B08 - W9123826RA012 A05 - DRAFT Plans Vol 5 - NSA-U CMF Vehicle CP - 20260521.pdf

PDF 4 MB Posted

Attached to
DRAFT SOLICITATION - USACE SPK DB Construction NSA-U Consolidation Mission Facility - Camp Williams, Utah
Solicitation number
Not on record
Issued by

About this file

This document is a corrected final Request for Proposal (RFP) package for architectural design drawings for the NSA-Utah Consolidation Mission Facility Vehicle Control Point located in Bluffdale, Utah. The solicitation number is W912PL25D0002, issued by the Sacramento District of the U.S. Army Corps of Engineers on May 21, 2026. Volume 5 specifically addresses the Vehicle Control Point component of the larger consolidation project, identified as P2 Number 567249.

The RFP package contains comprehensive architectural drawings and specifications for construction of vehicle control facilities, including a Vehicle Control Inspection Canopy and a Vehicle Control Point building. The drawings encompass first floor plans, roof plans, exterior elevations, building sections, reflected ceiling plans, and isometric views for both structures. Key design elements include pre-finished metal components (fascia, coping, gutters, downspouts), structural steel columns, cast-in-place and pre-cast concrete features, concrete masonry units, a pre-fabricated UL 752 Level 3 ballistic-rated guard/ID check booth, crash attenuators, and associated site improvements such as parking, sidewalks, and landscape features. The design includes reference elevation 100'-0" with canopy soffits at 118'-0" and parapet tops at 123'-0". The document is marked as CUI (Controlled Unclassified Information) and represents a corrected version issued following previous 35% design and final RFP submittals dated November 3, 2025, and April 2, 2026, respectively.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

W P

L D

W912PL25D0002

a H a s k e ll C o m p a n y

SACRAMENTO DISTRICT

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ G

E N

R h e n ry

.b u rg e r.

rv t

/2

/2

:1

:0

P

M

G-009

C O

V E

R S

H E

E T

V

E H

IC

L E

C O

N T

R O

L P

O

IN

T

H B

U R

G E

R

H B

U R

G E

R

A F

O X

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

05/21/2026

VOLUME 5: VEHICLE CONTROL POINT

NSA-UTAH, BLUFFDALE, UT

NSAU CONSOLIDATION - MISSION FACILITY

P2 NUMBER: 567249

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

AREA MAP

SITE MAP

MISSION FACILITY,

NSA, UTAH

PROJECT LOCATION

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

DRAFT

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ G

E N

R h e n ry

.b u rg e r.

rv t

/2

/2

:1

:0

P

M

G-010

S H

E E

T I

N D

E X

V

E H

IC

L E

C O

N T

R O

L P

O

IN

T

H B

U R

G E

R

H B

U R

G E

R

A F

O X

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

GENERAL

G-009 COVER SHEET - VEHICLE CONTROL POINT

G-010 SHEET INDEX - VEHICLE CONTROL POINT

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

ARCHITECTURAL

A-112 VEHICLE CONTROL INSPECTION CANOPY - FIRST FLOOR PLAN

A-122 VEHICLE CONTROL INSPECTION CANOPY - ROOF PLAN

A-203 VEHICLE CONTROL INSPECTION CANOPY - EXTERIOR ELEVATIONS

A-204 VEHICLE CONTROL INSPECTION CANOPY - EXTERIOR ELEVATIONS

A-303 VEHICLE CONTROL INSPECTION CANOPY - BUILDING SECTIONS

A-712 VEHICLE CONTROL INSPECTION CANOPY - REFLECTED CEILING PLAN

A-903 VEHICLE CONTROL INSPECTION CANOPY - ISOMETRIC VIEWS

A-904 VEHICLE CONTROL INSPECTION CANOPY - ISOMETRIC VIEWS

ARCHITECTURAL

A-111 VEHICLE CONTROL POINT - FIRST FLOOR PLAN

A-121 VEHICLE CONTROL POINT - ROOF PLAN

A-201 VEHICLE CONTROL POINT - EXTERIOR ELEVATIONS

A-202 VEHICLE CONTROL POINT - EXTERIOR ELEVATIONS

A-301 VEHICLE CONTROL POINT - BUILDING SECTIONS

A-302 VEHICLE CONTROL POINT - BUILDING SECTIONS

A-711 VEHICLE CONTROL POINT - REFLECTED CEILING PLAN

A-901 VEHICLE CONTROL POINT - ISOMETRIC VIEWS

A-902 VEHICLE CONTROL POINT - ISOMETRIC VIEWS

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

B B

A A

A-203

A1

A-204

H1

A-204

A1

A-203

H1

30' - 0" 30' - 0"

