B7 Structural Project Matrix Template.xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- N62470-25-R-0013
About this file
The file is a project matrix template for a complex historic building renovation project, specifically tailored for the B7 Structural Repairs at Portsmouth Naval Shipyard in Kittery, Maine. The template outlines key project requirements and desired contractor capabilities, focusing on extensive renovation of a three-story historic structure involving specialized skills such as hazardous material abatement, structural modifications to historic granite and timber framing, and comprehensive mechanical, electrical, and fire protection systems overhaul. The template emphasizes experience with projects in constrained urban environments, including temporary shoring, restricted site logistics, and adherence to Secretary of the Interior renovation guidelines.
The related federal contract opportunity is a Sources Sought Synopsis (N62470-25-R-0013) issued by Naval Facilities Engineering Command (NAVFAC) Atlantic, seeking qualified large and small businesses for the B7 Structural Repairs project. The synopsis targets various small business categories including 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned, and Economically Disadvantaged Women-Owned Small Businesses. The project involves a total interior renovation of a 16,196 square foot historic Building 7, encompassing hazardous material removal, structural modifications, and code-compliant improvements. The government will use the industry response to determine whether a small business set-aside acquisition is appropriate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Information Form.docx | DOCX document | |
| PLA Request for Information.docx | DOCX document | |
| Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Example
| SIZE | SCOPE | COMPLEXITY | ||||||||||
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | |||||||||
| (year); <10 years | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | A final construction cost of >$25M | Projects demonstrating complete renovation of a historic structure including repairing and removing interior structure while maintaining the exterior envelope, at least three stories tall, providing temporary shoring systems to support/brace existing framing members on a restricted area site with restricted site laydown and coordinated logistics | 1) Experience with hazardous material abatement | 2) Experience with interior and exterior renovation of historic granite block buildings including temporary shoring of structural loadbearing elements | 3) Experience with modifications to historic timber framing | 4) Experience with historic facilities and adherence to the Secretary of the Interior guidelines for selective demolition and renovation | 5) Experience with completely overhauling the building’s mechanical, electrical, and fire protection systems, utility outages, and/or temporary utilities that involved relevant utility systems | 6) Experience with multi-phased/sequenced construction | 7) Experience with projects in congested urban or industrial areas with limited construction laydown space and restricted access |
| 1 | ||||||||||||
| 2 | ||||||||||||
| 3 | ||||||||||||
| 4 | ||||||||||||
| 5 | ||||||||||||
| General Information: | Bonding Capacity | UEI | Cage | Address | SB Status | POC | POC Contact Information | Annual Revenue | #Offices |
File details come from the government source that posted it. Updated .