B2606PriceSheet.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- East Regional Force Main Part B-1
- Solicitation number
- B-26-06
- Issued by
- Volusia County, Florida
About this file
This is a price sheet for the East Regional Force Main Part B-1 project in Florida, a sewage force main installation project involving drilling and open-cut placement of approximately 7,400 linear feet of 12-inch DR-11 HDPE pipe and 450 linear feet of 12-inch C-900 PVC pipe along a specified route from S Blue Lake Ave through E Voorhis Ave, S Kepler Rd, to E Beresford Ave, with connection to an existing 8-inch sewage force main. The price sheet provides detailed line-item pricing for all labor, equipment, tools, services, and incidentals required to complete the work as specified in the contract documents and project drawings.
The document establishes unit prices and extended costs for the various components of construction, including drilling operations, pipe materials, connections, and related installation activities necessary for project completion. The pricing structure allows bidders to demonstrate their cost proposals for this infrastructure improvement project, with itemized costs reflecting the scope of work defined in the project specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2606RCA.pdf | ||
| B2606Tabulation.pdf | ||
| B2606PriceSheetRevised.xlsx | XLSX spreadsheet | |
| B2606ADD4.pdf | ||
| B2606ADD3.pdf | ||
| B2606ADD2.pdf | ||
| B2606ADD1.pdf | ||
| B2606Plans.pdf | ||
| B2606Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B-26-06 Price Sheet | |||||
| Item | Description | Unit | Qty | Unit Price | Extended Price |
| 1 | Mobilization / Demobilization | LS | 1 | $0.00 | |
| 2 | Clearing & Grubbing | LS | 1 | $0.00 | |
| 3 | Pre-Construction Video | LS | 1 | $0.00 | |
| 4 | Field Locate & Expose Existing Utilities | LS | 1 | $0.00 | |
| 5 | Furnish & Install C-900 PVC Force Main | ||||
| a) 4" | LF | 110 | $0.00 | ||
| b) 8" | LF | 25 | $0.00 | ||
| c) 12" | LF | 450 | $0.00 | ||
| 6 | Furnish & Install HDPE (DR 11) Force Main HDD | ||||
| a) 12" | LF | 7400 | $0.00 | ||
| 7 | Gate Valves & Valve Boxes | ||||
| a) 4" | EA | 3 | |||
| a) 8" | EA | 3 | $0.00 | ||
| b) 12" | EA | 9 | $0.00 | ||
| 8 | Air-Release Valve Assembly (2-inch) | EA | 12 | $0.00 | |
| 9 | Tie-Ins | ||||
| b) 8" | EA | 1 | $0.00 | ||
| c) 12" | EA | 3 | $0.00 | ||
| 10 | Concrete Driveways / Sidewalks (Remove & Replace) | ||||
| a) 4" thick | SY | 100 | $0.00 | ||
| b) 6" thick | SY | 150 | $0.00 | ||
| 11 | Open Cut & Asphalt Repair | SY | 150 | $0.00 | |
| 12 | Concrete Curb ( Remove & Replace) | LF | 100 | $0.00 | |
| 13 | Maintenance of Traffic | LS | 1 | $0.00 | |
| 14 | Erosion & Turbidity Control | LS | 1 | $0.00 | |
| 15 | Layout / As-Builts | LS | 1 | $0.00 | |
| 16 | Electronic Marker Balls | ||||
| a) Programmable | EA | 60 | $0.00 | ||
| b) Non-programmable | EA | 25 | $0.00 | ||
| 17 | Ductile Iron Fittings - Add or Delete | TN | 1.5 | $0.00 | |
| 18 | Landscape & Irrigation Restoration | LS | 1 | $0.00 | |
| 19 | Permits & Allowances | LS | 1 | $100,000.00 | $100,000.00 |
| 20 | Subtotal | $100,000.00 | |||
| 21 | 5% Contigency | LS | 1 | $5,000.00 | |
| Total | $105,000.00 |