B08_Solicitation_Attachment_2_Area_Maps.pdf

PDF 31 MB Posted

Attached to
MINUTE MAN NHP - REHAB HISTORIC FIELDS
Solicitation number
140P4326R0029
Issued by

About this file

This is a solicitation attachment containing area maps and detailed task descriptions for field restoration work at Minute Man National Historical Park across multiple sites in Concord, Lincoln, and Lexington, Massachusetts.

The project encompasses eight primary areas plus optional tasks, with work dates ranging from February 6, 2026 to May 14, 2026. Area 1 (Barrett Farm Unit) includes erosion control over 500 linear feet, removal of 45 vegetation items in the rear yard, root grinding, tree removal with vine clearing in the barn foundation area, treatment of invasive vines, and an optional pool removal and grading task. Area 2 (North Bridge Unit) requires tree removal of 18 trees near Monument Street Parking Lot and 9 trees near Sargent Field, all flush-cut at base without stump grinding, plus invasive vegetation treatment and pasture mowing. Area 3 (Meriam's Corner) involves mowing a 2.0-acre field, cutting vines and removing collapsed trees, felling 20 dead ash trees in a wooded area, and clearing vegetation along 1,200 linear feet of stone walls. Area 4 (Jones-Stow Farm) requires removal of 850 linear feet of livestock fence, clearing of two 2-acre areas with stump grinding, and erosion control installation with seeding. Area 5 (Brooks Village) includes erosion control over 400 linear feet, removal of hazardous trees, clearing and seeding of up to 3.0 acres across multiple parcels. Area 6 (Elm Brook, Hartwell, and Smith Areas) requires removal of standing dead white pines, stump grinding, mowing of up to 1.0 acres, removal of fill material, and invasive vegetation treatment. Area 7 (Paul Revere Capture Area) involves removal of a 50-cubic-yard fill pile with grading and seeding. Area 8 (Fiske Hill Area) requires removal of 10 dead ash trees, stump grinding, and vine clearing along approximately 700 linear feet. The solicitation also includes Option A for an inground pool removal (20x40 feet) and concrete deck removal at Barrett Farm, and Option B for two alternative tasks at Nelson Whittemore Area involving vine, shrub, and fallen tree removal with meadow seeding across 1.2-acre parcels. All work emphasizes native species preservation, invasive species treatment, erosion control, and restoration of historic field areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx

Task 1a: Erosion Control (500 ft), 45 Removals in rear yard (tagged) Root Grinding below grade, Smooth for seeding 1 Blue holly bush 2 Colorado blue spruce, 6” dbh 16 Forsythia clumps 1 Glossy buckthorn clump with vines 20 Hydrangea clumps 5 Lilac clumps 1 collapsed pear tree trunk, 6“ diameter 1 firewood pile, 3’ ht, 5’ wide, 30’ long Grind or remove roots in lawn area (Roots can remain near building and deck foundations.)

Smooth for seeding (seeding not included) Existing turf areas to remain

Task 1b: Trees with Vine Removal, within Barn Foundation 20 trees 6 to 10” dbh w/ vines, dead standing and collapsed, tagged, flush cut

Option A: Pool Removal & Grading Pool Removal (see Area 1- Option A)

Task 1b

Task 1a

Option A

Area 1: Barrett Farm Unit, 474 and 448 Barrett’s Mill Road, Concord, MA Field Restoration, PMIS 162869, PEPC 132580, Minute Man National Historical Park March 19, 2026 -- Latitude, Longitude: 42.47293, - 71.38070 NorthApproximate Scale: 1” = 80’

40 0 80 160

Area 1 Legend w etland

Barrett’s Mill Road

Pool

D rivew ay

Barn Foundation

Right-of-Way Do Not Block

Contract Project Areas

Bay Circuit Trail

Stone Walls

Wetland 25-foot bu�er

Property Line

Structures

Wetland area xxxxxxxxx Silt sock (500 ft +/-)

Task 1c

Treat porcelain berry and bittersweet vines

Treat porcelain berry and bittersweet vines

Treat porcelain berry and bittersweet vines

Seed disturbed area with grass mix

Bio Tech Focus Areas

Task 2a: Tree Removal (18 trees near Monument Street Parking Lot) Flush Cut at Base, no stump grinding 10 dying ash: 4 to 16” dbh 1 Norway maple: 6” dbh 3 leaning/ dead black locust: 10 to 13” dbh

Tree Removal (9 trees near Sargent Field Stone Wall) Flush Cut at Base, no stump grinding 3 dying black locust: 20, 28, 36” dbh 3 Norway maple: 24, 28, 30” dbh 3 Ash: 16, 24, 30” dbh

Task 2a

Area 2: North Bridge Unit, Liberty and Monument Streets, Concord, MA Field Restoration, PMIS 162869, PEPC 132580, Minute Man National Historical Park May 14, 2026 -- Latitude, Longitude: 42.46921, - 71.34840 NorthApproximate Scale: 1” = 500’

250 0 500 1000

Area 2 Legend

Contract Project Areas

Reformatory Trail

Stone Walls

Wetland 25-foot bu�er

Property Line

Structures

Wetland area

Treat glossy buckthorn

Treat porcelain berry and black swallowwort

Forest Resilience

Project Area

Treat porcelain berry and knotweed

Treat porcelain berry

Bio Tech Focus Areas

Mow Keyes Pasture and remove/treat vegetation on stone walls

MIMA Team: Mow Keyes Pasture and Remove Vegetation from stone walls Not an active pasture Mow 0.4 acre area Clean 500 linear feet of stone wall of vegetation

Lexington Road

Lexington Road

O ld

B ed fo rd

R oa d Lorem ipsumLorem ipsum

Task 3a: Mow Field, Cut Vines, Remove Collapsed Trees from Mowable Area Mow 2.0-acre field. Using boom-mounted mulcher or flail, or similar, selectively cut vines from trees and remove invasive shrubs from around 700 ft of field edge.

Remove 2 dead standing hazardous and 2 collapsed trees in mowable area or along mowable edge including 36” dbh collapsed white pine.

Task 3b: Cut Vines, Fell Dead Trees Within 1.5-acre area, use boom-mounted mulcher or flail, or similar to cut vines Fell 20 dead standing (ash) trees in wooded area (bounded by power line and sidewalk).

Remove canopy, acceptable to leave trunks in contact with ground but not on path or septic system. Avoid septic system.

Ensure wooded edge lacks hazards along 600 feet of edge. Will require police detail for some roadside work

Task 3c: Remove Dead Standing and Collapsed Trees from Mowable Area and Park Property Line Remove 3 dead standing & collapsed trees and other species filled with vines and invasive shrubs and vines in and along edge of mowable area. Use boom mounted mulcher or flail, or similar to preserve native species. Edge extends approx 800 feet.

Area 3: Meriam’s Corner, Lexington Road and Old Bedford Road, Concord, MA Field Restoration, PMIS 162869, PEPC 132580, Minute Man National Historical Park May 14, 2026 --- Latitude, Longitude: 42.45872, -71.32223 NorthApproximate Scale: 1” = 200’

100 0 200 400

Task 3e

Task 3e: Mow Edge/Cut Woody Veg Cut, clean, clear all vegetation within and south of 1,200 lin. ft of stone walls except live trees for 10 ft width south of wall.

Area 3 Legend

Park Boundary

Contract Project Areas

Town Trail & Battle Rd Trail

Stone Walls

Wetland 25-foot bu�er

Task 3c

Task 3b

Task 3a

Parcel Boundary Lines

Bio Tech Focus Areas

Treat vines along edges

Treat vines in wooded area and edges

Treat knotweed

Treat knotweed

Mow and treat vines on wall and in �eld area and edges

CONCORD

LINCOLN

M an ue l D r.

(n ot N

PS

L an d)

Fa rm

L an e, L ex in gt on

R oa d, C on co rd

Lexington Road

Lexington Road

Task 4a: Remove Livestock Fence, and associated vegetation Clearing At perimenter of former pasture, remove 850 ft of post & woven-wire livestock fence with corner braces.

Task 4b: Clearing, Stump Grinding Clear by field mowing within a 2-acre area of vines, shrubs, dead standing, and collapsed trees (ash). Grind stumps in mowable area.

Cut vines from stone walls and foundations.

Remove abandoned farm equipment from edge of agricultural field.

Task 4c: Clearing Clear within a 2-acre area of vines, shrubs, 3 dead standing, and 3 collapsed trees.

Remove vegetation from stone walls, approx 1,000 linear feet of stone wall in area.

Mow where feasible and elswhere trim to 6 inch height along stone walls.

Task 4d: Erosion Control (200 ft) Clearing, Grading, Disposal Seeding Install erosion control on lower edge of worksite at property line.

