This is a set of architectural and engineering drawings for an electrical construction project at a bio-laboratory facility.
The project, titled "Balance 3 Phase Power at Bio-Lab," involves eliminating single-phase loading and restoring balanced three-phase loading at the service entrance. Key work includes: providing a new 3-phase, 4-wire, 208Y/120V panel labeled "Main-2" sized at 225 amperes; installing a new 3-pole feeder breaker in the existing "Main-1" panel; running new feeder conductors from "Main-1" to "Main-2" consisting of three phase conductors, one neutral conductor, and one equipment grounding conductor in conduit; splicing new service conductors to existing 500 KCMIL service conductors using mechanical or compression connectors; converting the existing "Main-2" enclosure to a junction/splice enclosure with removal of overcurrent devices; providing listed insulated terminal blocks for termination and splicing within the existing "Main-2" enclosure rated for 600V and 75 degrees Celsius minimum; establishing an isolated neutral bar and bonded ground bar within "Main-2"; balancing branch circuits across all three phases at the new "Main-2" panel to maximum practical extent; and bonding and grounding "Main-2" per NEC requirements. The work also requires verification of phase rotation and system voltage, updated panel schedules and circuit directories, fire-retardant treated exterior-grade plywood backboard installation where "Main-2" is located, and de-energization and lockout/tagout procedures for existing single-phase panel "Main-2" prior to work. All work is located within Building 45 unless otherwise noted, with de-energization of electrical service potentially requiring operations at existing exterior utility equipment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4326R0016_Amd_0001.pdf | ||
| B08_Solicitation_Attachment_1_Specifications.pdf | ||
| Sol_140P4326R0016.pdf | ||
| B08_Solicitation_Attachment_3_DOL_Wage_Determination_MA20260001_01_02_2026.pdf | ||
| B08_Solicitation_Attachment_4_Construction_Contract_Administration.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISIONS
No. Description Date o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
F
E
B
1 2
BALANCE 3 PHASE POWER AT BIO-LAB
A
C
D
4321 765 98 10
TITLE SHEET
GENERAL NOTES:
1. ALL WORK SHOWN ON THESE DRAWINGS IS LOCATED WITHIN
BUILDING 45 UNLESS OTHERWISE NOTED. DE-ENERGIZATION OF THE
ELECTRICAL SERVICE MAY REQUIRE OPERATIONS AT EXISTING
EXTERIOR UTILITY EQUIPMENT, INCLUDING POLE-MOUNTED FUSE
CUTOUTS. NO NEW EXTERIOR CONSTRUCTION IS INCLUDED IN THE
SCOPE OF WORK.
2. PRIOR TO SUBMISSION OF MATERIAL SUBMITTALS, THE CONTRACTOR
SHALL FIELD-VERIFY EXISTING CONDUCTOR SIZES, MATERIALS,
INSULATION TYPES, AVAILABLE CONDUCTOR LENGTHS, AND PHASE
ROTATION. ANY DISCREPANCIES SHALL BE REPORTED TO THE
GOVERNMENT PRIOR TO PROCUREMENT OR INSTALLATION.
3. THE CONTRACTOR SHALL REMOVE THE SERVICE CONDUCTOR
TROUGH COVER AS REQUIRED TO INVESTIGATE EXISTING SPLICES,
CONDUCTOR SIZES, AND INSULATION CONDITIONS PRIOR TO
PREPARING MATERIAL SUBMITTALS. RESTORE ALL COVERS UPON
COMPLETION OF INVESTIGATION.
4. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED SIGNAGE,
BARRIERS, AND PROTECTIVE MEASURES TO PREVENT UNAUTHORIZED
ACCESS TO WORK AREAS. WORK AREAS, TOOLS, AND EQUIPMENT
SHALL NOT BE LEFT UNATTENDED AND SHALL BE SECURED WHEN THE
SITE IS NOT OCCUPIED.
5. POWER OUTAGES REQUIRED FOR INVESTIGATION, TESTING, AND
INSTALLATION OF NEW EQUIPMENT SHALL BE LIMITED TO A MAXIMUM
DURATION OF EIGHT (8) HOURS. FOR OUTAGES SCHEDULED TO
EXCEED ONE (1) HOUR, THE CONTRACTOR SHALL PROVIDE TWO (2) 5
KW GENERATOR AND EXTENSION CORDS AS NEEDED TO MAINTAIN
POWER TO LABORATORY REFRIGERATORS AND FREEZERS.
6. POWER FOR HAND TOOLS AND CHARGING OF BATTERY-POWERED
TOOLS IS AVAILABLE IN THE BUILDING MAIN ELECTRICAL ROOM.
CONTRACTOR SHALL COORDINATE ACCESS AND KEYS WITH THE
GOVERNMENT.
7. WORK ON ENERGIZED ELECTRICAL EQUIPMENT IS NOT PERMITTED.
ALL ELECTRICAL WORK SHALL BE PERFORMED WITH EQUIPMENT
DE-ENERGIZED, LOCKED OUT, AND VERIFIED SAFE PRIOR TO
COMMENCING WORK.
8. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, EQUIPMENT,
PPE, AND SPECIALTY TOOLS REQUIRED TO PERFORM SCHEDULED
POWER OUTAGES. ALL OUTAGES SHALL BE COORDINATED AND
APPROVED BY THE GOVERNMENT IN ADVANCE.
9. UNLESS OTHERWISE NOTED THE OVERHEAD UTILITY LINES AND
UNDERGROUND UTILITY LINES ARE THE PROPERTY OF THE
GOVERNMENT. PROVIDE ALL PERSONNEL AND EQUIPMENT TO
PERFORM THE REQUIRED POWER OUTAGES (ELECTRICIAN, HIGH
VOLTAGE ELECTRICIAN, BUCKET TRUCK, PPE, ETC). SCHEDULE AND
COORDINATE REQUIRED POWER SHUTDOWNS WITH GOVERNMENT.
REVISIONS
No. Description Date o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
F
E
B
1 2
BALANCE 3 PHASE POWER AT
BIO-LAB(NAC)
A
C
D
4321 765 98 10
EXISTING EQUIPMENT LOCATIONS
AND EXISTING ELECTRICAL SINGLE
LINE
REVISIONS
No. Description Date o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e r in c h o n e f o o t n e in c h o n e f o o t n e a n d o n e h a lf in c h o n e f o o t re e in c h o n e f o o t
F
E
B
1 2
BALANCE 3 PHASE POWER AT
BIO-LAB(NAC)
A
C
D
4321 765 98 10
NEW EQUIPMENT LOCATIONS AND
NEW ELECTRICAL SINGLE LINE
REVISIONS
No. Description Date o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
F
E
B
1 2
BALANCE 3 PHASE POWER AR BIO-LAB
A
C
D
4321 765 98 10
EXISTING CONDITIONS
File details come from the government source that posted it. Updated .