B08_Solicitation_Attachment_1_Specifications.docx
DOCX document 379 KB Posted
- Solicitation number
- 140P4326R0032
About this file
This is a Specifications document for a fixed-firm-price construction contract to re-stripe pavement markings at Acadia National Park in Bar Harbor, Maine, with a performance period from September 30, 2026 through September 30, 2027. The work encompasses repainting existing parking lot stall lines, crosswalks, center lines, lane markings, fog lines, and other pavement markings across designated sites on Mount Desert Island and Schoodic Point within the park boundaries.
The contract includes two pricing structures: a Primary Bid covering high-use areas including Paradise Hill Road, Park Loop Road, associated access roads, and parking areas (sheets P-1 through P-41); and Bid Option 1 covering additional Mount Desert Island and Thompson Island areas including roads, parking areas, and campgrounds (sheets B-1 through B-12, C-1 through C-8, M-1 through M-7, and T-1 through T-7). Markings must be applied using waterborne traffic paint Type B conforming to FP-14 specifications with Type I reflective beads per AASHTO M247, with stripes a minimum of four inches wide. Application requirements specify that centerlines and lane markings exceeding 200 linear feet must use truck-mounted striping systems with mechanical guides, while shorter sections and parking lot work use walk-behind sprayers. All work must comply with the 11th edition Manual of Uniform Traffic Control Devices (MUTCD), occur between 9 PM and 5 AM for roadway markings with temporary road closures not exceeding two hours, and require traffic control devices, flaggers, temporary road closures, and appropriate environmental protections. The contractor must furnish all labor, materials, equipment, tools, and supplies; observe weight restrictions of 40,000 pounds gross vehicle weight or 32,000 pounds per axle; and comply with NPS regulations, OSHA requirements, Davis-Bacon wage rates, and accident prevention protocols.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACADIA PAVEMENT MARKING 2027 SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
| 01010 | Summary of Work |
| 01025 | Definition of Contract Line Items |
| 01090 | Reference Standards |
| 01200 | Project Meetings |
01261 Contract Modification Procedures
| 01300 | Submittals |
| 01360 | Accident Prevention |
| 01510 | Temporary Services |
| 01550 | Maintenance of Traffic |
| 01560 | Temporary Controls |
| 01600 | Material and Equipment |
| 01700 | Project Closeout |
DIVISION 2 - SITE WORK
02581 Pavement Markings
DIVISION 3 – CONCRETE
DIVISION 4 – MASONRY
DIVISION 5 - METALS
DIVISION 6 - WOOD AND PLASTICS
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
DIVISION 8 - DOORS AND WINDOWS
DIVISION 9 - FINISHES
DIVISION 10 - SPECIALTIES
DIVISION 11 - EQUIPMENT
DIVISION 12 - FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING SYSTEMS
DIVISION 15 – MECHANICAL
DIVISION 16 – ELECTRICAL
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
I. DESCRIPTION
A. The work of this fixed-firm-price contract consists of repainting existing parking, symbols, crosswalks, center line, lane markings/fog line and other pavement markings.
B. The work includes the installation and removal of needed traffic control, protection of adjacent areas, performing minor layout of new or disappeared markings with the assistance of government personnel, painting markings, and protection from damage while drying.
C. All work proposed on this project shall be done in accordance with the contract documents, including all plans and specifications.
D. The Contractor shall furnish all labor, materials, equipment, tools, transportation services and supplies required to complete the work in accordance with the contract documents.
E. The contract performance time for initial work will be from September 30, 2026 until September 30, 2027.
F. All work will be performed under a single contract.
II. LOCATION
A. Work to be confined to various designated sites along the Park Roads on Mount Desert Island and on Schoodic Point, as shown on the attached contract drawing and will be within the confines of Acadia National Park, Maine.