Clear/mow 0.3-acre area of vines, shrubs, dead standing, and collapsed trees.

Remove vines from stone walls and foundations. Possibly debris removal.

Grade smooth and seed area with meadow mix.

Area 4: Jones - Stow Farm, Concord, MA Field Restoration, PMIS 162869, PEPC 132580, Minute Man National Historical Park May 14, 2026 --- Latitude, Longitude: 42.45766, -71.31905 NorthApproximate Scale: 1” = 400’

200 0 400 800

Area 4 Legend

Contract Project Areas

Battle Road Trail

Stone Walls

Wetland 25-foot bu�er

Wetland 50-foot bu�er

Wetland 100-foot bu�er

Task 4d

Task 4c

Task 4b

Task 4a

Remove invasive plants from stone walls, treat regen

Treat tree-of-heaven

Treat regen Plant native seedlings plus screen

Remove north half of fence

CONCORD

LINCOLN

C O

N C

O R

D

LI

N C

O

LN

Task 5a: Erosion Control (400 ft) Clearing and Seeding Within 2.0-acre Beatteay parcel at Lexington Rd, Concord, install erosion control (400 ft) Grade rough areas that are difficult to mow.

Move approx 100 1-to 2-cu ft stone to walls.

Remove debris to dumpster.

Mow 2.0-acre area with rotary mower.

Overseed area with meadow mix and amendments.

Retain cedars (marked).

Task 5b: Clearing at Park Entry Remove 10 hazardous and collapsed trees.

Task 5c: Clearing, Seeding Within Noah Brooks Pasture, 33 North Great Road, Lincoln, Cut, clear, mow, mulch 1.0-acre area and grade for seeding.

Seed with meadow mix and soil amends.

(area is outside pasture area).

Task 5d: Clearing and Seeding Clear 2.0-acre area of understory vines and shrubs within two feet of perimeter post-4-strand-tensile-wire fence.

Minimize chipping and maximize mulching in place to ensure seed germination.

(area is within pasture area and fence).

Area 5: Brooks Village, Lincoln and Concord, MA Field Restoration, PMIS 162869, Minute Man National Historical Park March 19, 2026 --- Latitude, Longitude: 42.452796, -71.306788 NorthApproximate Scale: 1” = 350’

175 0 350 700

Task 5b

Area 5 Legend

Park Boundary

Contract Project Areas

Battle Road Trail

Task 5a

Task 5c

Task 5d

Remove invasive knotweed and black swallowwort from �elds and �eld edges.

Monitor stilt grass along south boundary

Bio Tech Focus Area

Task 6b: Tree Removal and Stump Grinding in Rooney Field Remove two 24-30” dbh standing dead white pine, grind 5 stumps in mowable field, level grindings for future mowing.

Task 6c: Tree Removal, Stump Grinding Mowing in Jozwicki Field Within 1.0-acre area known as Jozwicki Field, remove 3 20-24”dbh standing dead trees and 8 collapsed trees. (one is in field to north) Grind 2 stumps in mowable area, level grindings.

Mow 1.0-ac Jozwicki field including vine and shrub covered southern edge of field.

Task 6a: Erosion Control (500 ft) Remove Pile of Loam and Rubble, Grade area, Seed Meadow, Install Fence, Remove Brush Pile Install erosion control to east and south (500 ft).

Remove pile (200+/- cubic yards) of stockpiled loam, stone, and rubble within150 ft of road. (and without Invasive plants.) Dispose off site.

Field stone in separate piles shall remain.

Smooth area for meadow seeding. Seed area.

Remove brush pile in adjacent field.

Task 6d: Tree and Vine Removal or Pruning in Park Entry Area Remove 5 hazardous and 5 collapsed trees or prune within polygon depicted above (but not in utility corridor or Right-of-way), including dead standing trees with vines on park land.

May require police detail.

Area 6: Elm Brook, Hartwell, and Smith Areas, Lincoln, MA Field Restoration, PMIS 162869, Minute Man National Historical Park March 19, 2026 --- Latitude, Longitude: 42.45121, -71.293807 NorthApproximate Scale: 1” = 400’

200 0 400 800

6a

Area 6 Legend Park Boundary

Contractor Project Areas

Battle Road Trail

Task 6c

Task 6d

Task 6b

Task 6b

Remove wisteria vine, glossy buckthorn, Restore �eld edges

Remove wisteria, knotweed, glossy buckthorn

Remove knotweed

Restore Meadow edge

Restore Field edges

Task 7a: Remove Pile of Fill, Smooth, Seed Remove pile (50 cubic yards +/-).

