B2610GeotechnicalReport.pdf
PDF 10 MB Posted
- Solicitation number
- B-26-10
- Issued by
- Volusia County, Florida
About this file
Summary of Geotechnical Engineering Report
This is a Geotechnical Engineering Report prepared by ECS Florida, LLC for the Earl Brown Pickleball Court Expansion project located at 816 South Amelia Avenue in DeLand, Volusia County, Florida. The report documents subsurface exploration and laboratory testing conducted to support the design and construction of court reconstruction, a one-story restroom building addition, a light canopy structure, and new light poles at the existing David E. Disney Tennis Center. The geotechnical investigation included eight Standard Penetration Test (SPT) borings drilled to approximately 20 feet below existing grade and comprehensive laboratory testing on soil samples. The project site, currently occupied by pickleball, tennis, and shuffleboard courts, is situated within an area mapped by USDA-NRCS as predominantly Astatula and Tavares fine sands. The report was completed on January 27, 2025, and was prepared under ECS Proposal No. 56-2347 dated August 27, 2024, with authorization provided by the client on November 25, 2024.
The geotechnical analysis supports the proposed construction on shallow foundations with a maximum allowable net bearing pressure of 2,000 psf, contingent upon proper site preparation and earthwork construction compliance. Subsurface conditions consist primarily of very loose to medium dense fine sand with silt and clay layers at depths of 0.5 to 25 feet. Groundwater was encountered at approximately 9 feet below grade at boring location B-03, with seasonal high groundwater estimated at approximately 7.5 feet below the surface. The report provides specific foundation design parameters for column and wall footings (minimum 24 and 18 inches width respectively, with 18 and 12 inches embedment depth), slab-on-grade specifications including a recommended 6-inch drainage layer and impervious membrane, and soil parameters for light pole foundation design. Construction recommendations address subgrade preparation, earthwork operations, structural fill compaction requirements to 95-98 percent of modified Proctor maximum dry density, utility installation standards, and erosion control measures. ECS recommends retained involvement during the construction phase for material testing and quality assurance verification to ensure geotechnical recommendations are properly implemented.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2610RCA.pdf | ||
| B2610Tabulation.pdf | ||
| B2610ADD5.pdf | ||
| B2610ADD4.pdf | ||
| B2610PriceSheetRevised.xlsx | XLSX spreadsheet | |
| B2610ADD3.pdf | ||
| B2610ADD2.pdf | ||
| B2610ADD1.pdf | ||
| B2610Final.pdf | ||
| B2610PlansPart2.pdf | ||
| B2610PlansPart1.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a
ECS Florida, LLC Geotechnical Engineering Report Earl Brown Pickleball Court Expansion - DeLand
816 South Amelia Avenue DeLand/Volusia County, Florida
ECS Project Number 56:1970
January 27, 2025
January 27, 2025
Mr. Curtis Burkett, P.E. LEED AP Legacy Senior Project Manager/Client Representative Freese and Nichols, Inc.
4 Office Park Drive, Pod 3 Palm Coast, FL 32137
ECS Project No. 56:1970 Reference: Geotechnical Engineering Report
Earl Brown Pickleball Court Expansion - DeLand 816 South Amelia Avenue DeLand/Volusia County, Florida
Dear Mr. Burkett:
ECS Florida, LLC. (ECS) has completed the subsurface exploration, laboratory testing, and geotechnical engineering analyses for the above-referenced project. Our services were performed in general accordance with our agreed-to scope of work. This report presents our understanding of the geotechnical aspects of the project along with the results of the field exploration and laboratory testing conducted, and our foundation design and earthwork construction recommendations.
It has been our pleasure to be of service to Freese and Nichols, Inc. during the design phase of this project. We would appreciate the opportunity to remain involved during the continuation of the design phase, and we would like to provide our services during construction phase operations as well to verify the assumptions of subsurface conditions made for this report. Should you have any questions concerning the information contained in this report, or if we can be of further assistance to you, please contact us.
Respectfully submitted, ECS Florida, LLC
Giovanni Mafiol, E.I. Nemer (Nick) Oweis, P.E.
Geotechnical Project Manager Senior Principal Engineer gmafiol@esclimited.com Registered, Florida No. 44755 noweis@ecslimited.com mailto:gmafiol@esclimited.com mailto:noweis@ecslimited.com
Earl Brown Pickleball Court Expansion – DeLand January 27, 2025 ECS Project No. 56:1970 Page i
TABLE OF CONTENTS
EXECUTIVE SUMMARY
1.0 INTRODUCTION
2.0 PROJECT INFORMATION
2.1 Project Location/Current Site Use
2.2 Past Site History/Uses
2.3 Soil Survey Mapping
2.4 Proposed Construction
3.0 FIELD EXPLORATION AND LABORATORY TESTING
3.1 Subsurface Characterization
3.2 Groundwater Observations
3.2.1 Encountered Groundwater
3.2.2 Estimated Seasonal High Groundwater
3.3 Laboratory Testing
3.3.1 Visual Classification and Index Testing
4.0 DESIGN RECOMMENDATIONS
4.1 Restroom Foundations
4.2 Slabs On Grade
4.2 Soil Parameters for Light Pole Foundation Design
4.3 Pavements
5.0 CONSTRUCTION AND QUALITY CONTROL RECOMMENDATIONS
5.1 Subgrade Preparation
5.1.1 Stripping and Grubbing
5.1.2 Subgrade Compaction
5.2 Earthwork Operations
5.2.1 Structural Backfill and Fill Soils
5.2.2 Playfield Areas
5.3 Utility Installations
6.0 CLOSING
ECS Project No. 56:1970 Page ii
Appendix A – Diagrams
• Figure 1 – Site Location Diagram
• Figure 2 – Boring Location Diagram
Appendix B – Field Operations
• Reference Notes for Boring Logs
• Subsurface Exploration Procedure: Standard Penetration Testing (SPT)
• Geotechnical SPT Boring Logs
Appendix C – Laboratory Test Results
• Laboratory Test Results Summary
ECS Project No. 56:1970 Page 1
EXECUTIVE SUMMARY
This Executive Summary is intended as a very brief overview of the primary geotechnical conditions that are expected to affect design and construction of the proposed court reconstruction, one-story building addition for restrooms, a light canopy structure for one of the courts and new light poles to be located at 816 South Amelia Avenue in DeLand, Florida. Information gleaned from the Executive Summary should not be utilized in lieu of reading the entire geotechnical report.