III. CONTRACTOR'S USE OF PREMISES
A. Construction Camp: Establishment of a camp within the park will not be permitted.
B. When on the one-way portion of the Loop Road, one lane of the Loop Road may be closed to the public by the contractor, at the discretion of the Park, in accordance with approved traffic control plan. When on two-way portions of the loop road lane restrictions will be permitted or temporary closures will be made at the Parks’ discretion, in accordance with approved traffic control plan.
C. Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Parking for workers’ personal vehicles at individual sites will not impede normal park visitation and operations with the exception of temporary traffic control necessary for work.
D. Storage areas for materials and staging areas at the work sites will be identified by the Contracting Officer. A central staging area, if needed, will be made available to the contractor during the duration of the contract performance time.
E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect the public.
2. Do not remove, injure, or destroy trees or other plants without prior approval.
F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions. For this project, the maximum weight limit for trucks fully loaded shall not exceed 40,000 pounds total or 32,000 pounds per axle. Seasonal weight restrictions apply to park roads where work is to be completed and are enacted from early March to late April/early May based on variable climate factors. Seasonal weight restrictions restrict weight to 23,000 pounds gross vehicle weight. Information regarding other rules and regulations for vehicular traffic on park roads may be found in the Superintendent's Compendium. Permission to use Park roads for commercial traffic will not relieve Contractor of liability for damage that may result from moving of equipment.
IV. FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
V. CONSTRUCTION MATERIALS
A. All new materials shall be Contractor-furnished from outside the park.
VI. BID OPTIONS
A. This contract includes a Primary Bid, as well as an optional Bid Option which may be added in part or in full by the Government, as decided prior to construction. Work included in the Bid Option, if exercised, should be completed at the fixed-firm price as quoted for the Bid Option. Bids are detailed below, and reference sub-sheets in the attached Specification Drawings.
a) Primary Bid includes high use areas of the park, including specified work on Paradise Hill Road, Park Loop Road, access roads to Paradise Hill Road and Park Loop Road, and parking areas accessed from Paradise Hill Road and Park Loop Road (excluding Cadillac Mountain Road). Bid work is shown in specifications sheets 02 through 43, which include sub-sheets listed below:
i. P-1 through P-41 inclusive (sheet numbers 03-43)
b) Bid Option 1 includes areas of Acadia National Park located on and around Mount Desert Island, including specified work roads, parking areas, and campgrounds in vicinity of Mount Desert Island excluding Park Loop Road. Bid work is shown in specifications sheets 44 through 78, which include sub-sheets listed below:
i. B-1 through B-12 inclusive (sheet numbers 45-56)
ii. C-1 through C-8 inclusive (sheet numbers 57-64)
iii. M-1 through M-7 inclusive (sheet numbers 65-71)
iv. T-1 through T-7 inclusive (sheet numbers 72-78)
PART 2 PRODUCTS Not used.
PART 3 EXECUTION Not used.
END OF SECTION
SECTION 01025
DEFINITION OF CONTRACT LINE ITEMS
PART 1 GENERAL
DESCRIPTION
The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one contract line item ends and another begins.
1. Each contract line item includes costs for mobilization, cleanup and costs of materials, labor, traffic control devices, and equipment associated with performance of this contract line item.
2. If no contract line item exists for a portion of the work, include the costs in a related contract line item.
3. Unit prices cannot be further broken down and payments will be made at the contract unit prices for work actually completed and accepted.
4. CONTRACT LINE ITEMS:
A. CONTRACT LINE ITEM #1-All pavement markings in the “Primary Bid” package, including pavement markings on Paradise Hill Road, Park Loop Road, access roads to Paradise Hill Road and Park Loop Road, and parking areas accessed from Paradise Hill Road and Park Loop Road. This contract line item consists of repainting existing centerlines or lane markings along park roads or on parking lot access roads in excess of 200 LF by vehicular mounted methods. Measurement will be the number of linear feet of 4-inch stripe applied, measured by the truck’s meters. This contract line item consists of repainting existing parking stall lines, neutral areas, crosswalks and other single lines within parking lots such as perimeter markings, and access roads less than 200 LF not suitable for vehicular mounted methods. Existing striping will be duplicated and layout for the isolated new striping will be designated and assisted in the field by government personnel. Measurement will be the number of linear feet of 4-inch-wide stripe, measured along the stripe, to the nearest foot.
