B77 Latrines-100pct-28Jul2021.pdf
PDF 4 MB Posted
- Attached to
- BLDG 77 Latrines and Room Addition Federal contract opportunity
- Solicitation number
- W91QF4-21-B-0004
About this file
This solicitation is for renovation work at Building 77 at Fort Leavenworth, Kansas. The work includes renovating six existing toilet rooms and creating two new unisex toilet rooms and a lactation room. The required scope of work includes demolition, new walls, flooring, plumbing fixtures, and finishes. The estimated value is between $100,000 and $250,000. The solicitation was issued by the Department of the Army Mission and Installation Contracting Command at Fort Eustis. The response due date is April 15, 2022. The period of performance is 90 calendar days from award. The contract will be a firm-fixed-price award. The solicitation sets aside the procurement for small business concerns only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IFB_Questions Answers_24Aug21.pdf | ||
| Amend 02_Sol_W91QF4-21-B-0004_Questions_Answers.pdf | ||
| W91QF4-21-B-0004_IFB_B-77_Latrines_Add_Room.pdf | ||
| WD-KS20200053-Building_09JUL2021.pdf | ||
| Amend 01_Sol_W91QF4-21-B-0004 Bldg_77_Latrines_Room_Addition.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABA Architectural Barriers Act ADA Americans with Disabilities Act AFF Above Finish Floor
Bldg Building CL Centerline Clg Ceiling CFM Cubic Feet per Minute CMU Concrete Masonry Unit CO Clean Out Conc Concrete
Ea Each Eq Equal
FD Floor Drain Ft Feet
Galv Galvanized GypBd Gypsum Board
HM Hollow Metal Ht Height
Insul Insulation
Mas Masonry Max Maximum Min Minimum
OC On Center Opp Opposite
N North NTS Not To Scale
Sched Schedule SF Square feet Sim Similar SS Solid Surface SS Stainless Steel
- Door Number
North Arrow
ROOM
NAME
Room Name Room Number
Graphic Scale
Detail Number
Origin Sheet Number
Scale
Detail Number
Sheet Number
Elevation Mark
Detail Reference
Detail Number
Sheet Number
Interior ElevationDetail Number
Sheet Number
Revision Reference
9' - 0" Ceiling Height
A
Wall Tag
Annotations and Symbols
Section Reference
A1 30.01
A1/30.01
A1 30.01
View Name 1/8" = 1'-0" View Title
NORTH
Name Elevation
0 2' 4' 8'
A1 30.01
See Mechanical, Electrical and Plumbing Sheets for related symbols
A-000 Cover Sheet
INDEX OF DRAWINGS
A-109 Specifications
A-101 Overall Floor Plans A-102 Demolition Plans A-103 Wall Types, Details A-104 Construction Plans A-105 Reflected Ceiling Plans A-106 ABA Elevations, Sections, Details A-107 Interior Elevations A-108 Schedules, Legends
P-101 First Floor A Section
PLUMBING
ARCHITECTURAL
GENERAL
P-105 Second Floor Section
P-102 First Floor A Section P-103 First Floor B Section P-104 First Floor B Section
MECHANICAL
M-101 HVAC Plans M-102 HVAC Plans
ELECTRICAL
E-001 General Information - Electrical ED-101 Demolition Plan - Electrical
EP-101 Power Plan New Work - Electrical E-501 Electrical Details and Schedules
A-110 Wall and Floor Finish Plans
P-602 Plumbing Sections
P-106 Second Floor Section P-501 Plumbing Details
EL-101 Lighting Plan New Work - Electrical
M-102 HVAC Plans
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-000
C ov er S he et
B7
La tri ne s
R ep ai r
JM JM
Architectural Symbols Legend Address: 290 Grant Avenue
Leavenworth, KS 66027
Scope of Work Summary: Renovation of six (6) existing toilet rooms and Break Room. Creation of two (2) unisex toilet rooms and a lactation room.
Applicable Codes: Univorm Fire Code (UFC) 2018 International Building Code (IBC) 2018 International Plumbing Code (IPC) 2018 International Mechanical Code (IMC) NFPA 70, National Electrical Code - UFC 3-501-01
Building Area: First Floor 42,230 SF (Exist to remain) Second Floor 24,844 SF
Total 67,074 SF
Project Area: Area 1A 309 SF Area 1B 814 SF Area 2 602 SF Total 1,725 SF
Occupancy Type: Business Group - B (Office)
Construction Type: IIIA
Sprinklered: Yes
Occupancy Count: 67,074 / 150 SF/P = 448 People (224 Men, 224 Women)
Plumbing Count:
Required Existing Proposed
Toilets/Urinals 1/25p first 50, 1/50 Men's: 9 toilets/5 urinals 5 toilets/5 urinals 6 toilets (and urinals* for Men) Women's: 7 toilets 8 toilets
Unisex/Family: 0 toilets 2 toilets
* Note: Urinals may be substituted for up to 1/2 of Men's required toilets. IPC 424.2
Lavatories 1/40p first 40, 1/80 Men's: 8 lavatories 5 lavatories - (M) 4 Lavatories (Men & Women) Women's: 6 lavatories 5 lavatories - (W)
Unisex/Family: 0 lavatories 2 lavatories
Drinking Fountains - 1/100 people Total: 0 drinking fountains 4 drinking fountains 5 Drinking Fountains
NOTE: Sprinkler adjustments to be design-build by the Contractor.
FORT LEAVENWORTH
DIRECTORATE OF PUBLIC WORKS
BUILDING 77 - 290 GRANT AVENUE
PROJECT SITE: Building 77 (B77) 290 Grant Ave.
Fort Leavenworth, KS
Gr an t A ve nu e
Mi ss ou ri R ive r
Reynolds Ave.
Gi bb on A ve
Cody Road
Stimson Ave.
Merritt Lake
Smith Lake
LOCATION MAP
Abbreviations Code Information Summary
Sh er ma n A ve nu e
100% DRAWINGS
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
A-102 C1
A-104 C1
A-102 C3
A-104 C3
AREA 1A
AREA 1B
Areas of Work
A-102 A1
A-104
A1AREA 2
Area of Work
1/16" = 1'-0"
A1 First Floor Overall Plan 1/16" = 1'-0"
A3 Second Floor Overall Plan
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-101
O ve ra ll
Fl oo r P la ns
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
N N
Floor to Building Key:
First Floor Areas Hatched
Floor to Building Key:
Second Floor Areas Hatched
M
AR
K D
ES
C
R
IP
TI
O
N D
Remove existing toilet, patch floor. Re: Plumbing
Remove existing toilet.
Prepare for new toilet. Re: Plumbing
Remove existing lavatory.
Carefully remove limted masonry for installation of new toilet. Re: Plumbing.
Remove existing toilet partition screens, posts, bars and all related appurtenances
Remove existing urinal
Remove existing 2'-10" x 7'-0" door and frame. Carefully cut opening 1" on either side for new 36" door.
Carefully remove masonry for new plumbing connection.
Re: Plumbing Dwgs.
Remove existing lavatories, Re: Plumbing
Remove existing damaged steam piping insulation, Re:
Construction Plan
Remove existing steam radiator cover. Prepare steam fintube for new covers. Protect all existing to remain from damage during project. Re: Mechanical.
Remove existing 2'-10" x 7'-0" door and frame. Carefully cut opening 1" on either side for new 36" door.
Remove existing toilet, patch floor. Re: Plumbing.
Remove existing toilet partition screens, posts, bars and all related appurtenances
Remove existing toilet.
