B08_Solicitation_-_Attachment_3_-_Wage_Determination.pdf
PDF 2 MB Posted
- Attached to
- Buffalo NR - Septic System Replacement Federal contract opportunity
- Solicitation number
- 140P6225B0001
About this file
This document is a federal wage determination for heavy construction projects in Arkansas, covering Baxter, Boone, Carroll, Conway, Franklin, Logan, Marion, Newton, Polk, Searcy, and Van Buren Counties. The wage determination specifies prevailing wage rates for various construction job classifications as of January 3, 2025, including:
Key wage rates include Carpenter at $17.32/hour, Common Laborer at $12.50/hour, Pipelayer at $12.56/hour, and various equipment operators like Backhoe/Excavator at $17.22/hour and Bulldozer at $17.11/hour. The document details different minimum wage requirements based on Executive Orders 14026 and 13658, with rates varying depending on the contract award date. It also includes provisions for paid sick leave and instructions for wage determination appeals, providing a comprehensive guide for wage standards in federally-funded construction projects in the specified Arkansas counties.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B11_Site_Visit_Attendence_0001.pdf | ||
| Sol_140P6225B0001_Amd_0001.pdf | ||
| B08_Solicitation_-_Attachment_2_-_Drawings.pdf | ||
| B08_Solicitation_-_Attachment_1_-_Specifications.pdf | ||
| Sol_140P6225B0001.pdf | ||
| B08_Solicitation_-_Attachment_4_-_Limitations_on_Subcontracting.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .