B08_SOW.pdf

PDF 162 KB Posted

Attached to
FIRE ALARM SYS REPLACEMENT SERVICE - SKAGWAY AK Federal contract opportunity
Solicitation number
140P9723Q0077
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This scope of work document outlines requirements for a contractor to replace the fire alarm system in two historic buildings located in Skagway, Alaska. The National Park Service seeks to replace outdated fire alarm panels and devices with a new Honeywell addressable system at the Pantheon Saloon and Red Front Buildings. The contractor will remove existing equipment, install new devices supplied by the government, program and test the new system, and provide inventory documentation upon completion. Key responsibilities include tracing wiring, addressing new devices consistently with other systems, installing additional notification appliances as needed, and completing all work in compliance with NFPA codes and manufacturer specifications. The period of performance is from award date through October 31, 2023 at the buildings located in Skagway. The solicitation number for this opportunity is 140P9723Q0077.

View the file

Other files for this federal contract opportunity

Other files attached to FIRE ALARM SYS REPLACEMENT SERVICE - SKAGWAY AK, newest first.
File Type Posted
Sol_140P9723Q0077_Amd_0001.pdf PDF
Bldg_Device_Inventories.zip ZIP file
SK-Photo_DataSheet_350118.pdf PDF
SilentKnight_6808_hbt-fire-351608-C.pdf PDF
SilentKnight_SwiftGateway_WSK-WGI_DataSheet.pdf PDF
B08_RFQ_Content.pdf PDF
Swift_AVbase_DataSheet.pdf PDF
B03_DL_WD_2015-5685_Rev_19.pdf PDF
SystemSensor_Heat_200Series_DataSheet_A05-0362.pdf PDF
KLGO_Pantheon_Saloon___Red_Front_FireAlarm_plans.pdf PDF
System-Smoke-Detectors-AppGuide-SPAG91.pdf PDF
SilentKnight_PullStations_DataSheet.pdf PDF
Sol_140P9723Q0077.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Klondike Gold Rush NHP

NATIONAL PARK SERVICE

Replace Fire Alarm System in the Pantheon Saloon and Red Front Buildings.

Skagway, Alaska 99840 6.13.2023

Background

The historic Pantheon Saloon and Red Front Buildings., constructed in 1897 and 1898 respectively. The Pantheon was rehabilitated, and the Red Front was reconstructed by the National Park Service between 1998 and 2000. The fire alarm system currently collectively monitoring these two buildings was installed during the original rehabilitation of the buildings, is outdated and due for replacement.

Objectives

The contractor is to replace the existing fire alarm panel and devises with an addressable Honeywell Silent Knight IntelliKnight fire alarm system provided by the government. During installation, the new system will be brought into compliance with current NFPA code for notification devises. The Contractor shall furnish the necessary personnel, tools, material, computer software, and services to install the new system as specified in the description of tasks below.

During the performance of the work, the contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of work.

All work is to be completed in accordance with this scope of work, manufactures specifications, and other contract documents, as well as all applicable codes and industry standards. Contractor shall comply with any and all applicable federal, state, and borough, laws, codes, regulations, and industry standards pertaining to the performance of the service that is to be rendered.

The Contractor shall take proper safety and health precautions to protect workers, the public, and property. The Contractor shall provide the Government all requested reports, and supporting material developed during the performance of the work. The Contractor shall ensure protection of historic structures during work. Any damage (of building finishes, tenant property, furnishings, etc.) done to the building will result in financial restoration to the government to complete the repairs.

The National Park Service (NPS) will furnish the fire alarm panel and necessary devises.

The NPS will also assist with the removal of the panel by removing any drywall and trim to gain access to disconnect the existing panel and reconnect current alarm circuits to the newly installed panel as needed. The NPS will also be responsible for replacing any removed drywall related to the panel replacement, as well as repainting or any other repairs necessary in this location that was the result of the demolition work performed by NPS employees. NPS will also dispose of removed devises and fire alarm panel.

Description of Tasks:

1. Fire Alarm System Design Review

a) Review current system drawings and propose locations for additional notification devises to ensure completed system will meet current NFPA code.

2. Fire Alarm System Replacement.

a. Remove all existing detectors and notification devises

i. Existing wires shall be used to the greatest extent possible during devise replacement. No new conduit or hard wired circuits will be installed in the building.

b. Trace out existing zone wire back to the panel to identify circuit routing for new devices.

c. Remove existing panel and current dialer and replace with new, government supplied equipment. The existing stand-alone Silent Knight dialer will not be replaced. Instead, communications to call out alarms will be programmed directly from the new panel.

d. Replace existing devises with new government supplied, addressable devises.

i. Devices are to be addressed in a way that is consistent with structure used in other recently replaced fire alarm panels in the park as provided by the government

e. In instances where deficiency with current NFPA code for notification devises, install new wireless notification devises, supplied by the government.

i. Location of any new devises must be coordinated with the government and approved on annotated drawings or photos.