Prepare for new toilet. Re: Plumbing
Existing floor tile flush with concrete to remain
Remove existing counter, cabinets, sink and related piping. Re: Plumbing Drawings
Remove existing modular walls and related doors
Care must be taken in demolition to not damage existing wall, double doors and finishes to remain. Brace existing wall to remain till new construction is in place
Remove existing toilets, urinals and lavatories, typical all. Re: Plumbing dwgs.
Remove existing toilet partitions and all related appurtenances
Remove door, frame and related masonry wall through new ABA stall. Re:
Construction Plan
Carefully remove existing masonry walls; protect existing walls to remain. Re: Construction Plan
Remove existing door and frame. Prepare opening for new door.
Re: Construction Plan
Remove existing toilets, urinals and lavatories, typical all. Re: Plumbing dwgs.
Remove existing toilet partitions and all related appurtenances
Remove existing entry partitions and all related appurtenances
Existing VCT flooring (verify) to be removed throughout existing Break Room
Existing floor tile flush with concrete to remain.
Protect existing carpet to remain in "Chief Plans & Op" room
Existing electrical cabinet to remain.
Protect throughout construction
Protect and maintain existing electrical conduit attached to wall and ductwork above
Protect existing "Air Handler Room" wall and door to remain
9' - 8 3/4" 3 3/4" 9' - 4" 2' - 0 1/2" 10' - 5 1/4" 3 3/4" 7' - 3 3/4"
1/
2"
Existing door to remain Remove wall full height for new 36" doors and frames
Existing fin-tube steam heaters and piping to remain, protect during project. Remove existing metal steam heater cover, typical in all three (3) rooms.
In both Men's and Womens toilet rooms, remove existing 8" thick clay tile/concrete flooring and related ramp ABOVE existing primary structural floor.
Contractor to take special care so as not to damage existing concrete floor.
Existing column to remain
NOTE: Contractor has option to leave wall in place and furr-out both sides within new restrooms and Mothers room (corridor would remain masonry). If option is taken, ABA tolerances will be tight in Mother's and Unisex toilet. Contractor to work with architect to ensure tolerances are met.
Remove existing lavatories, Re: Plumbing
Remove existing toilets (typical of 6)
Remove existing door and frame
Remove existing urinal
General Demolition Notes:
1. Contractor to remove all existing floor coverings. Anticipate +/- 5% subfloor replacement for bidding purposes.
2. Remove all toilets, urinals, lavatories (Re: Plumbing) and lighting (Re:
Electrical). Remove all toilet partitions and related appurtenances, mirrors, paper towel dispensers, soap dispensers, toilet paper dispensers, furniture and trashcans.
3. Protect all flooring, walls, ceiling surfaces, windows, steam heating elements, and any oother items existing to remain during demolition and construction activities.
4. Hazardous materials procedures.
5. All demolished materials will be removed from the site unless specifically noted to be salvaged or reused. Protect and store all items to be reused. Protect and store items where directed by Owner where noted to be salvaged.
6. Existing columns to remain and be protected. Refer to as-built structural drawings for locations.
7. Remove all interior suspended ceiling systems, light fixtures, toilet fixtures, toilet partitions, walls where noted, baseboard and miscelaneous appurtenances in their entirety where noted to be removed. Demolish where not shown or intended to be reused.
8. Mechanical, electrical and plumbing equipment to be removed as noted. Re: mechanical, electrical and plumbing plans.
9. All existing measurements are to be considered "+/-". All to be field verified by contactor.
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-102
D em ol iti on P la ns
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
1/4" = 1'-0"A-101
C1 Area 1A - Demolition Plan 1/4" = 1'-0"A-101
C3 Area 1B - Demolition Plan
1/4" = 1'-0"A-101
A1 Area 2 - Demolition Plan
N N
N
M
AR
K D
ES
C
R
IP
TI
O
N D
5/8" gypsum board over shimmed 7/8" metal furring. Prime and paint gypsum where exposed.
New Suspended Ceiling System, aluminum slat or lay-in cloud.
(Re: Finish Schedule)
Terrazo flooring over existing concrete floor
Description Wall tile over 5/8" gypsum on shimmed 7/8" metal furring at 24" on center over existing 3 5/8" masonry to remain. Provide blocking for new grab bars where located. Furred out walls to be built up to 6" above bottom of slat ceiling system (or 2" above ceiling in Area 1B).
WALL TYPE "1"
Interior Non-Load Bearing Partition to Deck
Existing 3 5/8" masonry to remain unless noted otherwise (approx.
1/4"+/- out of verticle plumb in some locations, verify)
Tile over 5/8" gypsum board, Re: Finish Schedule
Shimmed, 7/8" metal furring chanels Existing concrete structure above to remain
5/8" 7/8"
1/4"
5/8" gypsum board up to top of adjacent ceiling system; Prime and paint. Re:
Finish Schedule
Existing concrete floor to remain
Wainscot height wall tile over new shimmed 5/8" gypsum board.
Re: Finish Schedule. Re: Elevations
5 3/8"
3 5/8"Prime and paint (P6) items above ceiling.
Re: Room Finish Schedule Notes.
Slope to drain
Terrazzo wall base
5/8" gypsum board over shimmed 7/8" metal furring. Prime and paint gypsum where exposed.
New Suspended Ceiling System (Re: Finish Schedule)
Straight wall base flush with 3/4" Terrazo cove at edge of flooring
Description Wall tile over 5/8" gypsum on 5 1/2" metal studs at 24" on center over existing 3 5/8" masonry to remain. Provide blocking for new grab bars where located.
WALL TYPE "2"
Interior Non-Load Bearing Partition to Deck
Existing 3 5/8" masonry to remain unless noted otherwise (approx.
1/4"+/- out of verticle plumb in some locations, verify)
Tile over 5/8" gypsum board, Re: Finish Schedule
5 1/2" metal studs (for plumbing fixture carriers and Horiz. waste piping) Existing concrete structure above to remain
5/8" 5 1/2" 1/4"
3 5/8"
5/8" gypsum board; Prime and paint. Re: Finish Schedule
Existing concrete floor to remain
Wainscot height wall tile over new shimmed 5/8" gypsum board.
Re: Finish Schedule. Re: Elevations
10"
5 1/2" metal studs (for plumbing fixture carriers and waste piping)
As described above.
Prime and paint (P6) items above ceiling.
Re: Room Finish Schedule Notes.
5/8" gypsum board
3 5/8" metal studs
Acoustical insulation
5/8" gypsum board
Finish Floor
Description 3 5/8" metal stud to underside of concrete structure above, spaced max. 16" o.c. 5/8" gypsum board, staggered, each side of studs.
Acoustical batt insulation between studs to deck. Continue gypsum board to the underside of the deck. Use acoustical sealant to seal around openings and at the floor and deck. At walls above 12'-0" in height, use 20ga. metal studs.
WALL TYPE "3"
Interior Non-Load Bearing Partition to Deck
Acoustical insulation
Slip joint metal stud top track
3A
Acoustical Sealant
Acoustical Sealant
5/8" gypsum board
Resilient channel
3B
As described above.
As described above, but with 5 1/2” metal studs
As described above, but with only one (1) side of gypsum board
3C
As described above, but with 5 1/2” metal studs and only one (1) side of gypsum board3D
Existing masonry to remain to be widened for new door and frame.
Contractor's Option:
1) Replace 1 1/4" finish blocking with 3/4" thick blocking for 35" custom door and frame (Shown in THIS SECTION drawing); OR
2) overcut opening by 1" each side for new 36" wide door. Replace trim frame, blocking and stop with either solution. If cutting masonry, verify structural integrity of masonry jambs and lintel to remain prior to work.
