About this file

This document is Addendum #4 to a competitive sealed bid solicitation issued by the City of DeLand, Florida Finance Department for the East Regional Force Main Part B-1 project (B-26-06). The project involves the drilling of approximately 7,400 linear feet of 12-inch DR-11 HDPE and open-cut placement of 450 linear feet of 12-inch C-900 PVC sewage force main along a specified route from S Blue Lake Ave through E Voorhis Ave, S Kepler Rd, to E Beresford Ave, with connection to an existing 8-inch sewage force main. The addendum addresses 13 clarification questions submitted by prospective contractors, including specifications for sod replacement, field office requirements, plug valve usage, tie-in procedures, and corrections to bid item quantities. The base bid schedule of unit prices includes 19 line items covering mobilization, utility location, pipe installation, valve placement, paving, landscaping restoration, and permitting. The original bid opening date is June 23, 2026, at 3:00 P.M., with all other terms and conditions remaining unchanged from the original bid package.

The estimated project budget is $2 million. The addendum clarifies that no American Iron and Steel (AIS) or similar domestic material requirements apply to this project, and no field offices are mandatory. Several bid item quantities have been corrected to reflect actual plan requirements, with contractors to be billed on a per-installation or per-linear-foot basis rather than lump sum amounts where applicable. No line stops are required for the 12-inch tie-in at STA 102+56.93 as the line is inactive and dry; however, the 8-inch tie-in at STA 239+47.64 will require contractor notification one week in advance and coordination with the City to shut down existing valves during a low-flow period. No specific set-asides, incumbent information, or funding sources are identified in this addendum.

View the file

Other files

File Type Posted
B2606RCA.pdf PDF
B2606Tabulation.pdf PDF
B2606PriceSheetRevised.xlsx XLSX spreadsheet
B2606ADD3.pdf PDF
B2606ADD2.pdf PDF
B2606ADD1.pdf PDF
B2606Plans.pdf PDF
B2606Final.pdf PDF
B2606PriceSheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Finance Department 120 S. Florida Ave.

2nd Floor

DeLand, FL 32720

East Regional Force Main Part B-1 B-26-06

June 16, 2026 Addendum #4

TO ALL PROSPECTIVE CONTRACTORS

This is an Addendum to and shall be considered as part of the original Bid package for the above-mentioned Bid. Contractors are requested to acknowledge receipt of this Addendum with their

Submission.

CLARIFICATION TO QUESTIONS ASKED RECEIVED:

1. The estimated budget for this project is $2 million.

2. Q: Please advise if ALL Domestic materials are required for this project.

A: There is NO AIS or Baba requirements for this project

3. Q: Please provide the type of sod required.

A: Per Specification 329223, the replacement sod shall match the existing sod in all areas disturbed by construction. The proposed sod type shall be field verified and reviewed with the Engineer prior to procurement and installation to ensure compatibility with existing site conditions.

4. Q: Please advise if a field office is mandatory for this project or is up to the discretion of the

Contractor.

A: No field offices are required for this project.

5. Q: 2.18 Landscape and Irrigation Restoration BID ITEM 18

Payment of the applicable lump sum shall be full compensation for furnishing all labor, materials, and equipment necessary to furnish and properly restore irrigation systems and landscaping disturbed in direct association with project work. This bid item includes plant materials, trees (up to 4” DBH), Please advise if trees are expected to be encountered within the pipe line or construction limits for this project.

A: This is up to bidders to verify based on installing methods for proposed force main route.

6. Q: 2.9 PLUG VALVES

A. General: Plug valves shall be non-lubricated eccentric type with flanged or mechanical joint ends as specified below. Valves shall open by turning to the left (counter-clockwise), when viewed from the stem. Port area of valves shall be a minimum of 80 percent of full pipe area.

Please advise if plug valves should be used in lieu of gate valves. Generally, plug valves are used in Force Main applications.

A: No plug valves will be used for this job.

June 16, 2026 Addendum #4

7. Q: Please provide a pay item to make the 4" connection to the existing Lift Station FM at STA

116+45 on C-104. Bid items show only 8" and 12" connections.

A: See attached revised SOV

8. Q: Please advise if there is an operable valve nearby that the City can shut down to make the

12" Tie In connection at STA 102+56.93 on C-101. Or is a Line Stop required?

A: Line is inactive and dry at this time.

9. Q: Please advise if there is an operable valve nearby that the City can shut down to make the

8" Tie In connection at STA 239+47.64 on C-114. Or is a Line Stop required?

A: There are valves in both directions, city can shut down for a short period of time to allow the new Tee and gate valves to be installed. Contractor to preassemble tee and valves to allow a quicker tie in. Contractor to notify city one week ahead of tie in. Tie in to take place during low flow period.

10. Q: Bid Item 6c shows 7400 LF of 12" HDPE; however, the plans show only 6431 LF. This approximate 1000 LF discreancy will result in an uncessarry inflated bid cost to the City.

Please provide accurate qunatities.

A: Item to be installed and billed per LF.

11. Q: Bid Item 5c shows 450 LF of 12" PVC; however, the plans show only 378 LF. This discrepancy will result in an unnecessarily inflated bid cost to the City. Please provide accurate quantities.

A: Item to be installed and billed per LF.

12. Q: Bid Item 7c shows 12" Gate Valve at 9 EA; however, the plans show only 7 EA. This discrepancy will result in an unnecessary inflated bid cost to the City. Please provide accurate quantities.

A: Item to be installed and billed per installation.

13. Q: Bid Item 8 shows 2"ARV at 12 EA; however, the plans show only 10 EA. This discrepancy will result in an unnecessary inflated bid cost to the City. Please provide accurate quantities.

A: Item to be installed and billed per installation.

Attachments: Revised Schedule of Values

Revised Price Sheet

Please note that the bid opening date and time remains June 23, 2026 @ 3:00 P.M.

All other terms and conditions remain unchanged.

Sincerely, Corey McMillen, CPPB Purchasing Manager

June 16, 2026 Addendum #4

END OF ADDENDUM #4

SECTION 00310

CITY OF DELAND

EAST REGIONAL FORCE MAIN (PART B)

BASE BID

SCHEDULE OF UNIT PRICES

ITEM # DESCRIPTION QTY. UNIT UNIT PRICE TOTAL PRICE

1 Mobilization / Demobilization 1 LS

2 Clearing and Grubbing 1 LS

3 Pre-Construction Video 1 LS

4 Field Locate and Expose Existing Utilities 1 LS

a) 4" 110 LF

b) 8" 25 LF

c) 12" 450 LF

c) 12" 7,400 LF

a) 4" 3 EA

b) 8" 3 EA

c) 12" 9 EA

8 Air-Release Valve Assembly (2-inch) 12 EA

a) 4" 1 EA

b) 8" 1 EA

c) 12" 3 EA

a) 4" thick 100 SY

b) 6" thick 150 SY

11 Open Cut and Asphalt Repair 150 SY

12 Concrete Curb (Remove and Replace) 100 LF

13 Maintenance of Traffic 1 LS

14 Erosion and Turbidity Control 1 LS

15 Layout / As-builts 1 LS

a) Programmable 60 EA

b) Non-Programmable 25 EA

17 Ductile Iron Fittings - Add or Delete 1.5 TN

18 Landscape and Irrigation Restoration 1 LS

19 Permits and Allowances 1 LS 100,000.00$ 100,000.00$

Submitted by: ___________________________________________________________________________________________________________

Contractor: ______________________________________________________________________________________________________________

Address: _________________________________________________________________________________________________________________

Telephone: __________________________________ Fax: ________________________________________________ State of Florida Certified General Contractor or Underground Contractor (Required Information)

Licensee: _______________________________________ License No.: _______________________________________

TOTAL BASE BID

Concrete Driveways / Sidewalks (Remove and Replace)

Electronic Marker Balls

Furnish and Install C-900 PVC Force Main

Furnish and Install HDPE (DR 11) Force Main by HDD

Gate Valves and Valve Boxes

Tie-Ins

00310 - 1