B08_-_Solicitation_-__Specifications_-_Attachment_1.pdf
PDF 7 MB Posted
- Attached to
- SCDOT-Certified Limestone Rock Materials Federal contract opportunity
- Solicitation number
- 140FHR24Q0020
About this file
This document is a Solicitation for FDOT-certified Limestone Road Base. The Government is seeking 3,300 tons each of FDOT-certified #4 and #57 limestone for a road rehabilitation project at the Waccamaw National Wildlife Refuge. Pricing must be FOB Destination, with the contractor responsible for delivering the limestone to the specified location in Georgetown, SC between 8/15/24 and 11/15/24. The contractor will dump the limestone at the designated site across from 21424 N Fraser St, with deliveries of 15 truckloads per day. Local conditions like river flooding may affect delivery. A Technical Point of Contact will be provided. The Solicitation Number is 140FHR24Q0020 and the contracting agency is the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A06_-_Specifications_(Updated)_0003.pdf | ||
| B09_-_Solicitation_Amendment_-_RFQ_Vendor_Questions_and_Government_Responses_(0003)_0003.pdf | ||
| Sol_140FHR24Q0020_Amd_0003.pdf | ||
| Sol_140FHR24Q0020_Amd_0002.pdf | ||
| B09_-_Solicitation_Amendment_-_RFQ_Vendor_Questions_and_Government_Responses_(0002)_0002.pdf | ||
| Sol_140FHR24Q0020_Amd_0001.pdf | ||
| B09_-_Solicitation_Amendment_-_RFQ_Vendor_Questions_and_Government_Responses_0001.pdf | ||
| B08_-_Solicitation_-__Quote_Schedule_-_Attachment_2.pdf | ||
| Sol_140FHR24Q0020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FDOT‐CERTIFIED LIMESTONE ROAD BASE SOLICITATION NO. 140FHR24Q0020
FWS
Specifications
Project: Waccamaw NWR Rehab Rt. 402 Haulover-Normandy PR Number: 2041258
Item: FDOT-certified Limestone Road Base
1. Product Features
a. Name of Item: FDOT-certified #4 and #57 Limestone Road Base
b. Salient Characteristics:
(1) 3,300 tons of FDOT-certified #4 limestone and 3,300 #57 limestone for Road Base.
(2) Limestone will be stockpiled at designated location see attached map.
2. Delivery
a. Prices quoted must be FOB Destination.
“F.o.b. destination” means --Free of expense to the Government delivered on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery when required, if transfer to truck is required to complete delivery to consignee.
Contractor responsibilities. The contractor shall -- (1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements.
(2) Prepare and distribute commercial bills of lading.
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract.
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract.
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
b. Delivery Location:
Product shall be delivered to the following location: 21424 N Fraser St.
Georgetown, SC 29440
(See attached map)
c. Delivery Date:
(1) Required commencement date for delivery: 8/15/24
(2) Last date for delivery: 11/15/24
d. Delivery Instructions:
The Contractor that receives the contract will acquire the agreed upon FDOT-certified Limestone Road Base and deliver it to the location and will dump the FDOT-certified Limestone Road Base at the designated dumping site located across the road from 21424 N Fraser St. Georgetown, SC 29440 . (See attached map). A total of 15 truckloads of material will be delivered per day as scheduled in the delivery date window.
e. Customer Specific Delivery Requirements:
Local conditions that may affect delivery: Project area is near a river and floods often. Access requires dry weather.
3. Technical Point of Contact (POC): TBD
File details come from the government source that posted it. Updated .