B08 W91QVN-24-R-0058 Railcar safety inspection-PD2.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Repair Railcar Safety Inspection (LCS)
Solicitation number
W91QVN-24-R-0058
Issued by

About this file

This document appears to be the Attachment A: Railcar Lifespan for a federal solicitation W91QVN-24-R-0058 for Repair Railcar Safety Inspection (LCS). The solicitation requires the contractor to provide all necessary personnel, equipment, tools, materials, supervision, and other necessities to conduct precision safety diagnosis on 61 U.S. railcars manufactured between 1999-2000 to extend their lifespan by 5 additional years. The diagnosis must meet the standards set by the Republic of Korea (ROK) Ministry of Land, Infrastructure and Transport (MOLIT) and Railway Safety Act. The solicitation requires the contractor to coordinate with KORAIL to use the Gachun Train Station as the diagnosis location. The contract has a base year in CY 2024 for 26 railcars, and a first option year in CY 2025 for 35 railcars.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

499600 ~ 499720

ATTACHMENT A: Railcar Lifespan
US Regular RailcarsQuantityYear of ManufacturedDate of ManufacturedExpiration DateLocation
499660 ~ 661219996/1/996/1/24Gachun Train Station
499662 ~ 6842319997/22/997/22/24Gachun Train Station
499685 ~ 7193520003/31/003/31/25Gachun Train Station
4997201199912/31/9912/31/24Gachun Train Station
61
25th Trans BN will transport 26 railcars that need the diagnosis in 2024 to Gachun train station (inside Daegu) before 31 May 24. And the contractor
need to coordinate with KORAIL to use the Gachun train station as the diagnosis place.”
CY 24 (Base Year)26
CY 25 (1st Option Year)35

File details come from the government source that posted it. Updated .