6' - 0"6' - 0"

A1

A-303

A1

A-303

H1

A-303

H1

A-303

162 162162

154 154 154 154

130 130

130 130

60' - 0"

72' - 0"

163 163 163

141141

12' - 0" 12' - 0" 9' - 0" 8' - 0" 9' - 0"

155155

143 143 143

187 186

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = XXXX.XX USGS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

KEYED NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

T A

S K

O R

D E

R

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

M

IS

S

IO

N F

A C

IL

IT

Y N

S A

U

T A

H F

Y M

IL

C

O N

N S

A -U

C O

N S

O L

ID

A T

IO

N

P /N

W P

L D

T B

D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:5

P

M

A-112

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

F

IR

S

T F

L O

O R

P L A

N

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR PLAN

0 4' 8' 16'

PLAN NORTH

102 DASHED LINE INDICATES OUTLINE OF ROOF ABOVE.

130 STRUCTURAL STEEL COLUMN.

141 CAST-IN-PLACE CONCRETE CURB WITH INTEGRAL GUTTER.

143 PRE-CAST CONCRETE SPLASHBLOCK.

144 CAST-IN-PLACE CONCRETE SIDEWALK.

145 CONCRETE RAMP.

146 DETECTABLE WARNING SURFACE.

154 PRE-CAST CONCRETE WHEEL STOP.

155 CAST STONE CAP.

162 PARK BENCH.

163 PARKING STRIPE.

167 FIXED STEEL BOLLARD.

186 ACCESSIBLE PARKING SIGNAGE.

187 VAN ACCESSIBLE PARKING SIGNAGE.

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

A-203

A1

A-204

H1

A-204

A1

A-203

H1

30' - 0" 30' - 0"

A1

A-303

A1

A-303

H1

A-303

H1

A-303

S L O

P E

/2

:1

72' - 0"

6' - 0" 60' - 0" 6' - 0"

112 112 112113

121 121

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = XXXX.XX USGS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:5

P

M

A-122

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

R

O O

F P

L A

N

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE: 1/8" = 1'-0"

A1

ROOF PLAN

0 4' 8' 16'

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

125 PRE-FINISHED METAL STANDING SEAM ROOF PANEL.

PLAN NORTH

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

FIRST FLOOR

100' - 0"

BOTTOM OF SOFFIT

118' - 0"

TOP OF PARAPET

123' - 0"

150150

162 162 162162

143 143 143

186 187

112 112

30' - 0"30' - 0"

60' - 0"

FIRST FLOOR

100' - 0"

1 3

BOTTOM OF SOFFIT

118' - 0"

TOP OF PARAPET

123' - 0"

" 2

162 162162 162

154 154 154 154

155155155

186187

30' - 0" 30' - 0"

60' - 0"

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = XXXX.XX USGS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-203

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

E

X T

E R

IO

R

E L E

V A

T

IO

N S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

0 4' 8' 16'

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

H1

NORTH EXTERIOR ELEVATION

SCALE: 1/8" = 1'-0"

A1

SOUTH EXTERIOR ELEVATION

108 PRE-FINISHED METAL FASCIA PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

143 PRE-CAST CONCRETE SPLASHBLOCK.

144 CAST-IN-PLACE CONCRETE SIDEWALK.

150 CONCRETE MASONRY UNITS.

154 PRE-CAST CONCRETE WHEEL STOP.

155 CAST STONE CAP.

162 PARK BENCH.

167 FIXED STEEL BOLLARD.

186 ACCESSIBLE PARKING SIGNAGE.

187 VAN ACCESSIBLE PARKING SIGNAGE.

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

FIRST FLOOR

100' - 0"

BA

BOTTOM OF SOFFIT

118' - 0"

TOP OF PARAPET

123' - 0"

155 155 167

24' - 0"

FIRST FLOOR

100' - 0"

B A

BOTTOM OF SOFFIT

118' - 0"

TOP OF PARAPET

123' - 0"

155167

24' - 0"

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = XXXX.XX USGS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-204

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

E

X T

E R

IO

R

E L E

V A

T

IO

N S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

0 4' 8' 16'

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

H1

EAST EXTERIOR ELEVATION

SCALE: 1/8" = 1'-0"

A1

WEST EXTERIOR ELELVATION

108 PRE-FINISHED METAL FASCIA PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

143 PRE-CAST CONCRETE SPLASHBLOCK.

144 CAST-IN-PLACE CONCRETE SIDEWALK.

150 CONCRETE MASONRY UNITS.

155 CAST STONE CAP.

167 FIXED STEEL BOLLARD.

186 ACCESSIBLE PARKING SIGNAGE.

187 VAN ACCESSIBLE PARKING SIGNAGE.

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = XXXX.XX USGS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

FIRST FLOOR

100' - 0"

B A

BOTTOM OF SOFFIT

118' - 0"

TOP OF PARAPET

123' - 0"

" 2

155 155167

130 130

24' - 0"

FIRST FLOOR

100' - 0"

1 3

BOTTOM OF SOFFIT

118' - 0"

TOP OF PARAPET

123' - 0"

162162162162 167155

130 130

150150

187 186

30' - 0" 30' - 0"

60' - 0"

121 121

KEYED NOTES

0 4' 8' 16'

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

H1

BUILDING SECTION

SCALE: 1/8" = 1'-0"

A1

BUILDING SECTION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-303

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

B

U

IL

D

IN

G S

E C

T

IO

N S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

105 PRE-FINISHED METAL SOFFIT PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

143 PRE-CAST CONCRETE SPLASHBLOCK.

150 CONCRETE MASONRY UNITS.

155 CAST STONE CAP.

162 PARK BENCH.

167 FIXED STEEL BOLLARD.

186 ACCESSIBLE PARKING SIGNAGE.

187 VAN ACCESSIBLE PARKING SIGNAGE.

A1

A-303

A1

A-303

H1

A-303

H1

A-303

18' - 8"

18' - 8"

18' - 0"

18' - 8"

18' - 8"

18' - 8"18' - 8"

18' - 0" 105

1' - 1" 4' - 11" 60' - 0" 4' - 11" 1' - 1"

72' - 0"

72' - 0"

18' - 0"

1' - 1" 4' - 11" 60' - 0" 4' - 11" 1' - 1"

130 130

130130130

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SHEET A-001 FOR ARCHITECTURAL NOTES.

5. REFER TO SHEET A-002 FOR ABBREVIATIONS LEGEND.

6. REFER TO SHEET A-003 FOR ANNOTATION LEGEND.

7. REFER TO SHEET A-003 FOR GRAPHIC SCALES LEGEND.

8. REFER TO SHEET A-203 FOR EXTERIOR FINISH SCHEDULE.

9. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

10. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-712

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR REFLECTED CEILING PLAN

0 4' 8' 16'

105 PRE-FINISHED METAL SOFFIT PANEL.

118 PRE-FINISHED METAL SOFFIT TRIM.

130 STRUCTURAL STEEL COLUMN.

PLAN NORTH

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SHEET A-001 FOR ARCHITECTURAL NOTES.

5. REFER TO SHEET A-002 FOR ABBREVIATIONS LEGEND.

6. REFER TO SHEET A-003 FOR ANNOTATION LEGEND.

7. REFER TO SHEET A-003 FOR GRAPHIC SCALES LEGEND.

8. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-903

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

IS

O M

E T

R

IC

V

IE

W S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE:

A1

ISOMETRIC VIEW FROM SOUTHWEST

SCALE:

H1

ISOMETRIC VIEW FROM NORTHWEST

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SHEET A-001 FOR ARCHITECTURAL NOTES.

5. REFER TO SHEET A-002 FOR ABBREVIATIONS LEGEND.

6. REFER TO SHEET A-003 FOR ANNOTATION LEGEND.

7. REFER TO SHEET A-003 FOR GRAPHIC SCALES LEGEND.

8. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

9. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H

IN

S P

E C

T

IO

N C

A N

O P

Y R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-904

V E

H

IC

L E

C O

N T

R O

L I

N S

P E

C T

IO

N

C A

N O

P Y

IS

O M

E T

R

IC

V

IE

W S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE:

A1

ISOMETRIC VIEW FROM NORTHEAST

SCALE:

H1

ISOMETRIC VIEW FROM SOUTHEAST

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

A-202

A1

A-202

H1

A1

A-302

A1

A-302

A1

A-301

A1

A-301

144144

4' - 0" 51' - 0" 4' - 0"

148 148

155155

12' - 6" 10' - 0" 12' - 6"

59' - 0"

156 156

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

KEYED NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

T A

S K

O R

D E

R

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

M

IS

S

IO

N F

A C

IL

IT

Y N

S A

U

T A

H F

Y M

IL

C

O N

N S

A -U

C O

N S

O L

ID

A T

IO

N

P /N

W P

L D

T B

D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-111

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

F

IR

S T

F L O

O R

P L A

N

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR PLAN

0 4' 8' 16'

PLAN NORTH

102 DASHED LINE INDICATES OUTLINE OF ROOF ABOVE.

112 PRE-FINISHED METAL DOWNSPOUT.

130 STRUCTURAL STEEL COLUMN.

134 CAST-IN-PLACE CONCRETE PAVEMENT.

139 CAST-IN-PLACE CONCRETE CRASH ATTENNUATOR.

141 CAST-IN-PLACE CONCRETE CURB WITH INTEGRAL GUTTER.

142 CAST-IN-PLACE CONCRETE ISLAND.

144 CAST-IN-PLACE CONCRETE SIDEWALK.

145 CONCRETE RAMP.

146 DETECTABLE WARNING SURFACE.

148 STAMPED CAST-IN-PLACE CONCRETE PAVEMENT.

155 CAST STONE CAP.

156 PRE-CAST CONCRETE SPLASHBLOCK.

173 PRE-FABRICATED, PRE-FINISHED GUARD/ID CHECK BOOTH. UL 752 LEVEL 3

BALLISTIC RATED. REFER TO SHEET A-403.

177 CROSSWALK STRIPING.

178 DIVERGING TRAFFIC CHEVRON ROAD MARKINGS.

179 CRASH CUSHION.

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

A-201

H1

A-202

A1

A-201

A1

A-202

H1

A1

A-302

A1

A-302

A1

A-301

A1

A-301

S L O

P E

/2

:1

59' - 0"

4' - 0" 51' - 0" 4' - 0"

112 113

"121

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-121

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

R O

O F

P L A

N

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE: 1/8" = 1'-0"

A1

ROOF PLAN

0 4' 8' 16'

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

125 PRE-FINISHED METAL STANDING SEAM ROOF PANEL.

PLAN NORTH

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

FIRST FLOOR

100' - 0"

BOTTOM OF CANOPY

SOFFIT

118' - 0"

150 150

139144 144

TOP OF CANOPY

PARAPET

123' - 0"

155 155

"112

156 156

FIRST FLOOR

100' - 0"

BOTTOM OF CANOPY

SOFFIT

118' - 0"

1 2

TOP OF CANOPY

PARAPET

123' - 0"

" 2

130 130

155 155

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-201

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

E X

T E

R

IO

R E

L E

V A

T

IO

N S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

0 4' 8' 16'

0 4' 8' 16'

108 PRE-FINISHED METAL FASCIA PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

139 CAST-IN-PLACE CONCRETE CRASH ATTENNUATOR.

144 CAST-IN-PLACE CONCRETE SIDEWALK.

150 CONCRETE MASONRY UNITS.

155 CAST STONE CAP.

156 PRE-CAST CONCRETE SPLASHBLOCK.

173 PRE-FABRICATED, PRE-FINISHED GUARD/ID CHECK BOOTH. UL 752 LEVEL 3

BALLISTIC RATED. REFER TO SHEET A-403.

179 CRASH CUSHION.

SCALE: 1/8" = 1'-0"

H1

NORTH EXTERIOR ELEVATION

SCALE: 1/8" = 1'-0"

A1

SOUTH EXTERIOR ELEVATION

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

FIRST FLOOR

100' - 0"

BOTTOM OF CANOPY

SOFFIT

118' - 0"

BA

TOP OF CANOPY

PARAPET

123' - 0"

150150

130 130

" 2

155155

179 139

FIRST FLOOR

100' - 0"

BOTTOM OF CANOPY

SOFFIT

118' - 0"

B A

TOP OF CANOPY

PARAPET

123' - 0"

" 2

155 139 179

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-202

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

E X

T E

R

IO

R E

L E

V A

T

IO

N S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

0 4' 8' 16'

0 4' 8' 16'

108 PRE-FINISHED METAL FASCIA PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

139 CAST-IN-PLACE CONCRETE CRASH ATTENNUATOR.

150 CONCRETE MASONRY UNITS.

155 CAST STONE CAP.

156 PRE-CAST CONCRETE SPLASHBLOCK.

173 PRE-FABRICATED, PRE-FINISHED GUARD/ID CHECK BOOTH. UL 752 LEVEL 3

BALLISTIC RATED. REFER TO SHEET A-403.

