B2610ADD4.pdf

PDF 1 MB Posted

Attached to
Dave E Disney Tennis Center/Pickleball Expansion & Upgrade
Solicitation number
B-26-10
Issued by
Volusia County, Florida

About this file

This is Addendum #4 to the bid package for the Dave E Disney Tennis Center/Pickleball Expansion & Upgrade (B-26-10) project issued by the City of DeLand, Florida Finance Department. The project involves comprehensive transformation and expansion of athletic facilities including conversion of existing pickleball courts to tennis courts, expansion of existing tennis courts to pickleball courts, renovation of an existing office building into a Pro Shop with bathrooms, construction of a new concessions building with bathrooms, a custom shade pavilion, a pre-engineered metal building (PEMB), stone drainage swale and flume installation, landscaping and irrigation, synthetic turf, site and sports court lighting with 94 total lighting fixtures across three circuit types, new sidewalks, and a custom gateway feature. The addendum addresses 31 clarification questions submitted by prospective contractors regarding specifications for materials including potable water piping (HDPE/polyethylene per City of DeLand Standard Detail W403), the Knotwood Aluminum Batten System by OmniMax International for PEMB coordination, court construction details per USA Pickleball and ASBA guidelines, fencing and windscreen specifications, court grading and drainage requirements, and roofing materials. The proposal opening date was changed to June 25, 2026 at 3:00 P.M., with all other terms and conditions remaining unchanged. The Schedule of Values includes 105 line items organized by civil, utility, stormwater, hardscape, landscape and irrigation, sports lighting and site lighting, building renovation and new addition, pre-engineered metal building, and shade structure categories, with a total contingency of 5 percent and specified contract time requirements for substantial and final completion.

The addendum clarifies that contractors must base bids on specified products and materials as identified in the plans and specifications, with substitution requests to be handled post-award in accordance with contract documents, requiring contractors to demonstrate proposed substitutes equal or exceed specified products in quality, performance, appearance, durability, and compatibility. Key specifications address court construction profiles per USA Pickleball and ASBA guidelines, court grading configurations following existing site constraints, positive drainage requirements for pickleball court surfaces, existing concrete demolition limits based on field-observed conditions, electrical sizing for lighting circuits and HVLS fans, wind speed design criteria of 133 MPH Risk II Exposure B for the PEMB, and parking lot and trail pavement cross-sections per civil plans. The addendum includes Musco Sports Lighting design documentation detailing 94 total fixtures across three illumination areas: covered pickleball (70 fixtures, 9.62 kW), outdoor pickleball (12 fixtures, 12.84 kW), and tennis courts (12 fixtures, 6.32 kW), with equipment lists, illumination summaries, and amperage draw specifications for various fixture types including TLC-LED series and ARB models. Associated permit fees for City of DeLand Building Permits and Infrastructure Permits are incorporated into the Schedule of Values under designated pay items, with no set-asides indicated for small business or other program preferences.

View the file

Other files

File Type Posted
B2610RCA.pdf PDF
B2610Tabulation.pdf PDF
B2610ADD5.pdf PDF
B2610PriceSheetRevised.xlsx XLSX spreadsheet
B2610ADD3.pdf PDF
B2610ADD2.pdf PDF
B2610ADD1.pdf PDF
B2610Final.pdf PDF
B2610PlansPart2.pdf PDF
B2610GeotechnicalReport.pdf PDF
B2610PlansPart1.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance Department 120 S. Florida Ave.

2nd Floor

DeLand, FL 32720

Dave E Disney Tennis Center/Pickleball Expansion & Upgrade B-26-10

June 17, 2026 Addendum #4

TO ALL PROSPECTIVE CONTRACTORS

This is an Addendum to and shall be considered as part of the original Bid package for the above-mentioned Bid. Contractors are requested to acknowledge receipt of this Addendum with their

Submission.

CLARIFICATION TO QUESTIONS ASKED RECEIVED:

1. We respectfully submit for your consideration a request to approve products as an accepted substitute on Dave E Disney Tennis Center/Pickleball Expansion & Upgrade. Please find links below for the following supporting documentation: Substitution Request Summary: Substitution Request - Dave E Disney Tennis Center/Pickleball Expansion & Upgrade.pdf

Response: The Contract Documents establish the basis of bid using the materials, products, and manufacturers identified in the plans and specifications. Requests for substitutions will be handled consistent with the contract documents and will not be evaluated through the bidder question process.

Bidders shall base their bids on the specified products and materials. Following award, the selected

Contractor may submit substitution requests in accordance with the Contract Documents. The

Contractor shall bear the burden of demonstrating that any proposed substitute is equal to or exceeds the specified product in quality, performance, appearance, durability, and compatibility with the Work.

2. The plans do not specify what type of pipe and fittings to be used for the domestic water pipe.

Response: Potable water service piping outside the building shall be HDPE/polyethylene water service tubing in accordance with City of DeLand Standard Detail W403 and Specification Section 33 31 13.16.

Water service tubing shall be SDR 9, 200 psi, ASTM D2737 blue polyethylene tubing.

3. The PEMB suppliers need the load calculations for the Knotwood system that is called for in the plans?

Is there any additional information available on which system is being spec'd? They are drawings if they are available as well.

Response: Refer to Sheet A2-0.03 for the Aluminum Batten System specification. The Knotwood

Aluminum Batten System by OmniMax International is listed as the basis of design. The batten system shall be coordinated with the PEMB manufacturer for required support framing, attachment design, member sizing, and associated load calculations. No additional load calculations are included with the

Contract Documents. The contractor, batten system supplier, and PEMB supplier shall coordinate the attachment and support requirements as part of the contractor’s submittal process.

4. L2.07 box – chain link fence installation detail – you are calling for tension wire at the mid-rail position.

Is this really what you are looking for?

https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcalprocorp.my.salesforce.com%2Fsfc%2Fp%2Fj0000000Jztn%2Fa%2FRk000002zWTF%2F2z2rXevUb5JID60829VBXTsZuuwhcVuR8ZyaK9WuYiE&data=05%7C02%7CTravis.Terpstra%40freese.com%7Cf7700a815f774b5dab8608deb1da3da7%7C191657eabcff43859d04659ef9cee515%7C0%7C0%7C639143748658248135%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=DCqpSWdCJldei2ecQdAxLSlzm4SobRn9boGmdqdS7bA%3D&reserved=0 https://nam11.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcalprocorp.my.salesforce.com%2Fsfc%2Fp%2Fj0000000Jztn%2Fa%2FRk000002zWTF%2F2z2rXevUb5JID60829VBXTsZuuwhcVuR8ZyaK9WuYiE&data=05%7C02%7CTravis.Terpstra%40freese.com%7Cf7700a815f774b5dab8608deb1da3da7%7C191657eabcff43859d04659ef9cee515%7C0%7C0%7C639143748658248135%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=DCqpSWdCJldei2ecQdAxLSlzm4SobRn9boGmdqdS7bA%3D&reserved=0

June 17, 2026 Addendum #4

CB Response: The tension wire is specified at the mid-rail position on the Tennis Courts only to provide rigidity without impacting player safety. Per details and notes, middle rails shall be limited to corners or where required for bracing and shall not be installed along high traffic areas unless specifically approved during construction.

5. What is the spec on the fencing? Build quality, post size, mesh size, etc.

Response: Fencing Specifications can be found on Sheet L-2.07 with typical court layouts detailed on

Sheet L-2.05.

6. What net posts does the city want on the courts?

Response: The Hardscape Schedule on Sheet L-1.01 specifies both Pickleball and Tennis nets with installation details located on Sheet L-2.06.

7. Do they want long nets or short nets that don’t touch the ground?

Response: The Hardscape Schedule on Sheet L-1.01 specifies both Pickleball and Tennis nets with installation details located on Sheet L-2.06.

8. Are we installing windscreen on the fencing and if so, what weight and size?

Response: The Hardscape Schedule on Sheet L-1.01 specifies windscreen heights and location with installation details located on Sheet L-2.07 alongside the fencing specifications.

9. It looks to me that all the pickleball courts are totally enclosed. Are we doing entrance gates into each one from the walkway? Are we installing gates between the courts?

Response: Refer to Detail #2 on Sheet L-2.05 for a fencing diagram showing all perimeter fencing and site entry gates. Refer to enlargements A & B on Sheet L-2.05 for court entry gates. Fencing and gate details and specifications are located on Sheet L-2.06.

10. Page C-5 shows the slope of the tennis courts running south to north at 1%. This is ill-advised. All courts should slope from side to side in one plane across the entire COURT, singular. We can install a crown between courts, but we need to know if that’s the case or not. 1% is the proper slope and it can be as low at .83%, but no less than that in the even we don’t have the elevation to work with around the court edges. The reason for this is that you don’t want players playing up hill and downhill at each other. It’s a little less important for pickleball because the distance isn’t as great, but on tennis you’re talking about a 7.8” fall from one baseline to another. That makes serving quite different along with any rallying for one player to another.

Response: The grading shown in the Contract Documents generally follows the existing site grading and drainage constraints. No revisions to the court grading are being issued at this time.

For bidding purposes, contractors shall base their bids on the Contract Documents and shall assume the grading configuration requiring the greatest anticipated effort and cost to achieve a finished court surface meeting the project requirements. The Owner reserves the right to evaluate and refine the final tennis court grading configuration during the construction phase, including consideration of alternative court slope orientations and transitions, provided the finished courts satisfy the applicable performance, drainage, and playability requirements.

11. Page C-6 shows all kinds of slopes on the pickleball courts that are not possible. Unless of course these are all completely covered and will never get water on them. Courts must have a slope because if water doesn’t shed off the surface it will degrade the acrylics quite rapidly.

Response: The Western Pickleball courts will be fully covered, however, all pickleball courts have a proposed slope to keep water from standing on the pickleball court surface. Contractor shall ensure proper positive drainage off of the courts without birdbaths, reverse slopes, low points, or multi-directional court surface slopes that prevent drainage of the court surface.

12. How thick is the existing concrete that needs to be demolished?

Response: The thickness of the existing concrete pavement to be removed is unknown. No pavement cores or record information establishing existing concrete thickness are included in the Contract

Documents. Bidders shall base their bids on the demolition limits shown in the plans and field-observed conditions. Refer to Demolition Sheets C-2 and C-3.

13. What is the build profile for the construction of the courts?

Response: Refer to Details 1, 4, and 6 on Sheet L-2.06 for the court construction, additional court information regarding the layout can be found on Sheet L-2.05. As stated on Sheet L-2.05, courts to be constructed with current USA Pickleball and ASBA Court Construction Guidelines, and recommended practices, unless otherwise noted.

14. The minimum build standards in Florida for asphalt courts are 4” of lime rock base material, and 1” of compacted SIII/SP9.5 asphalt. That is NOT the recommended build profile though.

Response: Refer to Details 1, 4, and 6 on Sheet L-2.06 for the court construction, additional court information regarding the layout can be found on Sheet L-2.05. As stated on Sheet L-2.05, courts to be constructed with current USA Pickleball and ASBA Court Construction Guidelines, and recommended practices, unless otherwise noted.

