B08_Solicitation_-_Attachment_2_-_Drawings.pdf
PDF 21 MB Posted
- Attached to
- EFMO - Water System Rehabilitation 36569 Federal contract opportunity
- Solicitation number
- 140P6022R0019
About this file
This document provides details for a federal solicitation from the Department of the Interior National Park Service Midwest Region. Solicitation number 140P6022R0019 seeks bids for the EFMO - Water System Rehabilitation 36569 project, which involves rehabilitating water system infrastructure. Bids are due by the date specified in the associated solicitation documents. The attached file B08_Solicitation_-Attachment_2-_Drawings.pdf likely contains technical drawings or specifications to inform bid responses. The solicitation appears to be open to all qualified contractors.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fire ProtectionElectricalMechanicalArchitecturalStructuralCivil / Process R
E
C:\pwworking\central01\d1570835\G0 COVER.DWG, Layout1, 12/10/2020 10:59:46 AM, QKNUDSEN i:
i'� l:b 1 ii".
I� a
CORNER INTERSECTION
REINFORCINGSHOWII
:��LE ���LE
f ROOFBONDEEAM
PROVICE HAIRPINS SIZED
TO MATCH WALL RENF.
LAPTO HORIZVIIH�
INaCATED 00 PLAN
VERTS{'M-1811
SCHEDULED)
PRCMCE HAIRPINS SIZED
TO MATQ-1 WALL REINF.
LAPTO HORIZVIIHERE
INaCATED 00 PLAN
MCJFULL HBGHT
RAKE OUT MORTAR AND
APPLY SEAL.ANT, TYP EA
FACE,UNO
HORIZ REBAR CONTINUOUS
THROUGH MCJ AT ROCF
LEVEL BOND EEAM {SHOV,/N)
&DISCCX'lTINUOUS AT MC.I
AND ALL OTHER REINFORCED
B..EMENTS SUCH Af3 LINTELS
AND INTERMEDIATE BOND
BEAMS {NOT SHO'v\N)
JA�OREND O::WALL MASOORY CONTROL J9INT {MCJ}
� REINFORCING, SEE CMU WALL REINFORCING SHEDULE
2. INaCATES LOCATION OF VERTICAL BARS AT CENTERLINE O::WAL!., UNO IN
SCHEDULE.
3. EXTEND MCJ FULL HEIGHT a= MASONRY BOND BEAM.
4. LIMIT DISTANCE BETVv'EEN MCJ TO MAX 24'.Q''. SEE DRAWINGS FOR LOCATIONS.
5. HORIZOOT AL JOINT REINFORaNG NOT SHOWN.
6. MOaFY BAR CONFIGURATION 81-fOV\N AS RECUIREDw-tERE TV.o VERTICAL.
REINFORCING BARS ARE SHOWII ON THE SOiEDULE
7. SEE ARCHITECTURAL DRAWINGS FOR MCJ CETAILSAND REMAINCER OF JONT
DETAIL£
CMU WALL REINFORCING
�T TO SCALE
TYPE I REINFORCING l.OCA.TIOO
VERTS I VERTICAL BARS #6@32'' OC SINGLE CENTERED #6@32'' OC DOUBLE CENTERED
HORIZ I TOP OFWAI..L BOND BEAMS US, SEE MASOORYWALL ELEV. CETAIL US, SEE MASONRY WALL ELEV. CETAIL
INTERMEDIATE BOND BEAMS US CCM", A 4'-0'' OCVERT S"ACING US CCM", @4'-0'' OCVERT S"ACING
HORIZ JOINT REINF
LINTELS
9 GAGE WIRE, TRUSS TYPE JOINT
REINF A 16'' OC BETWEEN BCXIID
BEAMS
9 GAGE WIRE, TRUSS TYPE JOINT
REINF A 16'' OC BETWEEN BCXIID
BEAMS
US, SEE MASONRY WALL ELEV. CETAILI US, SEE MASONRY WALL ELEV. CETAIL
SEE CMU REINFORCEMENT ELEVATION I SEE CMU REINFORCEMENT ELEVATION
�Ed
SEENOTE4
SINGLE CENTERED
�I � SEENOTE4
DOUBLE CENTERED
1. PRCMCE THEABOVE SOiEDUL.ED MINIMUM WALL REINFORCING IN ALL CMU, UNO. SEE CMU WALL
REINFORCEMENT DETAIL
2, GROUT ONLY THE CELLS \NITH REINFORCING.
3. MAINTAIN MINIMUM 3" X 3'' CCM"INUOUSVERTICAL CEI.LAT EAOi REBAR. PLACE WALLS TO
MAXIMUM 4'-0' HEIGHT BEFORE GROUTING.
MASONRY REINFORCINO SPLICE TABLE
BAR 6'' 81..00< 8' BLOCK 10" 81..00( 12' 81..00<
SIZE BAR GI a. BAR A a. BAR A EDGE BAR GI a. BAR A EDGE BAR GI a. BAR A EDGE
VIIHBII REQUIRED SPLICE LENGTH EXCEEDS 4'-8'' • USE t.Ea-lANICAL TENSION SPLICES
WITH 1£1,N LIFT GROUTING.
MASONRY REINFORCING SPLICE TABLE
4. PRCMCE 'MRE REBAR POSITIONERS TO HOLD BARS IN PLACE.
5. STOP GROUT POUR 112' IEI..O(HOP OF COURa:AT EAOi GROUT LIFT.
ANGLE:
1. EXTEND f!f' PAST OPENING
\r\lHEN NO Ba...TS.
2. STOP AT ECX3E O:: OPENING
\r\lHERE BOLTS ARE USED, VBIIEER ]�
?YXXN>q I I
[ lr'IIALL CONTINUOUS
L_.,--
1-#5VERT
ED ����INFORCING SCHEDULE
VERT WALL REINF
SEE CMU WALL REINF SCHEDULE
, TYPICAL MASONRY LINTEL BEARING
�T TOs::AL.E
ANAL PLANS 12/30/2021
DESIGNED:
G. STELMASZEK
C. HOLMES
TEO-I. REVIEW:
S.MAGNUSSEN
C,TE
I '""""'
MCJ ADJACENT TO DOOR
SUB SHEET NO. TITLE OF SHEET DRA....,NGNO. ----
80045
S6 STRUCTURAL DETAILS PMISIPl((3N0.
2241128
SHEET
EFFIGY MOUNDS NATIONAL MONUMENT 24o,� i I, I lb 1 1l'.:
u
� �w-�����g,2 ,,,,,,,,,,- FTl>BCJ'.JEGRACEMINIMUM
WITH½EATHERCAf>
===::1
���=r��
DIESEL FIRE PUMP
'MTH EXHAUST
BATTERY RAO<
AND CHARGER
I I L ,J� FIRE CEeARTMENT
DIESELPUMPCFIVER
HEAT EXOiANGER PIPING
TOWASTEOUTLETAND
FLOCASr-lK
EAteR CONNECTIOO (COORDINATE
L---HQRN & STROBE A&NE. FDC
WITH INT AKE LOUVER)
SEE CfVIL SHEET C2
FOR CONTINLIAT�
FIRE PROTECTION FLOOR PLAN
F1 11,11•:1'-0"
SPRINKLER SYSTEM SCHEDULE*
MIN.DENSITY HYDR.OESIGNAREA HOSE"
HAZARD CLASS I (GPM/SQ.-FT.) {SQ.-FT.) (GPM) (MIN) DURATION
ALLAREASNOT
HATCHED
l
"""'DG,OU,2
0.20
I 1500 250
I
�EXTRAHAZARD
-� -- -GROUP2 0.� 2500 500
1.) THE FIRE SPRINKLER CONTRACTOR SHAU. BE RESPONSIBLE FOR DESIGNING A SPRINKLER SYSTEM THAT MINIMIZES FRICTION LOSSES AND PRESSURE DEMAND SUCH THAT THE RESERVOIR WATER SUPPLY IS CAPABLE OF l.) THE CONTRACTOR SHAU.CONDUCT A HYDRANT FLOW TEST IN ACCORDANCE WITH NFPA 291 AT NO AOOTlONAL COST TO THE OWNER PRIOR TO THE DESIGN OF AUTOMATIC SPRINKLER SYSTEM. THE CONTRACTOR SHALL COMPARE THEIR FLOW TEST RESULTS WITH TEST DATA BELOW AND USE THE LOWEST PRESSURE OFT HE
TWO DESIGNS, INCLUDING SAFETY FACTORS IN FIRE PROTECTION SYSTEMS SPEC 21 10 00.
3.J FlRE PUMP SHALL BE PEERLESS PUMP MOOEL6AEF16G OR EQUAL{DIESEL DRIVER WITH HEAT EXCHANGER COOLED)- CAPACITY SHALL BESOO GPM tJ 16 PSI AT THE DISCHARGE Fl.ANGE OF THE FIRE PUMP. FIRE PUMP
ASSEMBLY ANO ALL COMPONENTS SHALL BE NSF-61 RATED. SEE SPECIFACTION 21 10 00.
