated conditions are not intended as representations or warranties of accuracy. It is expressly understood that the Owner will not be responsible for interpretations and conclusions drawn by the Contractor.

5. Should any questions arise regarding the interpretation of the Contract Documents, reference shall be made to the Architect whose written decision thereon shall be final and conclusive. No alleged oral admission, condonation, or inadvertent neglect on the part of the Architect and/or Owner shall be accepted as an excuse for failure to comply with the Contract Documents.

6. Dimensions shown on the drawings are to the finished face of materials and/or centerlines of structure, unless noted otherwise. Refer to enlarged floor plans for dimensions and additional information.

7. Provide solid blocking at all items attached to wall surface (i.e. door stops, grab bars, toilet accessories, millwork, etc). ABA grab bars to resist a minimum 250 lbs. vertically and horizontally.

8. Provide water stop and sealant at all construction joints below the finished floor.

9. The Contractor shall conduct all work in a safe and timely manner.

Provide and maintain all necessary guards for prevention of accidents.

Failure to reject faulty equipment or practices by the Architect/Engineer does not relieve the Contractor of his liability for personal injury or property damage. The Architect shall not be responsible for the means and methods of construction, safety issues, control or supervision of the work, nor items related to stoppage of work. The authority to stop work rests solely with the Owner and Contractor.

10. Thoroughly clean all work prior to final review. All splatters, marks, scratches, debris and defective materials or parts shall be removed or replaced. Carpets shall be vacuumed and the space shall be in a move-in condition.

11. The Contractor shall coordinate all dumpster locations with the Owner prior to placement of dumpsters.

12. Gypsum board partitions that are extended to the underside of concrete structure above shall have a slip-track attachment of steel stud, unless noted otherwise.

Existing concrete floor to remain

Gypsum board, new or existing to remain. Paint, Re: Finish Schedule

3/4" high +/- coved terrazzo as required for sloping floor to drain. Verify slopes along with 1/2" maximum flooring transitions to adjacent flooring. 3/8" min.

thickness terrazzo. 1/16" minimum slope per foot, 1/8" slope preferred, 1/4" max.

Re: Finish Schedule.

Re: Wall and Floor Finish Plan

Rubber base, straight.

Re: Finish Schedule

3/4" Rad.

terrazzo manufacturer verify final width with

Concrete board as recommended by terrazzo manufacturer

Silver-colored metal divider as recommended by terrazzo manufacturer

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-103

W al l T yp es , D et ai ls

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

1" = 1'-0"

C1 Wall Type 1 - 7/8in Furr-Out on Masonry 1" = 1'-0"

C2 Wall Type 2 - 6in Metal Stud on Masonry 1" = 1'-0"

C3 Wall Type 3 - Metal Stud Wall 3" = 1'-0"

C4 Door Jamb/Head Detail - Exist. Masonry Wall

3" = 1'-0"

D4 Door Jamb/Head Detail - New Wall

3" = 1'-0"

B1 Detail - Wall at Window

12" = 1'-0"

A4 General Construction Notes 3" = 1'-0"

A1 Wall Base Detail

M

AR

K D

ES

C

R

IP

TI

O

N D

New ABA toilet where existing removed. Re: Plumbing.

New Grab Bars and stall accessories. Re: Elevations and Toilet Accessories Schedule.

New ABA toilet where existing removed. Re: Plumbing

New standard Toilet, where existing lavatory removed. Re: Plumbing.

New standard (Non-ABA) height urinal where existing urinal removed (leading edge at 24" AFF). Re: Plumbing

3'

- 6

" 5" 1 3

/4" 5'

- 0 1/

4" 1"3'

- 0

5" 1'

- 7 3/

4" 3'

- 0

4 1 /2"

1 3 /4"

5'

- 0

1/ 4"

1" 5'

- 5 1/

2"

Fur-out walls, Re: Wall Types.

New Door and Frame, Contractor's Option:

1) 36" door and frame with modified rough opening

2) 35" door and frame with modified trim in exist.

rough opening. Re: Door Schedule

New Door and Frame, Contractor's Option:

1) 36" door and frame with modified rough opening

2) 35" door and frame with modified trim in exist.

rough opening. Re: Door Schedule

3'

- 9

3'

- 0

New high-low drinking fountains

Baby-changing station, Re: Toilet Accessories Schedule

Baby-changing station, Re: Toilet Accessories Scheule

3' - 0 1/4"

Concrete Beams in vault below, Re: Plumbing

New lavatory, typical one each restroom. Re: Plumbing

3' - 6" 5" 5' - 8 3/4"

Re-wrap insulate steam pipe, cover horizontal with hard plastic casing

Paper Towel Dispenser.

Re: Toilet Accessories Schedule

Notes: 1. New Steam Radiator Covers: Verify all dimensions and full operations and maintenance access to all steam controls with Owner prior to work. Re: Fixture Schedule.

2. Clean and refurbish existing window sills to remain; protect throughout project.

3. Thoroughly clean existing windows to remain; protect throughout project.

4. Final placement of floor drains as shown, to be out of main walkways.

Toilet partitions, Re: Toilet Accessories Schedule.

Removable toilet partition at window wall (for privacy from window, removable for future pipe access)

3A

3A

3A

3A

1' - 10"

1'

- 1

0"

4 1/4" max. 4 1/4" max

" c lea r do or 32

" c lea r do or

ABA ABA

Shelf with built-out wall below, Re: Shelf DetailsNew radiators and pipe cover (4'-8" long, 2'-5"+/- high 1'-2"+/- deep, verify all), Re: Toilet Accessories Schedule.

Verify continuous controls access to all controls.

New radiators and pipe cover (6'-0" long, 2'-5"+/- high, 8"+/- deep, verify all), Re: Toilet Accessories Schedule max.

8".

Women

Men

A-106 sim.

sim.

A-106 sim.

sim.opp.

opp.opp.

opp.

A-106D1

7 3/4"

1" 5' - 0"

1" verify 3' - 11" +/- 1 3/4"

3 3/4"

1 3/4" verify 5' - 6 1/4"

1" verify 4' - 0 3/4" +/-

1 3/4"

Paper towel dispenser. Re: Toilet Accessories Schedule

1 2

Paint all sides of concrete column to match wall

Prime and paint existing masonry jambs and underside of header to match wall paint, including all sides steel angle trim (not aluminum window frames). Re: Room Finish Schedule.

To maintain ABA door pull clearances, do not furr out column

2' - 6"

D5

D4

D5

D4

A-107 C1

FD FD

1 3

/4"

5 1

/4"

1 3

/4"

9 1 /2"

Mirror Not over Lavatory, Re: Toilet Accessories Schedule

New wall paint and base to match existing white corridors. Re-mount existing "Women" sign

NOTE: White rubber floor base at new drinking fountain walls to match existing adjacent walls

ABA Sign, Re: "ABA Sign Elevation" Sheet A-106

ABA Sign

2" 2' - 0" 3' - 6"

1 3 /4"

8'

- 8

1/ 2"

1 3 /4"

7'

- 1

0 1 /4"

5"

2'

- 6

5'

- 4 1/

4"

5' - 6 3/4" 5" 4' - 11 3/4"

3'

- 3

Notes:

1. Plumbing wall in Mens toilet room may be replaced as shown or existing to remain, contractor's option, as is most efficient. If retained, the wall must be furred out for new tilet and paint finishes. Also, the wall behind the urinal and lavatories will require a full stud wall build-out to provide carriers for wall hung urinals and lavatories.

2. Note that most restroom plumbing in existing locations

3. Floor drains, urinals and clean-outs intentionally placed over the Basement pipe tunnel below to increase access and reduce plumbing costs. If it helped for current or future access, we could cut the pipe chase to be larger over the pipe tunnel. Drawing reflects a direct clean out in pipe tunnel below, and another clean-out low on the lavatory side wall.

New Doors and Frames, Contractor's Option:

1) 36" door and frame with modified rough opening

2) 35" door and frame with modified trim in exist. rough opening. Re: Door Schedule

Ice Mach.

Ref.

New double basin sink, Re: Plumbing drawings

13' - 4" 2' - 1"

Wall outlet

ABA

ABA

4' - 2" 2" +/-

New accessible Baby Changing Station, Re: Toilet Accessories Schedule One (1) new double lavatory per restroom. Re: Plumbing drawings.

New accessible Baby Changing Station, Re: Toilet Accessories Schedule

4 3 /4"

2'

- 2

1/ 2"

3'

- 0

3'

- 3

3/ 4"

5'

- 0

Exist. pipe tunnel below, Re: Plumbing

ABA

4' - 2 1/4"

Existing corridor double doors and wall to remain

FD

FD

Men

Women

Break

Family

3'

- 0

5 1

/4" 1'

- 1 0"

2'

- 7

2'

- 6

3/ 4"

1'

- 1

0" 5"

3'

- 6

Existing piping to remain, Reinsulate to make new.

Paint pipes to match adjacent wall

3'

- 0

1 3 /4"

9'

- 2

1 3

/4"

A-106

A-106

32" clear door

32" clear door

3 3 /4"

A-106

C4

C5

New ice machine and refrigerator provided and installed by Owner

Shelf with wall build-out below, Re: Shelf Details

5' - 8" 1" 2' - 8" 1"2' - 9 1/4"1" 2' - 5" 5" 6' - 1" 5" 4' - 2 1/4" 1 3/4"

1'-3" min 1' - 5" Existing 6' - 1"

Shelf with wall build-out below, Re: Shelf Details

Paper Towel Dispenser, typical of 2 per restroom.

Re: Toilet Accessories Sched.

B

A

3A

3A

3A

3A

3C

3A

2 1 /2"

3B

3B

3D

3C

3A

3A

3A

3A

5' - 0 3/4" 1"

2' - 9 1/4" 1"

2' - 8" 5"

6' - 8 1/2" 5"

5'

- 0

3B

D4

D5

D4

D5

A-106

D4

D5

30"x60" inside dim. ABA fiberglass Shower with grab bars and seat. (Re: Plumbing drawings), Shower Rod (Re: Toilet Accessories Schedule). Freedom, Mod.# APFQ6233BFF875L or approved equal.

A-107 C3

A-107

A1

1'

- 1

1 1 /2"

5"

4' - 0" +/-

A-107

4A

Solid surface counter with sides and back splashes with integral lavatory and accessible controls. Wall tile full height on three sides to inside corners.

