B08(c)_-_Attachment_2_QASP_for_USPP_SFFO_HMP_Stable_Maint.docx
DOCX document 52 KB Posted
- Attached to
- USPP SFFO Stall Maintenance Federal contract opportunity
- Solicitation number
- 140P2126Q0024
About this file
This is a Quality Assurance Surveillance Plan (QASP) for United States Park Police Horse Mounted Patrol Stall Maintenance Services. The QASP establishes the systematic methods and procedures that government representatives will use to monitor contractor performance and ensure compliance with the Performance Work Statement (PWS). The document outlines roles and responsibilities, with the Contracting Officer (CO) overseeing contract administration and the Contracting Officer's Technical Representative (COTR) serving as the primary government authority for performance management. The COTR will conduct daily 100% inspection surveillance using monitoring forms to document the contractor's adherence to required standards.
The QASP identifies 37 specific performance requirements organized across five service phases: initial feeding and horse preparation, stall cleaning and maintenance, aisle and paddock management, evening stable closing procedures, and secondary feeding. All performance standards have an Acceptable Quality Level (AQL) of 100%, meaning tasks must be performed to specification without deviation. Key responsibilities include dispensing hay or alfalfa per stall cards, ensuring continuous water availability, safely handling horses, removing manure and soiled bedding, maintaining clean water and feed buckets, checking for injuries or illness, removing cobwebs and dust, and securing the facility upon departure. The consequence for failing to meet performance standards is potential payment reductions at the CO's discretion and possible negative contractor reviews affecting future contract awards. Government surveillance occurs through 100% daily inspection with quarterly written reports summarizing overall performance assessment results.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B03_-_WD_2015-5637_REV_31.pdf | ||
| B08(b)_-_Attachment_1_-__PWS_USPP_HMP_SFFO_Stall_Maint.pdf | ||
| Sol_140P2126Q0024.pdf | ||
| B08(e)_-_Exhibit_A_-_Price_Schedule_140P2126Q0024.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
United States Park Police Horse Mounted Patrol Stall Maintenance Services i
TABLE OF CONTENTS
| 1 | INTRODUCTION | 1 |
| 1.1 | Purpose | 1 |
| 1.2 | Performance Management Approach | 1 |
| 1.3 | Performance Management Strategy | 1 |
| 2 | ROLES AND RESPONSIBILITIES | 2 |
| 2.1 | The Contracting Officer | 2 |
| 2.2 | The Contracting Officer’s Technical Representative | 2 |
| 3 | IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS | 2 |
| 4 | METHODOLOGIES TO MONITOR PERFORMANCE | 2 |
| 4.1 | Surveillance Techniques | 2 |
| 4.2 | Customer Feedback | 3 |
| 4.3 | Acceptable Quality Levels | 3 |
| 5 | QUALITY ASSURANCE DOCUMENTATION | 3 |
| 5.1 | The Performance Management Feedback Loop | 3 |
| 5.2 | Monitoring Forms | 3 |
| 6 | ANALYSIS OF QUALITY ASSURANCE ASSESSMENT | 3 |
| 6.1 | Determining Performance | 3 |
| 6.2 | Reporting | 4 |
| 6.3 | Reviews and Resolution | 4 |
| ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY | 5 | |
| ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM | 15 |
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled STALL MAINTENANCE AND CLEANING SERVICES UNITED STATES PARK POLICE HORSE MOUNTED PATROL. This plan sets forth the procedures and guidelines USPP HMP Staff will use in ensuring the required performance standards or services levels are achieved by the contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by USPP Staff to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The Contracting Officer The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the contracting officer's representative (COR), and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
The Contracting Officer’s Technical Representative The contracting officer’s technical representative (COTR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COTR limitations are contained in the written appointment letter. The COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· 100% Inspection – Daily, the COTR/COR, and/or his/her designee, shall review the work as outlined in the PWS.
Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels
1) The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed. For all activities at each of the USPP HMP Stables that are stabling horses, the desired performance level is established at 100 percent.
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
Monitoring Forms The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results of USPP HMP Stable Maintenance and Cleaning Services are being performed in accordance with the PWS.
