B08 - SolicitationAttachment1Specifications.pdf
PDF 1 MB Posted
- Attached to
- Roof replacement and skylight replacement at the P Federal contract opportunity
- Solicitation number
- 140P6220B0004
About this file
This solicitation is for a roof replacement and skylight replacement project at the Physical Medicine Center in Hot Springs National Park. The scope of work includes removing approximately 13,510 square feet of clay roof tiles and salvaging them for reinstallation, removing 1,500 square feet of existing asphalt shingles on the carport and replacing them, replacing all flashing and underlayment, evaluating and replacing structural decking as specified, and replacing an existing ridge skylight and flashing to match the historic profile with laminated safety glass. Ancillary repairs to components like flashing will also be included. The gutters and downspouts are to remain in place. The solicitation is issued by the National Park Service Midwest Region department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09 - Amendment2Atch1QuestionsAnswers_0002.pdf | ||
| Sol_140P6220B0004_Amd_0002.pdf | ||
| B09 - Amendment2Atch2TilePictures_0002.pdf | ||
| B09Amendment1Attachment_0001.pdf | ||
| Sol_140P6220B0004_Amd_0001.pdf | ||
| B08 - SolicitationAttachment5SF24BidBond.pdf | ||
| Sol_140P6220B0004.pdf | ||
| B08 - SolicitationAttachment6NoticetoContractorsCPARS.pdf | ||
| B08 - SolicitationAttachment2Drawings.pdf | ||
| B08 - SolicitationAttachment3WageDetermination.pdf | ||
| B08 - SolicitationAttachment4_OF17.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOT SPRINGS NATIONAL PARK
HOT SPRINGS, ARKANSAS
PHYSICAL MEDICINE CENTER ROOF
AND SKYLIGHT REPLACEMENT
PMIS 233843
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
MARCH 26, 2020
140P6220B0004 Attachment 1 Page 1 of 53
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 02 – EXISTING CONDITIONS
Section 02 41 19 – Selective Demolition
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
Section 06 10 00 – Rough Carpentry Section 06 16 00 - Sheathing
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
Section 07 31 13 – Asphalt Shingles Section 07 32 13 – Clay Roof Tiles
DIVISION 08 – OPENINGS
Section 08 63 00 – Metal Framed Skylights Section 08 80 00 – Glazing
DRAWINGS
(Drawings included as separate document)
Sheet # Sub-Sheet Sheet Name
1 G0.0 COVER PAGE
2 G0.1 GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
3 A1 DEMO ROOF PLAN
4 A2 ROOF PLAN
5 A3 BUILDING ELEVATIONS
6 A4 SKYLIGHT AND CLAY TILE DETAILS
140P6220B0004 Attachment 1 Page 2 of 53
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The Libbey Memorial Physical Medicine Center (PMC) is located at Hot Springs National Park. The PMC was constructed in 1922 by the National Park Service as the Government Free Bathhouse and Clinic, replacing an earlier structure serving the same purpose on Bathhouse Row. The Mediterranean Revival style building carried out this function until 1956, when declining use resulted in the closing of the free bathhouse and clinic and the building’s remodeling as a Physical Medicine Center, the only facility of its kind in the nation to be operated under government supervision. The concession-run PMC operated as a physical medicine center and health spa until 2005 when the concession contract was allowed to expire. The building has been vacant since that time. The scope of the project is to address the roof deficiencies and replace all roofing components necessary to continue future rehabilitation of the facility.
1.2 Work Covered by the Contract Documents:
A. Project Location: Hot Springs National Park, Physical Medicine Center, 501 Spring Street, Hot Springs, Arkansas 71901.
B. Summary: The project scope is a roof replacement and skylight replacement at the Physical Medicine Center at Hot Springs National Park. There is 13,510 square feet of clay tile that will be removed and salvaged for reinstallation, and the carport has approximately 1,500 square feet of existing 3-tab asphalt shingles the will be removed and replaced. All flashing and underlayment will be removed and replaced, while the structural decking will be evaluated and replaced as specified. The existing ridge skylight and flashing will be replaced to match the historic profile and laminated safety glass. Coordination of repairs to ancillary roof components will also be included in the scope, such as flashing. The gutters and downspouts will remain in place.
C. Work consists of:
1. Full tear-off and salvage of roof tile system to roof deck as indicated on Drawings.
2. Full tear off and replacement of existing asphalt shingle roofing at carport roof, as indicated on drawings.
3. Re-cover preparation of entire roof area where tear-off occurs, including installation of new roofing system.
4. Removal of flashings and counterflashings.
5. Removal and replacement of plumbing vents and boots in kind.
6. Temporary roofing during construction where required. Temporary roofing shall maintain the project roof as watertight and able to prevent leaks and damage to the building and structure until the reroofing work is completed. Contractor is to make sure that at the completion of work each day and with any impending weather the project’s roof is 100% watertight.
140P6220B0004 Attachment 1 Page 3 of 53
7. Salvage existing clay tile roof system. Remove associated roof flashings, down to deck, and patch or replace any openings or damage in the structural decking as required before re-installing salvaged, new replacement tiles, roof membrane, and associated metal roof flashings and trim.
8. Remove and replace the existing asphalt shingle roof system and associated roof flashings, down to deck and patch any openings in the structural decking as required before installing the new roof system, associated metal roof flashings and trims.
9. National Park Service (NPS) requires the existing roof decks to be walked after demolition has been completed with their onsite Contracting Office Representative (COR) or designated Project Inspector prior to installation of any new roof materials to ascertain if any water penetration has caused deterioration or corrosion of the existing decks which are to remain. If there are areas of concern the COR may require the Contractor to perform pull out tests to determine if the existing decking in question can remain or if it will need to be replaced. This can include visible areas of water damage or insect related damage. Testing and replacement of these types of unforeseen damaged areas will be by Change Order if required
D. All work will be performed under a single contract.
E. Roof Area:
1. Refer to proposed roof plan with general dimensions ±.
2. Note the Contractor is encouraged to field verify roof dimensions prior to bidding.
ITEM 2 - EXISTING UTILITIES
2.1 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
2.2 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
2.2.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
140P6220B0004 Attachment 1 Page 4 of 53
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Pubic Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7:30 a.m. to 4:00 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to 25 feet around the perimeter of the building. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
C. Security and Protection facilities installation:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR.
4. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion.
Perform control operations lawfully, using environmentally safe materials.
5. Site Enclosure Fence: Before construction operations begin, furnish and install portable chain link fencing in a manner that will prevent people and animals from easily entering site and or storage areas except by entrance gates.
140P6220B0004 Attachment 1 Page 5 of 53
a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage
b. Locate vehicular gates to avoid interference with traffic on public thoroughfares.
c. Locate pedestrian entrance gates as required to provide controlled personnel entry.
d. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide Contracting Officer with one set of keys.
6. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.
7. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
8. Port-A-Johns: Contractor to provide port-a-johns on site within fence enclosure of project site.
3.4 Storage - Staging Areas:
A. See site plan in drawings.
B. Confine Storage of materials and equipment to the project area. Limits of use and control shall be subject to Contracting Officer’s approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3.5 Hauling Restrictions: Match State and County road requirements for all park work/access.
3.6 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.
B. Dispose of waste materials legally using park dumpsters on site.
3.7 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.
b. Maintain existing building in a weather tight condition throughout construction
140P6220B0004 Attachment 1 Page 6 of 53 period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
3.8 Photo Documentation: All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days or as approved by COR.
A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic.
Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Images:
1. Document all sheathing/underlayment prior to install of roof tiles with enough overall field of view to show location and then details.
2. Document replacement of skylight, including wrapping of underlayment, support framing, and flashing with enough overall field of view to show location and then details.
3. Document all repairs to ancillary roof components, such as vent boots, cupula stucco repair, copper flashing, gutter and downspouts with enough overall field view to show location and then details.
4. Maintain organized index for photos with date, description, etc.
5. Additional images as needed when questions or emergency situations occur. Submit within
24 hours.
3.8 Fire and Life Safety:
As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.
C. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).
D. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
i. Immediately report all spills of hazardous materials to the park.
ii. Maintain a spill emergency response kit.
iii. Train employees how to respond to a spill and use the emergency response kit.
140P6220B0004 Attachment 1 Page 7 of 53
3.9 Noise and Acoustics Management:
A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer.
B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.
1. Do not exceed the following dB(A) limitations at 50 feet:
Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour
2. Maximum permissible construction equipment noise levels at 50 feet:
EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75
C. Ambient Noise:
1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:
a. Residential receiving area :
Daytime: 65 dB Nighttime: 45 dB
b. Commercial/Industrial receiving area:
Daytime: 67 dB Nighttime: 65 dB
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit. Please see FAR 52.236-27 - Site Visit (Construction).
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the following link under NPS Reference Standards: https://www.nps.gov/orgs/1671/do-business-with-us.htmf
140P6220B0004 Attachment 1 Page 8 of 53 https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.
7.2 Submittals:
A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:
1. Name of responsible supervisor to carry out the program
2. First aid procedures
3. Training, both initial and continuing
4. Planning for possible emergency situations
5. Contractor to identify nearest location of medical facility for emergencies
6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
140P6220B0004 Attachment 1 Page 9 of 53
7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26
ITEM 9 - SUBMITTALS
9.1 General Submittal Procedures:
A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit to COR.
B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
C. Preconstruction Conference Submittal: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor
140P6220B0004 Attachment 1 Page 10 of 53 standard clauses (SF1413).
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit.
b. The Agency(ies) with Jurisdiction issuing the permit.
c. Information required from the Government to complete the permit application.
9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.
A. Shop Drawings: Refer to each specification section for shop drawing submittals and requirements.
B. Product Data: Refer to each specification section for product data submittals.
C. Samples: Refer to each specification section for sample requirements.
D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval.
E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
140P6220B0004 Attachment 1 Page 11 of 53
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the Progress Schedule for format and content. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.
A sample Schedule of Values will be provided by the Contracting Officer.
ITEM 10 – NOT USED
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.
11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be substantially complete, following the final inspection, the.
Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.
B. If the work is not determined to be substantially complete following the final inspection, the
Contracting Officer will notify Contractor in writing. Contractor shall request a new final
140P6220B0004 Attachment 1 Page 12 of 53 inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days, documented weather permitting.
D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.
F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
G. Disposition of any permits and warranties required by the specifications in this section.
11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of Substantial Completion.
B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.
C. Information shall include operation and maintenance manuals for each warranted material.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
140P6220B0004 Attachment 1 Page 13 of 53
SECTION 024119
SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.2 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
1. To be disposed of in an offsite landfill
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to NPS that may be uncovered during demolition remain the property of NPS.
1. Carefully salvage in a manner to prevent damage and promptly return to NPS.
1.3 PREINSTALLATION MEETINGS
A. Pre-demolition Conference: Conduct conference at Physical Medicine Center (PMC) Project Site.
1.4 INFORMATIONAL SUBMITTALS
A. Engineering Survey: Submit engineering survey of condition of building
B. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
C. Schedule of selective demolition activities with starting and ending dates for each activity.
D. Pre-demolition photographs or video.
1.5 CLOSEOUT SUBMITTALS
A. Inventory of items that have been removed and salvaged.
1.6 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
140P6220B0004 Attachment 1 Page 14 of 53
1.7 FIELD CONDITIONS
A. Conditions existing at time of inspection for bidding purpose will be maintained by NPS as far as practical.
B. Notify COR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. If suspected hazardous materials are encountered, do not disturb, immediately notify the COR. Hazardous materials will be removed by NPS under a separate contract.
D. Storage or sale of removed items or materials on site is not permitted.
E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire protection facilities in service during selective demolition operations.
F. Arrange selective demolition schedule so as not to interfere with NPS operations.
1.8 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Engage a professional engineer to perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.
B. Inventory and record the condition of items to be removed and salvaged.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing: Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
140P6220B0004 Attachment 1 Page 15 of 53
3.3 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to the building and facilities to remain.
B. Temporary Protection: Provide temporary barricades and other protection to prevent damage to Thermal Water Fountain at North entrance plaza of building site.