B. CONTRACT LINE ITEM #2-All pavement markings in the “Bid Option 1” package, including pavement markings across various park owned roadways, parking areas, and campgrounds on Mount Desert Island and Thompson Island. This contract line item consists of repainting existing centerlines or lane markings along park roads or on parking lot access roads in excess of 200 LF by vehicular mounted methods. Measurement will be the number of linear feet of 4-inch stripe applied, measured by the truck’s meters. This contract line item consists of repainting existing parking stall lines, neutral areas, crosswalks and other single lines within parking lots such as perimeter markings, and access roads less than 200 LF not suitable for vehicular mounted methods. Existing striping will be duplicated and layout for the isolated new striping will be designated and assisted in the field by government personnel. Measurement will be the number of linear feet of 4-inch-wide stripe, measured along the stripe, to the nearest foot.
C.
END OF SECTION
SECTION 01090
REFERENCE STANDARDS
PART 1 GENERAL
| ACADIA PAVEMENT MARKING 2027 | SUMMARY OF WORK | |
| A. | The following abbreviations, which may be used in the construction specifications, refer to the organizations and specifications of the organizations listed below: |
AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street, NW, Suite 249 Washington, D.C. 20001 ANSI American National Standards Institute 11 West 42nd Street, 13th Floor New York, New York 10036 ASTM American Society for Testing and Materials 100 Barr Harbor Drive West Conshohocken, Pennsylvania 19428-2959 MSHA Mine Safety and Health Administration 4015 Wilson Boulevard, Room 601 Arlington, Virginia 22203 NFPA National Fire Protection Association 1 Batterymarch Park P.O. Box 9101 Quincy, Massachusetts 02269-9101 NIOSH National Institute for Occupational Safety and Health NIOSH Building 1, Room 3007 1600 Clifton Road, NE Atlanta, Georgia 30333 OSHA Occupational Safety and Health Administration (U.S. Department of Labor) Government Printing Office Washington, D.C. 20402
PART 2 PRODUCTS Not used.
PART 3 EXECUTION Not used.
END OF SECTION
SECTION 01200
PROJECT MEETINGS
PART 1 GENERAL
I. PRECONSTRUCTION CONFERENCE
A. Before start of construction, Contracting Officer will arrange a meeting with Contractor. The meeting agenda will, as a minimum, include the following when they apply:
1. Correspondence procedures
2. Designation of responsible personnel
3. Labor standards provisions
4. Payroll reports
5. Changes
6. Payments to Contractor
7. Subcontractors
8. National Park Service regulations
9. Accident prevention program (including name of responsible supervisor) compliance with the "Accident Prevention" section of the General Provisions and accident reporting. 10. Documents required under the contract
11. Park rules and regulations
12. Recycling Program
13. Saturday, Sunday, holiday and night work
14. Tentative construction schedule
15. Submittal of shop drawings, project data, samples, and approved equals, when required.
16. Project closeout requirements
II. Periodic Progress Meetings: No weekly or monthly meetings are planned. Periodic inspections by the Contracting Officer or designated representative will satisfy meeting requirements. Meetings may be scheduled on an as needed basis.
END OF SECTION
SECTION 01261
CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with B. Modifications
1. Estimating and preconstruction services
2. Mortgage costs
3. Real estate and corporate taxes
4. Automobile maintenance and travel costs for home office personnel
5. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
6. Depreciation of equipment and other assets
7. Home office supplies (paper, staples, etc.)
8. Legal services
9. Accounting and data processing
10. Professional fees/registration C. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager, Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks D. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power E. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: This is the hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:
i. Social Security
ii. Medicare
iii. Workers Compensation– Policy and company calculation to be made available.
iv. FUTA– Cap Rate and percentage to be proportionally allocated over one year.
v. SUTA– Cap Rate and percentage to be proportionally allocated over one year.
vi. Union agreement costs – Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
2) Health Care Insurance Premiums
3) Cell Phone
4) Clothing
5) 401K and Pensions
6) Vehicle allowances
7) Gas allowance
8) Life insurance premiums
9) Disability insurance
10) Other Fringe Benefits required under an enforceable collective bargaining agreement F. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
G. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.
H. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.
I. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.
3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.
5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. The labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by the NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for the work being performed.
2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.
3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.
6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.
8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit. Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project.
2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
PART 2 – PRODUCTS
PART 3 – EXECUTION
END OF SECTION 01261
SECTION 01300
SUBMITTALS
PART 1 GENERAL
I. DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction.
II. RELATED REQUIREMENTS
A. Closeout submittals - Section 01700.
III. SUBMITTAL AND APPROVAL PROCEDURES
A. All submittals shall be transmitted using National Park Service form CM-16. A copy of the form will be provided at the pre work conference. No action will be taken on a submittal item unless accompanied by the transmittal form.
B. As specified in the individual sections, forward submittals to Contracting Officer at least 10 days before need for approval.
C. Submit specification sheet for all materials used together with associated SDS safety data sheets.
END OF SECTION
SECTION 01360
ACCIDENT PREVENTION
PART 1 GENERAL
A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
II. SUBMITTALS
A. Accident Prevention Program: Before on-site work begins, submit for approval an accident prevention program. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the Contractor shall resubmit the program within 10 days. No progress payments will be made until the program is approved. The program shall include:
1. Name of responsible supervisor to carry out the program.
2. Safety meetings.
3. First aid procedures.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
5. Training, both initial and continuing.
6. Planning for possible emergency situations.
7. Fire Protection: Section 01510.
B. Certificates: When requested, provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.
D. Submit a report of safety meetings and of inspections.
E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
III. QUALITY ASSURANCE
A. In case of conflicts between Federal, State, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work. B. Qualifications of Employees:
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment. Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
IV. ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Notify Contracting Officer immediately in the event of a reportable accident. Within 3 days of a reportable accident, fill out and forward to the Contracting Officer the attached offline accident reporting worksheet.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
PART 2 PRODUCTS
I. FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the type of construction at the site.
II. PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH and MSHA.
III. BARRIERS
A. Section 01525. (NOT USED)
PART 3 EXECUTION
I. EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
II. EGRESS
A. Provide and maintain adequate egress at all times in accordance with the Life Safety Code (NFPA 101). No corridor, aisle, stairway, door, or exit shall be obstructed or used in a manner that interferes with egress.
III. PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual. B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
IV. SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the work site.
V. HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. No hard hat area will be designated by the Contracting Officer.
B. It is the Contractor's responsibility to require all those working on or visiting the site necessary protective equipment at all times.
VI. TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
END OF
SECTION
| 01360-1 | |
| ACADIA PAVEMENT MARKING 2018 | ACCIDENT PREVENTION |
| 01360-1 | |
| ACADIA PAVEMENT MARKING 2018 | ACCIDENT PREVENTION |
| 01360-1 | |
| ACADIA PAVEMENT MARKING 2027 | ACCIDENT PREVENTION |
SECTION 01510
TEMPORARY SERVICES
PART 1 GENERAL
I. DESCRIPTION
A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract.
II. RELATED REQUIREMENTS
A. Section 01560 - Temporary Controls.
PART 2 PRODUCTS
I. GENERAL
A. Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
II. SANITARY FACILITIES
A. Not all sites have sanitary facilities close at hand. Depending on length of job at each site, transport personnel to nearest facilities.
III. FIRE PROTECTION EQUIPMENT
A. Extinguisher shall have a minimum UL rating of 2-A:10-B:C.
PART 3 EXECUTION
I. ELECTRICITY AND LIGHTING
A. No electrical service is available at the project sites. When needed, the contractor shall provide source for power and lighting.