15. My recommendation for the city would be to go with 6” of compacted lime rock unless a geotechnical report concludes that crushed concrete is in order due to a high-water table or propensity for the base to get wet. Crushed concrete holds up better in those scenarios. I think 8” of compacted base is overkill in Florida.

Response: Refer to Details 1, 4, and 6 on Sheet L-2.06 for the court construction, additional court information regarding the layout can be found on Sheet L-2.05. As stated on Sheet L-2.05, courts to be constructed with current USA Pickleball and ASBA Court Construction Guidelines, and recommended practices, unless otherwise noted.

16. My next MINIMUM recommendation is going to be going with 1” of Virgin SP9.5. Now, it’s not technically 100% virgin asphalt. It’s more like 80-85% virgin. 100% virgin is not economically viable for courts. I see cities go with 1.5” compacted all the way up to 4”. It’s my belief that 3” is excessive but I’ve seen it plenty of times. The most I could ever rationalize paving courts with in FL is 2” and in one lift. There is NO reason to pave in multiple lifts here.

Response: Refer to Details 1, 4, and 6 on Sheet L-2.06 for the court construction, additional court information regarding the layout can be found on Sheet L-2.05. As stated on Sheet L-2.05, courts to be constructed with current USA Pickleball and ASBA Court Construction Guidelines, and recommended practices, unless otherwise noted.

17. What is the spec on the fencing? Build quality, post size, mesh size, etc.

Response: Fencing Specifications can be found on Sheet L-2.07 with typical court layouts detailed on

Sheet L-2.05.

18. What net posts does the city want on the courts?

Response: The Hardscape Schedule on Sheet L-1.01 specifies both Pickleball and Tennis nets with installation details located on Sheet L-2.06.

19. Could you please share the roofing specifications including materials and manufacturers approved.

Response: Roofing information for the Basis of Design: Building Renovation and Concession Building can be found on Sheets A1-1.12, A1-2.01, A1-3.01, A1-5.31, A1-5.41, and A1-5.42. Pre-Engineered Metal

Building (PEMB) can be found on Sheets A2-0.03, A2-1.30, A2-2.00A2-2.01, A2-3.00. Additional information regarding manufacturers can be located within the Specification Manual which is Exhibit 1 of the bid Package.

20. On page A1.-1.31 the two items below are called out as Plam counter tops, and the finish schedule has a Plam listed. All the Elevations have everything listed as Solid surface/Quartz. Which tops get Plam and which tops get solid surface/Quartz?

Response: Per Plans, all counters to be QTZ-1 Solid Surface, Quartz. Counter Bid Alternate is HPL-2 High Pressure Laminate. All cabinetry to be HPL-1. Refer to “Miscellaneous Finish Identification” on Sheet A1-6.01 materials, manufacturer for basis of design, and color selection.

21. Please ask the engineer to provide the wire size to be installed for all the LF-01 and LF-02 light fixtures in the metal structure. I just did a voltage drop calculation and based on the wattage and volts the minimum wire size needs to be 350MCM CU. Please ask the EOR to confirm or to please provide the wire size to be installed in writing. Also, the site electrical drawings don't show the circuits needed for the fans in the metal structure from panel RMB. Please ask the EOR to provide the wire and conduit size.

Response: Please confirm what circuit is calculated with 350KCMIL wire. Less than 2% Voltage drop was calculated to the first fixture using #4 copper on a 240V, 1-phase circuit. The voltage drop impact would reduce with each fixture after that on that circuit. Circuit information for the HVLS fans can be found on sheet E2-1.61 mechanical equipment schedule.

22. There is currently a discrepancy between the following documents:

A2-0.03: Wind Speed: 130 mph, Risk II, Exposure C

S2-0.02: Wind Speed: 133 mph, Risk II, Exposure B

Please advise on which specification is correct so we can provide an accurate proposal.

Response: The wind speed shown on Sheet S2-0.02 is correct. 133 MPH, Risk II, Exposure B.

23. The finish schedule states VCT-1 but the Material finish schedule does not list VCT-1 nor is VCT-1 specs in the project manual. What would you like for us to use for VCT-1

Response: VCT-1 is not in the project and confirmed with the finish schedule. All floors are EP.

24. What is the correct count on the Musco provided fixtures for the PEMB? Sheet E2.1.10 shows 70 lights and the Musco shop drawing show 49.

Response: The correct count is 70. See updated Musco Plan, attached.

25. The handhole detail for the Musco pole lights are to be on sheet E0.501. This sheet isn't in the set of prints.

Response: Handholes required for the Musco pole lights shall be included in the Contractor’s scope of work. Sheet E0.501 is not included in the Contract Documents; however, the Contractor shall account for all handholes necessary for a complete and functional installation.

26. Handholes shall be a minimum of 20" x 24" x 24" depth, H-20 traffic rated, and shall include grounding provisions and pull eye where required for the installation. The Contractor shall coordinate final handhole quantity, size, location, conduit entries, grounding/bonding, cover/loading requirements, and installation requirements with the Musco lighting package, Division 26 work, and applicable code requirements.

The new lights for the existing building office and canopy are to be recessed can lights with housings per lighting schedule. These fixtures require ceiling access to install and wire. Prints state these ceiling are to remain. What is the plan for this area with little to no ceiling access? - Is there a size for the pull boxes not called out in the key notes?

Response: For the ceiling access, refer to sheet A1-1.21 sheet note D for ceiling access panel information. Contractor to locate as required for recommended access point. Refer to supporting specification section 08 31 13 Access Doors and Frames.

27. The Mechanical contractor is responsible for the HVLS fans correct?

Response: Procurement and installation of the HVLS fans shall be included in the Contractor’s scope of work. The City direct-purchase scope identified for lighting shall not be assumed to include HVLS fans.

