B2610PriceSheetRevised.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Dave E Disney Tennis Center/Pickleball Expansion & Upgrade
Solicitation number
B-26-10
Issued by
Volusia County, Florida

About this file

This is a price sheet for the Dave E Disney Tennis Center/Pickleball Expansion & Upgrade project in DeLand, Florida. The document appears to be a revised pricing submission that outlines the costs associated with the transformation and expansion of athletic facilities at the tennis and pickleball center. The project involves converting existing pickleball courts into tennis courts while expanding and converting existing tennis courts into new pickleball courts, renovating an existing office building into a Pro Shop with bathrooms, and constructing new ancillary facilities including a concessions building with bathrooms, a custom shade pavilion, and a pre-engineered metal building. Additional scope includes site improvements such as stone drainage swales and flumes, landscaping and irrigation systems, synthetic turf installation, sports court and site lighting, new sidewalks, and a custom gateway feature designed to enhance beautification and optimize pedestrian flow between courts and parking areas.

The price sheet provides the financial basis for bidders to submit their cost proposals for the work described in the project. As a revised document, this pricing tool likely reflects modifications to the original pricing structure following bidder questions or clarifications issued during the procurement process. The specific line items, unit costs, and total project costs outlined in the spreadsheet establish the framework for evaluating contractor bids and determining contract award amounts. All areas disturbed during construction are to be restored to condition equal to or better than existed prior to work commencement.

View the file

Other files

File Type Posted
B2610RCA.pdf PDF
B2610Tabulation.pdf PDF
B2610ADD5.pdf PDF
B2610ADD4.pdf PDF
B2610ADD3.pdf PDF
B2610ADD2.pdf PDF
B2610ADD1.pdf PDF
B2610Final.pdf PDF
B2610PlansPart2.pdf PDF
B2610GeotechnicalReport.pdf PDF
B2610PlansPart1.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Item Summ - Sched of Values

