Sol_140P6220B0004_Amd_0002.pdf

PDF 94 KB Posted

Attached to
Roof replacement and skylight replacement at the P Federal contract opportunity
Solicitation number
140P6220B0004
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document contains an amendment to a solicitation for roof replacement and skylight replacement services at the Physical Medicine Center in Hot Springs National Park. The scope of work includes removing approximately 13,510 square feet of clay tile roof and 1,500 square feet of asphalt shingles, replacing all flashing and underlayment, evaluating and replacing structural decking as specified, and replacing an existing ridge skylight and flashing to match the historic profile with laminated safety glass. Coordination of repairs to ancillary roof components is also included. The gutters and downspouts will remain in place. The amendment adds questions and answers as attachments, changes the HUBZone set-aside clause to the alternate version, and does not modify the bid due date. The solicitation is issued by the National Park Service Midwest Region on behalf of the Department of the Interior for roof and skylight replacement services at the specified location.

View the file

Other files for this federal contract opportunity

Other files attached to Roof replacement and skylight replacement at the P, newest first.
File Type Posted
B09 - Amendment2Atch1QuestionsAnswers_0002.pdf PDF
B09 - Amendment2Atch2TilePictures_0002.pdf PDF
Sol_140P6220B0004_Amd_0001.pdf PDF
B09Amendment1Attachment_0001.pdf PDF
B08 - SolicitationAttachment4_OF17.pdf PDF
B08 - SolicitationAttachment5SF24BidBond.pdf PDF
Sol_140P6220B0004.pdf PDF
B08 - SolicitationAttachment6NoticetoContractorsCPARS.pdf PDF
B08 - SolicitationAttachment2Drawings.pdf PDF
B08 - SolicitationAttachment1Specifications.pdf PDF
B08 - SolicitationAttachment3WageDetermination.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P6220B0004 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PMM

St Louis MO 63123 7400 Grant Rd.

NPS, MWR - Missouri MABO

08/14/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/21/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: NPS

This amendment is issued to:

- Add Amendment 2, Attachment 1 - Questions and Answers

- Add Amendment 2, Attachment 2 - Tile Pictures

- Change the FAR Clause 52.219 -3 to use Alternate I.

The Bid Due Date and Time have not changed.

- Change FAR Clause 52.219-3, to use the Alternate I:

- Currently Basic Clause:

52.219-3 NOTICE OF HUBZONE SET-ASIDE OR SOLE SOURCE AWARD (MAR 2020)

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Neal Hause

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220B0004/0002

(a) Definitions. See 13 CFR 125.1 and

126.103 for definitions of terms used in the clause.

(b) Applicability. This clause applies only to-

(1) Contracts that have been set aside or awarded on a sole source basis to, HUBZone small business concerns;

(2) Part or parts of a multiple-award contract that have been set aside for HUBZone small business concerns;

(3) Orders set-aside for HUBZone small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F);

and

(4) Orders issued directly to HUBZone small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii).

(c) General.

(1) Offers are solicited only from HUBZone small business concerns. Offers received from concerns that are not HUBZone small business concerns will not be considered.

(2) Any award resulting from this solicitation will be made to a HUBZone small business concern.

(d) Limitations on subcontracting.The

Contractor shall spend¿

(1) For services (except construction), at least 50 percent of the cost of contract performance incurred for personnel on its own employees or employees of other HUBZone small business concerns;

(2) For supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, on the concern or other HUBZone small business concerns;

(3) For general construction¿

(i) At least 15 percent of the cost of contract performance incurred for personnel on its own employees;

(ii) At least 50 percent of the cost of the contract performance incurred for personnel on its own employees or on a combination of its own employees and employees of

HUBZone small business concern subcontractors; and

(iii) No more than 50 percent of the cost of contract performance incurred for

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220B0004/0002 personnel on concerns that are not HUBZone small business concerns; or

(4) For construction by special trade contractors¿

(i) At least 25 percent of the cost of contract performance incurred for personnel on its own employees;

(ii) At least 50 percent of the cost of the contract performance incurred for personnel on its own employees or on a combination of its own employees and employees of

HUBZone small business concern subcontractors;

(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns.

(e) A HUBZone small business contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraph (b)(1) or (2) of this clause -

[Contracting Officer check as appropriate.]

_ By the end of the base term of the contract and then by the end of each subsequent option period; or

_ By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraph (b)(3) or (4) of this clause, by the end of the performance period for the order.

(f) A HUBZone joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause shall be performed by the aggregate of the

HUBZone small business participants.

(g) Notice. The HUBZone small business offeror acknowledges that a prospective HUBZone awardee must be a HUBZone small business concern at the time of award of this contract. The

HUBZone offeror shall provide the Contracting

Officer a copy of the notice required by 13 CFR

126.501 if material changes occur before contract award that could affect its HUBZone eligibility.

If the apparently successful HUBZone offeror is not a HUBZone small business concern at the time of award of this contract, the Contracting

Officer will proceed to award to the next otherwise successful HUBZone small business concern or other offeror.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6220B0004/0002

(End of clause)

- Change to Alternate I as follow:

Alternate I (MAR 2020) . As prescribed in

19.1309(a)(2), substitute the following paragraphs (d)(3) and (d)(4) for paragraphs

(d)(3) and (d)(4) of the basic clause:

(3) For general construction, at least 15 percent of the cost of the contract performance to be incurred for personnel shall be spent on the concern's employees; or

(4) For specialty trade construction, at least 25 percent of the cost of the contract performance to be incurred for personnel shall be spent on the concern's employees.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

File details come from the government source that posted it. Updated .