The contractor shall provide and coordinate a complete and operational HVLS fan system, including all required equipment, mounting, power, controls, accessories, and installation, see specification on Sheet A2-0.03. Assignment to a specific subcontractor or trade is the responsibility of the Contractor.

28. Lighting controls show a dimming control panels. Is there a detail for this panel. And who is responsible for this panel?

Response: The Division 26 Contractor shall be responsible for the dimming control panel serving the building lighting and non-sports-related site lighting shown on Sheet E1-1.04. The panel shall include relays as required for each control zone shown in the Contract Documents, with a minimum of six spare relays, no additional panel detail is included at this time.

29. Is the lighting control color code for the office correct? Color code blue is for exterior and site lighting.

Response: Confirmed. The office lighting control zone is intended to be color code red. The blue color code designation applies to exterior/site lighting only.

30. There is a discrepancy between the Geotechnical report and the civil plans. Which one should we use to guide us? Civil plans call for:

2" FC-12.5 Asphalt Surface 8" Base 12" Stabilized Subgrade

Response: The City would like to use the pavement cross section in the Civil Plans for the parking lot and trail pavements.

31. Please include all associated fees for the City of DeLand Building Permit under Schedule of Values Item #67 (Building Renovation & New Addition – Division 01: General Requirements).

32. Please include all associated fees for the City of DeLand Infrastructure Permit under Pay Item #13 (Utility – Permit Fees).

Attachments: Musco Lighting Update

Revised Schedule of Values/Price Sheet

Please note that the proposal opening date and time has changed to June 25, 2026 @ 3:00 P.M.

All other terms and conditions remain unchanged.

Sincerely, Corey McMillen, CPPB Purchasing Manager

END OF ADDENDUM #3

PROJECT SUMMARY

Not to be reproduced in whole or part without the wri en consent of Musco Sports Ligh ng, LLC.

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092F • 10-Nov-25

Earl Brown Park Tennis Pickleball Deland,FL

LIGHTING SYSTEM

Structure/Fixture Summary Structure ID Structure Height Fixt. Attachment Ht. Fixture Qty Fixture Type Design Load Circuit

M1-M7 16' 1 OPS-17L-5Q-50K8.ies 0.10 kW C M8-M14 18' 1 OPS-17L-5Q-50K8.ies 0.10 kW C

M15-M21 19' 1 OPS-17L-5Q-50K8.ies 0.10 kW C M22-M26 21' 1 ARB-12-LS1-18L-850-R16AD.ies 0.14 kW C

M27 24' 1 ARB-12-LS1-18L-850-R16AD.ies 0.14 kW C M28-M29 24' 1 LSI ARB 12 0.24 kW C

M30 24' 1 ARB-12-LS1-18L-850-R16AD.ies 0.14 kW C M31-M40 24' 1 LSI ARB 12 0.24 kW C

M41 24' 1 ARB-12-LS1-18L-850-R16AD.ies 0.14 kW C M42-M43 24' 1 LSI ARB 12 0.24 kW C

M44 24' 1 ARB-12-LS1-18L-850-R16AD.ies 0.14 kW C M45-M49 21' 1 ARB-12-LS1-18L-850-R16AD.ies 0.14 kW C M50-M56 19' 1 OPS-17L-5Q-50K8.ies 0.10 kW C M57-M63 18' 1 OPS-17L-5Q-50K8.ies 0.10 kW C M64-M70 16' 1 OPS-17L-5Q-50K8.ies 0.10 kW C

P1-P4 50' 50' 1 TLC-LED-900 0.88 kW B 50' 2 TLC-LED-1200 2.33 kW B

T1-T4 40' 40' 3 TLC-LED-550 1.58 kW A 78 94 28.78 kW

*Fixtures in this design have dimmed output values to meet design specific needs.

Circuit Summary Circuit Description Design Load Fixture Qty

A Tennis 6.32 kW 12 B Outdoor Pickleball 12.84 kW 12 C Indoor Pickleball 9.62 kW 70

Fixture Type Summary Type Circuit Source Avg. Wattage Avg. Lumens L90 L80 L70 Quantity

ARB-12-LS1-18L-850-R16AD.ies C 135W 18,433 -- -- -- 14

LSI ARB 12 C LED 4000K - 80 CRI 237W 29,376 -- -- -- 14

OPS-17L-5Q-50K8.ies C 105W 17,237 -- -- -- 42

TLC-LED-1200 B LED 5700K - 75 CRI 1165W 152,199 >120,000 >120,000 >120,000 8

TLC-LED-550 A LED 5700K - 75 CRI 527W 66,345 >120,000 >120,000 >120,000 12

TLC-LED-900 B LED 5700K - 75 CRI 880W 104,529 >120,000 >120,000 >120,000 4

Single Fixture Amperage Draw Chart Driver Speci ca ons

(.90 min power factor) Line Amperage Per Fixture

(max draw)

Single Phase Voltage 208 (60)

(60)

(60)

(60)

(60)

(60)

(60)

TLC-LED-1200 6.9 6.5 6.0 5.2 4.2 3.8 3.0

TLC-LED-900 5.2 4.9 4.5 3.9 3.1 2.9 2.3

TLC-LED-550 3.2 3.0 2.8 2.4 1.9 1.8 1.4

LSI ARB 12 - - - - - - -

*Amp draw based on 100% fixture output, consult design specific datasheet for adjusted amperage draw chart

Light Level Summary

Calculation Grid Summary Grid Name Calculation Metric Illumination Ave Circuits Fixture QtyAve Min Max Max/Min Ave/Min

Covered Pickleball Horizontal Illuminance 52.67 37.67 71.02 1.89 1.40 C 70 Outdoor Pickleball Horizontal Illuminance 61.63 49.62 74.65 1.50 1.24 B 12

Tennis Horizontal Illuminance 53.52 44.48 57.84 1.30 1.20 A 12

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

M1-1.01

ILLUMINATION SUMMARY

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092F • 10-Nov-25

T1 T2

T3T4

SCALE IN FEET 1 : 20

0' 20' 40'

Equipment List For Areas Shown Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS

GRID

OTHER

GRIDS

4 T1-T4 40' - 40' TLC-LED-550 3 3 0

4 Totals 12 12 0

Above Field Level is height of fixtures above area shown

Earl Brown Park Tennis Pickleball Deland,FL Grid Summary

Name: Tennis Size: 2 Court - 12' Spacing

Spacing: 20.0' x 20.0' Height: 3.0' above grade

Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES

Entire Grid Guaranteed Average: 50

Scan Average: 53.52 Maximum: 57.84 Minimum: 44.48

Avg/Min: 1.20 Guaranteed Max/Min: 2

Max/Min: 1.30 UG (adjacent pts): 0.00

CU: 0.81

No. of Points: 30

FIXTURE INFORMATION

Applied Circuits: A No. of Fixtures: 12

Total Load: 6.32 kW

Pole location(s) dimensions are relative to 0,0 reference point(s)

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures

M1-1.02

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092F • 10-Nov-25

P1 P2

P3P4

SCALE IN FEET 1 : 20

0' 20' 40'

Equipment List For Areas Shown Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS

GRID

OTHER

GRIDS

4 P1-P4 50' - 50' TLC-LED-1200 2 2 0

50' TLC-LED-900 1 1 0

4 Totals 12 12 0 Above Field Level is height of fixtures above area shown

Earl Brown Park Tennis Pickleball Deland,FL Grid Summary

Name: Outdoor Pickleball Size: 135' x 141'

Spacing: 10.0' x 10.0' Height: 3.0' above grade

Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES

Entire Grid Guaranteed Average: 50

Scan Average: 61.63 Maximum: 74.65 Minimum: 49.62

Avg/Min: 1.24 Guaranteed Max/Min: 2

Max/Min: 1.50 UG (adjacent pts): 1.35

CU: 0.59

No. of Points: 156

FIXTURE INFORMATION

Applied Circuits: B No. of Fixtures: 12

Total Load: 12.84 kW

Pole location(s) dimensions are relative to 0,0 reference point(s)

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures

M1-1.03

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092F • 10-Nov-25

M1

M8

M34

M57

M64

M41

M27

M39

M32

M11

M60

M4

M67

M35

M42

M28

M10

M59

M3

M66

M38

M31

M9

M58

M2

M65 M68

M36

M43

M29

M12

M61

M5

M40

M33

M13

M62

M69

M6

M70

M37

M44

M30

M14

M63

M7

M50 M53M52M51 M54 M55 M56

M15 M18M17M16 M19 M20 M21

M48M46 M47

M23 M24 M25

M49

M26

M45

M22

SCALE IN FEET 1 : 30

0' 30' 60'

Equipment List For Areas Shown Structure Fixtures

QTY STRUCTURE ID SIZE GRADE

ELEVATION

ABOVE FIELD

LEVEL FIXTURE TYPE QTY/POLE THIS

GRID

OTHER

GRIDS

14 M1-M7 M64-M70 16' 16' OPS-17L-5Q-50K8.ies 1 1 0

14 M8-M14 M57-M63 18' 18' OPS-17L-5Q-50K8.ies 1 1 0

14 M15-M21 M50-M56 19' 19' OPS-17L-5Q-50K8.ies 1 1 0

10 M22-M26 M45-M49 21' 21' ARB-12-LS1-18L-850-R16AD.ies 1 1 0

M27 M30 M41 M44

24' 24' ARB-12-LS1-18L-850-R16AD.ies 1 1 0

M28-M29 M31-M40 M42-M43

24' 24' LSI ARB 12 1 1 0

70 Totals 70 70 0 Above Field Level is height of fixtures above area shown

Earl Brown Park Tennis Pickleball Deland,FL Grid Summary

Name: Covered Pickleball Size: 136' x 140'

Spacing: 10.0' x 10.0' Height: 3.0' above grade

Illumination Summary

MAINTAINED HORIZONTAL FOOTCANDLES

Entire Grid Guaranteed Average: 50

Scan Average: 52.67 Maximum: 71.02 Minimum: 37.67

Avg/Min: 1.40 Guaranteed Max/Min: 2

Max/Min: 1.89 UG (adjacent pts): 1.57

CU: 0.72

No. of Points: 196

FIXTURE INFORMATION

Applied Circuits: C No. of Fixtures: 70

Total Load: 9.62 kW

Pole location(s) dimensions are relative to 0,0 reference point(s)

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures

M2-1.01

EQUIPMENT LAYOUT

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092F • 10-Nov-25

Earl Brown Park Tennis Pickleball Deland,FL

Tennis

2 Court - 12' Spacing

T1

T2

T310

T4

Outdoor Pickleball

135' x 141'

P1

P2

P3

P4

(0.25', -181.00', 0.00')Covered Pickleball

136' x 140'

M1

M8

M34

M57 88

M64

M41

M27

M39

M32

M11

M60

M4

M67

M35

M42

M28

M10

M59

M3

M66

M38

M31

M9

M58

M2

M65

M68

M36

M43

M29

M12

M61

M5

M40

M33

M13

M6271

M69

M6

M70

M37

M44

M30

M14

M63

M7

M50

M53

M52

M51

M54

M55

M56

M15

M18

M17

M16

M19

M20

M21

M48

M46

M47

M23

M24

M25

M49

M26

M45

M22

(-175.28', -181.00', 0.00')

(0.00', 0.00', 0.00')

SCALE IN FEET 1 : 40

0' 40' 80'

Pole location(s) dimensions are relative to 0,0 reference point(s)

Equipment Layout

INCLUDES:

· Covered Pickleball

· Outdoor Pickleball

· Tennis Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.

Equipment List For Areas Shown Structure Fixtures

QTY STRUCTURE

ID SIZE GLOBAL

ELEVATION ABOVE GLOBAL LEVEL FIXTURE TYPE QTY/POLE

14 M1-M7 M64-M70 16' 16' OPS-17L-5Q-50K8.ies 1

14 M8-M14 M57-M63 18' 18' OPS-17L-5Q-50K8.ies 1

14 M15-M21 M50-M56 19' 19' OPS-17L-5Q-50K8.ies 1

10 M22-M26

M45-M49 21' 21' ARB-12-LS1-18L-850-

R16AD.ies 1

M27 M30 M41 M44

24' 24' ARB-12-LS1-18L-850-

R16AD.ies 1

M28-M29 M31-M40 M42-M43

24' 24' LSI ARB 12 1

4 P1-P4 50' - 50' 50'

TLC-LED-1200

TLC-LED-900

4 T1-T4 40' - 40' TLC-LED-550 3

78 Totals 94

Single Fixture Amperage Draw Chart Driver Speci ca ons

(.90 min power factor) Line Amperage Per Fixture

(max draw)

Single Phase Voltage 208 (60)

(60)

(60)

(60)

(60)

(60)

(60)

TLC-LED-1200 6.9 6.5 6.0 5.2 4.2 3.8 3.0

TLC-LED-900 5.2 4.9 4.5 3.9 3.1 2.9 2.3

TLC-LED-550 3.2 3.0 2.8 2.4 1.9 1.8 1.4

LSI ARB 12 - - - - - - -

*Amp draw based on 100% xture output, consult design speci c datasheet for adjusted amperage draw chart

Above Global Level is height of fixtures above design (0,0,0)

M2-1.02

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092FR1 • 10-Dec-25

T1 T2

T3T4

P1 P2

P3P4

(0.25', -181.00', 0.00')

M1 M8

M34

M57 M64

M41

M27

M39

M32

M11

M60

M4

M67

M35

M42

M28

M10

M59

M3

M66

M38

M31

M9

M58

M2

M65 M68

M36

M43

M29

M12

M61

M5

M40

M33

M13

M62 M69

M6

M70

M37

M44

M30

M14

M63

M7

M50 M53M52M51 M54 M55 M56

M15 M18M17M16 M19 M20 M21

M48M46 M47

M23 M24 M25

M49

M26

M45

M22

(-175.28', -181.00', 0.00')

0.04

0.03

0.02

0.01

0.01

0.01

0.01

0.01 0.01 0.01 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.00

0.00

0.01

0.01

0.01

0.00

0.01

0.01

0.01

0.01 0.010.010.020.020.020.030.030.040.040.040.040.040.04

0.03

0.03

0.03

0.04

0.04

0.04

0.05

0.06

0.06

0.06

0.06

0.05

0.04

0.04

0.03

0.03

0.03 0.03

0.04 0.04

SCALE IN FEET 1 : 80

0' 80' 160'

Earl Brown Park Tennis Pickleball Deland,FL Grid Summary

Name: Project Spill @ 3ft.

Spacing: 30.0' Height: 3.0' above grade

Illumination Summary

INITIAL HORIZONTAL FOOTCANDLES

Entire Grid Scan Average: 0.0211

Maximum: 0.0606 Minimum: 0.0030

CU: 0.00

No. of Points: 70

FIXTURE INFORMATION

Applied Circuits: A,B,C No. of Fixtures: 94

Total Load: 28.78 kW

Pole location(s) dimensions are relative to 0,0 reference point(s)

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures

M3-1.01

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092FR1 • 10-Dec-25

T1 T2

T3T4

P1 P2

P3P4

(0.25', -181.00', 0.00')

M1 M8

M34

M57 M64

M41

M27

M39

M32

M11

M60

M4

M67

M35

M42

M28

M10

M59

M3

M66

M38

M31

M9

M58

M2

M65 M68

M36

M43

M29

M12

M61

M5

M40

M33

M13

M62 M69

M6

M70

M37

M44

M30

M14

M63

M7

M50 M53M52M51 M54 M55 M56

M15 M18M17M16 M19 M20 M21

M48M46 M47

M23 M24 M25

M49

M26

M45

M22

(-175.28', -181.00', 0.00')

771 765 761 758 755 752 749

763768775784796808820828838846853856858

857 855

SCALE IN FEET 1 : 80

0' 80' 160'

Earl Brown Park Tennis Pickleball Deland,FL Grid Summary

Name: Project Spill @ 5ft.