DAVID E. DISNEY TENNIS & PICKLEBALL CENTER (B-26-10)
Pay Item Summary - Schedule of Values
P A Y I T E M S U M M A R YCIVIL
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
1Mobilization & DemobilizationLS1$0.00
2SWPPP/BMPLS1$0.00
3Clearing and GrubbingLS1$0.00
4Removal of Pavement (including sidewalks, driveways, curb and gutter,LS1$0.00
5Removal of Ex. City Utilities (Sanitary sewer & Laterals, WM & Services)LS1$0.00
6Earthwork Grading (Excavation and Embankment)LS1$0.00
7Construct 6-foot wide, thickened edge Conc. SidewalkLF320$0.00
8Construct FDOT Standard Curb and Gutter (Type F Style)LF22$0.00
9Milling Existing Asphalt - 2" average depthSY710$0.00
10Construct 2-Inch FDOT Type FC-12.5 (Traffic Level "C") AsphaltTN43$0.00
11Construct 8-Inch Crushed Conc. Base CourseSY300$0.00
12Construct 12-Inch Stabilized SubgradeSY300$0.00
CIVIL SUB-TOTAL$0.00
UTILITY
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
13Permit FeesLS1$0.00
14Furnish and Install 1-inch HDPE Potable Service Laterals and FittingsLF80$0.00
15Furnish and Install 2-inch HDPE Potable Service Lines and FittingsLF1,060$0.00
16Furnish and Install Above Ground Water SpigotEA6$0.00
17Connect to Existing 1-inch Water ServiceEA1$0.00
18Furnish and Install 18-inch PVC C-900 Reclaim WatermainLF200$0.00
19Furnish and Install 18-inch Gate ValveEA1$0.00
20Furnish and Install 18-inch 45-BendsEA3$0.00
21Connect 18-inch Proposed Reclaim Main to existing 18" Reclaim MainEA2$0.00
22Furnish and Install 6-inch Sanitary Cleanout and Connection to BuildingEA1$0.00
23Furnish and Install 6-inch Sanitary Sewer Service LateralLF101$0.00
24Connect to existing Sanitary gravity mainEA1$0.00
UTILITY SUB-TOTAL$0.00
STORMWATER
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
25Furnish and Install 18-inch HDPE Storm PipeLF136$0.00
26Furnish and Install 12-inch HDPE Storm PipeLF132$0.00
27Furnish and Install 8-inch HDPE Storm PipeLF16$0.00
28Furnish and Install FDOT Type "C" inletEA1$0.00
29Furnish and Install 18" MESEA1$0.00
30Furnish and Install FDOT Type "E" inletEA1$0.00
31Furnish and Install 8" ADS Nyoplast Drainage InletEA3$0.00
32Furnish and Install 12" ADS Nyoplast Drainage InletEA1$0.00
33Furnish and Install 18" ADS Nyoplast Drainage InletEA3$0.00
34Furnish and Install 24" ADS Nyoplast Drainage InletEA1$0.00
35Stone Swale / Stone FlumeCF1,100$0.00
STORMWATER SUB-TOTAL$0.00
HARDSCAPE
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
36Sports Courts (Surfacing/Fencing/Windscreen/Nets)LS1$0.00
37Gateway FeatureLS1$0.00
38Custom TablesEA4$0.00
39Synthetic TurfSF2800$0.00
40Sidewalk (Standard Concrete)SF5900$0.00
41Planter (Wall/Veneer/Cap/ Skate Deterents)LF250$0.00
42Synthetic Turf Concrete Edging (4'x6")LF60$0.00
434' Fencing (Additional to Sports Courts)LF1500$0.00
448' Fencing (Additional to Sports Courts)LF1100$0.00
4510' Fencing (Additional to Sports Courts)LF450$0.00
46Gates (Pedestrian & SlidingLS1$0.00
47Landscape EdgingLF500$0.00
48BenchEA12$0.00
49Waste ReceptacleEA2$0.00
50Bike RackEA2$0.00
HARDSCAPE SUB-TOTAL$0.00
LANDSCAPE & IRRIGATION
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
51Small TreeEA10$0.00
52Date PalmEA1$0.00
531 Gal. Grasses and GroundcoverEA702$0.00
543 Gal ShrubsEA323$0.00
55TurfSF12000$0.00
56Decorative StoneSF1700$0.00
57Pine Bark MulchYD30$0.00
58Tree StakingLS1$0.00
59Irrigation SystemLS1$0.00
LANDSCAPE & IRRIGATION SUB-TOTAL$0.00
SPORTS LIGHTING & SITE LIGHTING
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
60Sports Court Lighting - Outdoor Courts (F&I by others, Coordination only)LS1$0.00
61Sports Court Lighting - PEMB/Indoor Court (Furnished by others, Installation only)LS1$0.00
62Lighted BollardEA10$0.00
63Tree UplightEA12$0.00
64Gateway UplightEA12$0.00
65Linear Wall LightingLS1$0.00
66Site ElectricalLS1$0.00
SPORTS LIGHTING & SITE LIGHTING SUB-TOTAL$0.00
S C H E D U L E O F V A L U E SBUILDING RENOVATION & NEW ADDITION
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
67DIVISION 01: GENERAL REQUIREMENTSLS1$0.00
68DIVISION 02: EXISTING CONDITIONSLS1$0.00
69DIVISION 03: CONCRETELS1$0.00
70DIVISION 04: MASONRYLS1$0.00
71DIVISION 05: METALSLS1$0.00
72DIVISION 06: WOOD AND PLASTICSLS1$0.00
73DIVISION 07: THERMAL & MOISTURE PROTECTIONLS1$0.00
74DIVISION 08: OPENINGSLS1$0.00
75DIVISION 09: FINISHESLS1$0.00
76DIVISION 10: SPECIALTIESLS1$0.00
77DIVISION 11: EQUIPMENTLS1$0.00
78DIVISION 12: FURNISHINGSLS1$0.00
79DIVISION 13: SPECIAL COSTRUCTIONLS1$0.00
80DIVISION 22: PLUMBINGLS1$0.00
81DIVISION 23: HEATING, VENTILIATION, & AIR CONDITIONINGLS1$0.00
82DIVISION 26: ELECTRICALLS1$0.00
83DIVISION 28: ELECTRONIC SAFETY & SECURITYLS1$0.00
84DIVISION 31: EARTHWORKLS1$0.00
BUILDING RENOVATION & NEW ADDITION SUB-TOTAL$0.00
PRE-ENGINEERED METAL BUILDING
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
85DIVISION 01: GENERAL REQUIREMENTSLS1$0.00
86DIVISION 02: EXISTING CONDITIONSLS1$0.00
87DIVISION 03: CONCRETELS1$0.00
88DIVISION 05: METALSLS1$0.00
89DIVISION 07: THERMAL & MOISTURE PROTECTIONLS1$0.00
90DIVISION 09: FINISHESLS1$0.00
91DIVISION 10: SPECIALTIESLS1$0.00
92DIVISION 13: SPECIAL COSTRUCTIONLS1$0.00
93DIVISION 22: PLUMBINGLS1$0.00
94DIVISION 23: HEATING, VENTILIATION, & AIR CONDITIONINGLS1$0.00
95DIVISION 26: ELECTRICALLS1$0.00
96DIVISION 28: ELECTRONIC SAFETY & SECURITYLS1$0.00
97DIVISION 31: EARTHWORKLS1$0.00
PRE-ENGINEERED METAL BUILDING SUB-TOTAL$0.00
SHADE STRUCTURE
ITEM NO.ITEM DESCRIPTIONUNITQTYUNIT PRICEEXTENDED AMOUNT
98DIVISION 01: GENERAL REQUIREMENTSLS1$0.00
99DIVISION 02: EXISTING CONDITIONSLS1$0.00
100DIVISION 03: CONCRETELS1$0.00
101DIVISION 05: METALSLS1$0.00
102DIVISION 09: FINISHESLS1$0.00
103DIVISION 10: SPECIALTIESLS1$0.00
104DIVISION 13: SPECIAL COSTRUCTIONLS1$0.00
105DIVISION 26: ELECTRICALLS1$0.00
SHADE STRUCTURE SUB-TOTAL$0.00
PTOTAL$0.00
CONTINGENCY 5%$0.00

A TOTAL BASE BID ITEMS AMOUNT (Sum of Extended Amounts for each Base Bid Item + Contingency) $0.00

CONTRACT TIME
BContractor agrees to reach Substantial Completion in210days
CContractor agrees to reach Final Completion in240days

File details come from the government source that posted it. Updated .