-4.) FIRE PUMP HEAT EXCHANGER SHALL DISCHARGE TO A VISIBLE OPEN WASTE OUTLET PER NFPA 20 - 11.2.8.7.2
MAXIMUM DISCHARGE TEMPERATURE UO DEGREES.
CESIGNED: SUB SHEET NO. ----
ANOWKA
mm, T.FREEMAN
F1 z.:a-t. REVIEW:
SACHSEt#.4AJER
IY-.TE:
FINALPLANS12/Xl/2021 I 12/J0/l021
FM€ PBPJ§CIJ9N A§N§R&l NOJil
1. THE FIRE PUMP ROOM PIPING SCHEMATIC IS DIAGRAMTIC
ONLY AND THE CONTRACTOR SHALL BE RESPONSIBLE TO
PROVICE ALL VALVES, ACCESSORIES, ETC AS INDICATED IN
THE FIRE PUMP sa-tEMATIC ANDAS REQIJIRB) BY NFPA 13, NFPA 20 AND NFPA 22.
2. CONTRACTOO SHALL BE RESPONSIBLE FOO PROVIDING A
FULLY FUNCTICU'L SYSTEM IN OOMPUANCE'MTH NFPA 13,
NFPA 20 AND NFPA 22.
3. CONTRACTOO SHAU. BE RESPONSIBLE FOR COORDINATING
ALL REQUIRED TANK CRITERIA (I.E. PENETRATIONS,
LOCAT�S, ETC) WITH TANK tMNUFACTURER, INQ.UONG
BUT NOT LIMITED TO ALL TANK CONNECTICJ',IS AND THE
FINAL LOCATION OF THE SUt.f>. THE NEW FIRE WATER STORAGE TANK SHALL BE PROVICED AS CEsc:RIBED IN
SPEOFICATI0021 12 00.
◄. CONTRACTOO SHAU. BE RESPONSIBLE FOR ENSURING THE
FINAL INST ALL OOMPUES WITH ALL CCOE AND
MANUFACTURER REQUIRED CLEARANCES.
S. THE OESEL FIRE PUMP HEAT EXQ-IANGs:! OXLINO LOOP
SHALL BE SIZED AND SUPPLIED AS REQUIRED BY THE PUMP
MANUFACTURER AND NFPA 20 AND NFPA 22. TYPICALLY THE
SUPPLY COMES FROM THE OSOiARGE OF THE PUt.f>. THE ax:t.lNG LOCP DISCHARGE SHALL BE ROUTED TO THE FLOOR SINK THE CXXlUNG LOOP SHALL INQ.UCE ALL
NECESSARY EQUIPMENT INO...UONG STRAINERS,
ACTIVATIOO sa..ENOID, MANUAL BYPASS LINE, ETC.
6. THE NEW FIRE ALARM PANEL IN THE FIRE PUMP & WATER
STORAGE TANK BUILDING'S NEW FIRE PUMP ROOM WILL BE
A REMOTE PANEL REPORTING TO THE MA.STER FIRE ALARM
PANEL ON SITE. �INATE MASTERPANELLOCATION
'MTH QIM4s:!, THE NEW FIRE Al.ARM SYSTEM SHALL BE NET\/olCAKEDBET\4JEEN Bl.JILONGS USING NEJ\IIJORK
CABLING IN BURIED CONOJIT. NEW FIRE ALARM SYSTEM
SHAU. BE UTILIZED TO MONITOR THE FIRE PUMP SIGNALS,
FIRE SPRINl<I...ER SYSTEM SWITQiES AND VALVES, AND TO MONITOO THE EXISTING Al.ARM SYSTEM FOO ALARM, TROOBLE, AND SUPERVISORY SIGNALS. THE NEW FIRE
ALARM SYSTEM SHALL BE PRO\IICED AS CE�BED IN
SPEOFICATIOO 28 31 00.
7. ALL PANELS 51-IALL BE SURFACED MOUNTED w-lEN
LOCATED ON A RATED WALL
FIRE PRQTECTIOO LEGEND
� 1 HOUR FIRE BARRIER
"' FIRE EXTINGUISHER
TITLEOFSI-IEET DRA'MNGNO.
80045
FIRE PROTECTION FLOOR PMISJPKGNO.
PLAN
2241128
SHEET
EFFIGY MOUNDS NATIONAL MONUMENT - OF� 39
File details come from the government source that posted it. Updated .