Spacing: 30.0' Height: 5.0' above grade

Illumination Summary

INITIAL CANDELA (PER FIXTURE)

Entire Grid Scan Average: 806.1359

Maximum: 928.2614 Minimum: 744.1979

CU: 0.00

No. of Points: 70

FIXTURE INFORMATION

Applied Circuits: A,B,C No. of Fixtures: 94

Total Load: 28.78 kW

Pole location(s) dimensions are relative to 0,0 reference point(s)

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures

M3-1.02

©1981, 2025 Musco Sports Ligh ng, LLC.ENGINEERED DESIGN By: Brayton Carter • File #196092FR1 • 10-Dec-25

T1 T2

T3T4

P1 P2

P3P4

(0.25', -181.00', 0.00')

M1 M8

M34

M57 M64

M41

M27

M39

M32

M11

M60

M4

M67

M35

M42

M28

M10

M59

M3

M66

M38

M31

M9

M58

M2

M65 M68

M36

M43

M29

M12

M61

M5

M40

M33

M13

M62 M69

M6

M70

M37

M44

M30

M14

M63

M7

M50 M53M52M51 M54 M55 M56

M15 M18M17M16 M19 M20 M21

M48M46 M47

M23 M24 M25

M49

M26

M45

M22

(-175.28', -181.00', 0.00')

0.44

0.33

0.26

0.21

0.18

0.15

0.14

0.12 0.11 0.10 0.10 0.09 0.08 0.08

0.08

0.08

0.07

0.07

0.08

0.08

0.08

0.10

0.10

0.11

0.10

0.11

0.11

0.11

0.11

0.11

0.11

0.10

0.11

0.11

0.11

0.12

0.13 0.150.180.200.230.290.330.380.410.440.440.460.450.41

0.40

0.42

0.42

0.43

0.45

0.49

0.53

0.58

0.61

0.60

0.57

0.52

0.48

0.43

0.43

0.41

0.42 0.42

0.43 0.45

SCALE IN FEET 1 : 80

0' 80' 160'

Earl Brown Park Tennis Pickleball Deland,FL Grid Summary

Name: Project Spill @ 5ft.

Spacing: 30.0' Height: 5.0' above grade

Illumination Summary

INITIAL MAX VERTICAL FOOTCANDLES

Entire Grid Scan Average: 0.2653

Maximum: 0.6078 Minimum: 0.0697

CU: 0.00

No. of Points: 70

FIXTURE INFORMATION

Applied Circuits: A,B,C No. of Fixtures: 94

Total Load: 28.78 kW

Pole location(s) dimensions are relative to 0,0 reference point(s)

Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.

Field Measurements: Individual field measurements may vary from computer-calculated predictions.

Electrical System Requirements: Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing.

Installation Requirements: Results assume ± 3% nominal voltage at line side of the driver and structures