Existing glazed masonry block to remain
Existing blocking to be replaced, verify. Provide treated wood blocking
Contractor to carefully remove frame, trim and door stop. Corridor Side
Room Side
New door, Re: Door and Frame Schedule
Pre-primed 16 gage hollow metal knock down frame with door stop. Bondo and sand smooth corner seams. Prime corners and paint all. Fill frame voids with batt insulation. Re: Finish Schedule.
Shimmed metal furring to make flush and true vertial face wall
5/8" Type "X" gypsum, prime and paint, typical. Re: Finish Schedule.
Sealant continous around both sides. Color to match door frame
3 5 /8"
1 3 /4"
5 3 /8"
Fill frame voids solid with sound batt insulation, typical
Metal studs with sound batt insulation, Re: Wall Types
New treated 2x wood blocking
Pre-primed 16 gage hollow metal knock down frame with door stop.
Bondo and sand smooth corner seams. Prime corners and paint all.
Re: Finish Schedule.
Corridor Side
Room Side New door, Re: Door and Frame Schedule
5/8" Type "X" gypsum, prime and paint, typical.
Re: Finish Schedule.
Sealant continous around both sides. Color to match door frame
Fill frame voids solid with sound batt insulation, typical
Partition per floor plan.
Provide continuous sealant both sides
Existing stone sill to remain. Protect during construction. Do not penetrate nor damage with attachments. typical.
Prefinished aluminum break metal cap to match window system, match building standard
Neoprene filler, color to match window system
3" 6"
Existing exterior glass to remain, protect during construction, typical.
Existing annodized aluminum frame sill to remain
Existing exterior sill to remain General Construction Notes:
1. The Contractor's Bid is based solely upon the Construction Contract Documents and properly issued Addenda and not upon any other written or oral representation.
2. All construction is to be in accordance with the Building Codes of the authorities having jurisdiction. Re: Cover Sheet.
3. All work shall be done in accordance with the highest quality industry standards for material and installation. All work will be warranted for one year unless stated otherwise. Repair or replacement of warranted work and any area affected by failure of warranted item, shall be the Contractor's responsibility.
4. The Contractor shall be responsible for verifying all dimensions, elevations and details shown on the drawings with existing conditions. Any discrepancies which will prevent the accomplishment of the intent shown on the drawings shall be brought to the immediate attention of the Architect.
Indicated conditions are not intended as representations or warranties of accuracy. It is expressly understood that the Owner will not be responsible for interpretations and conclusions drawn by the Contractor.
5. Should any questions arise regarding the interpretation of the Contract Documents, reference shall be made to the Architect whose written decision thereon shall be final and conclusive. No alleged oral admission, condonation, or inadvertent neglect on the part of the Architect and/or Owner shall be accepted as an excuse for failure to comply with the Contract Documents.
6. Dimensions shown on the drawings are to the finished face of materials and/or centerlines of structure, unless noted otherwise. Refer to enlarged floor plans for dimensions and additional information.
7. Provide solid blocking at all items attached to wall surface (i.e. door stops, grab bars, toilet accessories, millwork, etc). ABA grab bars to resist a minimum 250 lbs. vertically and horizontally.
8. Provide water stop and sealant at all construction joints below the finished floor.
9. The Contractor shall conduct all work in a safe and timely manner.
Provide and maintain all necessary guards for prevention of accidents.
Failure to reject faulty equipment or practices by the Architect/Engineer does not relieve the Contractor of his liability for personal injury or property damage. The Architect shall not be responsible for the means and methods of construction, safety issues, control or supervision of the work, nor items related to stoppage of work. The authority to stop work rests solely with the Owner and Contractor.
10. Thoroughly clean all work prior to final review. All splatters, marks, scratches, debris and defective materials or parts shall be removed or replaced. Carpets shall be vacuumed and the space shall be in a move-in condition.
11. The Contractor shall coordinate all dumpster locations with the Owner prior to placement of dumpsters.
12. Gypsum board partitions that are extended to the underside of concrete structure above shall have a slip-track attachment of steel stud, unless noted otherwise.
Existing concrete floor to remain
Gypsum board, new or existing to remain. Paint, Re: Finish Schedule
3/4" high +/- coved terrazzo as required for sloping floor to drain. Verify slopes along with 1/2" maximum flooring transitions to adjacent flooring. 3/8" min.
thickness terrazzo. 1/16" minimum slope per foot, 1/8" slope preferred, 1/4" max.
Re: Finish Schedule.
Re: Wall and Floor Finish Plan
Rubber base, straight.
Re: Finish Schedule
3/4" Rad.
terrazzo manufacturer verify final width with
Concrete board as recommended by terrazzo manufacturer
Silver-colored metal divider as recommended by terrazzo manufacturer
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-103
W al l T yp es , D et ai ls
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
1" = 1'-0"
C1 Wall Type 1 - 7/8in Furr-Out on Masonry 1" = 1'-0"
C2 Wall Type 2 - 6in Metal Stud on Masonry 1" = 1'-0"
C3 Wall Type 3 - Metal Stud Wall 3" = 1'-0"
C4 Door Jamb/Head Detail - Exist. Masonry Wall
3" = 1'-0"
D4 Door Jamb/Head Detail - New Wall
3" = 1'-0"
B1 Detail - Wall at Window
12" = 1'-0"
A4 General Construction Notes 3" = 1'-0"
A1 Wall Base Detail
M
AR
K D
ES
C
R
IP
TI
O
N D
New ABA toilet where existing removed. Re: Plumbing.
New Grab Bars and stall accessories. Re: Elevations and Toilet Accessories Schedule.
New ABA toilet where existing removed. Re: Plumbing
New standard Toilet, where existing lavatory removed. Re: Plumbing.
New standard (Non-ABA) height urinal where existing urinal removed (leading edge at 24" AFF). Re: Plumbing
3'
- 6
" 5" 1 3
/4" 5'
- 0 1/
4" 1"3'
- 0
5" 1'
- 7 3/
4" 3'
- 0
4 1 /2"
1 3 /4"
5'
- 0
1/ 4"
1" 5'
- 5 1/
2"
Fur-out walls, Re: Wall Types.
New Door and Frame, Contractor's Option:
1) 36" door and frame with modified rough opening
2) 35" door and frame with modified trim in exist.
rough opening. Re: Door Schedule
New Door and Frame, Contractor's Option:
1) 36" door and frame with modified rough opening
2) 35" door and frame with modified trim in exist.
rough opening. Re: Door Schedule
3'
- 9
3'
- 0
New high-low drinking fountains
Baby-changing station, Re: Toilet Accessories Schedule
Baby-changing station, Re: Toilet Accessories Scheule
3' - 0 1/4"
Concrete Beams in vault below, Re: Plumbing
New lavatory, typical one each restroom. Re: Plumbing
3' - 6" 5" 5' - 8 3/4"
Re-wrap insulate steam pipe, cover horizontal with hard plastic casing
Paper Towel Dispenser.
Re: Toilet Accessories Schedule
Notes: 1. New Steam Radiator Covers: Verify all dimensions and full operations and maintenance access to all steam controls with Owner prior to work. Re: Fixture Schedule.
2. Clean and refurbish existing window sills to remain; protect throughout project.
3. Thoroughly clean existing windows to remain; protect throughout project.
4. Final placement of floor drains as shown, to be out of main walkways.
Toilet partitions, Re: Toilet Accessories Schedule.
