B246 Elevator Modernization Drawings.pdf

PDF 8 MB Posted

Attached to
Amendment 01 Elevator Replacement Bldg. 246
Solicitation number
W91QF426_Elevator
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R A

TE

O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

A N

C H

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

M ar qu ar dt

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

C on str uc tio n D ra wi ng s

M cC

LE

LL

A N

A

VE

FO

R T

LE

A

VE

N

W O

R

TH

, K S

7-

A-001

C ov er S he et

B2

E le va to r M od er ni za tio n D es ig ne r

Au th or

C he ck er

N ot

U se d on

T itl eB lo ck

FORT LEAVENWORTH

DIRECTORATE OF PUBLIC WORKS

BUILDING 246 ELEVATOR MODERNIZATION

610 KEARNY AVE

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWING SUBMITTAL : 100% FOR CONSTRUCTION

DATE: 9/2/2026

Sheet List A-001 Cover Sheet A-100 Basement Floor Plan MD-100 Basement HVAC Demo M-100 Basement HVAC Plan E-100 Basement Electrical F-100 Basement Fire Protection

GENERAL NOTES

1. ALL WORK SHALL COMPLY WITH UFC 3-490-06 DESIGN : ELEVATORS, ANSI A17.1, NFPA 13, IBC 30, and NFPA 72

2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS. ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND DRAWINGS SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE ENGINEER PRIOR TO CONSTRUCTION.

3. CONTRACTOR SHALL USE EXTREME CARE AND TAKE PRECAUTION DURING CONSTRUCTION SO AS NOT TO DAMAGE EXISTING ADJACENT FACILITIES.

ANY DAMAGE DONE TO EXISTING FACILITIES DURING CONSTRUCTION SHALL BE REPAIRED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE

WITHOUT ADDITIONAL COST TO THE OWNER.

4. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND THE SAFETY OF CONSTRUCTION

PERSONNEL AND AUTHORIZED VISITORS.

5. WHERE ANY MATERIAL OF CONSTRUCTION MAY BE INDICATED, NOTED, NAMED, DESCRIBED, OR REFERENCED (HOWEVER BRIEFLY) IN THE PROJECT DOCUMENTS BUT MAY NOT BE FULLY DETAILED OR FULLY SPECIFIED, SUCH MATERIAL SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH CURRENT (1) REFERENCED BUILDING CODES, ORDINANCES, AND REGULATIONS, (2) MATERIAL MANUFACTURERS RECOMMENDATIONS AND SPECIFICATIONS, (3) GENERALLY ACCEPTED GOOD CONSTRUCTION PRACTICE STANDARDS, WITH PRECEDENCE IN THAT ORDER, AND SUCH MATERIAL SHALL BE FURNISHED AND INSTALLED COMPLETE WITH HARDWARE, ACCESSORIES, ATTACHMENTS, CONTROLS AND OTHER DEVICES REQUIRED FOR THE PROPER INSTALLATION TO PROVIDE A COMPLETED OPERATIONAL SYSTEM WITH THE QUALITY WORKMANSHIP NOT LESS THAN INDUSTRY

ACCEPTED STANDARDS OF THAT TRADE.

6. MAKE ALLOWANCES FOR AMPLE EXPANSION AND CONTRACTION FOR ELECTRICAL, STRUCTURAL AND OTHER BUILDING COMPONENTS SUBJECT TO SUCH MOVEMENT. INSTALL SLEEVES, RECESSES, AND OPENINGS IN THE WORK TO RECEIVE THE MATERIALS INSTALLED BY OTHER TRADES.

COORDINATE WORK THROUGH THE USE OF SHOP DRAWINGS PREPARED BY EACH TRADE, APPROVED BY THE OWNER.

7. PRIOR TO THE INSTALLATION OF THEIR WORK, EACH CONTRACTOR SHALL INSPECT THE SUBSTRATE AND OTHER PREVAILING CONDITIONS AND REPORT IN WRITING ALL UNSATISFACTORY CONDITIONS. FURTHER, THEY SHALL MAKE CERTAIN SUCH CONDITIONS HAVE BEEN ADDRESSED BEFORE

PROCEEDING WITH INSTALLATIONS.