• Based on the results of our exploration, we consider the subsurface conditions at the site adaptable for support of the proposed structure on a properly designed conventional shallow foundation system with a maximum allowable net bearing pressure of 2,000 psf.
Provided the site preparation and earthwork construction recommendations outlined in Section 5.0 of this report are performed, the parameters presented in Section 4.1 of this report may be used for foundation design.
• We consider the subsurface conditions at the site adaptable for support of the proposed playfield sections when constructed on properly prepared subgrade soils as outlined in Section 5.0 of this report.
• The groundwater was encountered and measured at Boring B-03 location at a depth of approximately 9 feet below the existing ground surface. We could not ascertain the groundwater level at the remaining boring locations. We estimate the normal seasonal high groundwater level (SHGW) at the site to be at least 1.5 feet above this level, at approximately 7.5 feet below the ground surface at the boring locations.
• We recommend that ECS be provided the opportunity to review the foundation plans and earthwork specifications to verify that our recommendations have been properly interpreted and implemented. ECS should also be retained to perform the construction material testing and observations required for this project, to verify that our recommendations have been satisfied.
ECS Project No. 56:1970 Page 2
1.0 INTRODUCTION
The purpose of this study was to provide geotechnical information for the design and construction of proposed court reconstruction, one-story restroom addition, light canopy, and new light poles in 816 South Amelia Avenue DeLand, Florida.
Our services were provided in general accordance with the scope of services outlined in our Proposal No. 56-2347, dated August 27, the ECS Florida, LLC Terms and Conditions of Service, and as authorized by you on November 25, 2024.
This Geotechnical Engineering Report includes the following items:
• A brief review and description of our field and laboratory test procedures and the results of testing conducted;
• A review of surface topographical features and site conditions;
• A review of area and site geologic conditions;
• A review of subsurface soil stratigraphy with pertinent available physical properties;
• Final copies of our soil boring logs;
• Measured groundwater levels and our estimate for the normal seasonal high groundwater at the boring locations;
• Recommended foundation type and foundation design parameters for the proposed building addition and court canopy.
• Playfield design consideration.
• Recommended design parameters for the light pole foundations.
• Recommendations for the required site preparation and earthwork construction.
ECS Project No. 56:1970 Page 3
2.0 PROJECT INFORMATION
2.1 PROJECT LOCATION/CURRENT SITE USE
The project site is located at David E. Disney Tennis Center, DeLand, Florida. The site is an existing Pickleball, Tennis, and Shuffleboard courts in DeLand, Florida. The conditions surrounding the site were as follows:
• to the north was Earl Brown Park;
• to the west was South Alabama Avenue followed by a residential buildings;
• to the east was South Amelia Avenue followed by a residential development; and
• to the south was East Beresford Avenue followed by a residential development.
The general site location is shown below.
Site Location
At the time of our exploration, the site was the tennis center for the Earl Brown Park. Based on review of online topographic information available through Google Earth, the site has an elevation ranging between approximately EL. 24 and El. 29 feet. Note these elevations are approximate within several feet and should not be used for design.
2.2 PAST SITE HISTORY/USES
ECS has reviewed aerial photographs of the subject site on Google Earth and Historic Aerials (NETR Online). The aerial photographs reviewed were dated from 1952 to 2024. The 1952 to 1958 photographs showed the proposed site as undeveloped and scarcely populated by trees. By 1983 the photograph showed the pickleball and shuffleboard courts already constructed with the addition of the tennis courts by 1999, with site conditions approximately as they existed at the time of this report.
ECS Project No. 56:1970 Page 4
2.3 SOIL SURVEY MAPPING
Based on the Web Soil Survey for Volusia County, Florida, as prepared by the U.S. Department of Agriculture Natural Resource Conservation Service (USDA-NRCS), the predominant soil types existing within the site area boundaries are described in the following table. The site area is illustrated superimposed on the USDA-NRCS Soil Survey Map in the following figure.
Web Soil Survey Data
Soil Type Constituents Drainage Class Water Table
4 – Astatula fine sand, 0 to 8 percent slopes Fine Sand Excessively
Drained More than 80 inches
63 – Tavares fine sand, 0 to 5 percent slopes Fine Sand Moderately
Well Drained About 18 to 42 inches
Soil mapping of the site vicinity included soil types and numbers are presented in figure below, obtained from the USDA Web Soil site.
Site Soil Survey, Volusia County, Florida (FL127)
ECS Project No. 56:1970 Page 5
2.4 PROPOSED CONSTRUCTION
Based on information provided by Freese and Nichols, Inc., we understand that a court expansion, a one-story restroom addition, a light canopy and new light poles are proposed at 816 South Amelia Avenue, DeLand, Florida. For the purposes of this report, we have estimated the building construction and approximate loading conditions to be as outlined in the following table. We expect that construction will occur approximately at the existing site grade and the foundations of the canopy and light poles will be within the upper 10 feet and the upper 15 feet, respectively, below ground surface, with possibly minor fills (less than 2 feet) required to achieve final grades in structure areas.
Estimated Design Values for Proposed Commercial Building
SUBJECT DESIGN INFORMATION / EXPECTATIONS
# of Buildings 1
# of Stories One-Story Maximum Usage Restroom, Canopy, and Light Poles
Framing Masonry and wood-frame with concrete slab on grade - expected Column Loads Estimated 15 kips (Full Dead and Factored Live) - estimated
Wall Loads Estimated 1.5 kips per linear foot (klf) maximum –estimated Floor Loads 100 pounds per square foot (psf) maximum –estimated
*If the estimated structural loads differ from final design loads, this report needs to be revised to update and/or modify our foundation recommendations, bearing capacity, and settlement calculations.
3.0 FIELD EXPLORATION AND LABORATORY TESTING
Our scope of exploration work for the proposed court improvements included drilling eight (8) Standard Penetration Test (SPT) borings to a depth of approximately 20 feet below the existing site grades for the proposed structures. Our borings were located with a handheld GPS unit and their approximate locations are shown on the Field Exploration Diagram (Figure 2) in Appendix A. Our exploration procedures are explained in greater detail in Appendix B including the inserts titled Reference Notes for Boring Logs and Subsurface Exploration Procedure: Standard Penetration Testing (SPT).
3.1 SUBSURFACE CHARACTERIZATION
The following tables provide generalized characterizations of the soil strata. Please refer to the boring logs in Appendix B for detailed information on the subsurface conditions encountered.
Generalized subsurface Profile
Approximate Depth Range (ft) Stratum Description
0 – 0.5 - Topsoil
0.5 - 25 I
Very Loose to Medium Dense Fine Sand (SP), Fine Sand with Silt (SP-SM) and Fine Sand with Clay (SP-SC). As an exception, Silty
Fine Sand (SM) and Clayey Fine Sand (SC) layers were encountered at Boring B-04 and B-06 locations between depths of
4 to 6 feet and 12 and 15 feet, respectively.
ECS Project No. 56:1970 Page 6
3.2 GROUNDWATER OBSERVATIONS
3.2.1 Encountered Groundwater
Groundwater was measured at the time of drilling at a depth of approximately 9 feet below the ground surface at the boring location B-03. We could not ascertain the groundwater level at the remaining boring locations. Variations in the long-term water table may occur as a result of changes in precipitation, evaporation, surface water runoff, construction activities, and other factors.
3.2.2 Estimated Seasonal High Groundwater
The normal seasonal high groundwater level (SHGWL) is affected by a number of factors. The drainage characteristics of the soils, land surface elevation, relief points such as drainage ditches, lakes, rivers, swamp areas, etc., and distance to relief points are some of the more important factors influencing the normal SHGWL.
Based on our interpretation of the site conditions, including the boring logs and Web Soil Survey, we estimate the normal SHGWL to be approximately 1.5 feet higher than the levels encountered during the time of drilling during December, as indicated on the boring logs. It is possible that groundwater levels may exceed the estimated normal SHGWLs as a result of significant or prolonged rains.
3.3 LABORATORY TESTING
3.3.1 Visual Classification and Index Testing
Each sample from the borings was visually classified on the basis of texture and plasticity in accordance with ASTM D2487 Standard Practice for Classification for Engineering Purposes (Unified Soil Classification System (USCS)) and ASTM D2488 Standard Practice for Description and Identification of Soils (Visual-Manual Procedures) and including USCS classification symbols. After classification, the samples were grouped in the major zones noted on the boring logs in Appendix B. The group symbols for each soil type are indicated in parentheses along with the soil descriptions.
The stratification lines between strata on the logs are approximate; in situ, the transitions may be gradual.
The laboratory testing consisted of selected tests performed on samples obtained during our field exploration operations. Classification and index property tests were performed on representative soil samples and included percent fines (ASTM D1140) and moisture content (ASTM D2216) tests.
The test results are shown on the boring logs in Appendix B, and are tabulated in Appendix C.
4.0 DESIGN RECOMMENDATIONS
4.1 RESTROOM FOUNDATIONS
Provided subgrades and structural fills are prepared as recommended in this report, the proposed structure can be supported by shallow foundations including column footings and continuous wall footings. We recommend the foundation design use the following parameters:
Foundation Parameters
Design Parameter Column Footing Wall Footing
Minimum Width 24 inches 18 inches
Minimum Footing Embedment Depth (below slab or finished grade) 18 inches 12 inches
Estimated Maximum Total Settlement1 1 inch 1 inch
ECS Project No. 56:1970 Page 7
Design Parameter Column Footing Wall Footing
Estimated Maximum Differential Settlement2 ½ inch between columns
Less than ½ inches over 50 feet
Net Allowable Bearing Pressure3 2,000 psf
Acceptable Bearing Soil Material Compacted Subgrade/Engineered Fill
1. Based on estimated structural loads. If final loads are different, ECS must be contacted to update foundation recommendations and settlement calculations.
2. Based on estimated maximum column/wall loads and variability in borings. Differential settlement can be re-evaluated once the foundation plans are more complete.
3. Net allowable bearing pressure is the applied pressure in excess of the surrounding overburden soils above the base of the foundation.
Depending on the final floor elevation of the building, we anticipate that the soils at the foundation bearing elevation are able to support of the proposed structure, after preparation in accordance with Section 5.0 of this report. The bearing level soils, after compaction, should exhibit densities equivalent to 95 percent of the modified Proctor maximum dry density (ASTM D1557) to a depth of at least one foot below foundation bearing levels.
For turn down slabs and interior wall footings the minimum width should also be 18 inches, however the sloped transition portion of the turn-down may be included when determining the footing width. Even though the maximum allowable soil bearing pressure may not be achieved, these width recommendations should control the size of the foundations.