3. Programming and System Testing

a. Program software matching established devise nomenclature and upload to panel.

i. Verify all devises have been detected by the panel and addressed properly.

b. Complete final testing and certification of installed system.

4. Fire Alarm System Inventory

a. Upon completion, contractor shall inventory the newly installed fire alarm systems on government provided inventory forms and provide photographs of the completed installation.

i. Instructions for data collection are in the attachments.

In addition to the above tasks, the following shall apply to all work performed as part of this contract.

1. All work to be done in conformance with applicable National, State and Local codes, and at a minimum must meet industry standards.

2. Demonstrate performance of the newly installed equipment and document testing of new system’s operation.

3. All installation work shall be provided with a minimum 12-month warranty against defects of materials or labor.

4. Two complete copies of the manufacturer’s installation and data, and Operations and Maintenance manuals for the installed fire alarm panel, software, programming and devises shall be provided to the COR within 10 days of completion of installation.

5. All materials provided by the contractor shall meet buy American standards.

Government Furnished Materials and Labor

Government will provide the following equipment:

• Silent Knight 6820 Addressable Panel

• Silent Knight Swift Gateway WSK-WGI

• Silent Knight Horn Strobes for Wall and Ceiling

• Silent Knight Outdoor Selectable Horn Strobe for wall application.

• Silent Knight Addressable SK-Phot and SK-Heat detection devises

• System Sensor Swift AV Base for new wireless horn, strobe notification devises.

• Silent Knight Addressable Pull Stations

Government will remove existing dry wall and trim around the fire alarm control panel and fire alarm dialer in coordination with the contractor.

Government will repair and repaint any sheet rock or other necessary demolition in order to successfully remove the existing panel and silent knight dialer.

Government will be responsible for the disposal of demolished drywall removed fire alarm system components.

Hazard Control

Observe and enforce standards of fire prevention. A capable and qualified person shall be identified and placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment.

Re-performance of Service

When service performed does not conform to contract requirements, or when service was not performed in a specific area, the contractor shall perform or re-perform the service in conformity with contract requirements at no additional cost to the government.

Non-Payment for Additional Work

Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

Housekeeping

Keep project neat, orderly, and in a safe condition at all times. Work areas shall be cleaned at the end of each day. Contractor will conform with federal smoking laws and regulations within and around federal buildings.

Close-out Project

Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish non historic surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up and remove all debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use. Report any damage to historic surfaces to the COR.

Submit written certification that project, or designated portion of project, is substantially complete, and request, in writing, a final inspection. Upon receipt of written request that project is substantially complete, the COR will proceed with inspection within 2 business days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.

When work is determined to be substantially complete, the COR will prepare a list of deficiencies ("Punch List") to be corrected before final acceptance. Contractor shall complete the work described on the list of deficiencies within a reasonable amount of time. If work is not determined to be substantially complete, the COR will notify the Contractor in writing. After completing work, the Contractor shall resubmit certification and request a new final inspection.

If, following final inspection, the work is determined to be substantially complete, COR will issue a Letter of Substantial Completion. Substantial completion and Final Acceptance are reached when all installation specifications from the equipment manufacturer(s) are completed, as well as, all other requirements of this contract for site clean-up, and any remediation that may need to take place due to environmental contamination.

Required Travel and Other Direct Costs

Employee Travel Costs and Lodging: The principal place of performance is Skagway, Alaska. Accordingly, reimbursable travel and per diem for the contractor’s employees performing work on a regular basis at this place of performance is not authorized and must be included in the bid proposal. Any changes to the cost of travel that affects the final, accepted cost of the contract must be approved in advance by the contracting officer.

Shipment of Equipment and Delivery of Supplies/Materials: The principal place of performance is Skagway, Alaska. Accordingly, reimbursable shipping costs for equipment, supplies or materials to complete the work as specified in this document is not authorized. Any changes to this must be approved in advance by the contracting officer.

Period of Performance

The anticipated period of performance for the resultant contract is from date of award, through October 31st, 2023.

Location

The buildings are located on the Southwest corner of Broadway Street and 4th Avenue.

A map identifying the buildings is attached.

POINT OF CONTACT:

Contracting Officer’s Representative (COR) for Technical Support will be provided at time of award.

Contracting Office for Contractual Support:

Ron Bunch Contracting Officer MABO (Acquisitions) National Park Service | Interior Region 11, Alaska 240 West 5th Avenue | Anchorage, AK 99501 ronald_bunch@nps.gov Cell 907-201-7719

Contracting Officer’s Authority:

The Contracting Officer is the only person with the authority to act as agent of the Government under this contract. Only the Contracting Officer has authority to:

(1) direct or negotiate any changes in the Statement of Work or specifications;

(2) modify or extend the period of performance;

(3) change the delivery schedule; or

(4) otherwise change any terms and conditions of this contract.

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and not withstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

File details come from the government source that posted it. Updated .