II. HEATING AND VENTILATING
A. Not used
III. TELEPHONE
A. No telephone service is available at project sites for Contractor's use.
IV. WATER
A. Water for construction is not available at all work sites but a source will be provided within the park boundaries. The Contractor may have to transport water from a remote source.
B. Furnish cool, potable water for construction personnel in locations convenient to work stations.
V. SANITARY FACILITIES
A. Not used.
VI. FIRE PREVENTION AND PROTECTION
A. Responsible person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.
B. Hazard Control: Take all necessary precautions to prevent fire during construction.
Provide adequate ventilation during use of volatile or noxious substances. C. Spark Arresters:
1. Written determinations of periods and areas of potential fire hazard will be issued by Contracting Officer.
2. Equip all gasoline or diesel powered equipment used during periods of potential fire hazards or in potential forest and grass fire locations with spark arresters approved by the U. S. Forest Service.
D. Service and Refueling Areas: Only outside of Park or at the Park maintenance area at the Park HQ.
E. Smoking: Smoking within buildings or temporary storage sheds is prohibited.
F. Welding: Cutting by torch or welding shall be performed only when adequate fire protection is provided.
VII. PROTECTION EQUIPMENT REQUIRED
A. Buildings:
1. Not Used.
B. Vehicles and Equipment:
1. Provide one extinguisher on each vehicle or piece of equipment.
END OF SECTION
| 01510-1 | |
| ACADIA PAVEMENT MARKING 2018 | TEMPORARY SERVICES |
| 01510-1 | |
| ACADIA PAVEMENT MARKING 2018 | TEMPORARY SERVICES |
| 01510-1 | |
| ACADIA PAVEMENT MARKING 2027 | TEMPORARY SERVICES |
SECTION 01550 MAINTENANCE OF TRAFFIC
PART 1 GENERAL
A. This work shall consist of furnishing, installing, maintaining and removing traffic control devices and when moving materials or equipment or when lane closures require using flaggers to provide reasonable protection for motorists, pedestrians and workers. B. Traffic control devices include signs, signals, lighting devices, markings, barricades, channelizing and hand signaling devices.
II. TRAFFIC CONTROL DEVICES
A. All traffic control devices shall conform to the requirements of the 11TH edition of the Manual of Uniform Traffic Control Devices (MUTCD).
B. Only signs with symbol messages conforming to the design of the MUTCD shall be used unless the Contracting Officer approves the substitution of word messages.
C. Cones, drums, Type I, and Type II barricades may be used.
D. When traffic control devices are to remain in the roadway after dark, warning lights and battery operated flashing and steady burn lights shall be used.
III. REQUIREMENTS
A. Prior to starting any work on any part of the project adjacent to or being used by the traveling public, the Contractor shall install the appropriate traffic control devices in accordance with the latest edition of the Manual of Uniform Traffic Control Devices, Part VI, or as directed. The Contractor shall continuously maintain the traffic control devices in their proper position, clean, legible and in good repair throughout the duration of the work. If notified that the traffic control devices are not in place or not properly maintained, the Contractor may be ordered to immediately suspend work until all deficiencies are corrected.
1. No equipment or vehicles of the Contractor, his subcontractors or employees engaged in work on this contract shall be parked or stopped on lanes carrying traffic, or on shoulders adjacent to lanes carrying traffic, at any time, except as required by ongoing work operations.
B. Installation of Traffic Control Devices.
1. Easel mounted signs shall be erected so that the bottom of the sign is a minimum of 3 feet above the traveled way. Signs may be mounted lower or higher to fit the situation when authorized.
2. Cones shall be weighted.
3. Vertical panel markers shall be mounted with the top at least 4 feet above the traveled way.
4. Drums shall not be weighted on the top. Drain holes shall be provided to prevent water from accumulating in the drums. Drums may be weighted with loose dry sand.