Canopies: We expect the canopy will support nominal dead loads of approximately 25 kips, but that the foundations will be sized for uplift considerations and moment loading. The foundation maybe designed for a net allowable compressive soil pressure of 2,000 psf with a minimum lateral dimension (width or diameter) of 24 inches. To develop this net allowable soil pressure, the canopy foundations should be embedded at a minimum depth of 24 inches below finished grades. A maximum temporary soil pressure due to overturning live loading of 2,500 psf is acceptable.
For the design of the canopy foundation to resist uplift and overturning, the following soil parameters, shown in the table below can be utilized.
Canopy Foundation Design Parameters
0.0 – 10.0 feet
Coefficient of Earth Pressure at Rest (Ko): 0.50
Coefficient of Active Pressure at Rest (Ka): 0.33
Coefficient of Passive Earth Pressure (Kp): 3.00
Moist Unit Weight (γ) 115 pcf
Submerged Soil Moist Unit Weight (γs): 63 pcf
Cohesion (c): 0
Angle of Internal Friction (ø): 30°
4.2 SLABS ON GRADE
The floor slab can be constructed as a slab-on-ground, provided the site is prepared as outlined in Section 5.0. A minimum clearance of 2 feet is recommended between the estimated normal seasonal high groundwater table and the bottom of the floor slab; we expect that this is achievable based on measured estimated groundwater level measurements at the time of our evaluation. It is recommended the floor slab bearing soils be covered with an impervious membrane to reduce
ECS Project No. 56:1970 Page 8 moisture entry and floor dampness. A 6-mil thick plastic membrane is commonly used for this purpose. Care should be exercised not to tear large sections of the membrane during placement of reinforcing steel and concrete.
The following graphic depicts our soil-supported slab recommendations:
1. Drainage Layer Thickness: 6 inches
2. Drainage Layer Material: Gravel (GP, GW), SAND (SP, SP-SM, SW)
Soft or yielding soils may be encountered in some areas. Those soils should be removed and replaced with compacted structural fill per the recommendations in this report. It should be noted that some undercut below the slab may be required in order to install the noted capillary break as noted above. This will depend on the proposed site grading.
Slab Isolation: Soil-supported slabs should be isolated from the foundations and foundation-supported elements of the structure so that differential movement between the foundations and slab will not induce excessive shear and bending stresses in the floor slab. Where the structural configuration prevents the use of a free-floating slab, such as in a drop-down footing/monolithic slab configuration, the slab should be designed with suitable reinforcement and load transfer devices to preclude overstressing of the slab.
4.2 SOIL PARAMETERS FOR LIGHT POLE FOUNDATION DESIGN
Based on the results of the borings, we consider the subsurface conditions adaptable for support of the proposed light pole structures.
Soil Parameters for Light Pole Foundation Design
Boring Location
Soil Type(1)
Average N-Value(2)
Approx.
Depth (ft)(3) γT, Total Unit
Weight (lb/ft3) γ’, Effective
Unit Weight (lb/ft3) φ, Internal Friction Angle
(Degrees) c, Cohesion
(lb/ft2)
B4 to B8
SP -- 0-4 100 40 29 0
SP 7 4-8 110 42 29 0
SP 11 8-25 115 43 31 0
Notes: (1) Unified Soil Classification System (USCS)
(2) Standard Penetration Test (SPT) N-value; W.O.H. - N-value could not be measured, SPT split spoon sampler dropped under weight of hammer
(3) Feet below the existing ground surface
ECS Project No. 56:1970 Page 9
4.3 PAVEMENTS
The American Sports Builders Association (ASBA) recommends that an asphalt tennis court be comprised of a minimum 3 inches of asphalt over a minimum 6 inches of compacted base.
The following graphic depicts our estimated court section:
1. Aggregate Base Thickness: 6 inches
2. Aggregate Base Material: ODOT Item 304 LIMESTONE
5.0 CONSTRUCTION AND QUALITY CONTROL RECOMMENDATIONS
5.1 SUBGRADE PREPARATION
5.1.1 Stripping and Grubbing
The "footprint" of the proposed building and hardscape areas (restroom addition), plus a minimum additional margin of 5 feet and 3 feet, respectively, should be stripped of all pavement materials, surface vegetation, stumps, organic topsoil (if present) or other deleterious materials. During grubbing operations, roots with a diameter greater than 0.5-inch, stumps, or small roots in a concentrated state, should be grubbed and completely removed.
During stripping and grubbing, site materials should be observed for unsuitable soils, such as topsoil or soils with many organic materials. Any identified unsuitable soils should be removed from the building and parking/drive areas and can be stockpiled and may be considered for reuse subsequently in non-structural areas.
5.1.2 Subgrade Compaction
After completing the clearing and stripping operations the exposed surface should be compacted with a vibratory drum roller having a minimum static, at-drum weight, on the order of 4 tons to 6 tons. Typically, the material should exhibit moisture contents within ±2 percentage points of the modified Proctor optimum moisture content (ASTM D 1557) during the compaction operations.
Compaction should continue until densities of at least 95 percent of the modified Proctor maximum dry density (ASTM D 1557) have been achieved within the upper 2 feet of the compacted natural soils at the site.
Should the bearing level soil experience pumping and soil strength loss during the compaction operations, compaction work should be immediately terminated, and (1) the disturbed soils should be removed and backfilled with compacted structural fill, or (2) the excess moisture content within the disturbed soils should be allowed to dissipate before recompacting.