C. Remove temporary barricades and protections where hazards no longer exist.
3.4 SELECTIVE DEMOLITION
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.
Temporarily cover openings to remain.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Maintain fire watch during and for at least 4 hours after flame-cutting operations.
5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
6. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
5. On-site storage location indicated on site-plan in drawings.
D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by COR, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demotion operations are complete.
3.5 CLEANING
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction off-site.
140P6220B0004 Attachment 1 Page 16 of 53
B. Do not allow demolished materials to accumulate on site.
1. Remove and transport debris in a matter that will prevent spillage on adjacent surfaces and areas.
2. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
C. Burning: Do not burn demolished materials.
D. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
140P6220B0004 Attachment 1 Page 17 of 53
SECTION 061000
ROUGH CARPENTRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Rooftop equipment bases and support curbs.
2. Wood blocking, battens, and nailers.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product.
1.3 INFORMATIONAL SUBMITTALS
A. Material Certificates: For dimension lumber specified to comply with minimum allowable unit stresses. Indicate species and grade selected for each use and design values approved by the ALSC Board of Review.
B. Evaluation Reports: For the following from ICC-ES:
1. Wood-preservative-treated wood.
2. Power-driven fasteners.
3. Post-installed anchors.
4. Metal framing anchors.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with the applicable rules of any rules writing agency certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. Dress lumber, S4S, unless otherwise indicated.
B. Maximum Moisture Content of Lumber: 19 percent unless otherwise indicated.
2.2 WOOD-PRESERVATIVE-TREATED LUMBER
A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with ground, Use Category UC3b for exterior construction not in contact with ground.
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no arsenic or chromium.
140P6220B0004 Attachment 1 Page 18 of 53
B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or that does not comply with requirements for untreated material.
C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.
D. Application: Treat all rough carpentry unless otherwise indicated.
1. Wood cants, roof battens, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.
2.3 FASTENERS
A. General: Fasteners shall be of size and type indicated and shall comply with requirements specified in this article for material and manufacture.
1. Where rough carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners of Type 304 stainless steel.
B. Power-Driven Fasteners: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES AC70.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Framing Standard: Comply with AF&PA’s WCD 1, “Details for Conventional Wood Frame Construction,” unless otherwise indicated.
B. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted.
Fit rough carpentry accurately to other construction. Locate nailers, battens, blocking, and similar supports to comply with requirements for attaching other construction.
C. Do not splice structural members between supports unless otherwise indicated.
D. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated lumber.
E. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:
1. Table 2304.9.1, “Fastening Schedule,” in ICC’s 2018 International Building Code (IBC).
2. ICC-ES evaluation report for fastener.
3.2 PROTECTION
A. Protect wood that has been treated with inorganic boron (SBX) from weather. If, despite protection, inorganic boron-treated wood becomes wet, apply EPA-registered borate treatment.
Apply borate solution by spraying to comply with EPA-registered label.
B. Protect rough carpentry from weather. If, despite protection, rough carpentry becomes wet, apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-registered label.
140P6220B0004 Attachment 1 Page 19 of 53
SECTION 06 16 00
SHEATHING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Roof sheathing.
2. Sheathing joint and penetration treatment.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product.
1.3 INFORMATIONAL SUBMITTALS
A. Evaluation Reports: For the following, from ICC-ES:
1. Wood-preservative-treated plywood.
2. Fire-retardant-treated plywood.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Resistance Ratings: As tested according to ASTM E119; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
1. Fire-Resistance Ratings: Indicated by design designations from UL’s “Fire Resistance
Directory” or from the listings of another qualified testing agency.
2.2 PRESERVATIVE-TREATED PLYWOOD
A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC2 for interior construction not in contact with ground, Use Category UC3b for exterior construction not in contact with ground.
B. Mark plywood with appropriate classification marking of an inspection agency acceptable to authorities having jurisdiction.
C. Application: Treat all plywood unless otherwise indicated.
140P6220B0004 Attachment 1 Page 20 of 53
2.3 ROOF SHEATHING
A. Plywood Sheathing: Either DOC PS 1 or DOC PS 2, Exterior, Structural I sheathing. Match sheathing dimensions and depth for like-kind replacement and repairs of existing roof sheathing where needed.