8. ERECT, INSTALL AND SECURE BUILDING COMPONENTS IN A STRUCTURALLY SOUND AND APPROPRIATE MANNER. WHERE NECESSARY, TEMPORARILY BRACE, SHORE, OR OTHERWISE SUPPORT MEMBERS UNTIL FINAL CONNECTION OR INSTALL OR BRACE WALLS AND OTHER STRUCTURAL ELEMENTS TO PREVENT DAMAGE BY CONSTRUCTION OPERATIONS. LEAVE TEMPORARY BRACING, SHORING OR OTHER SUPPORTS IN PLACE AS LONG AS NECESSARY

FOR SAFETY AND UNTIL STRUCTURE IS STRONG ENOUGH TO WITHSTAND LOADS INVOLVED.

9. PROVIDE BARRICADES AROUND ANY UNSAFE CONDITIONS OR EXCAVATIONS TO PROTECT PERSONS AND PROPERTY. WORK TO BE ACCOMPLISHED IN A SAFE AND PROPER MANNER IN ACCORDANCE WITH THE PROVISIONS CONTAINED IN THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION MANUAL. LIABILITY FOR INJURIES IS THE CONTRACTORS RESPONSIBILITY AND INSURANCE FOR SUCH IS REQUIRED AND SHALL BE SUBMITTED TO THE

OWNER AS PROOF.

10. PROTECT WORK IN PROGRESS WITH COVERINGS OR OTHER PROTECTIONS FROM MOISTURE, DIRT OR DAMAGE. KEEP COVERED MATERIAL STORED

OR INSTALLED SUBJECT TO SUCH, DURING INSTALLATION OF SUBSEQUENT WORK.

11. ELEVATOR AUXILIARY POWER OPERATION : HYDRAULIC ELEVATOR MUST LOWER TO THE FEO DESIGNATED LANDING, OPEN AND CLOSE THE DOORS, AND BE REMOVED FROM SERVICE. IF ELEVATOR IS BELOW THE FEO DESIGNATED LANDING WHEN NORMAL POWER FAILS, ELEVATOR MUST OPEN AND CLOSE THE

DOORS AT FIRST AVAILABLE LANDING AND BE REMOVED FROM SERVICE.

ELEV.

EQUIP.

8'

- 0

9' - 0"

A3B 6"

ELEVATOR

A3 B

Wall Type A3B - (3-5/8" Metal Stud with 5/8" Gypsum Board On Each Face, 1 HR Rating)

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R A

TE

O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

A N

C H

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

A N

A

VE

FO

R T

LE

A

VE

N

W O

R

TH

, K S

7-

9/

/2

PR

EL

IM

IN

AR

Y

SC

H

EM

AT

IC

E

XP

AN

SI

O N

ID

EA

S

A-100

Ba se m en t F lo or P la n

B2

E le va to r M od er ni za tio n D es ig ne r

Au th or

C he ck er

N ot

U se d on

T itl eB lo ck

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1/8" = 1'-0"

B1 Basement Floor Plan A-100

General Notes:

1. The contractor shall demolish the existing electric traction elevator within building 246. The contractor shall install a new hydraulic in-ground passenger elevator with a 4,500 lb capacity. The elevator shall have 24' 3" of travel to 3 floors with front openings. The existing elevator shall fit within the existing hoistway. The contractor shall modify the hoistway and pit as necessary for the new elevator. To include but not limited to boring a hole beneath the elevator pit the depth of the elevator travel and installing a PVC casing to encase the new jack. The new cart interior shall be a minimum of 5'4" deep x 7'9" wide. The existing hoistway interior dimensions are 6'11" deep x 9' 6" wide.

2. The contractor shall build a new 72 S.F. (per the UFC) elevator equipment room directly adjacent to the elevator. Refer to detail A1 below for wall type.

New walls shall be painted to match the existing walls in the basement.

