This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a project by the National Park Service (NPS), Missouri MABO, located in Omaha, NE. Amendment 0001 provides clarification on several technical details for a site-specific project involving septic system work, including answers to contractor questions about installation requirements. Key clarifications include confirmation that a state license is required for system installation, specifications for 2-inch HDPE sewer line installation between lift station and dispersion lines, and instructions for handling existing septic tanks and lines (which will be pumped, removed, and properly disposed of).
The amendment also includes additional procedural guidance, specifically that contractors cannot burn brush or tree debris on-site and must instead chip or remove materials for offsite disposal. A site visit attendee list will be attached, and bids are to be submitted via email to mwromabobids@nps.gov by the specified due date. The effective date of the amendment is 08/01/2025, and it provides technical and procedural clarifications without changing the fundamental scope of the original solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B11_Site_Visit_Attendence_0001.pdf | ||
| Sol_140P6225B0001.pdf | ||
| B08_Solicitation_-_Attachment_2_-_Drawings.pdf | ||
| B08_Solicitation_-_Attachment_3_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Attachment_1_-_Specifications.pdf | ||
| B08_Solicitation_-_Attachment_4_-_Limitations_on_Subcontracting.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6225B0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMM
Omaha NE 68102 601 Riverfront Drive DOI, NPS, MWR - Missouri MABO NPS, MWR - Missouri MABO
08/01/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/01/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 0001 to the solicitation is as follows:
1. Attach the site visit attendee list.
2. Provide answers to the following questions received during the site visit:
-Is a license from the state required to install the system?
Answer: Yes.
-Are there any additional blown-up schematics for septic dispersion lines?
Answer: No additional photos available outside of what is shown in the plans.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bridget Parizek
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6225B0001/0001
-Can the 2 inch line be installed using two bores or is one required?
Answer: Two bores may be used for installation, the joint must be fused together.
-Does the design call for 2 inch sewer line going between the lift station and dispersion lines?
Answer: The plan calls for 2 inch HDPE for the line between the lift station and dispersion lines.
-Do tanks and dispersion lines have to be removed or crushed on site?
Answer: The septic tanks will be pumped and removed from the site, the dispersion lines will be pumped, collapsed, and filled with clean materials.
-Can the contractor burn brush and tree debris on-site?
Answer: NO. Materials can be chipped or removed for offsite disposal.
No further changes have been made to the solicitation.
Reminder: bids are to be submitted via email to mwromabobids@nps.gov by the due date.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .