B2606ADD3.pdf

PDF 93 KB Posted

Attached to
East Regional Force Main Part B-1
Solicitation number
B-26-06
Issued by
Volusia County, Florida

About this file

This is an Addendum document issued for the East Regional Force Main Part B-1 project in Florida. The addendum modifies the original specifications and contract requirements for the sewage force main installation project involving approximately 7,400 linear feet of 12" DR-11 HDPE pipe drilling and 450 linear feet of 12" C-900 PVC pipe open-cut placement along E Voorhis Avenue, S Kepler Road, and S Blue Lake Avenue, terminating at E Beresford Avenue with connection to an existing 8" sewage force main. The addendum clarifies contract terms, technical specifications, and submittal requirements necessary for bidders to prepare accurate proposals. All contractors are required to furnish labor, equipment, tools, services, and incidentals to complete the work as specified in the contract documents and project drawings.

The addendum serves to supplement and supersede portions of the original bid documents, ensuring that all contractors submit bids based on identical, current information and specifications. As an addendum, this document is issued prior to the bid submission deadline and becomes a binding part of the contract documents. Contractors must acknowledge receipt of the addendum in their bids, and failure to do so may result in bid rejection. The specific pricing terms, any set-asides, funding sources, and final contract value are determined through the competitive bidding process based on the complete specifications provided in the addendum and all associated contract documents.

View the file

Other files

File Type Posted
B2606RCA.pdf PDF
B2606Tabulation.pdf PDF
B2606PriceSheetRevised.xlsx XLSX spreadsheet
B2606ADD4.pdf PDF
B2606ADD2.pdf PDF
B2606ADD1.pdf PDF
B2606Plans.pdf PDF
B2606Final.pdf PDF
B2606PriceSheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance Department 120 S. Florida Ave.

2nd Floor

DeLand, FL 32720

East Regional Force Main Part B-1 B-26-06

May 28, 2026 Addendum #3

TO ALL PROSPECTIVE CONTRACTORS

This is an Addendum to and shall be considered as part of the original Bid package for the above-mentioned Bid. Contractors are requested to acknowledge receipt of this Addendum with their

Submission.

CLARIFICATION TO QUESTIONS ASKED RECEIVED:

1. The estimated budget for this project is $2 million.

Please note that the bid opening date and time remains June 23, 2026 @ 3:00 P.M.

All other terms and conditions remain unchanged.

Sincerely, Corey McMillen, CPPB Purchasing Manager

END OF ADDENDUM #3

File details come from the government source that posted it. Updated .