179 CRASH CUSHION.

SCALE: 1/8" = 1'-0"

H1

EAST EXTERIOR ELEVATION

SCALE: 1/8" = 1'-0"

A1

WEST EXTERIOR ELELVATION

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

FIRST FLOOR

100' - 0"

BOTTOM OF CANOPY

SOFFIT

118' - 0"

B A

TOP OF CANOPY

PARAPET

123' - 0"

" 2

130 173

30' - 0"

KEYED NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

T A

S K

O R

D E

R

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

M

IS

S

IO

N F

A C

IL

IT

Y N

S A

U

T A

H F

Y M

IL

C

O N

N S

A -U

C O

N S

O L

ID

A T

IO

N

P /N

W P

L D

T B

D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-301

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

B U

IL

D

IN

G

S E

C T

IO

N

S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

A1

BUILDING SECTION

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

105 PRE-FINISHED METAL SOFFIT PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

139 CAST-IN-PLACE CONCRETE CRASH ATTENNUATOR.

143 PRE-CAST CONCRETE SPLASHBLOCK.

150 CONCRETE MASONRY UNITS.

155 CAST STONE CAP.

173 PRE-FABRICATED, PRE-FINISHED GUARD/ID CHECK BOOTH. UL 752 LEVEL 3

BALLISTIC RATED. REFER TO SHEET A-403.

179 CRASH CUSHION.

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

FIRST FLOOR

100' - 0"

BOTTOM OF CANOPY

SOFFIT

118' - 0"

1 2

TOP OF CANOPY

PARAPET

123' - 0"

" 2

51' - 0"

KEYED NOTES

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-302

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

B U

IL

D

IN

G

S E

C T

IO

N

S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

0 4' 8' 16'

SCALE: 1/8" = 1'-0"

A1

BUILDING SECTION

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

105 PRE-FINISHED METAL SOFFIT PANEL.

108 PRE-FINISHED METAL FASCIA PANEL.

121 PRE-FINISHED METAL COPING.

130 STRUCTURAL STEEL COLUMN.

139 CAST-IN-PLACE CONCRETE CRASH ATTENNUATOR.

150 CONCRETE MASONRY UNITS.

155 CAST STONE CAP.

18' - 8"

18' - 8"

18' - 0"

18' - 0"

18' - 8"

18' - 0"

18' - 8"

18' - 0"

18' - 8"

1' - 1"

2' - 11" 51' - 0" 2' - 11" 1' - 1"

59' - 0"

118 112

130130

130 130

173 173

113112

GENERAL NOTES

• THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS INDICATED

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

KEYED NOTES

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

5. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-711

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

R E

F L E

C T

E D

C E

IL

IN

G P

L A

N

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE: 1/8" = 1'-0"

A1

FIRST FLOOR REFLECTED CEILING PLAN

0 4' 8' 16'

105 PRE-FINISHED METAL SOFFIT PANEL.

112 PRE-FINISHED METAL DOWNSPOUT.

113 PRE-FINISHED METAL GUTTER.

118 PRE-FINISHED METAL SOFFIT TRIM.

130 STRUCTURAL STEEL COLUMN.

173 PRE-FABRICATED, PRE-FINISHED GUARD/ID CHECK BOOTH. UL 752 LEVEL 3

BALLISTIC RATED. REFER TO SHEET A-403.

PLAN NORTH

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SHEET A-001 FOR ARCHITECTURAL NOTES.

5. REFER TO SHEET A-002 FOR ABBREVIATIONS LEGEND.

6. REFER TO SHEET A-003 FOR ANNOTATION LEGEND.

7. REFER TO SHEET A-003 FOR GRAPHIC SCALES LEGEND.

8. REFER TO SHEET A-201 FOR EXTERIOR FINISH SCHEDULE.

9. REFER TO SHEET A-611 FOR DOOR AND WINDOW SCHEDULES.

10. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:0

P

M

A-901

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

IS

O

M E

T R

IC

V

IE

W

S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE:

A1

ISOMETRIC VIEW FROM SOUTHWEST

SCALE:

H1

ISOMETRIC VIEW FROM NORTHWEST

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

ON DIMENSIONED PLANS, SHOP DRAWINGS, OR ESTABLISHED FIELD

DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF DETERMINING A

LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO PRECEEDING.

SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = 0000.00 USFS ACTUAL ELEVATION.

2. SLAB ON GRADE TOP OF CONCRETE ELEVATION - 100'-0" TYPICAL, UNLESS

OTHERWISE NOTED.

3. THE NORTH ARROW INDICATED ON THIS SHEET REPRESENTS PLAN NORTH.

REFER TO CIVIL FOR TRUE NORTH.

4. REFER TO SHEET A-001 FOR ARCHITECTURAL NOTES.

5. REFER TO SHEET A-002 FOR ABBREVIATIONS LEGEND.

6. REFER TO SHEET A-003 FOR ANNOTATION LEGEND.

7. REFER TO SHEET A-003 FOR GRAPHIC SCALES LEGEND.

8. REFER TO SHEET A-201 FOR EXTERIOR FINISH SCHEDULE.

9. REFER TO SHEET A-611 FOR DOOR AND WINDOW SCHEDULES.

10. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

11. REFER TO OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

S A

C R

A M

E N

T O

D

IS

T R

IC

T

J

S T

R

O O

M

S A

C R

A M

E N

T O

C

A

N S

A -U

T A

H B

L U

F F

D A

L E

U

T N

S A

U C

O N

S O

L

ID

A T

IO

N

M

IS

S

IO

N

F A

C

IL

IT

Y

P N

U M

B E

R

W P

L D a H a s k e ll C o m p a n y

CUI

CUI

A F

O X

D R

A W

IN

G

F

IL

E N

O

S P

E C

N O

-0

C

R e v it L o c a l\ A

R C

H G

A T

E E

N T

R Y

R n ic h o la s .w h it e C

X

W

.r v t

/1

/2

:3

:1

P

M

A-902

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

IS

O

M E

T R

IC

V

IE

W

S

M N

O B

E R

T

T A

U F

R A

N C

G P

A R

K E

R

/2

/2

C O

R R

E C

T E

D F

IN

A

L R

F P

V O

L U

M E

V E

H

IC

L E

C O

N T

R O

L P

O

IN

T

SCALE:

A1

ISOMETRIC VIEW FROM NORTHEAST

SCALE:

H1

ISOMETRIC VIEW FROM SOUTHEAST

A

D E

S

IG

N S

U B

M

IT

T A

L

/0

/2

B F

IN

A

L R

F P

/0 /2

C C

O R

R E

C T

E D

F

IN

A L

R F

P

/2

/2

GENERAL
G-009 - COVER SHEET - VEHICLE CONTROL POINT
G-010 - SHEET INDEX - VEHICLE CONTROL POINT
ARCHITECTURAL
A-112 - VEHICLE CONTROL INSPECTION CANOPY - FIRST FLOOR PLAN
A-122 - VEHICLE CONTROL INSPECTION CANOPY - ROOF PLAN
A-203 - VEHICLE CONTROL INSPECTION CANOPY - EXTERIOR ELEVATIONS
A-204 - VEHICLE CONTROL INSPECTION CANOPY - EXTERIOR ELEVATIONS
A-303 - VEHICLE CONTROL INSPECTION CANOPY - BUILDING SECTIONS
A-712 - VEHICLE CONTROL INSPECTION CANOPY - REFLECTED CEILING PLAN
A-903 - VEHICLE CONTROL INSPECTION CANOPY - ISOMETRIC VIEWS
A-904 - VEHICLE CONTROL INSPECTION CANOPY - ISOMETRIC VIEWS
ARCHITECTURAL
A-111 - VEHICLE CONTROL POINT - FIRST FLOOR PLAN
A-121 - VEHICLE CONTROL POINT - ROOF PLAN
A-201 - VEHICLE CONTROL POINT - EXTERIOR ELEVATIONS
A-202 - VEHICLE CONTROL POINT - EXTERIOR ELEVATIONS
A-301 - VEHICLE CONTROL POINT - BUILDING SECTIONS
A-302 - VEHICLE CONTROL POINT - BUILDING SECTIONS
A-711 - VEHICLE CONTROL POINT - REFLECTED CEILING PLAN
A-901 - VEHICLE CONTROL POINT - ISOMETRIC VIEWS
A-902 - VEHICLE CONTROL POINT - ISOMETRIC VIEWS

File details come from the government source that posted it. Updated .