Care should be exercised to avoid damaging any nearby structures while the compaction operation is underway. Prior to commencing compaction, occupants of adjacent structures should be notified, and the existing conditions of the structures should be documented with photographs and survey (if deemed necessary). Compaction should cease if deemed detrimental to adjacent structures, and
Asphalt (min. 3 inches)
Compacted Aggregate Base
Compacted Subgrade
ECS Project No. 56:1970 Page 10
ECS should be contacted immediately. We recommend the vibratory roller remain a minimum of 50 feet from existing structures. Within this zone, use of a track-mounted bulldozer, or a vibratory roller operating in the static mode, is recommended.
5.2 EARTHWORK OPERATIONS
5.2.1 Structural Backfill and Fill Soils
Structural fill is defined as a non-plastic, inorganic, granular soil having less than 10 percent material passing the No. 200 mesh sieve and containing less than 4 percent organic material. The fine sands with silt (SP-SM), without roots, as encountered in the borings, are suitable as fill materials and with proper moisture control, should densify using conventional compaction methods. Soils with more than 10 to 12 percent passing the No. 200 sieve will be more difficult to compact, due to their nature to retain soil moisture, and may require drying.
Structural Fill Compaction Requirements: Materials satisfactory for use as structural fill should consist of soils with the following compaction requirements.
STRUCTURAL FILL COMPACTION REQUIREMENTS
Subject Requirement
Compaction Standard Modified Proctor, ASTM D1557
Required Compaction 95% of Max. Dry Density (general structural fill) 98% of Max. Dry Density (upper one foot below the proposed pavement base course)
Loose Thickness prior to compaction
12 inches if vibratory drum roller compaction equipment is used 8 inches if vibratory drum roller is used in static mode
8 inches if track-mounted compaction equipment is used 6 inches if hand-held compaction equipment is used
Fill materials should not be placed on excessively wet soils. Excessively wet soils should be scarified, aerated, and moisture conditioned. Proper drainage should be maintained during the earthwork phases of construction to prevent ponding of water which has a tendency to degrade subgrade soils. The contractor should minimize dusting or implement dust control measures, as required.
We recommend that the grading contractor have equipment on site during earthwork for both drying and wetting fill soils. Moisture control may be difficult during extended periods of rain. The control of moisture content of soils containing more than 10% fines may be difficult when these soils become wet. Further, such soils are easily degraded by construction traffic when the moisture content is elevated.
5.2.2 Playfield Areas
Following compaction of subgrade soils in playfield areas, fill/paving materials required to achieve the finish pavement grades can then be placed and compacted as described in Section 5.2.1.
5.3 UTILITY INSTALLATIONS
Utility Subgrades: The soils encountered in the borings predominantly comprised fine sands (SP). It is our opinion that these soils are suitable bedding soils for pipelines and utility structures.
Utility Backfilling: Backfill placed around the pipe, and to a height of 2 feet above the top of pipe, should be placed in 6-inch lifts. Each lift should be compacted with hand-held equipment to 98
ECS Project No. 56:1970 Page 11 percent of the soil’s Modified Proctor (ASTM D1557) maximum dry density. Backfill placed above the 2-foot zone above the top of pipe elevation may be placed in 12-inch lifts and compacted with heavier equipment. Typically, the backfill soil should exhibit moisture contents within ±2 percent of the soil’s optimum moisture content as determined from the Proctor test. Care should be taken to avoid damaging the pipe during compaction operations.
Utility Excavation Dewatering: Based on the groundwater depths encountered in our borings, groundwater will likely be encountered by utility excavations which extend below existing grades.
It is expected that removal of groundwater will be required, especially for deeper utility excavations. The contractor should submit a dewatering plan prior to installing the site utilities.
Excavation Safety: All excavations and slopes should be made and maintained in accordance with OSHA excavation safety standards. The contractor is solely responsible for designing and constructing stable, temporary excavations and slopes and should shore, slope, or bench the sides of the excavations and slopes as required to maintain stability of both the excavation sides and bottom. The contractor’s responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor’s safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. ECS is providing this information solely as a service to our client. ECS is not assuming responsibility for construction site safety or the contractor’s activities; such responsibility is not being implied and should not be inferred.
Erosion Control: The surface soils may be erodible. Therefore, the Contractor should provide and maintain good site drainage during earthwork operations to maintain the integrity of the surface soils. All erosion and sedimentation controls should be in accordance with sound engineering practices and local requirements.
ECS Project No. 56:1970 Page 12
6.0 CLOSING
Our geotechnical exploration has been performed, our findings obtained, and our recommendations prepared, in accordance with generally accepted geotechnical engineering principles and practices. ECS is not responsible for any independent conclusions, interpretation, opinions, or recommendations made by others based on the data contained in this report.
Our scope of services was intended to evaluate the soil conditions within the zone of soil influenced by the proposed mast arm structures, roadway, and utility installations. Our scope of services does not address geologic conditions, such as sinkholes or soil conditions existing below the depth of the soil borings.
If any of the project description information discussed in this report is inaccurate, either due to our interpretation of the documents provided or site or design changes that may occur later, ECS should be contacted immediately in order that we can review the report in light of the changes and provide additional or alternate recommendations as may be required to reflect the proposed construction.
We recommend that ECS be allowed to review the project’s plans and specifications pertaining to our work so that we may ascertain consistency of those plans/specifications with the intent of the geotechnical report.
Field observations, monitoring, and quality assurance testing during earthwork and foundation installation are an extension of and integral to the geotechnical design recommendation. We recommend that the owner retain these quality assurance services and that ECS be allowed to continue our involvement throughout these critical phases of construction to provide general consultation as issues arise.
ECS is not responsible for the conclusions, opinions, or recommendations of others based on the data in this report.
APPENDIX A – Diagrams & Reports
Figure 1 – Site Location Diagram Figure 2 – Boring Location Diagram
1/21/2025
Service Layer Credits: World Boundaries and Places: Sources: Esri, HERE, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community
²
ENGINEER
SCALE
PROJECT NO.