The COR will retain a copy of all completed QA surveillance forms.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Reporting Quarterly, the COR, will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO, COR, and other government IPT personnel as deemed necessary to discuss performance evaluation. The CO will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
The following Performance Requirements Summary (PRS) indicates the desired outcomes, performance objectives, performance standards, and Acceptable Quality Levels (AQLs). Refer to the Performance Work Statement for the actual descriptions.
| PRS # |
| Paragraph |
| Specific Task |
| AQL |
| Performance Standard |
| Method of Surveillance |
| Consequence |
| 1 |
| 5.2.1.1 |
| Dispense hay or soaked alfalfa |
| 100% |
| Hay or soaked alfalfa is dispensed as designated on horse’s stall card |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 2 |
| 5.2.1.2 |
| Ensure that all horses have available water |
| 100% |
| All horses have available water through automatic waterer or full water bucket |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 3 |
| 5.2.1.3 |
| If COR or designee requests assistance, feed horses IAW stall card or feed room board |
| 100% |
| If COR or designee requested assistance, horses are fed IAW stall card or feed room board |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 4 |
| 5.2.2 |
| After horse has consumed feed, safely halter and lead horse from the stall |
| 100% |
| After the horse consumed its feed, the horse was safely haltered and led from the stall |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 5 |
| 5.2.3 |
| Be observant of any signs of injuries or illness. Any injuries or illness shall be reported immediately to COR of USPP staff. |
| 100% |
| Any injuries or signs of illness were immediately reported to the COR or USPP staff. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 6 |
| 5.2.4 |
| Secure the horse in cross ties or release into the paddock or turnout area. Any horse placed in turnout area shall have its halter removed |
| 100% |
| Horses were secured in cross ties or released into the paddock or turnout area. Any horse placed in the turnout area had its halter removed. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 7 |
| 5.2.5 |
Prior to returning the horse to the stall or releasing it into the paddock, the contractor shall pick each horse’s hoofs
| 100% |
| Horses had their hoofs picked prior to being returned to stall or turned out into the paddock |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 8 |
| 5.3.1 |
| Horses shall not be in the stall while performing Task 2. |
| 100% |
| Horses were not in the stall while stall was being cleaned IAW Task 2. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 9 |
| 5.3.1.1 |
| Utilizing wheelbarrows, pitch forks, brooms, shovels, or other appropriate tools, the contractor shall clean each stall occupied by a horse. |
| 100% |
| Utilizing wheelbarrows, pitch forks, brooms, shovels, or other appropriate tools, the contractor cleaned each stall occupied by a horse. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 10 |
| 5.3.1.2 |
| Check automatic waterer an/or water bucket for cleanliness. Clean if necessary. Test waterer to ensure it is in working condition. Fill water bucket if necessary. |
| 100% |
| Automatic waterer and/or water bucket is clean from algae, mold, and foreign debris. Water bucket is at least ¾ full. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 11 |
| 5.3.1.3 |
| Check feed bucket for cleanliness and consumption of feed. Clean if necessary. Report to USPP staff immediately if the horse has not consumed at least ¾ of its feed. |
| 100% |
| Feed buckets were cleaned and free from algae, mold, or foreign debris. Contractor reported to USPP staff about any horse that had not consumed at least ¾ of its feed. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 12 |
| 5.3.1.4 |
| Check stalls for damage and areas that pose a potential threat of injury to the horse. Report damage and potential injury sites to USPP staff prior to returning the horse to its stall. |
| 100% |
| Stalls were checked for damage and there are no sites that pose a potential threat of injury to the horse. Any damage or potential injury sites were reported to USPP staff prior to returning the horse to its stall. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 13 |
| 5.3.1.5 |
| Remove all manure, soiled and/or water saturated bedding and soiled hay from the stall. If the stall is equipped with rubber mats, the contractor shall ensure that there is no manure, bedding or other debris lodged under the mats and that the mats lay flat. |
| 100% |
| All manure, soiled and/or water saturated bedding and soiled hay was removed from the stall. If the stall was equipped with rubber mats, the contractor removed all manure, bedding, and other debris from under the mat, and the mat lays flat. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 14 |
| 5.3.1.6 |
| Dump soiled bedding/hay and manure in the exterior manure dumpster or other designated manure collection area. |
| 100% |
| Soiled bedding/hay and manure were dumped into the exterior manure dumpsters or other designated manure collection area. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 15 |
| 5.3.1.7 |
Replace removed soiled bedding with an equal amount of Government provided clean/dry sawdust or wood shavings. The amount of sawdust or wood shavings bedding in the stall will be listed on the stall card or IAW directions provided by USPP staff.