2.4 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.
1. For roof sheathing, provide fasteners of Type 304 stainless steel.
PART 3 - Execution
3.1 INSTALLATION, GENERAL
A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to use with minimum number of joint or optimum joint arrangement. Arrange joints so that pieces do not span between fewer than three support members.
B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting construction unless otherwise indicated.
C. Securely attach to substrate by fastening as indicated, complying with the following:
1. Table 2304.9.1, “Fastening Schedule,” in the ICC’s 2018 International Building Code
(IBC).
2. ICC-ES evaluation report for fastener.
D. Coordinate roof sheathing installation with existing sheathing, flashing, and joint-sealant installation so these materials are installed in sequence and manner that prevent exterior moisture from passing through completely assembly.
E. Do not bridge building expansion joints; cut and space edges of panels to match spacing of structural support elements.
3.2 WOOD STRUCTURAL PANEL INSTALLATION
A. General: Comply with applicable recommendations in APA Form No. E30, “Engineered Wood Construction Guide,” for types of structural-use panels and applications indicated.
B. Fastening Methods: Fasten panels as indicated below:
1. Roof Sheathing:
a. Nail to wood framing. Apply a continuous bead of glue to framing members at edges of wall sheathing panels.
b. Screw to cold-formed metal framing.
c. Space panels 1/8 inch apart at edges and ends.
140P6220B0004 Attachment 1 Page 21 of 53
SECTION 073113
ASPHALT SHINGLES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Selective Demolition.
2. Glass-fiber-reinforced asphalt shingles.
3. Underlayment materials.
4. Vents.
5. Sheet metal flashing and trim.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For the following:
1. Asphalt shingles.
2. Underlayment materials.
3. Ridge vents.
4. Asphalt roofing cement.
5. Elastomeric flashing sealant.
6. Sheet metal flashing and trim.
B. Shop Drawings: For sheet metal flashing and trim.
C. Samples: For each exposed product and for each color and blend specified.
1.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Research reports for synthetic underlayment.
C. Sample warranty.
1. Material warranty.
2. Roofing installer warranty.
1.5 SUBMITTAL COORDINATION
A. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of the submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
140P6220B0004 Attachment 1 Page 22 of 53
1.6 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: An authorized installer who is trained and approved by manufacturer.
1.8 WARRANTY
A. Materials Warranty: Manufacturer agrees to repair or replace asphalt shingles that fail within specified warranty period.
1. Materials Warranty Period: 30 years from date of Substantial Completion, prorated, with first 10 years non-prorated.
2. Wind-Speed Warranty Period: Asphalt shingles will resist blow-off or damage caused by wind speeds of up to 130 mph (58.1 m/s) for 15 years from date of Substantial Completion.
3. Algae-Resistance Warranty Period: Asphalt shingles will not discolor for 20 years from date of Substantial Completion.
B. Roofing Installer’s Warranty: Roofing installer to provide and sign a Roofing Installer’s Warranty in which Installer agrees to repair or replace components of asphalt-shingle roofing that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Five (5) years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Exterior Fire-Test Exposure: Provide asphalt shingles and related roofing materials identical to those of assemblies tested for Class A fire resistance in accordance with American Society of Testing Materials (ASTM) E108 or UL 790 by Underwriters Laboratories or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing agency.
B. Wind Resistance: Provide asphalt shingles that comply with requirements of ASTM D7158/D7158M, Class H.
C. Shingles:
1. Mineral granular-surfaced asphalt shingles.
a. Self-sealing.
b. Square tab.
c. Fungus-resistant.
d. Impact resistant shingles, Class 4.
e. Type I, weighing not less than 290 pounds per 100 square feet.
2.2 GLASS-FIBER-REINFORCED ASPHALT SHINGLES
A. Laminated-Strip Asphalt Shingles: ASTM D3462/D3462M, laminated, multi-ply overlay construction; glass-fiber reinforced, mineral-granule surfaced, and self-sealing.