A1 Wall Type A-100

1) B-1 - Johnsonite, Traditional Wall Base, 4" Resilient Base with Standard Toe, Match Existing Base Color

P-1 - Sherwin Williams, White, Match Existing Color

A3 Door Frame Type #1 A-100

1) Door Hardware

a) 3 Ea. Hinges 1 Ea. Lock Set - "Storeroom Function" to be compatible with Best 7 Pin M-Keyway 3 Ea. Silencers 1 Ea. Wall Stop

2) New door hardware to be brushed aluminum. Lever handles to be curved, not bent style.

3) Door to be keyed per building standard. Verify with the COR prior to order.

4) Door to function as exits without special knowledge, keys, etc. required.

8" Dia.

6" Dia.

As-builts show 10"x10".

Contractor to verify size.

Demolish the existing ductwork to the outside of the new machine room footprint (dashed line). Reinstall 6" round ductwork through the machine room and into the chase. (Re-use the existing diffuser). Route the 8" ductwork outside of the machine room and near the existing diffuser location.

ELEVATOR

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R A

TE

O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

A N

C H

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

A N

A

VE

FO

R T

LE

A

VE

N

W O

R

TH

, K S

7-

9/

/2

PR

EL

IM

IN

AR

Y

SC

H

EM

AT

IC

E

XP

AN

SI

O N

ID

EA

S

MD-100

Ba se m en t H

VA

C D em o

B2

E le va to r M od er ni za tio n D es ig ne r

Au th or

C he ck er

N ot

U se d on

T itl eB lo ck

MD-100

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1/8" = 1'-0"

1 Basement HVAC Demo

8" Dia.

6" Dia.

As-builts show 10"x10".

Contractor to verify size.

Rework the existing ductwork to be outside of the new machine room footprint. Install 6" round ductwork through the elevator equipment room and into the chase (only flex duct within 5' of the diffuser is allowed). Re-use the existing diffuser. Install new 8" ductwork outside of the equipment room and to the existing diffuser location. Install balance dampers on the two new branches of ductwork.50 CFM

ELEVATOR

CRU-1

CRU-1

ELEVATOR

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R A

TE

O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

A N

C H

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

A N

A

VE

FO

R T

LE

A

VE

N

W O

R

TH

, K S

7-

9/

/2

PR

EL

IM

IN

AR

Y

SC

H

EM

AT

IC

E

XP

AN

SI

O N

ID

EA

S

M-100

Ba se m en t H

VA

C P la n

B2

E le va to r M od er ni za tio n D es ig ne r

Au th or

C he ck er

N ot

U se d on

T itl eB lo ck

M-100

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1/8" = 1'-0"

B1 Basement HVAC

1/8" = 1'-0"

A1 Enlarged Basement HVAC

General Notes

1. The contractor shall install an air-cooled mini split system into the elevator equipment room. The unit shall run under its own internal controls with a hardwired thermostat. The contractor shall also install a hardwired room temperature sensor for BAS monitoring and alarming capabilities to the Automated Logic Frontend. Provide any programming and graphical changes for the new sensor. Exterior insulation shall have aluminum jacketing. The unit shall also have a standalone secondary condensate pump. Connect condensate into the existing condensate piping inside the basement.

Infill the existing window with an insulated metal panel to route the refrigerant lines through.

2. Provide a new equipment pad on the northeast side of the building. Concrete shall be 4" thick on top of a 4" compacted gravel base with 6"x6" WWF reinforcement. 4,000 PSI KCMMB mix design and weather sealed.

Condensing unit shall be installed on a 2 foot tall platform that is on top of the concrete pad. The pad shall extend 6" past all sides of the equipment and slope 1/8" per foot away from the building. Must maintain the manufacturers recommended clearances.

015M-100

"MDP"

"1"

"2"

"3" A1

ELEVATOR

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R A

TE

O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

A N

C H

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

A N

A

VE

FO

R T

LE

A

VE

N

W O

R

TH

, K S

7-

9/

/2

PR

EL

IM

IN

AR

Y

SC

H

EM

AT

IC

E

XP

AN

SI

O N

ID

EA

S

E-100

Ba se m en t E le ct ric al

B2

E le va to r M od er ni za tio n D es ig ne r

Au th or

C he ck er

N ot

U se d on

T itl eB lo ck

E-100

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1/8" = 1'-0"

B1 Basement Electrical

S

General Notes:

1. Contractor shall provide all electrical equipment, materials, and labor for a fully functional elevator. The contractor shall field verify existing electrical panel loads and spare capacity for the new elevator equipment and associated equipment for the equipment room. The contractor shall submit a shop drawing for the electrical work to include panels and breaker locations being used.