| 100% |
| Soiled bedding is replaced with an equal amount of Government provided clean/dry sawdust or wood shavings. The amount of sawdust or wood shavings in the stall are IAW the stall card or from directions provided by USPP staff. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 16 |
| 5.3.1.8 |
Remove cobwebs and dust from the interior walls of all occupied stalls (up to 8’)
| 100% |
| Cobwebs and dust from the interior walls of all occupied stalls is removed |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 17 |
| 5.3.1.9 |
Sweep sawdust away from stall entrance to prevent bedding from blocking door and spilling into the aisle.
| 100% |
| Sawdust is swept away from stall entrance and the bedding does not block the door or spills into the aisle. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 18 |
| 5.3.1.10 |
| Maintain tools in a safe manner to prevent injury to USPP staff, contractors, and horses. |
| 100% |
| Tools are maintained in a safe manner preventing injury to USPP staff, contractors, and horses. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 19 |
| 5.3.1.11 |
Return horse to stall, remove halter and secure door.
| 100% |
| Horse is returned to its stall, halter is removed, and the door secured. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 20 |
| 5.4.1.1 |
| Sweep aisle, clean up any manure and/or bedding and dispose in the manure dumpster or other designated area. |
| 100% |
| Aisle is swept and cleaned up of any manure and/or bedding and debris was disposed of in the manure dumpster or other designated area. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 21 |
| 5.4.1.2 |
| Pick manure from paddocks and turnout areas and dispose of in designated manure dumpster. Remove any trash or hazardous debris from the paddocks and dispose in the appropriate trash receptacle. Report and hazards to COR or on duty USPP personnel |
| 100% |
| Manure was picked from paddocks and turnout areas. Any trash or hazardous debris from the paddocks are disposed of in the appropriate trash receptacle. Any hazards are reported to the COR or on duty USPP personnel. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 22 |
| 5.4.1.3 |
Provide all horses with additional hay or soaked alfalfa as designated on their stall card (as needed) after stalls are cleaned.
| 100% |
| All horses were provided with additional hay or soaked alfalfa as designated on their stall cards after the stalls were cleaned. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 23 |
| 5.4.1.4 |
Check, clean, and fill outdoor waterers, buckets, and/or basins. There should be no algae, mold, or foreign matter in the outdoor waterers, buckets, and/or basins. Provide hay or soaked alfalfa as designated on their stall card to horses remaining in turnout.
| 100% |
| All outdoor waterers, buckets, and/or basins were checked, cleaned, and filled. There is no algae, mold, or foreign matter in the outdoor waterers, buckets, and/or basins. Hay or soaked alfalfa as designated on their stall card was provided to horses remaining in turnout. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 24 |
| 5.4.1.5 |
Remove cobwebs and dust from the exterior walls of all stalls, and all aisle walls and posts (up to 8’)
| 100% |
| Cobwebs and dust from exterior walls of stalls and all aisle walls and posts is removed (up to 8’) |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 25 |
| 5.4.1.6 |
Fill feed bins with 50-pound bags of feed when feed bins are empty.