SHEET
DATE
56:1970
1" = 150'
MK6
Freese and Nichols, Inc.
816 South Amelia Avenue, Deland, Florida
Earl Brown Pickleball Court Expansion - DeLand
SITE LOCATION DIAGRAM
B-08
B-07 B-06
B-05 B-04
B-03
B-02
B-01
1/21/2025
Service Layer Credits: World Boundaries and Places: Sources: Esri, HERE, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community
²
ENGINEER
SCALE
PROJECT NO.
SHEET
DATE
56:1970
1" = 50'
MK6
Freese and Nichols, Inc.
816 South Amelia Avenue, Deland, Florida
Earl Brown Pickleball Court Expansion - DeLand
BORING LOCATION DIAGRAM
Legend
Approximate Boring Locations - B
APPENDIX B – Field Operations
Reference Notes for Boring Logs Subsurface Exploration Procedure: Standard Penetration Testing (SPT) ASTM D 1586 Geotechnical SPT Boring Logs
REFERENCE NOTES FOR BORING LOGS
MATERIAL1,2
1Classifications and symbols per ASTM D 2488-17 (Visual-Manual Procedure) unless noted otherwise.
2To be consistent with general practice, “POORLY GRADED” has been removed from GP, GP-GM, GP-GC, SP, SP-SM, SP-SC soil types on the boring logs.
3Non-ASTM designations are included in soil descriptions and symbols along with ASTM symbol [Ex: (SM-FILL)].
4Typically estimated via pocket penetrometer or Torvane shear test and expressed in tons per square foot (tsf).
5Standard Penetration Test (SPT) refers to the number of hammer blows (blow count) of a 140 lb. hammer falling 30 inches on a 2 inch OD split spoon sampler required to drive the sampler 12 inches (ASTM D 1586). “N-value” is another term for “blow count” and is expressed in blows per foot (bpf). SPT correlations per 7.4.2 Method B and need to be corrected if using an auto hammer.
6The water levels are those levels actually measured in the borehole at the times indicated by the symbol. The measurements are relatively reliable when augering, without adding fluids, in granular soils. In clay and cohesive silts, the determination of water levels may require several days for the water level to stabilize. In such cases, additional methods of measurement are generally employed.
7Minor deviation from ASTM D 2488-17 Note 14.
8Percentages are estimated to the nearest 5% per ASTM D 2488-17.
Reference Notes for Boring Logs (09-02-2021).doc © 2021 ECS Corporate Services, LLC. All Rights Reserved
COHESIVE SILTS & CLAYS
UNCONFINED
COMPRESSIVE
STRENGTH, QP4
<0.25
0.25 - <0.50
0.50 - <1.00
1.00 - <2.00
2.00 - <4.00
4.00 - 8.00
>8.00
SPT5
(BPF)
CONSISTENCY7
(COHESIVE)
GRAVELS, SANDS & NON-COHESIVE SILTS
SPT5
DENSITY
<5 5 - 10
11 - 30 31 - 50
>50
Very Loose Loose
Medium Dense Dense
Very Dense
WATER LEVELS6
RELATIVE
AMOUNT7
Trace
With
Adjective (ex: “Silty”)
COARSE
GRAINED
(%)8
<5
FINE
GRAINED
(%)8
<5
DRILLING SAMPLING SYMBOLS & ABBREVIATIONS
PARTICLE SIZE IDENTIFICATION
DESIGNATION PARTICLE SIZES
Hollow Stem Auger Power Auger (no sample) Bulk Sample of Cuttings Wash Sample Shelby Tube Sampler Split Spoon Sampler
Rock Quality Designation % Rock Sample Recovery % Rock Core, NX, BX, AX Rock Bit Drilling Pressuremeter TestSS
ST
WS
BS
PA
HSA
RQD
PM
RD
RC
REC
Boulders Cobbles
Gravel:
Sand:
Silt & Clay (“Fines”) Fine Medium
Coarse Fine Coarse
0.074 mm to 0.425 mm (No. 200 to No. 40 sieve) <0.074 mm (smaller than a No. 200 sieve)
0.425 mm to 2.00 mm (No. 40 to No. 10 sieve)
2.00 mm to 4.75 mm (No. 10 to No. 4 sieve)
4.75 mm to 19 mm (No. 4 sieve to ¾ inch) ¾ inch to 3 inches (19 mm to 75 mm) 3 inches to 12 inches (75 mm to 300 mm) 12 inches (300 mm) or larger
>50 31 - 50 16 - 30
9 - 15 5 - 8 2 - 4 <2
Very Hard Hard
Very Stiff
Stiff Firm Soft
Very Soft
ASPHALT
CONCRETE
GRAVEL
TOPSOIL
VOID
BRICK
AGGREGATE BASE COURSE
GW
GP
GM
GC
SW
SP
SM
SC
ML
MH
CL
CH
OL
OH
PT
WELL-GRADED GRAVEL
gravel-sand mixtures, little or no fines
POORLY-GRADED GRAVEL
gravel-sand mixtures, little or no fines
SILTY GRAVEL
gravel-sand-silt mixtures
CLAYEY GRAVEL
gravel-sand-clay mixtures
WELL-GRADED SAND
gravelly sand, little or no fines
POORLY-GRADED SAND
gravelly sand, little or no fines
SILTY SAND
sand-silt mixtures
CLAYEY SAND
sand-clay mixtures
SILT
non-plastic to medium plasticity
ELASTIC SILT
high plasticity
LEAN CLAY
low to medium plasticity
FAT CLAY
high plasticity
ORGANIC SILT or CLAY non-plastic to low plasticity
ORGANIC SILT or CLAY high plasticity
PEAT
highly organic soils
WL (First Encountered)
WL (Completion)
WL (Seasonal High Water)
WL (Stabilized)
FILL POSSIBLE FILL PROBABLE FILL ROCK
FILL AND ROCK
25 - 45
10 - 20
30 - 45
10 - 25
SUBSURFACE EXPLORATION PROCEDURE:
STANDARD PENETRATION TESTING (SPT)
ASTM D 1586
Split-Barrel Sampling
Standard Penetra on Tes ng, or SPT, is the most frequently used subsurface explora on test performed worldwide. This test provides samples for iden fica on purposes, as well as a measure of penetra on resistance, or N-value. The N-Value, or blow counts, when corrected and correlated, can approximate engineering proper es of soils used for geotechnical design and engineering purposes.