Re: Plumbing. Re: Elevation

5" 5"

1'

- 8

FD

Unexcavated both sides

4"

4 1 /4" opposite

MatchTerminate wall tile

Terminate wall tile

22' - 4 1/2"

NOTE: Corridor side faces of walls being replaced to align with existing and existing adjacent, typical

10' - 11 1/2" 6 3/4" 24' - 10 1/2"

One stud width bump out each side (create tiled lavatory alcove)

Align

ABA Sign, Re: "ABA Sign Elevation" Sheet A-106

ABA Sign, Re: "ABA Sign Elevation" Sheet A-106

ABA Sign, Re: "ABA Sign Elevation" Sheet A-106

ABA Sign, Re: "ABA Sign Elevation" Sheet A-106

Cl ea r

Full length mirror (not over Lavatory) centered in wall, Re: Toilet Accessories Schedule

Two (2) robe hooks on centered behind door.

Re: Toilet Access. Sched.

(Mount 46" and 60" AFF)

A-107

A1 sim.

2' - 9"

3" 2' - 6"

8'

- 0

1/ 2"

6 3 /4"

5'

- 5

5"

5'

- 0

New Door and Frame. Contractor Option:

1) 36" door and frame with modified rough opening

2) 35" door and frame with modified trim in exist. rough opening. Re: Door Sched.3' - 11 1/2"

1" 5' - 0"

1 3/4" 2' - 0 1/2" mi n.

1'

- 6

ABA

New 36" door, Re: Door Schedule

New 36" door, Re: Door Schedule

New radiators and pipe covers (one 4'-10" long and one 4'-2" long, 2'-10" high, 6" off wall, verify all), Re: Toilet Accessories Schedule. Verify easy access to units & controls

New radiator cover (3'-10" long, 2'-10" high, 6" off wall, verify all), Re: Toilet Accessories Schedule

3' - 6" 5' - 8 1/4"

4'

- 8

1"

2'

- 1

0"

1" 5'

- 3

5"

2'

- 7

Infill existing door opening with framing and gypsum board, prime and paint to match in existing room to remain. Match baseboard.

5'

- 5

1/ 4"

1" 2'

- 9

1" 5'

- 0

5" 6'

- 0

ABA

ABA

New radiator cover (6'-6" long, 2'-10" high, 6" off wall, verify all), Re: Toilet Accessories Schedule

1' - 10".1' - 10" 4"

3' - 4"

1 3/4" +/-furred out walls

9' - 0 1/2" +/- to face of 1 3/4"

2' - 0 1/2" 9' - 6 1/4" 5" 7' - 11 3/4" +/- 1 3/4" +/-

1' - 6"1' - 2 1/4"

4" 1' - 10"

9"

Terminate new wall at existing window glazing with neoprene gasket, Re: Sheet A1 "Detail - Wall at Window".

New accessible Drinking Fountains, Re: Plumbing Schedule and Elevation

Existing masonry wall to remain

Existing masonry walls to remain

Existing door and frame to remain

New undercounter refrigerator Countertop with integral sink, back and sidesplashes, Re:

Section and Finish Schedule.

New ABA Toilet, Grab Bars and Lavatory.

Re: Elevations. Re: Plumbing

30"x60" inside dim. ABA fiberglass Shower with grab bars and seat. (Re: Plumbing drawings), Shower Rod (Re: Toilet Accessories Schedule). Freedom, Mod.# APFQ6233BFF875L or approved equal.

New Standard and ABA urinals. Re:

Elevation and Plbg. Fixture Sched.

New Standard and ABA toilets, Re: Elevation and Plbg. Fixture Schedule

Urinal Screen and Toilet Partitions, typical.

Re: Toilet Accessories Schedule

New double Lavatories Mirrors and Accessories, Re: Elevations and Plbg. and Toilet Accessories Schedules, typical.

Existing steam heater and cover to remain

New Shelf with built-out wall below, Re: Section, typcal one each restroom.

Women

Men

Mothers

Unisex

5'

- 9

1/ 2"

1'

- 1

0"

New Shelf with built-out wall below, Re: Section, typcal one each restroom except Floor 1 “Family” Toilet room.

A-106

5' - 0" 1"

4' - 5 1/4"

A-106 sim.opp.

sim.opp.

A-106

D1

A-106

2'-0" wide partition

32" clear door32" clear door

3A

3C

3A

Notes: 1. Existing toilet room plumbing wall and corridor wall replacements to be in place of existing. It is the Contractor’s option to retain existing masonry walls between Mens and Womens rooms and furr out with Wall Type 1.

2. Clean and refurbish existing window sills to remain; protect throughout project.

3. Thoroughly clean existing windows to remain; protect throughout project.

4. Final placement of floor drains to be in stalls at partitions, out of main walkways.

8"

5' - 0" minCL

A-106 C4

C5 201 202 204

Note: Contractor may at its option leave 18” of existing masonry wall in place below window sill around pipe and “jog” wall to glazing. If so, masonry must be completely concealed, with seamless gypsum.

3A

3A

3A

3A

3A

3D

2'

- 1

3A

Easily removable side partition for radiator access

D5

D4

D5

D4 D4

D2

A-106

A1

FD

FD

FD

5 1 /4"

Ve r ify

1/

4"

1' - 8" +/-

Mirror not over Lavatory, Re: Toilet Accessories

Mirror not over Lavatory, Re: Toilet Accessories Schedule

8"

ABA Sign, Re:

Elevation Sheet A-106

ABA Sign, Re:

Elevation Sheet A-106

6"

ABA Sign, Re: Elevation Sheet A-106

ABA Sign, Re:

Elevation Sheet A-106

Two (2) robe hooks on centered in wall. Re: Toilet Access. Sched.

(Mount 46" and 60" AFF)

A-107 A1

A-107A1 sim.

sim. 6'

- 6

1/ 4"

18"min

1' - 9" 5"5" 1' - 9"

2'

- 1

3' - 5" 5"

2"

2"

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-104

C on st ru ct io n Pl an s

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

1/4" = 1'-0"A-101

C1 Area 1A - Construction Plan N N

N

1/4" = 1'-0"A-101

C3 Area 1B - Construction Plan

1/4" = 1'-0"A-101

A1 Area 2 - Construction Plan

M

AR

K D

ES

C

R

IP

TI

O

N D

New gypsum board soffits at 8'-2" above floor, typical at lavatories in both restrooms. Paint bottom and sides P6. Paint face of soffits up to structure above. Re Finish Legend. Re: Electrical drawings.

Suspended slat ceiling system. Bottom of slats to be mounted at 8'-6" above floor.

Re: Finish Schedule.

sy st e m, ty p ic al

8" on ce nte r c eil ing

Eq

Eq. 8' - 0" Eq.

ce ili n g s ys te m , ty pi c al

8" on ce nte r

7' - 0"

4'

- 8

4'

- 8

4'

- 8

1'

- 4

4'

- 0

4'

- 0

1'

- 2 3/

4"

Throughout both restrooms paint from the level of the top of the ceiling system (9' - 0" AFF) and above: all walls, concrete structure above, conduit, ductwork, diffusers, all pipes except sprinkler piping and heads, and all appurtenances other than chrome or stainless steel. Verify all and any items not designated with Owner prior to work.

Four (4) 4'-0" light fixtures in Women's and three (3) fixtures in Men's. Re: Electrical drawings

Eq. 8' - 6" Eq.

4' - 6"

Eq. 6' - 0"

6' - 6" 1" 1' - 9"

8' - 6"

1" 1'

- 9

One (1) down "can" light centered in soffit. Typical each restroom.

Re: Electrical Drawings.

2'

- 6

1/ 2"

Existing pipes to remain, typical

6' - 1"

1'

- 9

Eq

4'

- 0

Eq

Eq.

2 x Eq. Eq.

Eq

Eq

Build face of gypusum soffits up to structure above. Paint bottom and face of soffits up to structure above Two (2) surface-mounted light fixtures. Typical both restrooms.

Re: Finish Legend.

Re: Electrical Drawings.

Four (4) 4'-0" and one (1) 2'-0" light fixtures, align east end of all strip light fixtures. Re: Electrical drawings system at 8'-6" above floor 8" on center ceiling

4' - 8" 4' - 8" 6' - 0" 5' - 4"

8'

- 0

Eq

7'

- 0

Eq

5'

- 0

Align east end of all ceiling boards, typical in Men's restroom

Eq. 2 x Eq. Eq.

Eq .E q.

2'

- 1

Eq. 4' - 0" 4' - 0" Eq.

2' - 0" x 2' - 0" light fixtures, typical. Re: Electrical drawings

Build soffit up to structure above.

Paint bottoms and sides P6. Two

(2) surface-mounted light fixtures.

Re: Finish Legend.

Re: Electrical drawings

New 2'x4' lay-in ceiling system, typical of 3 "clouds" (looks like 1'x1') Re: Finish Schedule

Re: Finish Schedule ceiling system 8" on center

Re: Finish Schedule

Eq. 2 x Eq. Eq.

1'

- 9

Eq .E q.

2x4 lay-in ceiling system (with 2'x2' look). Align grid through doorway opening. Re: Finish Schedule for grid and ceiling panels.

6"

6" 7'

- 3 3/

4" 6"

6" 6"

4"

6"

6" 6"

6" 6"

Throughout Men's and Unisex restrooms and Break Room paint from the level of the top of the ceiling system (Mens 8' - 10" AFF, Womens 8' - 2" AFF, Unisex, 8' - 10" AFF, Break Rm 9' - 6" AFF) and above: all walls, concrete structure above, conduit, ductwork, diffusers, all pipes except sprinkler piping and heads, and all appurtenances other than chrome or stainless steel. In Women's room, start paint at 2" above bottom of grid ceiling and paint elements described above. Verify all and any items not designated with Owner prior to work.

Eq

Eq

Suspended slat ceiling system. Bottom of slats to be mounted at 8'-4" above floor. Re: Finish Schedule.

Suspended slat ceiling systems. Bottom of slats to be mounted at 8'-8" in Unisex Toilet and in Break Room. Re: Finish Schedule.

Eq

5'

- 3

8' - 4"

Five (5) 4'-0" light fixtures. Re:

Electrical drawings

8' - 0"

7' - 8"

A-107

A1

A-107

4A

One (1) down "can" lights above shower level with slat ceiling, center in slats and above shower. Re: Electrical drawings

4'

- 9

5'

- 0

1'

- 0

3'

- 6

8" 7'

- 0

8" 3'

- 6

1'

- 0

9' - 0"

8' - 6"

8' - 6"

7' - 11"

Eq

Eq Eq

7' - 11"

Note: Under-cabinet lighting below the upper cabinets, Re: Section and Electrical drawings.

4'

- 7

4'

- 0 1/

4" 4'

- 8

4'

- 0

5' - 10"

2' - 6"

3'

- 4

4'

- 8

7'

- 4

3/ 4"

1'

- 7

1/ 4" sy st e m, ty p ic al

8" on ce nte r c eil ing sy st e m, ty p ic al

8" on ce nte r c eil ing

6' - 6"

Gypsum soffit built up to concrete structure above, Paint bottom and side wall(s) P5. Re Finish Legend.