140P6220B0004 Attachment 1 Page 23 of 53
1. Basis of Design: Atlas Pinnacle Pristine High Performance Shingles.
2. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Atlas Molded Products; a Division of Atlas Roofing Corporation.
b. CertainTeed Corporation.
c. GAF.
d. Owens Corning.
e. Tamko Building Products, Inc.
f. Other Approved Equals.
3. Strip Size: Manufacturer's standard approximately 42 inch.
4. Algae Resistance: Granules resist algae discoloration.
5. Impact Resistance: Underwriters Laboratory (UL) 2218, Class 4.
6. Fire Resistance: UL 790 for Class A.
7. Color and Blends: As selected by COR from manufacturer's full range.
B. Hip and Ridge Shingles: Manufacturer's standard units to match asphalt shingles.
2.3 UNDERLAYMENT MATERIALS
A. Synthetic Underlayment: UV-resistant polypropylene, polyolefin, or polyethylene polymer fabric with surface coatings or treatments to improve traction underfoot and abrasion resistance;
evaluated and documented to be suitable for use as a roof underlayment under applicable codes by a testing and inspecting agency acceptable to authorities having jurisdiction.
B. Basis of design: RhinoRoof U20, as manufactured by InterWrap, Inc.
C. Product requirements include the following minimum characteristics listed below:
1. Permeability ASTM E96 - .05 perms.
2. Water Transmission ASTM D4869 – pass.
3. Tear Strength ASTM D4533 – MD 30 lbs (14 kg).
4. Tensile Strength ASTM D751 – MD 80 lbs (36 kg).
5. Bursts Strength ASTM D751 – 150 psi (1033 kPa)
6. Nominal Thickness ASTM D1777 – 6 mils (0.15 mm).
7. Width Per Roll – 36 inches.
D. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Atlas Roofing Corporation.
2. CertainTeed Saint-Gobain.
3. GAF.
4. Owens Corning.
5. Tamko Building Products, Inc.
6. Other Approved Equals.
F. Valleys, Eaves, Rake, and Roof/Wall Intersections: Install Self-Adhering, Polymer-Modified Bitumen Sheet: ASTM D1970/D1970M, minimum 55-mil- (1.4-mm-) thick sheet; glass-fiber-mat-reinforced, polymer-modified asphalt; with slip-resistant top surface and release backing; cold applied. Material to be supplied in 36 inch wide rolls. Provide primer for adjoining concrete, masonry, and metal surfaces to receive underlayment as recommended by the manufacturer.
Approved product includes but is not limited to the following:
140P6220B0004 Attachment 1 Page 24 of 53 http://www.specagent.com/Lookup?ulid=4726 http://www.specagent.com/Lookup?uid=123457152155 http://www.specagent.com/Lookup?uid=123457152156 http://www.specagent.com/Lookup?uid=123457152154 http://www.specagent.com/Lookup?uid=123457152159 http://www.specagent.com/Lookup?uid=123457152161 http://www.specagent.com/Lookup?ulid=9296 http://www.specagent.com/Lookup?uid=123457152955 http://www.specagent.com/Lookup?uid=123457152918 http://www.specagent.com/Lookup?uid=123457152205 http://www.specagent.com/Lookup?uid=123457152207 http://www.specagent.com/Lookup?uid=123457152209
1. Grace Ice & Water Shield; Grace Construction Products.
2. WinterGuard Waterproofing underlayment; CertainTeed.
3. RhinoRoof Granulated Self-Adhered underlayment.
4. Other Approved Equals.
2.4 VENTS
A. Rigid Ridge Vent: Manufacturer's standard, rigid-section, high-density, UV-stabilized plastic ridge vent for use under ridge shingles. Provide vents to match the size and net free area of the existing vents being replaced.
1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to the following:
a. VenturiVent Plus, as manufactured by Air Vent Inc.
b. Certainteed Ridge Vent - 12".
c. Owens Corning VentSure.
d. Other Approved Manufacturers.
2. Minimum Net Free Area: 18 sq. in. per ft.
2.5 ACCESSORIES
A. Asphalt Roofing Cement: ASTM D4586/D4586M Type II, asbestos free.
B. Roofing Nails: ASTM…
This is the start of the file's text. The full file is on GovTribe.