B08_Solicitation_-_Attachment_5_-_Submittal_List.pdf
PDF 128 KB Posted
- Attached to
- CHSC - Replace HVAC Federal contract opportunity
- Solicitation number
- 140P6025Q0034
About this file
The document is a Submittal List for the Little Rock Central High School (LRCHS) PMIS 305706 project to Replace Visitor Center HVAC. The comprehensive submittal list details specific documentation requirements across multiple specification sections, including general requirements, selective demolition, acoustical treatment, painting, HVAC piping identification, testing, adjusting, and balancing.
The list outlines various informational and action submittals that must be provided during the project, such as a preconstruction conference submittal, construction schedule, safety plan, quality control plan, product data, manufacturer's installation instructions, shop drawings, samples, and final reports. Submittals are categorized by specification section (e.g., 01 1000 General Requirements, 23 0553 HVAC Piping Identification) and include detailed requirements for certification, lab tests, manufacturing data, and other technical documentation needed to ensure compliance and project quality.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12_MISC_QA_0001.docx | DOCX document | |
| Sol_140P6025Q0034_Amd_0001.pdf | ||
| Sol_140P6025Q0034.pdf | ||
| B08_Solicitation_-_Attachment_3_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Attachment_4_-_PPQ.doc | DOC document | |
| B08_Solicitation_-_Attachment_2_-_Drawings.pdf | ||
| B08_Solicitation_-_Attachment_1_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C E
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
O T
H E
R
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
01 1000 9.1.C General Requirements
Preconstruction Conference Submittal X
Letter designating Project Superintendent X
Construction Schedule X
Schedule of Values X
Accident Prevention (Safety) Plan X list of Subcontractors X statements from subcontractors...compliance... X
Quality Control Plan X
Waste Management Plan X
Indoor Air Quality (IAQ) Management Plan X
List of Required Construction Permits X
02 4119 1.4 Selective Demolition
Proposed Protection Measures X
Pre-demolition Photographs or Video X
Statement of Refrigerant Recovery X
09 51 00 1.3 Acoustical Treatment
Product Data X
Samples X
09 90 00 Painting
Manufacturer's Product Data X
Samples X
VOC Data X
23 0553 Identification For HVAC Piping and Equipment
1.03 Product Data X
Manufacturer's Installation Instructions X
23 0593 Testing, Adjusting, and Balancing For HVAC
1.04 Final Report X X
SUBMITTAL LIST
Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.
Spec. Sec. Par. No. Description
INFORMATIONAL ACTION
LRCHS PMIS 305706 Replace Visitor Center HVAC
SUBMITTAL REQUIREMENTS (indicate with an "X")
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
O T
H E
R
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
SUBMITTAL LIST
Note: See tab below for Samples and Instructions. Attach to end of Specification Section 01 33 23 when complete.
Spec. Sec. Par. No. Description
INFORMATIONAL ACTION
LRCHS PMIS 305706 Replace Visitor Center HVAC
SUBMITTAL REQUIREMENTS (indicate with an "X")
Instrument Calibration X X
23 0713 Duct Insulation
1.03 Product Data X
Manufacturer's Installation Instructions X
23 3100 HVAC Ducts and Casings
1.05 Product Data X
Manufacturer's Installation Instructions X
23 3700 Air Outlets and Inlets
1.03 Product Data X
23 8146 Water-Source Unitary Heat Pumps
1.04 Product Data X
Manufacturer's Installation Instructions X
R T
./L A
B T
E S
T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
. D A
T A
IN
S T
R U
C T
IO
N
S
0 0 0 0 0 0 0
SUBMITTAL LIST AND REVIEW ESTIMATE
A/E REVIEW TIME
(indicate number of hours)
ACTION SUBMITTAL
REVIEW ESTIMATE
Park/PMIS/Project Title
SUBMITTAL
Par. No. Description
INFORMATIONAL
(Complete this portion for AE Const. Serv.
task order negotiation.)
C E h rs
S E h rs
M E h rs
E E h rs
P M
C o o r.
h rs
A R
C H h rs
L A h rs
SUBMITTALS LIST
Spec.