M3-1.03

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

1 Mobilization & Demobilization LS 1 $0.00

2 SWPPP/BMP LS 1 $0.00

3 Clearing and Grubbing LS 1 $0.00

4 Removal of Pavement (including sidewalks, driveways, curb and gutter, LS 1 $0.00

5 Removal of Ex. City Utilities (Sanitary sewer & Laterals, WM & Services) LS 1 $0.00

6 Earthwork Grading (Excavation and Embankment) LS 1 $0.00

7 Construct 6-foot wide, thickened edge Conc. Sidewalk LF 320 $0.00

8 Construct FDOT Standard Curb and Gutter (Type F Style) LF 22 $0.00

9 Milling Existing Asphalt - 2" average depth SY 710 $0.00

10 Construct 2-Inch FDOT Type FC-12.5 (Traffic Level "C") Asphalt TN 43 $0.00

11 Construct 8-Inch Crushed Conc. Base Course SY 300 $0.00

12 Construct 12-Inch Stabilized Subgrade SY 300 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

13 Permit Fees LS 1 $0.00

14 Furnish and Install 1-inch HDPE Potable Service Laterals and Fittings LF 80 $0.00

15 Furnish and Install 2-inch HDPE Potable Service Lines and Fittings LF 1,060 $0.00

16 Furnish and Install Above Ground Water Spigot EA 6 $0.00

17 Connect to Existing 1-inch Water Service EA 1 $0.00

18 Furnish and Install 18-inch PVC C-900 Reclaim Watermain LF 200 $0.00

19 Furnish and Install 18-inch Gate Valve EA 1 $0.00

20 Furnish and Install 18-inch 45-Bends EA 3 $0.00

21 Connect 18-inch Proposed Reclaim Main to existing 18" Reclaim Main EA 2 $0.00

22 Furnish and Install 6-inch Sanitary Cleanout and Connection to Building EA 1 $0.00

23 Furnish and Install 6-inch Sanitary Sewer Service Lateral LF 101 $0.00

24 Connect to existing Sanitary gravity main EA 1 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

25 Furnish and Install 18-inch HDPE Storm Pipe LF 136 $0.00

26 Furnish and Install 12-inch HDPE Storm Pipe LF 132 $0.00

27 Furnish and Install 8-inch HDPE Storm Pipe LF 16 $0.00

28 Furnish and Install FDOT Type "C" inlet EA 1 $0.00

29 Furnish and Install 18" MES EA 1 $0.00

30 Furnish and Install FDOT Type "E" inlet EA 1 $0.00

31 Furnish and Install 8" ADS Nyoplast Drainage Inlet EA 3 $0.00

32 Furnish and Install 12" ADS Nyoplast Drainage Inlet EA 1 $0.00

33 Furnish and Install 18" ADS Nyoplast Drainage Inlet EA 3 $0.00

34 Furnish and Install 24" ADS Nyoplast Drainage Inlet EA 1 $0.00

35 Stone Swale / Stone Flume CF 1,100 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

36 Sports Courts (Surfacing/Fencing/Windscreen/Nets) LS 1 $0.00

37 Gateway Feature LS 1 $0.00

38 Custom Tables EA 4 $0.00

39 Synthetic Turf SF 2800 $0.00

40 Sidewalk (Standard Concrete) SF 5900 $0.00

41 Planter (Wall/Veneer/Cap/ Skate Deterents) LF 250 $0.00

42 Synthetic Turf Concrete Edging (4'x6") LF 60 $0.00

43 4' Fencing (Additional to Sports Courts) LF 1500 $0.00

44 8' Fencing (Additional to Sports Courts) LF 1100 $0.00

45 10' Fencing (Additional to Sports Courts) LF 450 $0.00

46 Gates (Pedestrian & Sliding LS 1 $0.00

47 Landscape Edging LF 500 $0.00

48 Bench EA 12 $0.00

49 Waste Receptacle EA 2 $0.00

50 Bike Rack EA 2 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

51 Small Tree EA 10 $0.00

52 Date Palm EA 1 $0.00

53 1 Gal. Grasses and Groundcover EA 702 $0.00

54 3 Gal Shrubs EA 323 $0.00

55 Turf SF #### $0.00

56 Decorative Stone SF 1700 $0.00

57 Pine Bark Mulch YD 30 $0.00

58 Tree Staking LS 1 $0.00

59 Irrigation System LS 1 $0.00

$0.00

P

A

Y

I

T

E

M

S

U

M

M

A

R

Y

CIVIL SUB-TOTAL

HARDSCAPE

HARDSCAPE SUB-TOTAL

LANDSCAPE & IRRIGATION

LANDSCAPE & IRRIGATION SUB-TOTAL

DAVID E. DISNEY TENNIS & PICKLEBALL CENTER (B-26-10)

CIVIL

Pay Item Summary - Schedule of Values

UTILITY

UTILITY SUB-TOTAL

STORMWATER

STORMWATER SUB-TOTAL

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

60 Sports Court Lighting - Outdoor Courts (F&I by others, Coordination only) LS 1 $0.00

61 Sports Court Lighting - PEMB/Indoor Court (Furnished by others, Installation only) LS 1 $0.00

62 Lighted Bollard EA 10 $0.00

63 Tree Uplight EA 12 $0.00

64 Gateway Uplight EA 12 $0.00

65 Linear Wall Lighting LS 1 $0.00

66 Site Electrical LS 1 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

67 DIVISION 01: GENERAL REQUIREMENTS LS 1 $0.00

68 DIVISION 02: EXISTING CONDITIONS LS 1 $0.00

69 DIVISION 03: CONCRETE LS 1 $0.00

70 DIVISION 04: MASONRY LS 1 $0.00

71 DIVISION 05: METALS LS 1 $0.00

72 DIVISION 06: WOOD AND PLASTICS LS 1 $0.00

73 DIVISION 07: THERMAL & MOISTURE PROTECTION LS 1 $0.00

74 DIVISION 08: OPENINGS LS 1 $0.00

75 DIVISION 09: FINISHES LS 1 $0.00

76 DIVISION 10: SPECIALTIES LS 1 $0.00

77 DIVISION 11: EQUIPMENT LS 1 $0.00

78 DIVISION 12: FURNISHINGS LS 1 $0.00

79 DIVISION 13: SPECIAL COSTRUCTION LS 1 $0.00

80 DIVISION 22: PLUMBING LS 1 $0.00

81 DIVISION 23: HEATING, VENTILIATION, & AIR CONDITIONING LS 1 $0.00

82 DIVISION 26: ELECTRICAL LS 1 $0.00

83 DIVISION 28: ELECTRONIC SAFETY & SECURITY LS 1 $0.00

84 DIVISION 31: EARTHWORK LS 1 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

85 DIVISION 01: GENERAL REQUIREMENTS LS 1 $0.00

86 DIVISION 02: EXISTING CONDITIONS LS 1 $0.00

87 DIVISION 03: CONCRETE LS 1 $0.00

88 DIVISION 05: METALS LS 1 $0.00

89 DIVISION 07: THERMAL & MOISTURE PROTECTION LS 1 $0.00

90 DIVISION 09: FINISHES LS 1 $0.00

91 DIVISION 10: SPECIALTIES LS 1 $0.00

92 DIVISION 13: SPECIAL COSTRUCTION LS 1 $0.00

93 DIVISION 22: PLUMBING LS 1 $0.00

94 DIVISION 23: HEATING, VENTILIATION, & AIR CONDITIONING LS 1 $0.00

95 DIVISION 26: ELECTRICAL LS 1 $0.00

96 DIVISION 28: ELECTRONIC SAFETY & SECURITY LS 1 $0.00

97 DIVISION 31: EARTHWORK LS 1 $0.00

$0.00

ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE EXTENDED AMOUNT

98 DIVISION 01: GENERAL REQUIREMENTS LS 1 $0.00

99 DIVISION 02: EXISTING CONDITIONS LS 1 $0.00

100 DIVISION 03: CONCRETE LS 1 $0.00

101 DIVISION 05: METALS LS 1 $0.00

102 DIVISION 09: FINISHES LS 1 $0.00

103 DIVISION 10: SPECIALTIES LS 1 $0.00

104 DIVISION 13: SPECIAL COSTRUCTION LS 1 $0.00

105 DIVISION 26: ELECTRICAL LS 1 $0.00

$0.00

P $0.00

$0.00

A $0.00

CONTRACT TIME

B Contractor agrees to reach Substantial Completion in days

C Contractor agrees to reach Final Completion in days

TOTAL

CONTINGENCY 5%

TOTAL BASE BID ITEMS AMOUNT (Sum of Extended Amounts for each Base Bid Item + Contingency)

S

C

H

E

D

U

L

E

O

F

V

A

L

U

E

S

SHADE STRUCTURE

SHADE STRUCTURE SUB-TOTAL

SPORTS LIGHTING & SITE LIGHTING

SPORTS LIGHTING & SITE LIGHTING SUB-TOTAL

BUILDING RENOVATION & NEW ADDITION

BUILDING RENOVATION & NEW ADDITION SUB-TOTAL

PRE-ENGINEERED METAL BUILDING

PRE-ENGINEERED METAL BUILDING SUB-TOTAL

File details come from the government source that posted it. Updated .