Removable toilet partition at window wall (for privacy from window, removable for future pipe access)
3A
3A
3A
3A
1' - 10"
1'
- 1
0"
4 1/4" max. 4 1/4" max
" c lea r do or 32
" c lea r do or
ABA ABA
Shelf with built-out wall below, Re: Shelf DetailsNew radiators and pipe cover (4'-8" long, 2'-5"+/- high 1'-2"+/- deep, verify all), Re: Toilet Accessories Schedule.
Verify continuous controls access to all controls.
New radiators and pipe cover (6'-0" long, 2'-5"+/- high, 8"+/- deep, verify all), Re: Toilet Accessories Schedule max.
8".
Women
Men
A-106 sim.
sim.
A-106 sim.
sim.opp.
opp.opp.
opp.
A-106D1
7 3/4"
1" 5' - 0"
1" verify 3' - 11" +/- 1 3/4"
3 3/4"
1 3/4" verify 5' - 6 1/4"
1" verify 4' - 0 3/4" +/-
1 3/4"
Paper towel dispenser. Re: Toilet Accessories Schedule
1 2
Paint all sides of concrete column to match wall
Prime and paint existing masonry jambs and underside of header to match wall paint, including all sides steel angle trim (not aluminum window frames). Re: Room Finish Schedule.
To maintain ABA door pull clearances, do not furr out column
2' - 6"
D5
D4
D5
D4
A-107 C1
FD FD
1 3
/4"
5 1
/4"
1 3
/4"
9 1 /2"
Mirror Not over Lavatory, Re: Toilet Accessories Schedule
New wall paint and base to match existing white corridors. Re-mount existing "Women" sign
NOTE: White rubber floor base at new drinking fountain walls to match existing adjacent walls
ABA Sign, Re: "ABA Sign Elevation" Sheet A-106
ABA Sign
2" 2' - 0" 3' - 6"
1 3 /4"
8'
- 8
1/ 2"
1 3 /4"
7'
- 1
0 1 /4"
5"
2'
- 6
5'
- 4 1/
4"
5' - 6 3/4" 5" 4' - 11 3/4"
3'
- 3
Notes:
1. Plumbing wall in Mens toilet room may be replaced as shown or existing to remain, contractor's option, as is most efficient. If retained, the wall must be furred out for new tilet and paint finishes. Also, the wall behind the urinal and lavatories will require a full stud wall build-out to provide carriers for wall hung urinals and lavatories.
2. Note that most restroom plumbing in existing locations
3. Floor drains, urinals and clean-outs intentionally placed over the Basement pipe tunnel below to increase access and reduce plumbing costs. If it helped for current or future access, we could cut the pipe chase to be larger over the pipe tunnel. Drawing reflects a direct clean out in pipe tunnel below, and another clean-out low on the lavatory side wall.
New Doors and Frames, Contractor's Option:
1) 36" door and frame with modified rough opening
2) 35" door and frame with modified trim in exist. rough opening. Re: Door Schedule
Ice Mach.
Ref.
New double basin sink, Re: Plumbing drawings
13' - 4" 2' - 1"
Wall outlet
ABA
ABA
4' - 2" 2" +/-
New accessible Baby Changing Station, Re: Toilet Accessories Schedule One (1) new double lavatory per restroom. Re: Plumbing drawings.
New accessible Baby Changing Station, Re: Toilet Accessories Schedule
4 3 /4"
2'
- 2
1/ 2"
3'
- 0
3'
- 3
3/ 4"
5'
- 0
Exist. pipe tunnel below, Re: Plumbing
ABA
4' - 2 1/4"
Existing corridor double doors and wall to remain
FD
FD
Men
Women
Break
Family
3'
- 0
5 1
/4" 1'
- 1 0"
2'
- 7
2'
- 6
3/ 4"
1'
- 1
0" 5"
3'
- 6
Existing piping to remain, Reinsulate to make new.
Paint pipes to match adjacent wall
3'
- 0
1 3 /4"
9'
- 2
1 3
/4"
A-106
A-106
32" clear door
32" clear door
3 3 /4"
A-106
C4
C5
New ice machine and refrigerator provided and installed by Owner
Shelf with wall build-out below, Re: Shelf Details
5' - 8" 1" 2' - 8" 1"2' - 9 1/4"1" 2' - 5" 5" 6' - 1" 5" 4' - 2 1/4" 1 3/4"
1'-3" min 1' - 5" Existing 6' - 1"
Shelf with wall build-out below, Re: Shelf Details
Paper Towel Dispenser, typical of 2 per restroom.
Re: Toilet Accessories Sched.
B
A
3A
3A
3A
3A
3C
3A
2 1 /2"
3B
3B
3D
3C
3A
3A
3A
3A
5' - 0 3/4" 1"
2' - 9 1/4" 1"
2' - 8" 5"
6' - 8 1/2" 5"
5'
- 0
3B
D4
D5
D4
D5
A-106
D4
D5
30"x60" inside dim. ABA fiberglass Shower with grab bars and seat. (Re: Plumbing drawings), Shower Rod (Re: Toilet Accessories Schedule). Freedom, Mod.# APFQ6233BFF875L or approved equal.
A-107 C3
A-107
A1
1'
- 1
1 1 /2"
5"
4' - 0" +/-
A-107
4A
Solid surface counter with sides and back splashes with integral lavatory and accessible controls. Wall tile full height on three sides to inside corners.
Re: Plumbing. Re: Elevation
5" 5"
1'
- 8
FD
Unexcavated both sides
4"
4 1 /4" opposite
MatchTerminate wall tile
Terminate wall tile
22' - 4 1/2"
NOTE: Corridor side faces of walls being replaced to align with existing and existing adjacent, typical
10' - 11 1/2" 6 3/4" 24' - 10 1/2"
One stud width bump out each side (create tiled lavatory alcove)
Align
ABA Sign, Re: "ABA Sign Elevation" Sheet A-106
ABA Sign, Re: "ABA Sign Elevation" Sheet A-106
ABA Sign, Re: "ABA Sign Elevation" Sheet A-106
ABA Sign, Re: "ABA Sign Elevation" Sheet A-106
Cl ea r
Full length mirror (not over Lavatory) centered in wall, Re: Toilet Accessories Schedule
Two (2) robe hooks on centered behind door.
Re: Toilet Access. Sched.
(Mount 46" and 60" AFF)
A-107
A1 sim.
2' - 9"
3" 2' - 6"
8'
- 0
1/ 2"
6 3 /4"
5'
- 5
5"
5'
- 0
New Door and Frame. Contractor Option:
1) 36" door and frame with modified rough opening
2) 35" door and frame with modified trim in exist. rough opening. Re: Door Sched.3' - 11 1/2"
1" 5' - 0"
1 3/4" 2' - 0 1/2" mi n.
1'
- 6
ABA
New 36" door, Re: Door Schedule
New 36" door, Re: Door Schedule
New radiators and pipe covers (one 4'-10" long and one 4'-2" long, 2'-10" high, 6" off wall, verify all), Re: Toilet Accessories Schedule. Verify easy access to units & controls
New radiator cover (3'-10" long, 2'-10" high, 6" off wall, verify all), Re: Toilet Accessories Schedule
3' - 6" 5' - 8 1/4"
4'
- 8
1"
2'
- 1
0"
1" 5'
- 3
5"
2'
- 7
Infill existing door opening with framing and gypsum board, prime and paint to match in existing room to remain. Match baseboard.
5'
- 5
1/ 4"
1" 2'
- 9
1" 5'
- 0
5" 6'
- 0
ABA
ABA
New radiator cover (6'-6" long, 2'-10" high, 6" off wall, verify all), Re: Toilet Accessories Schedule
1' - 10".1' - 10" 4"
3' - 4"
1 3/4" +/-furred out walls
9' - 0 1/2" +/- to face of 1 3/4"
2' - 0 1/2" 9' - 6 1/4" 5" 7' - 11 3/4" +/- 1 3/4" +/-
1' - 6"1' - 2 1/4"
4" 1' - 10"
9"
Terminate new wall at existing window glazing with neoprene gasket, Re: Sheet A1 "Detail - Wall at Window".
New accessible Drinking Fountains, Re: Plumbing Schedule and Elevation
Existing masonry wall to remain
Existing masonry walls to remain
Existing door and frame to remain
New undercounter refrigerator Countertop with integral sink, back and sidesplashes, Re:
Section and Finish Schedule.
New ABA Toilet, Grab Bars and Lavatory.
Re: Elevations. Re: Plumbing
30"x60" inside dim. ABA fiberglass Shower with grab bars and seat. (Re: Plumbing drawings), Shower Rod (Re: Toilet Accessories Schedule). Freedom, Mod.# APFQ6233BFF875L or approved equal.
New Standard and ABA urinals. Re:
Elevation and Plbg. Fixture Sched.
New Standard and ABA toilets, Re: Elevation and Plbg. Fixture Schedule
Urinal Screen and Toilet Partitions, typical.
Re: Toilet Accessories Schedule
New double Lavatories Mirrors and Accessories, Re: Elevations and Plbg. and Toilet Accessories Schedules, typical.
Existing steam heater and cover to remain
New Shelf with built-out wall below, Re: Section, typcal one each restroom.
Women
Men
Mothers
Unisex
5'
- 9
1/ 2"
1'
- 1
0"
New Shelf with built-out wall below, Re: Section, typcal one each restroom except Floor 1 “Family” Toilet room.
A-106
5' - 0" 1"
4' - 5 1/4"
A-106 sim.opp.
sim.opp.
A-106
D1
A-106
2'-0" wide partition
32" clear door32" clear door
3A
3C
3A
Notes: 1. Existing toilet room plumbing wall and corridor wall replacements to be in place of existing. It is the Contractor’s option to retain existing masonry walls between Mens and Womens rooms and furr out with Wall Type 1.
2. Clean and refurbish existing window sills to remain; protect throughout project.
3. Thoroughly clean existing windows to remain; protect throughout project.
4. Final placement of floor drains to be in stalls at partitions, out of main walkways.
8"
5' - 0" minCL
A-106 C4
C5 201 202 204
Note: Contractor may at its option leave 18” of existing masonry wall in place below window sill around pipe and “jog” wall to glazing. If so, masonry must be completely concealed, with seamless gypsum.
3A
3A
3A
3A
3A
3D
2'
- 1
3A
Easily removable side partition for radiator access
D5
D4
D5
D4 D4
D2
A-106
A1
FD
FD
FD
5 1 /4"
Ve r ify
1/
4"
1' - 8" +/-
Mirror not over Lavatory, Re: Toilet Accessories
Mirror not over Lavatory, Re: Toilet Accessories Schedule
8"
ABA Sign, Re:
Elevation Sheet A-106
ABA Sign, Re:
Elevation Sheet A-106
6"
ABA Sign, Re: Elevation Sheet A-106
ABA Sign, Re:
Elevation Sheet A-106
Two (2) robe hooks on centered in wall. Re: Toilet Access. Sched.
(Mount 46" and 60" AFF)
A-107 A1
A-107A1 sim.
sim. 6'
- 6
1/ 4"
18"min
1' - 9" 5"5" 1' - 9"
2'
- 1
3' - 5" 5"
2"
2"
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-104
C on st ru ct io n Pl an s
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
1/4" = 1'-0"A-101
C1 Area 1A - Construction Plan N N
N
1/4" = 1'-0"A-101
C3 Area 1B - Construction Plan
1/4" = 1'-0"A-101
A1 Area 2 - Construction Plan
M
AR
K D
ES
C
R
IP
TI
O
N D
New gypsum board soffits at 8'-2" above floor, typical at lavatories in both restrooms. Paint bottom and sides P6. Paint face of soffits up to structure above. Re Finish Legend. Re: Electrical drawings.
Suspended slat ceiling system. Bottom of slats to be mounted at 8'-6" above floor.
Re: Finish Schedule.
sy st e m, ty p ic al
8" on ce nte r c eil ing
Eq
Eq. 8' - 0" Eq.
ce ili n g s ys te m , ty pi c al
8" on ce nte r
7' - 0"
4'
- 8
4'
- 8
4'
- 8
1'
- 4
4'
- 0
4'
- 0
1'
- 2 3/
4"
Throughout both restrooms paint from the level of the top of the ceiling system (9' - 0" AFF) and above: all walls, concrete structure above, conduit, ductwork, diffusers, all pipes except sprinkler piping and heads, and all appurtenances other than chrome or stainless steel. Verify all and any items not designated with Owner prior to work.
Four (4) 4'-0" light fixtures in Women's and three (3) fixtures in Men's. Re: Electrical drawings
Eq. 8' - 6" Eq.
4' - 6"
Eq. 6' - 0"
6' - 6" 1" 1' - 9"
8' - 6"
1" 1'
- 9
One (1) down "can" light centered in soffit. Typical each restroom.
Re: Electrical Drawings.
2'
- 6
1/ 2"
Existing pipes to remain, typical
6' - 1"
1'
- 9
Eq
4'
- 0
Eq
Eq.
2 x Eq. Eq.
Eq
Eq
Build face of gypusum soffits up to structure above. Paint bottom and face of soffits up to structure above Two (2) surface-mounted light fixtures. Typical both restrooms.
Re: Finish Legend.
Re: Electrical Drawings.
Four (4) 4'-0" and one (1) 2'-0" light fixtures, align east end of all strip light fixtures. Re: Electrical drawings system at 8'-6" above floor 8" on center ceiling
4' - 8" 4' - 8" 6' - 0" 5' - 4"
8'
- 0
Eq
7'
- 0
Eq
5'
- 0
Align east end of all ceiling boards, typical in Men's restroom
Eq. 2 x Eq. Eq.
Eq .E q.
2'
- 1
Eq. 4' - 0" 4' - 0" Eq.
2' - 0" x 2' - 0" light fixtures, typical. Re: Electrical drawings
Build soffit up to structure above.
Paint bottoms and sides P6. Two
(2) surface-mounted light fixtures.
Re: Finish Legend.
Re: Electrical drawings
New 2'x4' lay-in ceiling system, typical of 3 "clouds" (looks like 1'x1') Re: Finish Schedule
Re: Finish Schedule ceiling system 8" on center
Re: Finish Schedule
Eq. 2 x Eq. Eq.
1'
- 9
Eq .E q.
2x4 lay-in ceiling system (with 2'x2' look). Align grid through doorway opening. Re: Finish Schedule for grid and ceiling panels.
6"
6" 7'
- 3 3/
4" 6"
6" 6"
4"
6"
6" 6"
6" 6"
Throughout Men's and Unisex restrooms and Break Room paint from the level of the top of the ceiling system (Mens 8' - 10" AFF, Womens 8' - 2" AFF, Unisex, 8' - 10" AFF, Break Rm 9' - 6" AFF) and above: all walls, concrete structure above, conduit, ductwork, diffusers, all pipes except sprinkler piping and heads, and all appurtenances other than chrome or stainless steel. In Women's room, start paint at 2" above bottom of grid ceiling and paint elements described above. Verify all and any items not designated with Owner prior to work.
Eq
Eq
Suspended slat ceiling system. Bottom of slats to be mounted at 8'-4" above floor. Re: Finish Schedule.
Suspended slat ceiling systems. Bottom of slats to be mounted at 8'-8" in Unisex Toilet and in Break Room. Re: Finish Schedule.
Eq
5'
- 3
8' - 4"
Five (5) 4'-0" light fixtures. Re:
Electrical drawings
8' - 0"
7' - 8"
A-107
A1
A-107
4A
One (1) down "can" lights above shower level with slat ceiling, center in slats and above shower. Re: Electrical drawings
4'
- 9
5'
- 0
1'
- 0
3'
- 6
8" 7'
- 0
8" 3'
- 6
1'
- 0
9' - 0"
8' - 6"
8' - 6"
7' - 11"
Eq
Eq Eq
7' - 11"
Note: Under-cabinet lighting below the upper cabinets, Re: Section and Electrical drawings.
4'
- 7
4'
- 0 1/
4" 4'
- 8
4'
- 0
5' - 10"
2' - 6"
3'
- 4
4'
- 8
7'
- 4
3/ 4"
1'
- 7
1/ 4" sy st e m, ty p ic al
8" on ce nte r c eil ing sy st e m, ty p ic al
8" on ce nte r c eil ing
6' - 6"
Gypsum soffit built up to concrete structure above, Paint bottom and side wall(s) P5. Re Finish Legend.
Throughout all three (3) restrooms paint above the level of the top of the slat ceiling system (9' - 0" AFF) and Mothers room above ceiling side trim (8' - 10" AFF): all walls, concrete structure above, conduit, ductwork, diffusers, pipes and pipe-wrap (except sprinkler piping and heads), and all appurtenances other than chrome or stainless steel. Verify all and any items not designated with Owner prior to work.
Re: Finish Schedule and Legend.
2' - 4"
1'
- 0
Eq. 4' - 9" Eq.
ce ili n g s ys te m 1'
- 4 " o n c en ter
Existing low duct at 7'-4" above floor - below 8' - 10" (level of top of ceiling side trim) paint to match adjacent walls, above 8' - 10" paint black (P-6) Re:
Finish Schedule and Legend typ ica l
Two (2) 4'-0" light fixtures in Unisex toilet room, centered between walls.
Re: Electrical drawings
Four (4) 4'-0" light fixtures in each of Mens and Womens Rooms, centered between walls.
Re: Electrical drawings shower
2' - 6"
Eq
One (1) down "can" light centered in shower (no ceiling over shower). Re:
Electrical Drawings
Suspended slat ceiling system.
Bottom of slats to be mounted at elevation shown on Room Finish Schedule, typical.
Eq. 8' - 0" Eq.
Eq. 8' - 0" Eq.
8' - 2" 8' - 2"
Eq.Eq.
1' - 9"1' - 9"
Eq.Eq.
Eq
2 x E q.
Eq
Eq
2 x E q.
Eq
6 1 /2"
3' - 9"
2'
- 1
3' - 5"
8' - 0"
2'
- 0
8"
8"
Suspended slat ceiling system at 8" on center.
Bottom of slats to be mounted at elevation shown on Room Finish Schedule, typical.
4'-0" light fixture, centered.
Re: Electrical drawings
Two (2) down "can" lights between lay-in "cloud" and wall Re: Electrical drawings
4" 3" Eq
7' - 0" Eq
Eq 2 x Eq Eq
8' - 6"
1' - 0"
Two (2) downlights surface mouinted flush in soffit, typical, Re: Electrical
One (1) down "can" light centered in soffit. Re:
Electrical Drawings
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-105
R ef le ct ed C ei lin g Pl an s
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
N N
N
1/4" = 1'-0"
C1 Area 1A - Reflected Ceiling Plan 1/4" = 1'-0"
C3 Area 1B - Reflected Ceiling Plan
1/4" = 1'-0"
A1 Area 2 - Reflected Ceiling Plan
M
AR
K D
ES
C
R
IP
TI
O
N D
High fountain to have prefabricated cane-detectable skirt by drinking fountain manufacturer. Height to match elevation of adjacent low fountain.
Wall paint and rubber Wall base to match existing adjacent white wall
Paint new gypsum wall to match existing
Note: Verify and provide carrier or blocking support requirements mi n.
cle ar r o ll-u nd e r
2'
- 3
" a bs olu te ma x.
ca ne de tec tio n
" m in.
, 4
3 " m ax
3'
- 4 sp ou t o utl et to lo w sp ou t 2'
- 9 1/
2"
ABA/ANSI compliant drinking fountains centered in wall, Re: Plumbing Drawings
1/2"
2'
- 1
0"
5' - 0"
1' - 6" 3' - 0" 6"
Back Wall
Shower controls location
" m in.
, 1
9 " m ax
1'
- 6
ABA compliant fold-down shower seat
2% max. floor slope to drain
2 1/2" max.
16" max.
15" min.
2' - 3" max
ABA-compliant grab bars
3'
- 2
" m in
4'
- 0
" m ax
Note: Final grab bar selections to be coordinated with shower unit. Side bar must not be over seat.
2' - 6"
2'
- 1
0"
Side Wall
6" max.ABA-compliant grab barsSolid surface counter with eased top and bottom edges.
Both outside corners to be radiused 3/4" in plan
Wall base. Re: Schedule
5/8" gypsum board over 3 5/8" metal stud; prime and paint. Re: Finish Schedule
(A
BA
- 4 0"
A
FF
m in )
3'
- 4
9" typ.
1"
SECTION
PLAN
9"
1' - 10"
3/4" overhang typical
9"
1' - 8" 1"
3/4" radiused all outside corners, typical
Area 1A Areas 1B, 2
(3 4" m ax
2'
- 9 max.
4" working position stored position to o p er ati on of al l e lem en ts 4'
- 0 " A
FF
m ax plumbing wall 1' - 8" min from of sa nit ar y n ap kin 2'
- 6 " m ax . to to p dis po sa l u nit ele ctr ica l &
1'
- 3
" m in to da ta ou tle ts Fir e A lar m Pu ll S tat ion s
Th er mo sta ts
Sw itc he s
Co at
Ho ok
So ap
Di sp en se r
Pa pe r T ow el Di sp en se r
De vic e H old er min.
3' - 6"
2'
- 1
0" max.
1' - 0" cle a r an ce
1 1 /2" m in.
(3 9" m in.
, 4 1" m ax
3'
- 3 1/
2" mi n .
1'
- 6 pa p e r o utl e t 1'
- 8
Wall base Re: Finish Schedule
Toilet paper dispenser
Accessible toilet, Re:
Plumbing
ADA accessible grab bars cle ar un de r b ar
1 1 /2" m in.
(7"to9") 11"
(39" min., 41" max.)
3' - 4"
4' - 6" min
Re: Room Finish Schedule for wall finishes
Til e
Pa int Schluter strip
5'
- 0
New accessible grab bars.
Mount with blocking to reinforce for ADA required 250 lb forces. Contractor to be careful so as to minimize the cut into existing wall covering
Wall base, re: Finish Schedule
New accessible toilet with flush operator on the open side, adjust centerline of toilet
Flush operator on "open" side of toilet (if not an automatic flush)
24" x 36" channel-framed miror fully adhered to wall, centered above lavatory min.
1' - 0" min.
2' - 0"
2'
- 1
0"
Accessible lavatory centered in wall; insulate all pipes and sharp edges below. Re: Plumbing.
ro ll- u nd er
2'
- 3
" m in
Lavatory height:
27" min. for roll-under 27" max. cane-detection lav a to ry rim
2'
- 1
0" m ax . to re fle cti ve su rfa ce 3'
- 4 " m ax . to m irr or
1' - 5"
7' - 11 1/2" +/-
(4 8" m ax
) t o t op of sh elf
3'
- 4 mi n)
Paper towel dispenser adjacent the lavatory, bottom level with mirror. Re: Toilet Accessories Schedule cle a r
1 1 /2" m in
Gypsum soffit over lavatory and aluminum ceiling system, Re: Reflected Ceiling Plan
Full height polished tile.
Re: Finish Legend.
Re: Wall and Floor Finish Plan.
Gypsum Board, paint. "Bump-outs at sink up to structure above.
Re: Finish Schedule
Wall Tile. Re: Wall and Floor Finish Plan. Re: Typ. Wainscot Tile Elevation
Wall base Re: Finish Schedule
Accessible toilet, Re:
Plumbing
ADA accessible grab bars
1 1/2"
2' - 0" 1' - 0"
2'
- 1
0"
Flush operator open side (if not automatic)
(16" min., 18" max.)
1' - 5"
Til e
Pa int Schluter strip
5'
- 0
1x4 framing
Wall base;
Re: Finish Schedule
Solid surface countertop with 3/4" x 4" backsplash
4" wire pulls
Plastic laminate base cabinet with melamine clad interior
3/4" melamine clad interior and adjustable plywood shelves
1/4" melamine clad hardboard back
Kitchen Sink, Re: Plumbing drawings
Gypsum board, paint.
Re: Finish Schedule
Insulate all pipes and sharp edges under sink
Plastic laminate upper cabinet
2' - 1"
2'
- 9
1/ 2"
1'
- 6
1/ 2"
3'
- 0
7'
- 4
Under-mount sink with 1/4" counter overhang. Clear sealant around
Undercabinet light. Re: Electrical.
1x4 framing
Wall base;
Re: Finish Schedule
Solid Surface (SS-1) with 3/4" x 4" backsplash
4" wire pulls
Plastic laminate base cabinet with melamine clad interior
3/4" melamine clad interior and adjustable plywood shelves
1/4" melamine clad hardboard back
Plastic laminate upper cabinet
4" wire pulls
Plastic laminate base cabinet with melamine clad interior and adjustable shelf2'
- 9 1/
2" 1'
- 6 1/
2" 3'
- 0
7'
- 4
" Undercabinet light. Re: Electrical.
8'
- 1
0"
Pa int
P 6 ( ab ov e c eil ing
Re : F ins ih
Le ge nd Pa int
Re : R oo m
Fin . S ch ed
New lay-in ceiling "cloud," Re: Finish Legend, Re: Reflected Ceiling Plan Paint new gypsum board, Re: Room Finish Schedule
Solid surface counter with back and side splashes and 22 1/2" wide x 16" x 6" deep rectangular integral sink (SS-2) with 1" rounded corners, centered with mirror. Re: Finish Legend.
2'
- 1
0" (m ax )ADA-height mini-fridge supplied and installed by
Owner
(30" min. clear) 2' - 9"
15" min.
1' - 4 1/2" mi n.
ro ll-u nd er
2'
- 3
" c lea r 7"
4"
Insulate all pipes and sharp edges below sink
24" x 36" Channel-framed Mirror centered over lavatory, Re: Toilet Accessories Sched.
re fle cti ve su rfa ce 3'
- 4 " m ax to
Soap dispenser, Re: Toilet Accessories Schedule
Paint (P6) above ceiling and ductwork, Re: Finish Legend
2'
- 6
1/ 2"
3 1 /2"
4"
Wall support below counter
Baseboard, Re: Finish Schedule
Open below counter Open below counter
ABA Accessible Urinal, Re: Plumbing
1'
- 5 min 1' - 3" min 1' - 3"
4'
- 0
" m ax
3'
- 1
0" maximum 1' - 6"
Signs to be ABA - compliant including but not limited to:
- Raised Tactile and visual contrasting letters 5/8" to 2" high with non-glare finish,
- Braille below tactile letters Signs to be carved solid surface.
Refuge Area of
" m ini mu m
" m ax im um pic to g ra ms 6" hi gh m in.
wh er e p ro vid ed
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-106
AB
A
El ev at io ns , S ec tio ns , D et ai ls
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
3/4" = 1'-0"A-104
D1 Elevation - Drinking Fountains
1/2" = 1'-0"A-104
C4 ABA Shower Elevation - Back Wall 1/2" = 1'-0"A-104
C5 ABA Shower Elevation 3/4" = 1'-0"
C3 Shelf Details 3/4" = 1'-0"
B2 Baby Changing Table 3/4" = 1'-0"
B1 ABA Wall-Mounted Elements
1/2" = 1'-0"A-104
D4 ABA Toilet Elevation - Side Wall (FV) 1/2" = 1'-0"A-104
D2 ABA Toilet Elevation - Plumbing Wall (FV - 1/2" = 1'-0"A-104
D5 ABA Toilet Elevation - Rear Wall (FV)
3/4" = 1'-0"A-107
A3 Break Room Sink Section 3/4" = 1'-0"A-107
A2 Break Room Cabinet Section 1/2" = 1'-0"A-104
A1 Elevation Mothers Room
1/2" = 1'-0"
C6 ABA Urinal Elevation
1/2" = 1'-0"
A4 ABA Sign Elevation NOT USED
Flush Valve)
M
AR
K D
ES
C
R
IP
TI
O
N D
3/
4" A
FF
2'
- 9 1/
2"
Fr on t e dg e 5'
- 0
8'
- 6
6" pip es an d s tru ctu re Pa int (P
4) w all s, 9" 6'
- 0
Paint (P4) walls, pipes and structure above ceiling (Re: Finish Legend and plan note)
Wall Tile, Re: Finish Schedule
Wall Paint, Re: Finish Schedule
Slat open ceiling system, Re: Finish Schedule
Toilet Partitions, Re: Floor Plan and Toilet Accessories Schedule
Re : D eta ils
3'
- 4 mi
n) sh elf mo rro r r efl ec tiv e s ur fac e
3'
- 4
" t o b ott om of
24"x36" channel-framed mirror, centered over lavatory. Re: Toilet Accessories Schedule
Furred out walls up to top of ceiling level
"Fin" wing walls to structure above
New door and frames.
Re: Details and Door and Frame Schedule
Rubber wall base over epoxy terrazo cove base. Re: Detail A1/ A-103.
Re: Room Finish Schedule & Legend
New toilet, Re: Plumbing drawings
New ADA-compliant lavatory Re: Plumbing drawings
Solid surface shelf with wall build-out below, Re: Details
Equal Equal
Wall Paint, Re: Finish Schedule 3'
- 1 0"
Paper towel dispenser Re: Toilet Accessories Schedule
Strip light fixtures between slat ceiling system. Re: Electrical drawings
Face of gypsum soffit, Paint (P5), Re: Finish Legend and plan note
4"
Soap dispenser.
Re: Toilet Accessories Schedule
Terminate tile at inside corner on entry side of wing wall
Wall clean out, Re: Plumbing drawings
Full height tile on wall behind lavatory. Re: Finish Legend, Wall and Floor Finish Plan
" m ax 1'
- 4 1/
2"
2'
- 0
2' - 5" 2' - 9 1/4"
9" 6'
- 0 "8'
- 4
Paint (P4) walls, pipes and structure above ceiling (Re: Finish Legend and plan note)
Wall Tile, Re: Finish Schedule
Wall Paint, Re: Finish Schedule
Slat open ceiling system, Re: Finish Schedule
Toilet Partitions, Re: Floor Plan and Toilet Accessories Schedule
24"x36" channel-framed mirrors, centered over each lavatory, typical of 2.
Re: Toilet Accessories Schedule
Furred out walls up to top of ceiling level
Both "Fin" wing walls to be built up to structure above
Rubber wall base over epoxy terrazo cove base. Re: Detail A1/ A-103.
Re: Room Finish Schedule & Legend
New toilet, Re: Plumbing drawings New ADA-compliant double lavatory centered in alcove, e: Plumbing drawings
Solid surface shelf with wall build-out below, Re: Details
Paper towel dispenser, typical of 2.
Re: Toilet Accessories Schedule
Strip light fixtures between ceiling slat system.
Re: Electrical drawings
Face of gypsum soffit, Paint (P5). Note: side and end of wing walls to match adjacent wall paint above and below ceiling. Re: Finish Legend and plans.
New ABA toilet and grab bars, Re: Plan and Elevations.
Re: Plumbing drawings
ABA urinal Re: Plumbing drawings
Standard urinal Re: Plumbing drawings
Wall Paint, Re: Finish Schedule
4"
Soap dispenser, typical of 2.
Re: Toilet Accessories Schedule
2'
- 9
1/ 2" ma x.
bo tto m of
3'
- 4
" m in top of sh elf mi rro r r efl ec tiv e s ur fac e
EqualEqual
Terminate tile at inside corner created at end of wing wall by lavatory, Re: Wall and Floor Finish Plan
Til e w ain sc ot 5'
- 0 " 1 1
/2" 5 1
/2" mi n r oll
-u nd er 2'
- 3 " a bs olu te ma x c an e-de tec tio n
2'
- 1
0"
1' - 8"
Insulate all pipes and sharp edges below lavatory and counter
Solid Surface (SS-2) countertop with 4" sides and back splashes and integral 22 1/2" x 13" x 6" deep (inside dimensions) oval lavatory with 3/4" recessed front apon, with accessible faucet controls. Full width tube steel support behind apron. Re:
Plumbing
Back-lit mirror centered over lavatory. Re: Toilet Accessories Schedule. Re: Electrical re fle cti ve su rfa ce 3'
- 4 " m ax to m irr or
8'
- 8
Rubber wall base over epoxy terrazo cove base. Re: Detail A1/ A-103.
Re: Room Finish Schedule & Legen
4"
Gypsum board, paint.
Re: Room Finish Schedule
Gypsum board face of soffit, paint (P5). Re: Finish Legend Gypsum board wing wall, paint above ceiling (P5).
Re: Finish Legend
Open slat ceiling system, Re: Finish Legend, Re: Reflected Ceiling Plan
Suspended light fixture, mount flush with bottom of ceiling, Re: Electrical.
Re: Reflected Ceiling Plan
Gypsum board, paint.
Re: Room Finish Schedule
Paper towel dispenser, Re: Plan.
Re: Toilet Accessories Schedule
Soap dispenser, Re: Plan. Re: Toilet Accessories Sched.
Wall tile full height behind lavatories Re: Room Finish Schedule
1/2"
25" deep solid surface countertops with 4" high back and side splashes.
Re: Finish Legend
Plastic laminate wall cabinets with adjustable shelves. Re: Finish Legend
Plastic laminate base cabinets, Re: Finish Legend
Accessible under-mount sink with disposal, centered in cabinet.
Re: Plumbing drawings
Wall Base, Re: Finish Legend
Filler strip to match
Filler strip to match
3614 3614
3924 3624 36241524
Wall Base, Re: Finish Schedule
Accessible Refrigerator, supplied and installed by
Owner Accessible
Ice Machine, supplied and installed by
Owner
Note: Contractor to verify all equipment with Owner prior to shop drawings being submitted, including Refrigerator and Ice Machine
New lay-in ceiling system Re: Finish Legend Re: Reflected Ceiling Plan
Pa int
P 9 ( ab ov e c eil ing
Re : F ins ih
Le ge nd Pa int
Re : R oo m
Fin . S ch ed
9'
- 6
Paint new gypsum board, Re: Room Finish Schedule
Wall Tile (cross-hatched) to wrap wall and column east of counter, and built-out wall adjacent to counter on west. Use light color for 4" checkerboard pattern on back wall above counter only Re: Room Finish Sched.
A3 A-106
A2 A-106
Fin ish ed E nd Fin ish ed
E nd clearances required Verify equipment Soap Dispenser, Re: Toilet Accessories Sched.
Terminate tile at inside corner adjacent to lower cabinets
Terminate tile at inside corner adjacent to column
WT-2 Primary (Re: Finish Legend) WT-2 Secondary (Re: Finish Legend)
WT-2 Primary (Re: Finish Legend)
4'
- 4
FORT LEAVENWORTH
DPW
SHEET ID
D
IR
EC
TO
R
AT
E O
F
PU
B
LI
C W
O R
K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R
AN
C
H D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
PR
O
JE
C
T N
O
1 2 3 4 5
D
C
B
A
0%
D ra wi ng s
M cC
LE
LL
AN
A
VE
FO
R
T
LE
AV
EN
W O
R
TH
, K S
7-
A-107
In te rio r E le va tio ns
B7
La tri ne s
R ep ai r
D es ig ne r
Au th or
C he ck er
1/2" = 1'-0"A-104
C1 Area 1A Women - Elevation
1/2" = 1'-0"A-104
A1 Area 1B Men - Elevation 1/2" = 1'-0"A-104
4A Area 1B Family - Lav. Elevation
1/2" = 1'-0"A-104
C3 Area 1B Break Room - Elevation
M
AR
K D
ES
C
R
IP
TI
O
N D
Finish Schedule Comments:
1. Radiator Covers for existing steam radiators (Re: Toilet Accessory Schedule).
2. Paint exposed pipes and pipe wraps to match adjacent wall.
3. In Women's room (Rm 104) and Mothers (Rm 203) start paint (P6) above ceiling side trim. Re: "Ceiling Height" level, Re: Finish Legend).
4. Toilet Partitions to be TP-1 (Women's: Bronze - Re: Toilet Accessories Schedule)
5. Toilet Partitions to be TP-2 (Men's" Dark Blue - Re: Toilet Accessories Schedule)
6. Break Room Wall Tile to left and right of lower cabinets, and between upper and lower cabinets. Re: Elevation.
7. Attach 1 layer of 5/8" gypsum on each inside of each masonry exterior window jamb. Board to vertically cover the full space between vertical metal trim. Use corner bead for both exposed vertical edges. Paint to match wall.
8. Window Shades (Re: Finish Legend below).
Wall Tile:
WT-1 Manufacturer: American Olean
Type: Sunset Falls (Glazed Ceramic) Selection: 6" x 18" pieces, 1/3 lap consistent Notes: Schluter strip trim - Rondec, soft brushed aluminum finish on all exposed top and sides (not inside corners)
WT-2 (Re: Break Room Elevation and Wall and Floor Finish Plan) Manufacturer: Daltile Type: Classic (Glazed Ceramic) Selection: Primary: Matte Chalkboard 0780 (2)
Secondary: Architectural Gray 0109 (2) (only in checkerboard pattern over counter)
Size/Mounting: 4-1/4" x 4-1/4" with full bull-nosed top edge and outside corners Notes: Schluter strip top and side trim - Rondec, soft brushed aluminum
Ceilings:
C-1 Manufacturer: Longboard Products
Type: Dauntless (Extruded Aluminum open slat system) Selection: Weathered Grey, Wood Grain Notes: 6" high, 1 5/8" wide ceiling slat "baffle" system, slats 8" on center
C-2 Manufacturer: Armstrong Ceilings Type: 2x4 Lay-In Ceiling Panel - 15/16" Grid Selection: DUNE…