Sec.
ACTION
REQUIREMENTS(indicate with an "X")
Total
PHASE OF
WORK
RESPONSIBLE
PARTY
DESCRIPTION OF TASKS
1. Fill out Park/PMIS/Project Title cell with project reference information.
2. Use this form to record construction submittal requirements for the project. Fill out the Specification Section, Paragraph number, Description columns on the left side of the form. Insert Additional rows, as required for sections containing multiple submittals.
3. In the columns designated "REQUIREMENTS", indicate the submittal requirement(s) by placing an "X" in the appropriate box(es). Insert additional columns as necessary under the headings of Informational or Action to correctly show the type of submittal. Refer to Specification Section 01 33 23 for clarification on what are Informational submittals or Action submittals. (Action submittals require Government responsive action and informational do not.) All Division 01 Specification Submittals should be shown as Informational Submittals.
4. Attach a black and white version to the end of Specification Section 01 33 23 in the project manual. Delete instructional note on the top of the page.
1. Utilize the "Submittal List" form submitted with the Final Construction Documents. Copy/paste submittal information into the Submittal List and review estimate. If amendments have been issued, make adjustments to the submittal requirements if necessary.
2. Attach this form to the "A/E Construction Services" Scope of Services.
3. Utilize this form to the generate the estimated time required for the A/E to accomplish the Action submittal reviews by inserting your estimated number of hours per discipline under corresponding column headings.
4. Add discipline heading columns, as required.
5. Use the total number of hours per discipline at the bottom of the form and apply the hourly rates listed in the IDIQ contract (using appropriate option period rates) to formulate the Government estimate for submittal reviews. Refer to the sample by selecting an appropriate tab below.
6. Use the information contained within this form to negotiate the submittal review portion of the A/E Construction Services task order.
7. Provide this form to the CMR so they have an understanding of which submittals they are responsible for and which are to be forwarded to the A/E.
All Informational submittals will be reviewed by the CMR.
1. Indicate level of effort required for each Action submittal review by inserting the number of hours for each discipline under the "A/E Review Time (indicate number of hours)" column.
2. All Informational submittals will be reviewed by the CMR.
3. Use the total number of hours indicated for each discipline and apply the appropriate rates from the IDIQ contract (using the appropriate option period rates) to formulate your estimate. Refer to the sample by selecting an appropriate tab below.
4. Use this estimate to negotiate the submittals review portion of the A/E Construction Services portion of the task order.
D E
S
IG
N S
E R
V
IC
E S
(C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
P H
A S
E
D es ig n
A /E
SUBMITTAL LIST AND REVIEW ESTIMATE
INSTRUCTIONS
C o n st ru ct io n
C O
R
C O
N S
T R
U C
T
IO
N S
E R
V
IC
E S
(C O
N S
T R
U C
T
IO
N P
H A
S E
A /E
Spec.
Sec.
Par. No. Description
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
02110 1.3 Excavation safety plan X 02120 1.4 Signed copies of manifest X 02320 1.2 Procedures for trench dewatering X 02501 1.3 Water and sewer test accuracy cert. X 02502 1.2 Water line marking tape sample X 02517 1.2 Fire Hydrants
Manufactures information: x-section X Certification with AWWA C502-94 X
02725 1.2 Aggregate base course X 02778 1.2 Walks, curbs and gutters, mix design X X 03300 1.3 Cast in-Place Concrete
Steel placement shop drawing X Batching and hauling plan X Rebar certification X
04100 1.2 Mortar Cured mortar sample X Material certification & test reports X
04201 1.3 Masonry Work Shop drawings X Masonry unit sample X Mfg. information on admixtures X
05120 1.4 Structural steel X 05311 1.3 Steel roof deck shop drawings X 05400 1.3 Cold Formed Metal Framing
Shop drawings and erection diagrams X Mill certificates X Welder certificates X
06402 1.3 Interior architectural woodwork X X X 07100 1.4 Cold Fluid Applied Waterproofing
Product data X Shop drawings X Installer certification X Product test reports X
07260 1.2 Vapor retarder mfg. installation instructions X 07610 1.3 Sheet metal roofing X X X 08110 1.3 Steel Doors and Frames
SUBMITTAL
SUBMITTAL LIST
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities
REQUIREMENTS
(indicate with an "X")
INFORMATIONAL ACTION
Par. No. Description
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
S H
O P
D R
A W
IN
G
S A
M P
L E
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
SUBMITTAL
SUBMITTAL LIST
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities
REQUIREMENTS
(indicate with an "X")
INFORMATIONAL ACTION
Shop drawings X Catalog cuts and install instructions X Door schedule X
08520 1.3 Aluminum windows X X 08710 1.2 Finish hardware schedule X 09310 1.6 Ceramic Tile
Sample X Mfg. literature X Certification X
09901 1.4 Painting Mfg. color chart X Paint sample applied to like material X Mfg. information X
10800 1.7 Toilet and bath acc.mfg.info X 11452 1.2 Kitchen appliances, product data X 12500 1.3 Horizontal louver blinds X 15060 1.4 Piping and accessories X X X 15800 1.3 Ductwork X X 16470 1.4 Panel boards X X X
Par. No. Description
C E
R T
L
A B
T E
S T
R E
P O
R T
/C A
L C
O
R P
L A
N
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
S A
M P
L E
S H
O P
D R
A W
IN
G
M fg
D
A T
A
I N
S T
R U
C T
IO
N
S
02110 1.3 Excavation safety plan X
02120 1.4 Signed copies of manifest X 02320 1.2 Procedures for trench dewatering X 02501 1.3 Water and sewer test accuracy cert. X 02502 1.2 Water line marking tape sample X 2 02517 1.2 Fire Hydrants
Manufactures information: x-section X Certification with AWWA C502-94 X
02725 1.2 Aggregate base course X 02778 1.2 Walks, curbs and gutters, mix design X X 3 2 03300 1.3 Cast in-Place Concrete
Steel placement shop drawing X 1 2 Batching and hauling plan X 1 Rebar certification X
04100 1.2 Mortar cured mortar sample X 1 1 Material certification & test reports X
04201 1.3 Masonry Work Shop drawings X 4 Masonry unit sample X 1 Mfg. information on admixtures X 1
05120 1.4 Structural steel X 4 05311 1.3 Steel roof deck shop drawings X 4 05400 1.3 Cold Formed Metal Framing
Shop drawings and erection diagrams X 4 Mill certificates X Welder certificates X
06402 1.3 Interior architectural woodwork X X X 6 07100 1.4 Cold Fluid Applied Waterproofing
Product data X Shop drawings X 2 Installer certification X Product test reports X
07260 1.2 Vapor retarder mfg. installation instructions X 07610 1.3 Sheet metal roofing X X X 3 2 08110 1.3 Steel Doors and Frames
Shop drawings X 3 Catalog cuts and install instructions X Door schedule X
08520 1.3 Aluminum windows X X 6 08710 1.2 Finish hardware schedule X 09310 1.6 Ceramic Tile
Sample X 2 Mfg. literature X Certification X
09901 1.4 Painting Mfg. color chart X 3 Paint sample applied to like material X 2 Mfg. information X
10800 1.7 Toilet and bath acc.mfg.info X 11452 1.2 Kitchen appliances, product data X 12500 1.3 Horizontal louver blinds X 15060 1.4 Piping and accessories X X X 3 15800 1.3 Ductwork X X 3 16470 1.4 Panel boards X X X 3
29 7 24 6 3 0 0
SUBMITTAL REVIEW
ESTIMATE
SUBMITTAL LIST AND REVIEW ESTIMATE
INFORMATIONAL ACTION
A R
C H h rs
C E h rs
S
(h rs
M
(Complete this portion for AE Const. Serv.
task order negotiation)
A/E REVIEW TIME
(indicate number of hours)
SUBMITTAL LIST
Death Valley National Park, PMIS 06660, Rehabilitate Maintenance Facilities
SUBMITTAL
Total
P M
C o o r.
h rs
L A
REQUIREMENTS
(indicate with an "X")
File details come from the government source that posted it. Updated .