5. The Contractor shall maintain the devices in proper position and clean them when dirty.
6. The Contractor shall replace damaged traffic control devices with devices of equal quality.
C. The Contractor shall provide a roadway width as specified or as directed. Vertical panel markers, drums, or cones shall be used to clearly delineate the roadway through the construction area.
1. The traffic control devices shall be moved or removed as the work progresses to assure compatibility between the use of the traffic control devices and the traffic flow. Traffic control devices which become unnecessary shall be immediately removed from use.
IV. MATERIALS
A. If required by the Contracting Officer, certification as to conformance to these specifications shall be furnished based on results of tests made by an independent testing laboratory. All lights are subject to random inspection and testing. All necessary random samples shall be provided to the Contracting Officer upon request at no additional expense to the Government. All such samples shall be returned to the Contractor upon completion of the tests.
V. FLAGGERS
A. Flaggers are required when setting or resetting traffic control devices or when activities are conducted temporarily in the traveled lane.
B. Orange/yellow clothing, such as a vest, shirt, or jacket and hard hat shall be furnished for and worn by flaggers. For nighttime conditions similar outside garments shall be reflectorized and lighted hand signal devices shall be used.
C. Only signals which conform to the latest edition of the Manual of Uniform Traffic Control Devices, Part VI, may be used.
D. While flagging, the flagger should stand either on the shoulder adjacent to the traffic being controlled or in the barricaded lane. At a spot obstruction, the flagger may stand on the shoulder opposite the barricaded sections to operate effectively. Under no circumstances shall the flagger stand in the lane being used by moving traffic. The flagger should be clearly visible to approaching traffic at all times and should stand alone.
E. When conditions do not allow for proper approach sight distance of a flagger or storage space for waiting vehicles, additional flaggers shall be used at the rear of the backlogged traffic or at a point where approaching vehicles have adequate stopping sight distance to the rear of the backlogged traffic.
F. Flaggers shall be provided 10 minute breaks every two hours and a lunch period away from the work station. The Contractor shall furnish sufficient spare trained flaggers to provide continuous flagging during required or necessary breaks and during lunch period.
PART 2 PRODUCTS Not used.
PART 3 EXECUTION
I. Center line and other road way markings will be done between 9 PM and 5 AM and the road sections will be temporarily closed to traffic, not to exceed 2 hours. Contractor to provide lead vehicle to temporarily close park gates or set up barricades/cones on two way sections and a trail vehicle to prevent passing traffic on all road sections.
II. Parking lots will be closed partially or fully for marking. The Contractor shall provide sufficient barricades when (cones are inadequate for lot closure) and labor to close the next day’s work, the evening before. The government will prioritize the order of completion of the lots during each day (with consideration for contractor’s efficiency) to ensure reopening to minimize adverse impacts to Park operations.
| 01550 - 1 | ||
| ACADIA PAVEMENT MARKING 2018 | MAINTENANCE OF TRAFFIC |
| 01550 - 1 | ||
| ACADIA PAVEMENT MARKING 2018 | MAINTENANCE OF TRAFFIC |
| 01550 - 1 | ||
| ACADIA PAVEMENT MARKING 2027 | MAINTENANCE OF TRAFFIC |
SECTION 01560 TEMPORARY CONTROLS
PART 1 GENERAL
A. The work of this section consists of providing temporary controls for the maintenance of Park cleanliness and the prevention of contamination of Park lands by construction operations.
PART 2 PRODUCTS
I. NOT USED
PART 3 EXECUTION
I. HOUSEKEEPING
A. Keep project area neat, orderly, and in a safe condition at all times.
B. Provide enough containers for collecting construction debris.
C. Wet down dry materials and rubbish to prevent blowing dust.
D. Keep volatile wastes in covered fire and explosion proof containers.
II. DISPOSAL
A. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the Park.
B. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Do not use Park refuse containers. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Park. Do not burn or bury refuse inside the Park.
III. AIR POLLUTION CONTROL
A. Take all necessary reasonable measures to minimize air pollution by any material or equipment used during construction.
IV. EQUIPMENT FUELING AND SERVICING
A. All construction equipment that frequently travels the Park roads (such as trucks) and other equipment that can reasonably travel from the work area, shall be fueled and serviced outside the Park limits. B. Fuel and service equipment that cannot reasonably travel from the work area to outside the Park at designated sites within, or accessible from, the work zones.
C. Fuel and service vehicles shall carry tools and materials needed for the clean-up of any accidental spills. Clean up all spills immediately and remove and dispose of contaminated materials outside of the Park.
D. Notify the Contracting Officer of any spillage immediately, regardless of the amount of fuel, oil or other contaminant spilled.
E. Equipment that is found to be leaking fuel, oil, lubricant, or other contaminant shall be immediately removed from the Park.
V. WATER POLLUTION/SEDIMENTATION
A. Do not dispose of wastes in storm drains or any other location within the park.
B. Do not allow waste materials to be washed into streams or bodies of water.
C. Remove all temporary facilities when no longer needed.
MATERIAL AND EQUIPMENT
PART 1 GENERAL
I. DESCRIPTION
A. The work of this section consists of the general procedures for handling, storing, and protecting material and equipment.
II. TRANSPORTATION AND HANDLING
A. Arrange deliveries of materials in accordance with construction schedules; coordinate to avoid conflict with work and conditions at the site. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible. Contractor is encouraged to obtain materials in biodegradable or recyclable/reusable packaging which uses the minimum amount of packaging possible.
III. STORAGE AND PROTECTION
A. Store materials in accordance with manufacturer's instructions, with seals and labels accessible for inspection.
B. Interior Storage: Maintain temperature and humidity within the ranges required by manufacturer's instructions. C. Exterior Storage:
1. Store products subject to damage by the elements in weather-tight enclosures.
2. Store fabricated products above the ground, on blocking or skids; prevent soiling or staining. Cover products subject to damage or deterioration with impervious sheet coverings; provide adequate ventilation to avoid condensation.
3. Store loose granular materials in a well-drained area on solid surfaces to prevent mixing with foreign matter.
D. Protection After Installation: Provide adequate coverings as necessary to protect installed materials from damage resulting from natural elements, traffic, and subsequent construction. Remove when no longer needed.
IV. STORAGE AND PROTECTION OF EQUIPMENT
A. Store equipment remaining at job site over-night and on weekends in such a way that emergency vehicles and vehicular traffic can pass.
The contractor is responsible for any vandalism that might occur to equipment.
PART 2 PRODUCTS Not used.
PART 3 EXECUTION
I. TRANSPORTATION RESTRICTIONS
A. The weight of a fully loaded truck used to haul materials shall not exceed 40,000 pounds, or 32,000 pounds per axle, and shall observe all State load restrictions. Maximum speed limits in the Park shall be observed at all times.
END OF SECTION
01600-2 MATERIAL AND EQUIPMENT SECTION 01700
PROJECT CLOSEOUT
PART 1 GENERAL
I. DESCRIPTION
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
PART 2 PRODUCTS Not used.
PART 3 EXECUTION
I. CLEANING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
II. PROJECT RECORD DRAWINGS
A. None Required.
III. CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
1. Guarantees and Bonds: No submittal required.
2. Keys: return all keys issued by the Park including duplicates.
IV. SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. Notify the Contracting Officer that the work substantially complete, and request a final inspection. Contracting Officer will make an inspection within 10 days of receipt of request.
1. If necessary Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance. Contractor shall complete the work described on the list of deficiencies within 10 calendar days, as weather permits. After completing work, Contractor shall resubmit certification and request a new final inspection. If the Contractor fails to complete the work within this time frame, the Contracting Officer may replace, repair, or remedy the work with an appropriate reduction in the contract price.
V. ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, at the completion of the entire contract a Letter of Acceptance and Release of Claims will be issued.