2. Provide a lockable shunt trip circuit breaker in the Main Distribution Panel for the new elevator. Interlock with the emergency battery-powered lowering system.

Wire to new disconnect switch in the elevator equipment room.

Key Notes:

1. Connect new light to nearest existing lighting circuit or provide new to nearest panel and provide a new 20A/1 pole breaker. Contractor to verify panel space.

Refer to light fixture schedule for light details.

2. Provide a new fused disconnect for main elevator power. Wire to the existing auxiliary disconnect located in the hoistway.

3. Demo the existing main elevator power disconnect in Electrical Room 006.

4. Demo the existing 30A 208V fused disconnect for the elevator cab lighting.

Install a new fused disconnect for the new elevator cab lighting inside the new elevator equipment room.

5. Provide power to the indoor cassette and outdoor condensing unit for the mini-split. The outdoor condensing unit shall also have a fused disconnect.

3 4

1-1/2" 1

6-0 1-1/4

7- 9-1/2

1- 1/4

-1

0- 1/2

2-1/2 19 - 2

ELEVATOR

FORT LEAVENWORTH

DPW

SHEET ID

D

IR

EC

TO

R A

TE

O

F

PU

B

LI

C W

O R

K S

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

D

ES

IG

N

B R

A N

C H

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

IS

SU

E D

AT

E:

PR

O

JE

C

T N

O

1 2 3 4 5

D

C

B

A

0%

D ra wi ng s

M cC

LE

LL

A N

A

VE

FO

R T

LE

A

VE

N

W O

R

TH

, K S

7-

9/

/2

PR

EL

IM

IN

AR

Y

SC

H

EM

AT

IC

E

XP

AN

SI

O N

ID

EA

S

F-100

Fi re

P ro te ct io n

B2

E le va to r M od er ni za tio n D es ig ne r

Au th or

C he ck er

N ot

U se d on

T itl eB lo ck

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1/8" = 1'-0"

B1 Basement Fire Protection

General Notes:

1. The existing system shall be modified in accordance with NFPA 72, UFC 3-600-01, and IBC Chapter 30.

2. New smoke detectors are required in the machine room and top of hoist way.

Activation of associated detector must activate the facility fire alarm system and send the elevator to the designated floor per ASME A17.1 Phase I emergency recall operation and Phase II emergency in-car operation.

3. The elevator shall be equipped to operate with a standardized fire service elevator key.

4. The existing sprinkler system shall be modified in accordance with NFPA 13, UFC 3-600-01, and IBC Chapter 30.

5. Modify the existing sprinkler piping to add a sprinkler head in the new elevator equipment room and at the bottom of the elevator pit. Activation of sprinkler waterflow switches shall shunt trip elevator power with no delay upon switch activation.

Key Notes:

1. Modify existing sprinkler pipe to install a new sprinkler head within the elevator equipment room. Contractor to determine head type and required coverage.

Coordinate exact location with new light.

2. Modify existing sprinkler pipe to install a new sprinkler head in the elevator pit.

Contractor to determine head type and required coverage.

3. Modify the existing fire alarm system to install a new smoke detector and heat detector into the new elevator equipment room. The smoke detector shall be used for Phase I Emergency Recall. The heat detector shall be used for the elevator shunt trip and within 24" of the new sprinkler head.

Legend

Existing Sprinkler Pipe

New Sprinkler Pipe

Existing Sprinkler Head

New Sprinkler Head

New Heat Detector

New Smoke Detector

F-100

A-001 - Cover Sheet
A-100 - Basement Floor Plan
MD-100 - Basement HVAC Demo
M-100 - Basement HVAC Plan
E-100 - Basement Electrical
F-100 - Fire Suppression

File details come from the government source that posted it. Updated .