Dispose off site. Grade area smooth and seed with meadow mix with soil amendments.

Area 7: Paul Revere Capture Area, Lincoln, MA Field Restoration, PMIS 162869, Minute Man National Historical Park March 19, 2026 --- Latitude, Longitude: 42.44908, -71.278514 NorthApproximate Scale: 1” = 300’

150 0 300 600

7a

Area 7 Legend

Contract Project Areas

Battle Road Trail

Remove invasive knotweed and black swallowwort from �elds and �eld edges, retain high bush and low bush blueberries

Bio Tech Focus Area

Task 8a: Tree Removal, Vine Clearing and Fence Replacement Remove 10 dead ash trees, grind 2 stumps Cut vines at base of vine-filled live trees, vine-filled shrubs, and vines from edge of 2.0-acre area at Ebenezer Fiske House and Bashian Barn site. Edge approx 700 ft in length.

Area 8: Fiske Hill Area, Lexington, MA Field Restoration, PMIS 162869, Minute Man National Historical Park March 19, 2026 --- Latitude, Longitude: 42.44728, -71.26387 NorthApproximate Scale: 1” = 350’

175 0 350 700

Park Boundary

Buildings (none)

Wetland area

Contract Project Areas

Boardwalk

Fiske Hill Loop Trail

Area 8 Legend

8a

Remove wisteria vine, glossy buckthorn, forsythia, and bittersweet

Bio Tech Focus Areas

Remove invasive vines 1200 ft stone wall

Seed area, treat invasive resprouts, plant seedlings

Access Road

Pool Removal Project Area xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx

100 ft wetland bu�er

50 ft wetland bu�er

25 ft wetland bu�er elev. 126 ft elev. 126 ft elev. 126 ft elev. 126 ft wetland

Barrett Farm Unit, 474 and 448 Barrett’s Mill Road, Concord, MA Field Restoration, PMIS 162869 - Option A: Inground Pool Removal March 19, 2026 -- Latitude, Longitude: 42.47290, -71.38193 NorthApproximate Scale: 1” = 40’

0 20 60 100

Option A: Inground Pool Removal Legend

25 ft Wetland Bu�er

100 ft Wetland Bu�er

50 ft Wetland Bu�er

Wetland edge

Property Line

Structures

Topography

Project Area/Fencing xxxxxxxxx Silt sock (500 ft +/-)

House at 474 Barrett’s Mill Road

Barrett’s Mill Road

Barrett House at 448 Barrett’s Mill Road

20 x 40 ft Inground Pool to be removed

17.5 x 40 ft Concrete Deck to be removed

Barn Foundation topsoil stockpile area topsoil stockpile area

Deck Area

Driveway and

Staging Area

Option B: Nelson Whittemore Area, Lincoln - Lexington, MA Field Restoration, PMIS 162869, Minute Man National Historical Park February 6, 2026 --- Latitude, Longitude: 42.45182, -71.27190 NorthApproximate Scale: 1” = 350’

175 0 350 700

Park Boundary

Buildings

Contract Project Areas

Battle Road Trail

Option B Legend

Option B-b

Option B-a

Option B-a. Vine, Shrub, Fallen Tree Removal, Meadow Seeding Remove vines, shrubs, and collapsed trees from 1.2-ac parcel, 12 Airport Road.

All soil remains on site.

Level stump grinding and brush pile sites for mowing. Seed with meadow mix with soil amendments.

Option B-b: Shrub and Brush Pile Removal, Stump Grinding Clear approximately 50 mature landscape shrubs (yew, rhodod.,etc), from 1.2-acre lot around house, 8 Airport Road.

All soil remains on site.

Grind shrub stumps below grade.

Prepare bare areas for seeding.

Seed bare areas with meadow mix with soil amendments.

Remove brush piles on northern edge of property and seed with meadow mix with soil amendments.

Bio Tech Focus Areas

Trainor Field Black

Swallowwort

Tabitha Mowing and

Glossy Buckthorn

Wetland edges and Stone Walls

Knotweed, Glossy Buckthorn, Bittersweet, Black Swallowwort

Wetland edges and Stone Walls

Knotweed, Glossy Buckthorn, Bittersweet, Black Swallowwort