B. The warranty period for all tasks will begin when the Letter of Acceptance and the Release of Claims are completed.
ACADIA PAVEMENT MARKING 2018
ACADIA PAVEMENT MARKING 2018
01560 - 3
ACADIA PAVEMENT MARKING 2027 TEMPORARY CONTROLS
SECTION 02581 TRAFFIC MARKINGS
PART 1: GENERAL
A. DESCRIPTION: The work of this section consists of furnishing and applying traffic markings on existing paved roads. All markings except blackout paint, regardless of location, are to have reflective beads.
B. QUALITY ASSURANCE: Traffic markings shall be in accordance with MUTCD as modified by the Park, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14) 634.05 available at https://flh.fhwa.dot.gov/resources/specs/ unless otherwise shown or specified.
C. SUBMITTALS: As specified in Section 01300.
1. Certificate from manufacturer that paint and bead materials meet requirements specified.
2. Shop drawings showing symbol and lettering patterns.
D. PROJECT CONDITIONS: Apply traffic markings, when air and pavement temperatures exceed 40 degrees, weather conditions are favorable, and surface is clean and dry.
PART 2: PRODUCTS
A. PAINT: Paint shall conform to FP-14 718.10 for White and Yellow Waterborne Traffic Paint Type B. Beads shall be Type I conforming to AASHTO M247, as per FP-14 Section 718.14.
PART 3: EXECUTION
A. GENERAL: The surfaces on which markings are to be applied shall be clean, dry surfaces and free of loose particles, dirt, accumulations of tar or grease, or other deleterious materials.
B. PREPARATION: Clean area of debris, winter sand and vegetation.
C. PATTERNS:
1. Stripes shall be a minimum of 4 inches wide, adjust width if necessary to cover existing markings. Broken lines shall be 10 feet in length with 30 foot gaps. Broken lines in parking areas may be reduced keeping the 1:3 proportions. Double stripes shall be separated by a 4 inch space.
2. Stop bars: Match Existing.
D. APPLICATION:
1. Line Location: Before placing paint, mark location by placing spots of paint at intervals to ensure accurate location of line. In areas where old paint markings exist, install new paint over existing; unless otherwise directed.
2. Application: Apply paint using FP-14 section 634.
3. Equipment: Spray machine equipped with mechanical agitator, multiple applicators, and automatic skip control, capable of painting a clean-edged stripe of the designated width. Bead dispenser shall be directly behind and synchronized with paint applicator. Spray nozzle and bead dispenser shall be shielded to prevent over spraying. Use adequate hand operated equipment in areas not accessible to striping machine.
4. Road center lines and lane markings exceeding 200 LF in length will be painted using a truck mounted system manufactured for the purpose with a guide sufficient to ensure accurate alignment, walk behind sprayers or self-propelled walk behind sprayers that permit an operator to ride are not permitted on these sections.
5. Stop Bars: Apply with walk behind sprayer. Use mechanical means to spread beads.
6. Symbols and lettering: Apply with walk behind sprayer. Use mechanical means to spread beads. Lettering to be applied using government furnished stencils, unless permission is granted in each case by the Contracting Officer to apply paint over existing without stencils.
7. Removal of Outdated Pavement Markings: Where pavement lines are directed to be moved, outdated pavement markings should be removed or covered such as to prevent visibility of the incorrect markings. Pavement markings should not be removed using water blasting, blasting abrasives, chemical removal, or other means which may pollute the environment surrounding the roadway or severely damage the roadway.
8. ACCEPTANCE: Markings shall be accurately placed, and appear clean and uniform day and night. Unsatisfactory markings shall be corrected at no additional expense to the Government.
9. PROTECTION: Protect newly painted pavement markings from traffic until paint is sufficiently dry to prevent pickup or tracking by vehicles.
10. CLEANUP: Completely remove all tracking marks, spilled marking materials, markings in unauthorized locations, and defective materials.