| 100% |
| When feed bins were empty, the contractor filled the bins with 50-pound bags of feed. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 26 |
| 5.4.1.7 |
| Store all tools in the designated storage area(s). |
| 100% |
| All tools are stored in the designated storage area(s). |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 27 |
| 5.5.2.1 |
| If applicable, return horses that are turned out to outdoor paddocks to the stable. The contractor shall always lead a horse with the appropriate halter and lead rope. |
| 100% |
| All horses were returned to the stable. The contractor always led the horse with the appropriate halter and lead rope. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 28 |
| 5.5.2.2 |
| Prior to returning the horse to their designated stall, the contractor shall pick each horse’s hoofs. |
| 100% |
| The contractor picked each horse’s hoofs prior to returning the horse to their designated stall. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 29 |
| 5.5.2.3 |
| Be observant of any signs of injuries or illness. Any injuries or illness shall be reported immediately to COR of USPP staff. |
| 100% |
| Any injuries or signs of illness were immediately reported to the COR or USPP staff. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 30 |
| 5.5.2.4 |
| Check stalls for damage and areas that pose a potential threat of injury to the horse. Report damage and potential injury sites to USPP staff prior to returning the horse to its stall. |
| 100% |
| Stalls were checked for damage and there are no sites that pose a potential threat of injury to the horse. Any damage or potential injury sites were reported to USPP staff prior to returning the horse to its stall. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 31 |
| 5.5.2.5 |
| Check automatic waterer an/or water bucket for cleanliness. Clean if necessary. Test waterer to ensure it is in working condition. Fill water bucket if necessary. |
| 100% |
| Automatic waterer and/or water bucket is clean from algae, mold, and foreign debris. Water bucket is at least ¾ full. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 32 |
| 5.5.2.6 |
| Check feed bucket for cleanliness. There should be no algae, mold, manure, or foreign debris other than feed in the feed bucket. Clean if necessary. |
| 100% |
| Feed bucket was checked for cleanliness. There is no algae, mold, manure, or foreign debris other than feed in the feed bucket. Cleaned if necessary. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 33 |
| 5.5.2.7 |
| Dispense hay or soaked alfalfa to all horses as designated on their stall card. |
| 100% |
| Hay or soaked alfalfa was dispensed to all horses as designated on their stall card. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 34 |
| 5.5.2.8 |
| If applicable, feed horses grain and administer designated medications and/or nutritional additives/supplements as designated on their stall card. |
| 100% |
| If applicable, horses were fed grain and administered designated medications and/or nutritional additives/supplements as designated on their stall card. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 35 |
| 5.5.2.9 |
| Sweep aisle, clean up any manure, hay, dirt, and/or bedding and dispose of the manure in the dumpster or other designated area. |
| 100% |
| Swept aisle, cleaned up any manure, hay, dirt, and/or bedding and disposed of the manure in the dumpster or other designated area. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 36 |
| 5.5.2.10 |
| Ensure each horse is secured in their designated stall with the latch properly fastened. |
| 100% |
| Ensured each horse was secured in their designated stall with the latch properly fastened. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
| 37 |
| 5.5.2.11 |
| Upon departure, turn off all interior lights and ensure exterior doors of the USPP SFFO HMP Stable are properly locked and secured, and the alarm system is properly activated. |
| 100% |
| Upon departure, turned off all interior lights and ensured exterior doors of the USPP SFFO HMP Stable were properly locked and secured, and the alarm system was properly activated. |
| 100% Surveillance |
Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer. Additionally, a negative review of the Contractor could affect future contract awards.
NOTE: Government surveillance of Contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
PRS Description of contents:
a. PRS #: indicates the numbering sequence within the PRS table.
b. Paragraph: PWS paragraph number(s) specifying each required task(s)
c. Specific Task: a brief summary of required tasks to be monitored.
d. Actual Quality Level (AQL): This column lists the maximum allowable degree of deviation from perfect performance of each requirement before the Government considers contractor performance unsatisfactory. An AQL does not say the contractor may knowingly offer defective service to the Government, but recognizes defective performance sometimes happens unintentionally.
e. Performance Standard: appropriate performance standard, usually described in terms of quality and timeliness, so that a distinction can be made between satisfactory and unsatisfactory performance.
f. Method of Surveillance: method(s) utilized to objectively perform surveillance of requirement.
g. Consequence of failure to achieve the AQL
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):
| Monthly | Quarterly | As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (Check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
File details come from the government source that posted it. Updated .