• Involves driving a hollow tube (split-spoon) into the ground by dropping a 140-lb hammer a height of 30-inches at desired depth
• Recording the number of hammer blows re-quired to drive split-spoon a distance of 12 inches (in 3 or 4 Increments of 6 inches each)
• Auger is advanced* and an addi onal SPT is performed
• One SPT test is typically performed for every two to five feet
• Obtain 1.5-inch diameter soil sample
*Drilling Methods May Vary— The predominant drilling methods used for SPT are open hole fluid rotary drilling and hollow-stem auger drilling.
SPT Procedure:
DE
PT
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP) FINE SAND, trace organics, light grayish brown, moist (SP) FINE SAND, grayish brown, moist
(SP) FINE SAND, white/ tan, moist, loose
(SP) FINE SAND, trace organics, white/ light grayish brown, moist, loose
(SP) FINE SAND, trace organics, light grayish brown, moist, loose
(SP) FINE SAND, white and light reddish orange, moist, medium dense
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-2
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
2-3-3-3 (6)
3-4-3-5 (7)
4-5-4-5 (9)
4-4-5 (9)
7-9-11 (20)
3.0 [0.9%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-01 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
28.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
Not encountered BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol Text Box Hand Augered to Avoid Utilities
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP) FINE SAND, trace organics, trace gravel, grayish brown, moist (SP) FINE SAND, grayish brown, moist
(SP) FINE SAND, light grayish brown, moist, very loose
(SP) FINE SAND, white, moist, loose
(SP) FINE SAND, white/ light grayish brown, moist, loose
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-2
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
1-1-1-1 (2)
2-3-3-4 (6)
4-3-4-5 (7)
4-4-5 (9)
5-3-5 (8)
3.9 [1.3%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-02 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
28.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
Not encountered BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP) FINE SAND, dark gray, moist
(SP) FINE SAND, light grayish brown, moist
(SP) FINE SAND, white/ light grayish brown, moist, very loose to loose
(SP) FINE SAND, light grayish brown, moist to saturated, loose
(SP) FINE SAND, white/ light grayish brown, saturated, loose
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-1
-6
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
1-2-2-2 (4)
3-3-2-3 (5)
3-4-4-4 (8)
4-3-4 (7)
4-4-5 (9)
3.2 [2.6%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-03 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
24.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
9.00
7.00
BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP) FINE SAND, grayish brown, moist
(SM) SILTY FINE SAND, dark gray, moist, very loose
(SP) FINE SAND, light brown, moist, very loose
(SP) FINE SAND, light grayish brown, moist, very loose
(SP) FINE SAND, trace clay, light grayish brown, moist, loose
(SP) FINE SAND, white/ light grayish brown, moist, loose
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-4
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
1-1-1-1 (2)
1-1-2-3 (3)
1-2-2-3 (4)
3-4-4 (8)
4-4-6 (10)
6.6 [1.5%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-04 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
26.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Not encountered
Giovanni Mafiol
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP-SM) FINE SAND WITH SILT, dark grayish brown, moist (SP) FINE SAND, light grayish brown, moist
(SP) FINE SAND, light grayish brown, moist, loose
(SP) FINE SAND, light gray, moist, loose
(SP) FINE SAND, light grayish brown, moist, loose
(SP-SC) FINE SAND WITH CLAY, light grayish brown, moist, medium dense to loose
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-2
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
2-2-3-1 (5)
2-2-3-3 (5)
3-4-3-3 (7)
5-6-7 (13)
4-4-5 (9)
4.7 [1.5%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-05 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
28.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
Not encountered BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP) FINE SAND, grayish brown, moist
(SP) FINE SAND, light brown/ tan, moist
(SP) FINE SAND, light grayish brown, moist, very loose
(SP-SC) FINE SAND WITH CLAY, light grayish brown, moist, loose
(SC) CLAYEY FINE SAND, moƩled orange, red and gray, moist, medium dense
(SP) FINE SAND, light orange, moist, medium dense
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-1
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
1-2-2-2 (4)
3-2-2-4 (4)
4-3-4-5 (7)
5-8-9 (17)
7-7-8 (15)
18.6 [30.0%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-06 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
29.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
Not encountered BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP) FINE SAND, trace gravel, contains roots, grayish brown, moist (SP) FINE SAND, light orange and gray, moist
(SP) FINE SAND, white/ light brown, moist, very loose
(SP) FINE SAND, white/ tan, moist, loose
(SP) FINE SAND, tan, moist, loose
(SP) FINE SAND, trace clay, light brown, moist, loose
(SP) FINE SAND, light grayish brown, moist, medium dense
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-1
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
1-1-2-2 (3)
3-3-3-4 (6)
3-3-4-3 (7)
4-4-4 (8)
4-5-8 (13)
3.8 [1.3%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-07 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
29.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
Not encountered BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol
H (F
T)
SA
M
PL
E
N U
M
BE
R
S-3
S-4
S-5
S-6
S-7
SA
M
PL
E
TY
PE
SS
SS
SS
SS
SS
SA
M
PL
E
DI
ST
IN
RE
CO
VE
RY
(I N
DESCRIPTION OF MATERIAL
Topsoil Thickness[6.00"] (SP-SM) FINE SAND WITH SILT, grayish brown, moist (SP) FINE SAND, tan/ light brown, moist
(SP) FINE SAND, tan/ light brown, moist, loose
(SP) FINE SAND, light grayish brown and white, moist, loose
(SP) FINE SAND, white/ light grayish brown, moist, loose
(SP) FINE SAND, light grayish brown, moist, medium dense
(SP) FINE SAND, grayish brown, moist, medium dense
END OF BORING AT 20.0 FT
W
AT
ER
L
EV
EL
S
EL
EV
AT
IO
N (F
T)
-2
BL
O
W S/
6" (T
CP
/M
C/
SP
T- N v al ue
4-3-4-5 (7)
4-3-5-4 (8)
5-5-5-5 (10)
4-5-6 (11)
5-5-7 (12)
2.7 [1.1%]
CLIENT:
Freese and Nichols, Inc.