Throughout all three (3) restrooms paint above the level of the top of the slat ceiling system (9' - 0" AFF) and Mothers room above ceiling side trim (8' - 10" AFF): all walls, concrete structure above, conduit, ductwork, diffusers, pipes and pipe-wrap (except sprinkler piping and heads), and all appurtenances other than chrome or stainless steel. Verify all and any items not designated with Owner prior to work.

Re: Finish Schedule and Legend.

2' - 4"

1'

- 0

Eq. 4' - 9" Eq.

ce ili n g s ys te m 1'

- 4 " o n c en ter

Existing low duct at 7'-4" above floor - below 8' - 10" (level of top of ceiling side trim) paint to match adjacent walls, above 8' - 10" paint black (P-6) Re:

Finish Schedule and Legend typ ica l

Two (2) 4'-0" light fixtures in Unisex toilet room, centered between walls.

Re: Electrical drawings

Four (4) 4'-0" light fixtures in each of Mens and Womens Rooms, centered between walls.

Re: Electrical drawings shower

2' - 6"

Eq

One (1) down "can" light centered in shower (no ceiling over shower). Re:

Electrical Drawings

Suspended slat ceiling system.

Bottom of slats to be mounted at elevation shown on Room Finish Schedule, typical.

Eq. 8' - 0" Eq.

Eq. 8' - 0" Eq.

8' - 2" 8' - 2"

Eq.Eq.

1' - 9"1' - 9"

Eq.Eq.

Eq

2 x E q.

Eq

Eq

2 x E q.

Eq

6 1 /2"

3' - 9"

2'

- 1

3' - 5"

8' - 0"

2'

- 0

8"

8"

Suspended slat ceiling system at 8" on center.

Bottom of slats to be mounted at elevation shown on Room Finish Schedule, typical.

4'-0" light fixture, centered.

Re: Electrical drawings

Two (2) down "can" lights between lay-in "cloud" and wall Re: Electrical drawings

4" 3" Eq

7' - 0" Eq

Eq 2 x Eq Eq

8' - 6"

1' - 0"

Two (2) downlights surface mouinted flush in soffit, typical, Re: Electrical

One (1) down "can" light centered in soffit. Re:

Electrical Drawings

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-105

R ef le ct ed C ei lin g Pl an s

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

N N

N

1/4" = 1'-0"

C1 Area 1A - Reflected Ceiling Plan 1/4" = 1'-0"

C3 Area 1B - Reflected Ceiling Plan

1/4" = 1'-0"

A1 Area 2 - Reflected Ceiling Plan

M

AR

K D

ES

C

R

IP

TI

O

N D

High fountain to have prefabricated cane-detectable skirt by drinking fountain manufacturer. Height to match elevation of adjacent low fountain.

Wall paint and rubber Wall base to match existing adjacent white wall

Paint new gypsum wall to match existing

Note: Verify and provide carrier or blocking support requirements mi n.

cle ar r o ll-u nd e r

2'

- 3

" a bs olu te ma x.

ca ne de tec tio n

" m in.

, 4

3 " m ax

3'

- 4 sp ou t o utl et to lo w sp ou t 2'

- 9 1/

2"

ABA/ANSI compliant drinking fountains centered in wall, Re: Plumbing Drawings

1/2"

2'

- 1

0"

5' - 0"

1' - 6" 3' - 0" 6"

Back Wall

Shower controls location

" m in.

, 1

9 " m ax

1'

- 6

ABA compliant fold-down shower seat

2% max. floor slope to drain

2 1/2" max.

16" max.

15" min.

2' - 3" max

ABA-compliant grab bars

3'

- 2

" m in

4'

- 0

" m ax

Note: Final grab bar selections to be coordinated with shower unit. Side bar must not be over seat.

2' - 6"

2'

- 1

0"

Side Wall

6" max.ABA-compliant grab barsSolid surface counter with eased top and bottom edges.

Both outside corners to be radiused 3/4" in plan

Wall base. Re: Schedule

5/8" gypsum board over 3 5/8" metal stud; prime and paint. Re: Finish Schedule

(A

BA

- 4 0"

A

FF

m in )

3'

- 4

9" typ.

1"

SECTION

PLAN

9"

1' - 10"

3/4" overhang typical

9"

1' - 8" 1"

3/4" radiused all outside corners, typical

Area 1A Areas 1B, 2

(3 4" m ax

2'

- 9 max.

4" working position stored position to o p er ati on of al l e lem en ts 4'

- 0 " A

FF

m ax plumbing wall 1' - 8" min from of sa nit ar y n ap kin 2'

- 6 " m ax . to to p dis po sa l u nit ele ctr ica l &

1'

- 3

" m in to da ta ou tle ts Fir e A lar m Pu ll S tat ion s

Th er mo sta ts

Sw itc he s

Co at

Ho ok

So ap

Di sp en se r

Pa pe r T ow el Di sp en se r

De vic e H old er min.

3' - 6"

2'

- 1

0" max.

1' - 0" cle a r an ce

1 1 /2" m in.

(3 9" m in.

, 4 1" m ax

3'

- 3 1/

2" mi n .

1'

- 6 pa p e r o utl e t 1'

- 8

Wall base Re: Finish Schedule

Toilet paper dispenser

Accessible toilet, Re:

Plumbing

ADA accessible grab bars cle ar un de r b ar

1 1 /2" m in.

(7"to9") 11"

(39" min., 41" max.)

3' - 4"

4' - 6" min

Re: Room Finish Schedule for wall finishes

Til e

Pa int Schluter strip

5'

- 0

New accessible grab bars.

Mount with blocking to reinforce for ADA required 250 lb forces. Contractor to be careful so as to minimize the cut into existing wall covering

Wall base, re: Finish Schedule

New accessible toilet with flush operator on the open side, adjust centerline of toilet

Flush operator on "open" side of toilet (if not an automatic flush)

24" x 36" channel-framed miror fully adhered to wall, centered above lavatory min.

1' - 0" min.

2' - 0"

2'

- 1

0"

Accessible lavatory centered in wall; insulate all pipes and sharp edges below. Re: Plumbing.

ro ll- u nd er

2'

- 3

" m in

Lavatory height:

27" min. for roll-under 27" max. cane-detection lav a to ry rim

2'

- 1

0" m ax . to re fle cti ve su rfa ce 3'

- 4 " m ax . to m irr or

1' - 5"

7' - 11 1/2" +/-

(4 8" m ax

) t o t op of sh elf

3'

- 4 mi n)

Paper towel dispenser adjacent the lavatory, bottom level with mirror. Re: Toilet Accessories Schedule cle a r

1 1 /2" m in

Gypsum soffit over lavatory and aluminum ceiling system, Re: Reflected Ceiling Plan

Full height polished tile.

Re: Finish Legend.

Re: Wall and Floor Finish Plan.

Gypsum Board, paint. "Bump-outs at sink up to structure above.

Re: Finish Schedule

Wall Tile. Re: Wall and Floor Finish Plan. Re: Typ. Wainscot Tile Elevation

Wall base Re: Finish Schedule

Accessible toilet, Re:

Plumbing

ADA accessible grab bars

1 1/2"

2' - 0" 1' - 0"

2'

- 1

0"

Flush operator open side (if not automatic)

(16" min., 18" max.)

1' - 5"

Til e

Pa int Schluter strip

5'

- 0

1x4 framing

Wall base;

Re: Finish Schedule

Solid surface countertop with 3/4" x 4" backsplash

4" wire pulls

Plastic laminate base cabinet with melamine clad interior

3/4" melamine clad interior and adjustable plywood shelves

1/4" melamine clad hardboard back

Kitchen Sink, Re: Plumbing drawings

Gypsum board, paint.

Re: Finish Schedule

Insulate all pipes and sharp edges under sink

Plastic laminate upper cabinet

2' - 1"

2'

- 9

1/ 2"

1'

- 6

1/ 2"

3'

- 0

7'

- 4

Under-mount sink with 1/4" counter overhang. Clear sealant around

Undercabinet light. Re: Electrical.

1x4 framing

Wall base;

Re: Finish Schedule

Solid Surface (SS-1) with 3/4" x 4" backsplash

4" wire pulls

Plastic laminate base cabinet with melamine clad interior

3/4" melamine clad interior and adjustable plywood shelves

1/4" melamine clad hardboard back

Plastic laminate upper cabinet

4" wire pulls

Plastic laminate base cabinet with melamine clad interior and adjustable shelf2'

- 9 1/

2" 1'

- 6 1/

2" 3'

- 0

7'

- 4

" Undercabinet light. Re: Electrical.

8'

- 1

0"

Pa int

P 6 ( ab ov e c eil ing

Re : F ins ih

Le ge nd Pa int

Re : R oo m

Fin . S ch ed

New lay-in ceiling "cloud," Re: Finish Legend, Re: Reflected Ceiling Plan Paint new gypsum board, Re: Room Finish Schedule

Solid surface counter with back and side splashes and 22 1/2" wide x 16" x 6" deep rectangular integral sink (SS-2) with 1" rounded corners, centered with mirror. Re: Finish Legend.

2'

- 1

0" (m ax )ADA-height mini-fridge supplied and installed by

Owner

(30" min. clear) 2' - 9"

15" min.

1' - 4 1/2" mi n.

ro ll-u nd er

2'

- 3

" c lea r 7"

4"

Insulate all pipes and sharp edges below sink

24" x 36" Channel-framed Mirror centered over lavatory, Re: Toilet Accessories Sched.

re fle cti ve su rfa ce 3'

- 4 " m ax to

Soap dispenser, Re: Toilet Accessories Schedule

Paint (P6) above ceiling and ductwork, Re: Finish Legend

2'

- 6

1/ 2"

3 1 /2"

4"

Wall support below counter

Baseboard, Re: Finish Schedule

Open below counter Open below counter

ABA Accessible Urinal, Re: Plumbing

1'

- 5 min 1' - 3" min 1' - 3"

4'

- 0

" m ax

3'

- 1

0" maximum 1' - 6"

Signs to be ABA - compliant including but not limited to:

- Raised Tactile and visual contrasting letters 5/8" to 2" high with non-glare finish,

- Braille below tactile letters Signs to be carved solid surface.

Refuge Area of

" m ini mu m

" m ax im um pic to g ra ms 6" hi gh m in.

wh er e p ro vid ed

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-106

AB

A

El ev at io ns , S ec tio ns , D et ai ls

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

3/4" = 1'-0"A-104

D1 Elevation - Drinking Fountains

1/2" = 1'-0"A-104

C4 ABA Shower Elevation - Back Wall 1/2" = 1'-0"A-104

C5 ABA Shower Elevation 3/4" = 1'-0"

C3 Shelf Details 3/4" = 1'-0"

B2 Baby Changing Table 3/4" = 1'-0"

B1 ABA Wall-Mounted Elements

1/2" = 1'-0"A-104

D4 ABA Toilet Elevation - Side Wall (FV) 1/2" = 1'-0"A-104

D2 ABA Toilet Elevation - Plumbing Wall (FV - 1/2" = 1'-0"A-104

D5 ABA Toilet Elevation - Rear Wall (FV)

3/4" = 1'-0"A-107

A3 Break Room Sink Section 3/4" = 1'-0"A-107

A2 Break Room Cabinet Section 1/2" = 1'-0"A-104

A1 Elevation Mothers Room

1/2" = 1'-0"

C6 ABA Urinal Elevation

1/2" = 1'-0"

A4 ABA Sign Elevation NOT USED

Flush Valve)

M

AR

K D

ES

C

R

IP

TI

O

N D

3/

4" A

FF

2'

- 9 1/

2"

Fr on t e dg e 5'

- 0

8'

- 6

6" pip es an d s tru ctu re Pa int (P

4) w all s, 9" 6'

- 0

Paint (P4) walls, pipes and structure above ceiling (Re: Finish Legend and plan note)

Wall Tile, Re: Finish Schedule

Wall Paint, Re: Finish Schedule

Slat open ceiling system, Re: Finish Schedule

Toilet Partitions, Re: Floor Plan and Toilet Accessories Schedule

Re : D eta ils

3'

- 4 mi

n) sh elf mo rro r r efl ec tiv e s ur fac e

3'

- 4

" t o b ott om of

24"x36" channel-framed mirror, centered over lavatory. Re: Toilet Accessories Schedule

Furred out walls up to top of ceiling level

"Fin" wing walls to structure above

New door and frames.

Re: Details and Door and Frame Schedule

Rubber wall base over epoxy terrazo cove base. Re: Detail A1/ A-103.

Re: Room Finish Schedule & Legend

New toilet, Re: Plumbing drawings

New ADA-compliant lavatory Re: Plumbing drawings

Solid surface shelf with wall build-out below, Re: Details

Equal Equal

Wall Paint, Re: Finish Schedule 3'

- 1 0"

Paper towel dispenser Re: Toilet Accessories Schedule

Strip light fixtures between slat ceiling system. Re: Electrical drawings

Face of gypsum soffit, Paint (P5), Re: Finish Legend and plan note

4"

Soap dispenser.

Re: Toilet Accessories Schedule

Terminate tile at inside corner on entry side of wing wall

Wall clean out, Re: Plumbing drawings

Full height tile on wall behind lavatory. Re: Finish Legend, Wall and Floor Finish Plan

" m ax 1'

- 4 1/

2"

2'

- 0

2' - 5" 2' - 9 1/4"

9" 6'

- 0 "8'

- 4

Paint (P4) walls, pipes and structure above ceiling (Re: Finish Legend and plan note)

Wall Tile, Re: Finish Schedule

Wall Paint, Re: Finish Schedule

Slat open ceiling system, Re: Finish Schedule

Toilet Partitions, Re: Floor Plan and Toilet Accessories Schedule

24"x36" channel-framed mirrors, centered over each lavatory, typical of 2.

Re: Toilet Accessories Schedule

Furred out walls up to top of ceiling level

Both "Fin" wing walls to be built up to structure above

Rubber wall base over epoxy terrazo cove base. Re: Detail A1/ A-103.

Re: Room Finish Schedule & Legend

New toilet, Re: Plumbing drawings New ADA-compliant double lavatory centered in alcove, e: Plumbing drawings

Solid surface shelf with wall build-out below, Re: Details

Paper towel dispenser, typical of 2.

Re: Toilet Accessories Schedule

Strip light fixtures between ceiling slat system.

Re: Electrical drawings

Face of gypsum soffit, Paint (P5). Note: side and end of wing walls to match adjacent wall paint above and below ceiling. Re: Finish Legend and plans.

New ABA toilet and grab bars, Re: Plan and Elevations.

Re: Plumbing drawings

ABA urinal Re: Plumbing drawings

Standard urinal Re: Plumbing drawings

Wall Paint, Re: Finish Schedule

4"

Soap dispenser, typical of 2.

Re: Toilet Accessories Schedule

2'

- 9

1/ 2" ma x.

bo tto m of

3'

- 4

" m in top of sh elf mi rro r r efl ec tiv e s ur fac e

EqualEqual

Terminate tile at inside corner created at end of wing wall by lavatory, Re: Wall and Floor Finish Plan

Til e w ain sc ot 5'

- 0 " 1 1

/2" 5 1

/2" mi n r oll

-u nd er 2'

- 3 " a bs olu te ma x c an e-de tec tio n

2'

- 1

0"

1' - 8"

Insulate all pipes and sharp edges below lavatory and counter

Solid Surface (SS-2) countertop with 4" sides and back splashes and integral 22 1/2" x 13" x 6" deep (inside dimensions) oval lavatory with 3/4" recessed front apon, with accessible faucet controls. Full width tube steel support behind apron. Re:

Plumbing

Back-lit mirror centered over lavatory. Re: Toilet Accessories Schedule. Re: Electrical re fle cti ve su rfa ce 3'

- 4 " m ax to m irr or

8'

- 8

Rubber wall base over epoxy terrazo cove base. Re: Detail A1/ A-103.

Re: Room Finish Schedule & Legen

4"

Gypsum board, paint.

Re: Room Finish Schedule

Gypsum board face of soffit, paint (P5). Re: Finish Legend Gypsum board wing wall, paint above ceiling (P5).

Re: Finish Legend

Open slat ceiling system, Re: Finish Legend, Re: Reflected Ceiling Plan

Suspended light fixture, mount flush with bottom of ceiling, Re: Electrical.

Re: Reflected Ceiling Plan

Gypsum board, paint.

Re: Room Finish Schedule

Paper towel dispenser, Re: Plan.

Re: Toilet Accessories Schedule

Soap dispenser, Re: Plan. Re: Toilet Accessories Sched.

Wall tile full height behind lavatories Re: Room Finish Schedule

1/2"

25" deep solid surface countertops with 4" high back and side splashes.

Re: Finish Legend

Plastic laminate wall cabinets with adjustable shelves. Re: Finish Legend

Plastic laminate base cabinets, Re: Finish Legend

Accessible under-mount sink with disposal, centered in cabinet.

Re: Plumbing drawings

Wall Base, Re: Finish Legend

Filler strip to match

Filler strip to match

3614 3614

3924 3624 36241524

Wall Base, Re: Finish Schedule

Accessible Refrigerator, supplied and installed by

Owner Accessible

Ice Machine, supplied and installed by

Owner

Note: Contractor to verify all equipment with Owner prior to shop drawings being submitted, including Refrigerator and Ice Machine

New lay-in ceiling system Re: Finish Legend Re: Reflected Ceiling Plan

Pa int

P 9 ( ab ov e c eil ing

Re : F ins ih

Le ge nd Pa int

Re : R oo m

Fin . S ch ed

9'

- 6

Paint new gypsum board, Re: Room Finish Schedule

Wall Tile (cross-hatched) to wrap wall and column east of counter, and built-out wall adjacent to counter on west. Use light color for 4" checkerboard pattern on back wall above counter only Re: Room Finish Sched.

A3 A-106

A2 A-106

Fin ish ed E nd Fin ish ed

E nd clearances required Verify equipment Soap Dispenser, Re: Toilet Accessories Sched.

Terminate tile at inside corner adjacent to lower cabinets

Terminate tile at inside corner adjacent to column

WT-2 Primary (Re: Finish Legend) WT-2 Secondary (Re: Finish Legend)

WT-2 Primary (Re: Finish Legend)

4'

- 4

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R

AT

E O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

AN

C

H D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

AN

A

VE

FO

R

T

LE

AV

EN

W O

R

TH

, K S

7-

A-107

In te rio r E le va tio ns

B7

La tri ne s

R ep ai r

D es ig ne r

Au th or

C he ck er

1/2" = 1'-0"A-104

C1 Area 1A Women - Elevation

1/2" = 1'-0"A-104

A1 Area 1B Men - Elevation 1/2" = 1'-0"A-104

4A Area 1B Family - Lav. Elevation

1/2" = 1'-0"A-104

C3 Area 1B Break Room - Elevation

M

AR

K D

ES

C

R

IP

TI

O

N D

Finish Schedule Comments:

1. Radiator Covers for existing steam radiators (Re: Toilet Accessory Schedule).

2. Paint exposed pipes and pipe wraps to match adjacent wall.

3. In Women's room (Rm 104) and Mothers (Rm 203) start paint (P6) above ceiling side trim. Re: "Ceiling Height" level, Re: Finish Legend).

4. Toilet Partitions to be TP-1 (Women's: Bronze - Re: Toilet Accessories Schedule)

5. Toilet Partitions to be TP-2 (Men's" Dark Blue - Re: Toilet Accessories Schedule)

6. Break Room Wall Tile to left and right of lower cabinets, and between upper and lower cabinets. Re: Elevation.

7. Attach 1 layer of 5/8" gypsum on each inside of each masonry exterior window jamb. Board to vertically cover the full space between vertical metal trim. Use corner bead for both exposed vertical edges. Paint to match wall.

8. Window Shades (Re: Finish Legend below).

Wall Tile:

WT-1 Manufacturer: American Olean

Type: Sunset Falls (Glazed Ceramic) Selection: 6" x 18" pieces, 1/3 lap consistent Notes: Schluter strip trim - Rondec, soft brushed aluminum finish on all exposed top and sides (not inside corners)

WT-2 (Re: Break Room Elevation and Wall and Floor Finish Plan) Manufacturer: Daltile Type: Classic (Glazed Ceramic) Selection: Primary: Matte Chalkboard 0780 (2)

Secondary: Architectural Gray 0109 (2) (only in checkerboard pattern over counter)

Size/Mounting: 4-1/4" x 4-1/4" with full bull-nosed top edge and outside corners Notes: Schluter strip top and side trim - Rondec, soft brushed aluminum

Ceilings:

C-1 Manufacturer: Longboard Products

Type: Dauntless (Extruded Aluminum open slat system) Selection: Weathered Grey, Wood Grain Notes: 6" high, 1 5/8" wide ceiling slat "baffle" system, slats 8" on center

C-2 Manufacturer: Armstrong Ceilings Type: 2x4 Lay-In Ceiling Panel - 15/16" Grid Selection: DUNE…