This Addendum No. 1 clarifies and modifies the contract documents for the City of DeLand's Westside Interceptor ARV Replacements (Bid No. 26-09), a project to replace four air release valves throughout DeLand, Florida. The addendum extends the bid submission deadline to April 15, 2026, at 3:00 p.m., with the final day for questions set at Friday, April 10, 2026, by 5:00 p.m. The contract specifies a thirty-day period for final completion, with liquidated damages assessed at $500 per day if the project extends beyond forty-five calendar days. A one-year warranty period is required, and bidders must acknowledge receipt of the addendum in their proposal submissions. The addendum addresses twenty-six numbered questions from prospective bidders, clarifying project specifications including pipe material (PVC), force main operating pressure (approximately 30 PSI), restoration requirements (Bahia sod for disturbed areas), and responsibility allocations, such as contractors supplying tankers and disposing of removed flatwork while the City handles asphalt patching and sidewalk replacement. The City will provide as-built drawings, manhole depths, and disposal for tanker trucks containing only waste from the City's system.

The contract documents include a bid bond template (bidders may use alternative forms), a one-page agreement form specifying the lump-sum contract price, and detailed payment terms providing partial monthly payments at ninety percent of work performed and stored materials, with final payment due within thirty days of completion certificate approval. No retainage is withheld from payments, and no liquidated damages apply if work extends beyond completion dates without exceeding the forty-five-day substantial completion threshold. The bid package does not establish any set-asides for disadvantaged businesses or specific contractor categories, and no incumbent contractors are identified. Bidders must provide professional liability insurance, and a Florida Underground Utility & Excavation license is acceptable; a general contractor license is not required. The City of DeLand is exempt from federal excise taxes and sales taxes, and payment will be made via VISA Purchasing Card or standard accounts payable processes in accordance with Florida Prompt Payment Act requirements. The City reserves the right to reject any or all bids and will award to the lowest responsive and responsible bidder.

View the file

Other files

File Type Posted
B2609RCA.pdf PDF
B2609Tabulation.pdf PDF
B2609ADD3.pdf PDF
B2609ADD2.pdf PDF
B2609PriceSheet.xlsx XLSX spreadsheet
B2609Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

WESTSIDE INTERCEPTOR ARV REPLACEMENTS

CITY OF DeLAND

BID NO. 26-09

April 6, 2026

The following items are clarifications, corrections or deletions to the contract documents. THIS

ADDENDUM TAKES PRECEDENCE OVER THE ORIGINAL PARTS OF THE

CONTRACT DOCUMENTS.

All the parts of the contract documents, not specifically modified by this or other addenda, remain in full force and effect.

Contractors shall thoroughly familiarize themselves with the contents of this addendum before submitting bid proposals. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO

INFORM THE SUBCONTRACTORS, SUPPLIERS, MANUFACTURERS AND OTHER

PARTIES PARTICIPATING IN THE WORK OF APPLICABLE REQUIREMENTS IN

THIS ADDENDUM.

Contractors shall acknowledge receipt of this addendum, identified by number and date, on their bid proposal. Failure to acknowledge receipt of addendum may be grounds for rejection of the bid proposal.

I. GENERAL

The Bid due date has been extended: Bids will be received until April 15th, 2026 at 3 pm.

Last day for questions is Friday, April 10th by 5 pm.

Contract duration is Thirty (30) days for final completion.

One year warranty period is required.

II. QUESTIONS

1. There are two postings on demandstar for Westside Interceptor ARV Replacements. Both project manuals indicate Bid #26-09 and both price sheets indicate B-26-09.

Answer: Both are correct. “B” stands for Bid.

2. Is there an Engineer’s estimate?

Answer: No.

3. Are there liquidated damages or a penalty for late completion if substantial completion goes beyond forty-five (45) days; and if so, what is the amount per day?

Answer: Liquidated damages will be sustained at $500/day if project is overrun.

4. Will a bid bond form be added to the documents.

Answer: There is a bid bond template attached to this addendum but any bid bond will suffice.

5. Bid Form 00100-5- Why are two names listed to be typed or printed? Is one principal/owner acceptable if it’s a limited liability company?

Answer: Yes.

6. Does the certificate of corporation need to be filled out if it’s a limited liability company, whereas the General Manager is authorized to execute the contract?

Answer: No.

7. Is a General Contractor required or is a FL Underground Utility & Excavation license acceptable?

Answer: GC is not required.

8. Bid form 00100-10- Please clarify what does “To which you refer” means; Do you just require three additional references other than the ten mentioned in 3 above?

Answer: Yes.

9. Bid form 00100-11- Where is the disclosure form or will it be added to the documents?

Answer: N/A. Disregard.

10. Is Professional liability insurance required for this project?

Answer: Yes.

11. Is Builders risk applicable to this project since the Contractor would not be constructing a building? Or do you want an installation floater? Or will this be waived?

Answer: N/A to this project.

12. Is there a retainage; and if so, what percentage?

Answer: No.

13. Will there be a sample agreement added to the documents?

Answer: Yes.

14. Will the City inform the contractor the type PVC, HDPE, DIP or Cast Iron?

Answer: Yes. They are PVC.

15. What condition is the pipe in?

Answer: Good.

16. If Dip or Cast, do you have any information on deterioration around the orifice of each ARV site?

Answer: Bad saddle (Rust).

17. Would the City accept a full wrap around the SS saddle depending on the condition of the force main?

Answer: Yes.

18. Are the tankers to be supplied by the City or Contractor?

Answer: Contractor

19. What is the operating PSI of the force main?

Answer: Roughly 30 PSI

20. Will the 18” Force Main Valves shut down the force main 100%?

Answer: Yes.

21. Will the entire top section of structure be removed at each location?

Answer: By contractor

22. Will the City supply the depth of each ARV Manhole location?

Answer: Yes

23. Could the City provide As-Built drawings for this Force Main?

Answer: Yes.

24. Will there be hardscape that would need to be removed and disposal requirements?

Answer: No

25. Will there be MOT Lane closures required and the location anticipated?

Answer: Yes

26. Does the City have a disposal for flatwork to be removed and will the City provide disposal for tanker trucks?

Answer: Disposal of any flatwork is the responsibility of the Contractor. The City will provide disposal for the tanker trucks provided only waste from the City’s system is being discarded.

27. Will sod – bahia of disturbed area be required, or will seed & mulch be acceptable?

Answer: Bahia

28. Should ARV’s enclosures above ground fall into DOT or County ROW underground boxes should be utilized and is there a detail for this specification?

Answer: No

29. Will the ARV require protection bollards with the ROW, if so, please provide a detail of the bollard that needs to be installed?

Answer: No

30. Per the Price sheet under “work by others” asphalt patching and sidewalk replacement are listed. Could you please clarify whether this indicates that the City already has contractors in place for these items, or if we are expected to include these costs in our bid?

Answer: The City is handling these items.

31. Are there any plans for the Westside Interceptor ARV Replacements?

Answer: No

END OF ADDENDUM

Disclaimer: This addendum was posted on Vendor Link (www.demandstar.com). It is the sole responsibility of the bidder to confirm that all addenda have been received prior to submitting bid and acknowledge such in the bid documents.

http://www.demandstar.com/

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we __________________________________ ________________________________________________ as Principal, and _______________ _____________________________________________________________________ as Surety, are held and firmly bound unto CITY OF DELAND, hereinafter called the OWNER in the penal sum of ____________________________Dollars ($ ), lawful money of the United States, for the payment of which sum well and truly be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.

The condition of this obligation is such that whereas the Principal has submitted the accompanying bid dated ____________ _________, 20___, for the construction of

CITY OF DELAND

Westside Interceptor ARV Replacements

NOW THEREFORE, if the Principal shall not withdraw said bid within the period of time set forth in the contract documents, and shall within fifteen (15) calendar days after the prescribed forms are presented to him for signature enter into a written contract with the OWNER in accordance with the bid as accepted, and if the Principal shall give the required bonds with good and sufficient sureties for the faithful performance and proper fulfillment of such contract and for the protection of laborers and materialmen, or in the event of the withdrawal of said bid within the periods specified, or the failure to enter into said contract, and give such bonds within the time specified, if the Principal shall within sixty (60) days after request by the OWNER pay to the OWNER the difference between the amount specified in said bid and the amount for which the OWNER may procure the required work if the latter amount be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue.

It is further agreed that if the OWNER is required to initiate legal proceedings to recover on this bond, it may also recover its costs relating thereto including a reasonable amount for attorneys' fees.

IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under their several seals this ______ day of _____________, 20___, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

WITNESSES (If individual) PRINCIPAL

___________________________ By ___________________________

Title _________________________

ATTEST (if corporation)

Title _________________________

Corporate Seal

SURETY

By ___________________________

Title _________________________

Any claims under this bond may be addressed to:

name and address of Surety name and address of agent or representative in Florida if different from above telephone number of Surety and agent or representative in Florida

ATTEST

Title _______________

Corporate Seal

AGREEMENT 00500-1

SECTION 00500

AGREEMENT

THIS AGREEMENT, entered into this ________________, by the City of DeLand, Florida, hereinafter called the OWNER, Party of the First Part, and a CORPORATION known as ____________________________organized and existing under the laws of the State of Florida, with a mailing address of________________________________, hereinafter called the CONTRACTOR, Party of the Second Part.

WITNESSETH: That the parties hereto do mutually agree as follows:

ARTICLE I

A. The Contractor agrees to furnish all labor, superintendence and materials to perform all work necessary for or incidental to, and to perform all other obligations imposed by this Contract for the Construction of

PROJECT TITLE

Bid No. 26-XX herein called for, in strict accordance with the Drawings and Project Manual, which Contract include, but is not limited to, the following Contract Documents:

a . Invitation d. Insurance b . Bid Form e. Specifications c . This Agreement

ARTICLE II

A. The Contractor agrees that the work shall be started not later than the date indicated in the Notice to Proceed and that the work on PROJECT TITLE shall be completed as outlined in Contract documents.

B. The Contractor further agrees that for each calendar day, with the exception of Sundays and legal holidays, that any work shall remain uncompleted after the completion times stipulated above, the sum of $500 (500HUNDRED

AGREEMENT 00500-2

DOLLARS) shall be deducted from monies due the Contractor, not as a penalty, but as liquidated damages. If the Contractor is declared in default in accordance with the provisions of the Project Manual, liquidated damages shall be charged as provided herein, and such amounts shall be deducted from the final amount payable to the Contractor or his Surety. Should the total amount chargeable as liquidated damages exceed the amount due or payable to the Contractor or his Surety, then such excess shall be paid to the Owner by the Contractor or his Surety.

ARTICLE III

A. The Contractor shall receive and accept the compensation for the performance of the Contract (subject to additions or deductions noted therein) in accordance with the prices stipulated in the Proposal, and in the manner provided in Article IV for the Contract Price of $________________and for additions or revisions approved in Change Orders at Unit Prices.

ARTICLE IV

A. Payment to the Contractor shall be made as follows:

1. Not later than the fifteenth (15th) day of each calendar month, the Owner will make a partial payment to the Contractor on the basis of a duly certified and approved estimate by the Engineer of the work performed during the preceding calendar month under this Contract, and (at the option of the City) an amount equal to 90% of materials and equipment not incorporated in the work but delivered and suitably stored. When payment to the Contractor is made for stored materials and equipment, Contractor shall submit invoices marked paid by the supplier with the next month's request for payment to document that Contractor has paid for said materials and equipment or the previously paid amount for stored materials shall be deducted from any remaining payment(s) for any stored materials not so properly documented.

2. Upon completion of the entire work under Contract, the Engineer shall make a final inspection and certify such completion to the Owner. Upon approval of the completion certificate by the Owner, the Owner shall notify the Contractor and the Surety of the satisfactory completion of the

AGREEMENT 00500-3

work and except as otherwise provided in the Project Manual, final payment therefore shall be made to the Contractor within thirty (30) days after written acceptance by the Contractor of the final certificate computation.

ARTICLE V

A. The Contract shall not sublet, sell, transfer, assign, or otherwise dispose of the Contract or any portion thereof, or his right, title, or interest therein, without written consent of the Owner.

ARTICLE VI

A. The work shall be subject at all times to the supervision of the Engineer and his authorized assistants. The Engineer shall decide all questions which may arise relative to the Drawings, Project Manual, and the performance of the work. Any doubt concerning the meaning of the Specifications and the Drawings, or any ambiguity or obscurity as to wording or intent of them shall be decided by the Engineer, and such decisions shall be binding upon both parties hereto, and shall not be subject to arbitration.

ARTICLE VII

A. The Contractor shall guarantee his work and shall remedy, without cost to the Owner, any defects which may develop therein during a period of one (1) year from the date of the Owner's approval of the Completion Certificate issued by the Engineer.

ARTICLE VIII

A. In the event of conflict between any of the Contract Documents, the provisions of this Agreement shall govern.

AGREEMENT 00500-4

IN WITNESS WHEREOF, the Parties hereto have signed this Contract in quintuplicate the day and year first above written.

ATTEST: CITY OF DELAND, FLORIDA

By: _________________________________ City Clerk Christopher M. Cloudman, Mayor

CONTRACTOR

By: _________________________________ Signature

Printed Name

Title

END OF SECTION