PROJECT NAME:
Earl Brown Pickleball Court Expansion - DeLand
PROJECT NO.: BORING NO.: SHEET:
56:1970 B-08 1 of 1
DRILLER/CONTRACTOR:
Allstate Geotechnical Drilling Inc.
SITE LOCATION:
816 South Amelia Avenue, Deland, Florida, 32724
LOSS OF CIRCULATION
LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION:
28.0
BOTTOM OF CASING
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL
WL (First Encountered)
WL (CompleƟon)
WL (Seasonal High Water)
WL (Stabilized)
Not encountered BORING STARTED:
BORING
COMPLETED:
EQUIPMENT:
CME 45
Dec 11 2024
Dec 11 2024
LOGGED BY:
Bladimirio
CAVE IN DEPTH:
HAMMER TYPE:
DRILLING METHOD:
Auto
Fluid Rotary
GEOTECHNICAL BOREHOLE LOG
STANDARD PENETRATION BLOWS/FT
10 20 30 40 50 20 40 60 80 100
ROCK QUALITY DESIGNATION & RECOVERY
RQD
REC
MC SAMPLER BLOWS/FT
10 20 30 40 50
TEXAS CONE PENETRATION BLOWS/FT
LIQUID LIMIT
PLASTIC LIMIT
CALIBRATED PENETROMETER
TSF
1 2 3 4 5
WATER CONTENT %
[FINES CONTENT] %
10 20 30 40 50
Giovanni Mafiol
APPENDIX C – Laboratory Testing
Laboratory Testing Summary
S-3 3.0 0.9
S-2 3.9 1.3
S-1 3.2 2.6
S-5 6.6 1.5
S-1 4.7 1.5
S-6 18.6 30.0
S-5 3.8 1.3
S-3 2.7 1.1
Client:
Laboratory Testing Summary
Sample Location Sample
Number
Depth
(feet)
^MC
Soil
Type
Atterberg Limits **Percent
Passing
No. 200
Sieve
Moisture - Density
@ LBR (%)
#Organic
Content (%)
SP
PL PI
<Maximum
Density (pcf)
<Optimum
Moisture (%)
B-01 4-6
B-02 2-4
B-03 0-2
B-04 8-10
B-05 0-2
B-06 13.5-15
B-07 8-10
B-08 4-6
Notes:
See test reports for test method, ^ASTM D2216-19, *ASTM D2488, **ASTM D1140-17, @FM 5-515, #ASTM D2974-20e1 < See test report for D4718 corrected values
Definitions: MC: Moisture Content, Soil Type: USCS (Unified Soil Classification System), LL: Liquid Limit, PL: Plastic Limit, PI: Plasticity Index, CBR: California Bearing Ratio, OC: Organic Content
Project: Earl Brown Pickleball Court Expansion - DeLand Project No.: 56:1970
Freese and Nichols, Inc. Date Reported: 1/8/2025
Office / Lab Address Office Number / Fax
ECS Florida LLC - Daytona
Beach
2330 South Nova Road
Suite A
South Daytona, FL 32119
(386)944-9588
(386)944-9589
Tested by Checked by Approved by Date Received
HPhanthavy HPhanthavy HPhanthavy
LL
SP
SP
SP
SP
SC
SP
SP
December 12, 2025
Travis Terpstra, PE Project Manager Freese and Nichols, Inc 4 Office Park Drive, Pod 3 Palm Coast, FL 32137
ECS Job No.: 56:1970
Reference: Results of Infiltration Testing Earl Brown Pickleball Court – 816 S Amelia Avenue DeLand, Florida
Dear Mr. Trepstra:
As authorized by acceptance of our change order, dated November 7, 2025, ECS Florida, LLC (ECS) has completed the soil boring and infiltration test adjacent to the pickleball courts at 816 S Amelia Avenue in DeLand, Volusia County, Florida. The purpose of the testing was to determine the Infiltration rate of the near surface soils for the proposed stormwater swale.
FIELD EXPLORATION
We performed the field exploration at the proposed pond location on December 3, 2025. We located and performed one (1) hand auger boring, advanced to a depth of 10 feet below the existing ground surface. Additionally, we performed one (1) infiltration test using the Modified Philip Dunne (MPD) method. The approximate location of the boring and infiltration test is included on the attached Figure 1, Boring Location Diagram. Detailed Boring Logs and Infiltration Test Results are included as an attachment to this report.
GENERAL SUBSURFACE CONDITIONS
The attached boring log presents the descriptions of the soils encountered at the boring location.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .